Loading...
HomeMy WebLinkAboutSWA000102_Construction Sequence_20210504FEI CIVIL ENGINEERS AND LAND SURVEYORS Memorandum To: Whom it may concern Iola From: Brent Sievers, P.E. Date: 04/23/21 Re: Hopewell Stormwater BMP Construction Sequence for Future Phases At this time there is no intention to develop future phase not shown in the submitted Drainage Pan for Hopewell Gardens. Brent Sievers, RE FEI Civil Engineers and Land Surveyors 8518 Triad Drive Colfax. NC 27235 phone:M5444-6432 CONFIDENTIAL � F E I Civil Engineers and Land Surveyors