HomeMy WebLinkAboutSWA000102_Construction Sequence_20210504FEI
CIVIL ENGINEERS AND LAND SURVEYORS
Memorandum
To: Whom it may concern
Iola
From: Brent Sievers, P.E.
Date: 04/23/21
Re: Hopewell Stormwater BMP
Construction Sequence for Future Phases
At this time there is no intention to develop future phase not shown in the submitted Drainage
Pan for Hopewell Gardens.
Brent Sievers, RE
FEI
Civil Engineers and Land Surveyors
8518 Triad Drive
Colfax. NC 27235
phone:M5444-6432
CONFIDENTIAL � F E I
Civil Engineers and Land Surveyors