HomeMy WebLinkAboutSW6210402_O&M Agreemnt_20210504
Operation & Maintenance Agreement
Project Name:Woodhaven Subdivision
Project Location:Phillipi Church Road, Hoke County, North Carolina
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & corresponding O&M sheets will be added automatically):
Infiltration Basin
Quantity:Location(s):
Infiltration TrenchQuantity:Location(s):
Quantity:Location(s):
Bioretention Cell
Wet PondQuantity:Location(s):
Stormwater Wetland
Quantity:Location(s):
Permeable PavementQuantity:Location(s):
Sand Filter
Quantity:Location(s):
Rainwater Harvesting
Quantity:Location(s):
Green Roof
Quantity:Location(s):
Level Spreader - Filter StripQuantity:Location(s):
Proprietary System
Quantity:Location(s):
Treatment Swale
Quantity:Location(s):
Dry PondQuantity:Location(s):
Disconnected Impervious Surface
Present:NoLocation(s):
User Defined SCM
Present:NoLocation(s):
Low DensityType:
Present:Yes
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party: Mubarak Shahbain
Manager - Raeford Development Company, LLC
Title & Organization:
Street address:645 Laurinburg Highway
City, state, zip:
Raeford, NC 28376
Phone number(s):
910-638-6102
Email:
jamal@jandkbuilders.com
Signature: Date:
I,, a Notary Public for the State of
County of, do hereby certify that
personally appeared before me thisday of and
acknowledge the due execution of the Operations and Maintenance Agreement .
Witness my hand and official seal, _____________________________________________.
SealMy commission expires
STORM-EZ5/4/2021
O&M Agreement
Version 1.5 Page 1 of 1
Low Density Maintenance Requirements
Important maintenance procedures:
The drainage area to the vegetated conveyance or vegetated receiving area will be
-
carefully managed to reduce the sediment load to the vegetated conveyance or
After the initial fertilization to establish the grass in the vegetated conveyance or the
-
vegetated receiving area, fertilizer will not be applied to the vegetated receiving
The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of
operation and maintenance will be kept in a known set location and will be available upon request.
pection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:Potential problem:How to remediate the problem:
Maintain grassed vegetation such that the swale or
Vegetation is too short
Vegetationvegetated area does not erode during the peak flow
or too long.
from the 10-year storm
Trash/debrisis
Remove the trash/debris.
present
Regrade the soilif necessary to remove the gully, and
Areas of bare soil
then re-sod (or plant with other appropriate species)
and/or erosive gullies
and water until established. Provide lime and a one-
Vegetated receiving
have formed.
areastime fertilizer application.
Trees and/or other Remove the trees and woody vegetation from the
woody vegetation are swale, regrade the swale if necessary and re-establish
present in the swale.grass as shown on the approved plans.
Trash/debris is
Remove the trash/debris.
present.
Regrade the soilif necessary to remove the gully, and
Areas of bare soil
then re-sod (or plant with other appropriate species)
and/or erosive gullies
and water until established. Provide lime and a one-
have formed.
time fertilizer application.
Sediment covers the
Remove sediment and dispose in an area that will not
grass at the bottom of
Vegetatedimpact streams or SCMs. Re-sod if necessary.
the swale.
conveyances /
The side slope is Regrade the slopes to the permitted configuration per
swales / roadside
steeper than the the approved plan and reestablish vegetation. If as-
ditches (other than
approvedbuilt or existing conditions do not allow the slopes to
curb outlet swales)
configuration.be regraded, contact the applicable permitting
Determine the source of the problem: soils,
Grass is dead, hydrology, disease, etc. Remedy the problem and
diseased or dying.replace plants. Provide a one-time fertilizer
application to establish the ground cover if necessary.
Trees and/or otherRemove the trees and woody vegetationfrom the
woody vegetation are vegetated conveyance, regrade the vegetated
present in the conveyance if necessary and re-establish grass as
vegetatedshown on the approvedplans.
The longitudinal Regrade to meet the permitted longitudinal slope as
slope exceeds 5%.shown on the approved plans.
The swale profile does
Regrade the swale to the approved profile as shown
Curb outlet swales or
not match the
vegetated areason the approved plans.
approved detail.
ThelengthoftheExtendtheswaletoachievethe100-footminimum
swale or vegetated length. If as-built or existing conditions do not allow
area is less than 100 the slopes to be regraded, contact the applicable
feetpermittingagency
Clogging has Clean out the outlet device. Dispose of the sediment
occurred.off-site.
The outlet device (if
applicable)
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs
Repair the damage and improve the flow dissipation
of damage have
structure.
occurred at the outlet.
Discharges from the
The receiving water
site are causing
Contact the local NCDEQ Regional Office.
erosion or
sedimentation in the
receiving water.