Loading...
HomeMy WebLinkAboutSW6210402_Plansheet (Set)_20210504LEGEND: "'Z ECM -EXISTING CONCRETE MONUMENT EIP Oa EIP-EXISTING IRON PIPE EIR Oa EIR-EXISTING IRON ROD EPKO EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR SRBO SRB-SET REBAR c COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE RIGHT-OF-WAY - - - - -SETBACK LINE OVERHEAD UTILITY - - WETLANDS X FENCE LINE TREE LINE VICINITY MAP NOT TO SCALE GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) TEMPORARY SKIMMER BASIN #5 L-60', W-25', 2:1 SIDE SLOPES= 2:1 �82.50 LF @ 0.51% 18" R TOP OF BASIN: 211.50' p BOTTOM OF BASIN: 208.50' 212.58 10' EMERGENCY SPILLWAY: 210.50' INVERT OF SKIMMER: 208.50' 27.93 LF @ 0.61% 18" RCP SIDE SLOPES OF BASIN ARE TO FES-35�- \ r+ BE SEEDED WITHIN SEVEN DAYS. **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) WITH 0.8" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCT. / RIP RAP N/F L=9' W: OG rw TERESA M. KELTON � � ♦ �, " .� D.=8" TRACT 1 OF �` / ,O CLASS E DB 932, PG 879 " DB 128, PG 59 00 ,. RIP RAP DISSIPATER DITCH #5 L=3' W=1/3' TO BE SEEDED �� WITHIN 7 DAYS D�=8" D.Ax=12" CLASS B 18" THICK, 1/2 ERB I PP. UTILITY POLE GRADING NOTES NOTIFICATION OF COMBINED SELF -MONITORING AND I I I C SELF -INSPECTION FORM: GUY WIRE 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE I I 0 WATER METER VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR ASPHALT --- 0 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH �/2„ I CONCRETE SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED - S r� _ _ _ _ ERB 0 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING EROSION AND SEDIMENTATION CONTROL PLAN IS BEING - - _ _ WETLANDS - - � _ _ _REMOVE EXISTING. �� _ _ ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE DRIVEWAY - - 0 BUILDINGS SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. °" r a�,� UNSUITABLE SOILS ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON EPK 210 MAJOR CONTOUR NEIGHBORING ROADS. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS rv," " " " ' . EPK SR 1461 (KOONCE ROAD 207 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR f ) MINOR CONTOUR CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; DEVELOPED A COMBINED FORM. THE SELF -INSPECTION 60' PUBLIC R/W "w NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING roc roc LIMITS OF CONSTRUCTION � � 1. -o- BEEN COMPLETED PROGRAM OF THE NPDES STORMWATER PERMIT FOR - - - sr• - sr• -SILT FENCE LINE - 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER CONSTRUCTION ACTIVITIES. THE FOCUS OF THE - A - A - JUTE NETTING TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING SELF -INSPECTION REPORT IS THE INSTALLATION AND i" EIP ECM - ow - ow - DIVERSION BERM OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL ""`"" REMOVE EXISTING (PINCHED) UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE MEASURES ACCORDING TO THE APPROVED PLAN. THE DRIVEWAY ECM O INLET PROTECTION PLAN INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF I 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND 1 ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: 28 1 SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION I 1 TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 1 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, 1 I GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 29 1 PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY 433-3300. I PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. % I 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. / N/F 1 I 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE / JAMES D. BRYANT, III & WIFE, 1 ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. LOC�r C.��OC RACHEL DIAZ 1 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A J CI-1 �'�-LOC_ DB 1242, PG 270 I 1 CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL / (DOUBLE) FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR 1 SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL / 26 G' DRAINAGE PATTERNS. / 16.73 217.3 217.55 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO 72.98 LF @ 1.43% 18" RCP 217.55 \ 30 I 1 THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR CI-' 2i 21� -� (PINCHED) �„ 1 EQUAL SUBSTITUTE. 216.44 216.71 , 5/8" (DOUBLE) , ERB 13. STORM PIPE DISTANCES SHOWN ARE TO THE CENTER OF THE BOX FOR ALL \ LP' / / / ' • • \ tkjC EIP I STRUCTURES UNLESS OTHERWISE NOTED. 69.66 LF @ 0.65% 18" RCP \� CI-5 5/8" 217.09 / 217 \\ 1 �r;;y� ERB216.47 1 P79.35 LF @ 0.95% 15" RCP / CI-3 / 34.00 LF @ 0.74% 18" RCP I 1 25 - `FES-4 p 1 , CI-6 � f RIP RAP DISSIPATER o 16 L=9' W=4.5'/10.5' �2 �76 1 I DsoS D8" THICK `79.52 LF @ 0.86% 15" RCP 1 17 � ,,� CLASS B 18" THICK � •• .�„ 18 19 O O \ 1 O % Cr i„ 1" EIP 1 I 26.00 LF @ 0.5818" RP EIP �\ 20 > ' I CI-7 Q �15.00 LF @1.00% 15" RCP 60.16 LF @ 0.53% 18" RCP (PINCHED) \. �01 37.67 LF C� 0.80% 18 RCP a.., RIP RAP DISSIPATER, CI-10 I LIMITS OF CONS UCTIO) J9 ,FES 1 CI-8� 7.0 AC DITCH #1 > r, L=9' W=4.5'/10.5 r15.00 LF C� 0.93% 15" RCP TO BE SEEDED Deo=8" Dm�x--12" ���� CI_9� 213.10 4oC, 21 WITHIN 7 DAYS '� ma's CLASS B 18" THICK I `� I- LOC LOCH LOC I n� ,•,.,. vp, LIIr_ 10 UTILITY Iry ti - - _ LOC 111 26.00 LF @ 0.50% 18' RCP_ O 213.79 2�a CI-29 - - 75.80 LFCI 289% 18'-RC= Q EASEMENT �,� I ^� 0 32 U TEMPORARY SKIMMER BASIN #1 \ �s ti SLADE CORNER ROAD 87.57 c1-27 OC.�\ 22 L=150', W=65', D=3' Jp OS2 j� 213.79 50' R/W (PUBLIC) LF ®0.34% 15" RCP SIDE SLOPES= 2:1 > CI-30 U v F. \ 276 702. TOP OF BASIN: 215.00' a m / -' 20 4F ®03 C BOTTOM OF BASIN: 212.00' \ I J a -JD�� �F . 20' EMERGENCY SPILLWAY: 214.00 NSF. 7 LF C� 0.79% 1080 RCP - 49 R J I 31.6 7S•. CI-22 pj - INVERT OF SKIMMER: 212.00' ,FES-31 J(?� SF Cp SIDE SLOPES OF BASIN ARE TO a CO 1, 10' UTILITY I N a '�, RIP R ^\` 52.90 LF @ 0.34% 15" RCP W • "W �. - AP DISSIPATER BE SEEDED WITHIN SEVEN DAYS. CV v � c� L-9' W-4.5'/10.5' �� °� ��SF **ATTACH A 2.0" FAIRCLOTH SKIMMER (OR EQUAL) i �-�, 0 EASEMENT I 0 •N M CI-23 HOC WITH 1.4" ORIFICE FOR DEWATERING THE o J I p I I 1 N Nip Dso=8° D.N=12° \& v � \ SEDIMENT BASIN DURING CONSTRUCTION. v -4 = J 1400 CLASS B 18" THICK 215.79 : m I CO 7 20' DRAINAGE �\ \ CCC' I LU )RARY SKIMMER BASIN #4 EASEMENT N I / = 0 L=80', W=35_ D=3' 00 �� zoo 24 I V o ,PIDEFSROPns I. �2:111 �n 11 I I 10 ^ p4 215.06 215.40 � noon niccinnrrn 0 O II ([ 33 )1 1 I � I / �♦-..-..-..- 2 Q- (TYP) \ `7S\��\ BLOC / j////� : I l I 'I t CI-20\ f n.. PO-18 216.34 6.00i LF y -- 2 @ 0.50% 18" RCP 3 8' 0' DRAINAGE EASEMENT of �0 EIR � ;- ;- � i �.� _ • • - � � . - .. - • • - • • J •�� 213.84 � h � •°°, n.. �43.43 LF C� 0.97% 30" RCP INV: 211.20 UTILITY 26.00 LF @ 0.58% 18" RCP • . _ 36.77 LF @ 0.52% 18" RCP �- r DITCH 4 213.84 EASEMENT _ ".- 215.69 Ci 1 �c INV 216.80 p # \\� _ - - 215.99_.. 3 216.3 ��-0G-- ��OC-NV N 44s,a23.461 ♦ v� .. TO BE SEEDED '" 13.21 ^ EASE \CI-18 - - 216 215.41 215.70- z17 • 1 E 1,974,300.032 a.- WITHIN 7 DAYS °, " `� 215 CI -lb CI-14 �216.97- - - NC GRID NAD 83 _ _ ----------------------- 80.00 LF 0 50% 15" RCP - / (( 44 / 26.00 LF @ 0.50% 30" RCP 216.13 g (2oii) y N/F RIP A3 DISSI 3� �� SF `� 26.00 LF @ 0.50% 18" RCP - / J01 01 RIP RAP -DISSIPATER 213.21 LF @ 0.33% 36" RCP y WOODHAVEN PARTNERS, LLC _ JOl 4514 �j �\1j _ L=9' W-4.5'/10.5' FES-19 CI-36 216 W00 > D 8" D 12' .� 77.05 ��a ,E" � DB 1240, PG 929 � ! eo= �,,,� Dso=8" Dunx=12" ° v i,% ,� 0,48% 36 RCP- CI-17-160.74 LF @ 0.50% 18" RCP CI-15 " PC 4, SLIDE 4-67, MAP 003 CLASS B 18" THICK, g f� CLASS B 18" THICK / �h ' 1 f \. CI-25 21LP 1 1 # RIP 24' W�59'I/27ER �0T .. -JOT '' C�k 1 2 I OG 77.28 LF C� 0.50% 18' RCP DITCH 2 -" ' - ' ' �001 001 JOl 001 001 9 j / TO REINFORCED WITH �, A l ERB /FES-26 212 63� p Dso=10" Dunx=15" 0 1 HOC 9�/ 212.86 NAG S75 EC MATTING CI-24 LP " CLASS 1 22.5" THICK INV: 216.40�; 1 / 20' DRAINAGE 0 / � CC �� ti^ �I 1/B OCi � �2�� i � 0.47%\18' RCP= � STAPLE PATTERN D � ti � ERB .,... � " � " �.,", � �� ✓ � a � � � � EASEMENT 1 � � 12 '' � � �°",°� 1 /2" O / DIVERSIONERB BERM �� n," �o � ,,,' 2, 3 - - � 1 A 7 w.,N•° �, �. • ° �. 0 (TYP) v DITCH #3 N/F - 0 TO BE SEEDED �, .. 1 MICHAEL HENDRICKS & WIFE, TEMPORARY SKIMMER BASIN #3 > SF 0� ZQ N/F WITHIN , 1 KAREN SMITH L=65', W=30', D=3' '% Q ti�, WOODHAVEN PARTNERS, LLC 'J 7 DAYS •" O DB 1240, PG 929 DB 370, PG 432 SIDE SLOPES= 2:1 SLIDE 359, MAP 8 TOP OF BASIN: 210.75 00' RIP RAP DISSIPATER ""° „ -- v o PB 4117, PG 6 BOTTOM OF BASIN: 207.75 L=3' W=1 /3' CLASS B 18" THICK RIP L=3'RAP DISSIPATER /3' ER 10' EMERGENCY SPILLWAY: 209.75' ♦ D�-8" D"""-12' L-3' DISSIP 0" INV RT OF 07.75' SIDEESLOPESSOF BASINARETO -12 CLASS86 D8" THICK BE SEEDED WITHIN SEVEN DAYS. O� **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) ♦ TEMPORARY SKIMMER BASIN #2 31 EROSION CONTROL NOTES SEVEN DAYS STABILIZE H ENT ORIFICE FOR DEWATERING THE 0.8"L=90', W=40', D=3' SIDE SLOPES= 2:1 EIR THE STOCKPILES BY WITH BASIN DURING CONSTRUCTION. r'•°'� °""� �..,.., i/2" 1/2" �/ I / SE CONSTRUCTION ACTIVITIES. CONSTRUCTION SEQUENCE TOP OF BASIN: 212.00' ,. ERe ERB" 1/2' VEGETATIVE COVER, TARPS, OR OTHER MEANS. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE BOTTOM OF BASIN: 209.00' ERBr 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR CONTROL EROSION FROM ALL STOCKPILES BY PLACING ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND 10' EMERGENCY SPILLWAY: 211.00' MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SILT BARRIERS AROUND THE PILES. TEMPORARY PERFORMING WORK ON THIS PROJECT. HOLD PRE CONSTRUCTION CONFERENCE. INVERT OF SKIMMER: 209.00' / SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP STOCKPILES LOCATED ON PAVED SURFACES MUST BE 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT SIDE SLOPES OF BASIN ARE TO AND INLET PROTECTION DEVICES WHEN THE STORAGE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER BE CHECKED FOR STABILITY AND OPERATION FOLLOWING FENCE, AND DIVERSION BERMS WHERE SPECIFIED. N/F BE SEEDED WITHIN SEVEN DAYS. / CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE 3. CONSTRUCT TEMPORARY SKIMMER BASINS. **ATTACH A 1.5" FAIRCLOTH SKIMMER OR EQUAL Y M. LOWERY ( GRAVEL WILL BE CLEANED OR REPLACED WHEN THE HOURS. LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS 4. CLEAR AND GRUB THE SITE AS NEEDED. ZACT 2 OF WITH 1.1" ORIFICE FOR DEWATERING THE / SEDIMENT POOL NO LONGER DRAINS PROPERLY. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT WILL BE MADE IMMEDIATELY TO MAINTAIN ALL 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING 1172, PG 261 SEDIMENT BASIN DURING CONSTRUCTION. N/F SEDIMENT WILL BE REMOVED FROM BEHIND THE CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING PRACTICES AS DESIGNED. N/F TO AREAS REMAIN GRASSED. / ERY SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP DRAINAGE AREA HAS BEEN STABILIZED. INSPECT 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR AEL IPARRAGUIRf6. INSTALL TEMPORARY CHECK DAMS IN SWALES AS SHOWN. PERRY M. LO AT THE FENCE. THE SEDIMENT FENCE WILL BE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES GRADED SLOPES AND FILLS SHALL BE NO GREATER TRACT 2 OF 7. INSTALL UTILITIES. TRACT 1 OFF DB 1172, PG 261 REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. ON A DAILY BASIS AND REPLACE DETERIORATED, THAN THE ANGLE THAT CAN BE RETAINED BY B 969, PG 190 8. INSTALL INLET PROTECTION ON ALL NEW STORM WATER / 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR DAMAGED, OR ROTTED EROSION CONTROL DEVICES VEGETATIVE COVER OR OTHER ADEQUATE EROSION INLETS. PERMANENT FACILITIES INTENDED TO CONTROL EROSION IMMEDIATELY. CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, 9. PERFORM FINE GRADING. / OF AND EARTH DISTURBANCE OPERATION SHALL BE 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 10. INSTALL AND PREPARE BASE COURSE. INSTALLED BEFORE ANY EARTH DISTURBANCE DENUDED AREAS WHICH HAVE BEEN FINISH GRADED, CALENDAR DAYS OF COMPLETION OF ANY PHASE OF 11. PAVE ROADWAYS AND PARKING LOTS. OPERATIONS TAKE PLACE OR AT THE EARLIEST AND ALL DENUDED AREAS IN WHICH GRADING OR SITE GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH 12. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED POSSIBLE POINT DURING CONSTRUCTION. BUILDING CONSTRUCTION OPERATIONS ARE NOT TEMPORARY OR PERMANENT GROUND COVER, DEVICES AREAS. 3. TEMPORARY & PERMANENT EROSION CONTROL ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. 13. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO MEASURES SHALL BE CONSTRUCTED PER THE DETAILS WIND AND RUNNING WATER WITHIN 14 DAYS. USE PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR REMOVE ALL TEMPORARY MEASURES. • HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE SEEDING AND MULCHING, EROSION CONTROL MATTING, PERMANENT GROUND COVER SUFFICIENT TO RETAIN 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED / WITH THE NORTH CAROLINA EROSION AND SEDIMENT AND/OR SODDING AND STAKING IN GREEN SPACE EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND r CONTROL PLANNING AND DESIGN MANUAL. AREAS AND OTHERWISE APPROPRIATE MEASURES. USE AREAS WITHIN 90 CALENDAR DAYS FOLLOWING ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. / GRAPHIC SCALE 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO PAVED. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL 60 0 30 60 120 BEGINNING ANY LAND DISTURBING ACTIVITIES. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL EROSION CONTROL MEASURES SHOWN AND ANY Know what's below. 910-433-3300 DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE ADDITIONAL MEASURES REQUIRED TO CONTROL THE 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR FINAL STABILIZATION AND PERMANENT VEGETATION HAS SEDIMENT DURING THE COURSE OF CONSTRUCTION. / Call before you dig. OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS IN FEET PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY APPROVE THE ACTION PRIOR TO REMOVAL. NECESSARY, AND MULCHED ACCORDING TO THE DETAILS ( ) BASIS WHEN TRACKING OCCURS. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED HEREIN. 1 inch = 60 ft. 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES 1/2" FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR ACTIVITY. THAT ARISE ON SITE IS STEVE PHILLIPS. CONTACT ERB DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN 11. THE INSTALLATION OF EROSION CONTROL MEASURES 910-638-6102. SHALL TAKE PRECEDENCE OVER ALL OTHER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED \\E SOt(T, � j/ N 0 00 0 z 0 0 L) z 240 11 IIII ■ SolutuonS CiD Is im t e vil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com ����ral►I I I I11//�777 ♦����N ♦� CARO . •........ SS SEA • 0274 If mW REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION GRADING AND EROSION CONTROL PLAN CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED MARCH 1, 2021 SHEET NUMBER C-3mO UTILITY NOTES 1. THE CONTRACTOR SHALL MAINTAIN A SET OF RED LINE AS-BUILTS DURING THE CONSTRUCTION OF THE WATER LINE. ALL DEVIATIONS FROM THE PLAN SHALL BE NOTED ON THE AS -BUILT DRAWINGS. ALL VALVES AND CHANGE IN DIRECTION OF THE WATER LINE SHALL BE LOCATED WITH A MINIMUM OF TWO DISTANCES FROM A KNOWN OBJECT. THE CONTRACTOR WILL PROVIDE THE AS -BUILT DRAWINGS TO THE OWNER TO BE USED FOR THE WATER LINE CERTIFICATION AT THE COMPLETION OF THE PROJECT. 2. ANY WATER ENTERING THE SANITARY SEWER SYSTEM TO BE CONSTRUCTED UNDER THE APPROVED PLANS SHALL NOT BE DISCHARGED TO THE EXISTING SEWER SYSTEM. PLUGS SHALL BE INSTALLED IN EXISTING MANHOLES AS NECESSARY TO PERMIT PUMPING THE NEW SYSTEM CLEAR OF WATER AND DEBRIS PRIOR TO ACCEPTANCE BY THE CITY. CARE SHALL BE EXERCISED IN LOCATING PLUGS TO AVOID INTERRUPTING SERVICE TO EXISTING CONNECTIONS. MECHANICAL PLUGS OR MORTAR AND BRICK MUST BE USED. INFLATABLE DEVICES ARE NOT ALLOWED 3. HORIZONTAL DIMENSIONS GIVEN FOR UNDERGROUND UTILITY TIES ARE APPROXIMATE UNLESS OTHERWISE NOTED. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES AFFECTED BY THE PROPOSED WORK. 5. THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE THE PROPOSED WORK, AND SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS 6. PIPE SHALL BE LAID UPSTREAM WITH THE SPIGOT ENDS POINTING DOWNSTREAM. ALL PIPES SHALL BE PLACED TRUE TO LINE AND 7. MINIMUM SEPARATION BETWEEN SEWER (STORM OR SANITARY) AND WATER LINES SHALL BE 10' HORIZONTAL OR 18" VERTICAL UNLESS NOTED OTHERWISE. MINIMUM VERTICAL SEPARATION BETWEEN SANITARY SEWER AND STORM SEWER SHALL BE 24" UNLESS NOTED OTHERWISE. 8. ALL MAINS, LATERALS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH HOKE COUNTY PUBLIC WORKS AND NCDEQ TECHNICAL SPECIFICATIONS. 9. ALL MATERIALS SHALL BE APPROVED BY HOKE COUNTY PUBLIC WORKS BEFORE INSTALLATION. 10. ALL SEWER SERVICES SHALL BE 4" PVC WITH A MINIMUM SLOPE OF 2%. TOP ELEVATIONS ARE 2" BELOW FINISHED GRADE. IF 6" SERVICE IS REQUIRED, MINIMUM GRADE IS 1%. 11. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AND HOKE COUNTY PUBLIC WORKS A MINIMUM OF 48 HOURS BEFORE CONSTRUCTION OF THE WATER LINE AND SANITARY SEWER LINE BEGINS. THE CONTRACTOR SHALL ALSO NOTIFY THE ENGINEER OF RECORD AND HOKE COUNTY PUBLIC WORKS 48 HOURS IN ADVANCE OF ALL TESTING. 12. EXISTING UTILITIES NOT FOUND IN THE FIELD DURING SURVEY MAY REQUIRE DEMOLITION. NO UTILITIES SHALL BE LEFT IN PLACE THAT CROSS THE NEW LOTS UNLESS RUNNING ALONG A LOT LINE. IF ADDITIONAL UTILITIES ARE FOUND, CONTACT ENGINEER PRIOR TO DEMOLITION. 13. ALL ELEVATIONS ARE IN NAVD 88 DATUM. 14. ALL SERVICE LATERALS THAT TIE DIRECTLY INTO A MANHOLE SHALL BE LAID SUCH THAT THE INVERT OF THE SERVICE LATERAL IS A VICINITY MAP MINIMUM OF 8" ABOVE THE INVERT OUT OF THE MAIN. GRADE WITH ENDS ABUTTING, CAREFULLY CENTERED, AND WITH A ,,,. SMOOTH INVERT AT THE JOINT. 15. ALL STORM PIPE IS CLASS IV RCP UNLESS OTHERWISE NOTED. N/F 1 NOT TO SCALE ! - - - JAMES D. BRYANT, III &WIFE, 1 N 447,342.853y� o RACHEL DIAZ �1j x2 ' • . � • � � DB 1242, PG 270 I \ E 1,974,475.528 x ? NC GRID NAD 83 1/2" `SCI-105 OS (DOUBLE) 3� LEGEND: (2011) ERB 26 CMZ / \ �40 1 ECM -EXISTING CONCRETE MONUMENT EIR Oa EIP-EXISTING IRON PIPE EIR Oa EIR-EXISTING IRON ROD l �x°° 6�00 \ 1" EIP 1 E0 EPK-EXISTING PK NAIL CI-2 , -� ` x \ (PINCHED) 1„ 1 ERBRB5/8" (DOUBLE) � EIP O ERB-EXISTING REBAR ERB \ sRBO SRB-SET REBAR \ /X / : CI-5 a COMPUTED POINT 5/8" 7+65.8 7+62.3sx 1 N/F - NOW OR FORMERLY ERB \ y 2 BV \ oo \ R/W - RIGHT OF WAY I \x� CI -3�• , I / PROPERTY LINE ADJACENT PROPERTY LINE �.... 15 25 µo - 2+6go ,, S-4 �• \` O FE RIGHT-OF-WAY I " ^ CI-6 - - - - -SETBACK LINE \\ 31 J OVERHEAD UTILITY \P. \ I WETLANDS + + 1 m, 17 k •V 1� X FENCE LINE "+' �yy�$ I # TREE LINE ��xox S3 3 18 19 3+64.0 ,� o _ . 2 BVPP # I SC- GUY WIRE S \ \ REDUCER 1" 1" EIP 1 C UTILITY POLE 14 s / 20 1 CI-7 3t 54.4 " w, EIP (PINCHED) / ❑■ WATER METER CI-33 Rx \ T FH CI-10 3+38.4 / ASPHALT ���°�v � � � `� FES-1i`°��� CI-8 CONCRETE N \ 00 0 C`-9 0 WETLANDS + + 21 ' BUILDINGS CI-32 \ - - - - 3 3 FH 10' UTILITY -..-..-.. -.._ 3 + M 10' UTILITY PROPOSED FIRE HYDRANT I 13+27.2 - .. - - _ EASEMENT I ��� 10+13.5 ❑■ PROPOSED WATER METER 2" BV W2.. - - _ _ _ 3 \ i EASEMENT O • CI-34 PROPOSED BALL VALVE \ 13+23.97�x0o W2 CI-29- W2 CI-28 i I 32 SLADE CORNER ROAD. °°°10+33.5 REDUCERwis CI-27 OS2 T~ PROPOSED WATER VALVE FES-35,.;, 2 PLUG �- "° •- 12+00 50' .. � ' � � • . 22 ",, O I , N PROPOSED TAP SLEEVE AND VALVE ` ti • \ R/W (PUBLIC) CI-30 2 BV- 10+23.5 Ws \ Oo I .. • PROPOSED BLOW OFF ♦ � `����"����-��" '" ,5x�� �13+<<.4 11+00 10+00 IS-1PROPOSED TEE p ��� 2" BO -..-.. ► PROPOSED PLUG s / y „ ♦ rn 00 FES-31 "� \ ,�x WM2+14.7 10 oo �� 23 $ W WM2+04.7 N + + 10 UTILITY I �. 7+69.7 EASEMENT + + '„". + N - N I y \ 8x ., 0+18.0 ♦ 3 3 ` \ . 0n 01+08.0 15"X2" TS I = J { CO ' \ 2' BV �'• H m a♦ 13 20' DRAINAGE o A I W ♦ EASEMENT I o°° \ \ \ 2 3 12 � i � •' 24 I v � I �, ♦ 11 I I 10 /. / V p o 33 - x I OD W O ♦ U10v X� Q- CI_21 \ I / - 2, I JpQ" Q \ o ICI 20 . �� - . - • - 0' DRAINAGE PO 18 EASEMENT - h° •/� \ EIRUTILITY EASEMENT \,,...�.,,..� - . - .. - .. - .. - .. C 3 6.. GV CI \1+ IFH _-.. i 1 50. 1 t ♦♦ -- -- 0+33.0-..-..-..-..-6" TS&v� 1 N 446,823.461 .. - .. / / / \ C - W6 - - - - - 0+18.7 1 1 18 CI-16------------- CI-CI E 1,974,300.032 W6 W6 W6 NC GRID NAD 83 N �� �, v-------- 6�� �V 61IX6' TEE y (2011) /F y ° 4 �, o �� 1+83.5 WOODHAVEN PARTNERS, LLC o h 1+98.5- -- x x = CI-36 00 3+00 ' 0+18.0 1+00 o+00 „ ! ti FES-19 X 2+00 "' ���� y ��"` DB 1240, PG 929 PC 4, SLIDE 4-67, MAP 003 CI-17 CI-15 0# 04 4 / 2+13.9 + -..-..-..-..-..-.. 1/2„ 0 1/2„ 63CI-25 2+18.9 2�� PLUG rn ERB y / FES-26 "'"y 2' BV 2+12.9 0 co ERB 1' 1 20 EASEMENT !-~' CI-24 2 BO + + 1/2" 1 ER ,,, /,,. q� - - ?X 1 /2" • „ �<<, ti • � ' � . • '11�x ERB # O # 1 N/F ♦ �/ 1 MICHAEL HENDRICKS & WIFE, ti.•' ♦ Q / N/F # KAREN SMITH "" Q WOODHAVEN PARTNERS, LLC y • �� DDB 1240,PG929 DB 370, PG 432 SLIDE 359, MAP 8 O PB 4117, PG 6 / 1 A, 3/8 EIR�.- ,, ERB 1ERB � er 1/2' ♦ 1" ERBr EIR N/F PERRY M. LOWERY TRACT 2 OF DB 1172, PG 261 N/F N/F MICHAEL IPARRAGUIRRE PERRY M. LO F TRACT 1 OF TRACT 2 OF DB 1172, PG 261 DB 969, PG 190 �\ 1 _E / N/F ® WORTHY KELTON & WIFE, GRACE KELTON '( DB 336, PG 393 SLIDE 359, MAP 8 1/2 / GRAPHIC SCALE ERB / 60 0 30 60 120 Know what's below. Call before you dig. EIP \ / ( IN FEET ) \ I inch = 60 ft. 1/2" N/F ERB MICHAEL IPARRAGUIRRE \ THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED -0+50 240 I 1 1 I 1 1 I 1 1 11 IIII D Is im t e 011101111utions e ivil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com .•••• ••. Z�: OFF /0 ••• `9 i • 4� SEA • 0274 CC) 1 REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION UTILITY PLAN PIN#494740001055 CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE HORIZONTAL: 1 "=60' DATE RELEASED MARCH 1, 2021 SHEET NUMBER C-400 �\ A a�'s Z a �, �%,0 s" , ti , O,1n'lOS � I a 73 a N N 250 245 240 235 230 225 220 215 210 205 200 195 190 SLADE CORNER ROAD 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 14+00 LOW POINT ELEV = 214.95 ................... ................... ................... ................... ................... ................... ................... ................... ............... LOW POINT ELEV = 214.29 LOW POINT STA = 5+49.31 LOW POINT STA = 11+95.96 PVI STA = 5+49.31 PVI STA = 11+46.20 __ PVI ELEV = 214.82 PVI ELEV = 214.54 A.D. = 1.00% = A.D. 0.50% K = 100.00 K = 198.15 " " "" "" " " " "" "" " " " "" "" " _ LOW POINT ELEV _ 216.32 ................... ................... ................... ................... ... "" "" " 100 VC "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" 100' VC "" LOW POINT STA = 2+50.02 PVI STA = 2+04.32 __ " " "" "" " " " "" "" " " " "" "" " PVI ELEV = 216.55 ",. "" "" " " "" "" " " "" "" " " " "" "" " " " "" "" " " " "" " " " ^ " " " "" "" " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" " " " "" "" "" "" " "" "" "" "" " " " "" "" " " " "" "" " " " "" "" ". - A.D. - 1.08% 00 ,-. T ....... ................... ................... ................... ................... ................... ................... ................... ................... ................... ................. 0 K=84.99 N! �M 91' VC W �" W �� " " "" "" " " " "" "" " "" " 1-. -L 00 ....... - ........... o 00 O 00tT ................. ................... ................... ................... .................... M ,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, _ 1 I U „",,,,,,,,, ""vC ""„"",,,,""„""„", ,"„",,,,,,,,","",,, �� ,,,, ,,,,,,,, ,"„",,,,,,,,","",", ""„"",,,,""„""„" M M� - N ,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,, ,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,",". rM 0>O O ,,,,",,,,,,,, """"""""„"",,,,,, ,""„"",,,""„""„", ""„"",,,,""„""„", ""„"",,,,""„"",,, r7 """""""" ....� v" =rnN HIGH POINT ELEV = 216.27 MON M N N M "",",„ ","", ""„"",,,,"",,, ,"„",,,,,,,,"",,,", ""„"",,,,""„""„", ""„"",,,,""„", , ",',,,,,,""„ """"""""""", o """"""""""""""""""", """"""."",, ","""", ,. 01 ""," , , ,"„",,,,,,,,,",",,, ""„"",,,,""„"", " o M ,,,,"„ ' �z o °' ""„"",,,,""„""„", ,,,,,"""," '" ...,,,,, ""„"",,,,""„""„", ,,,,,"""," '" ...,,,,, ""„"",,,,""„""„", ,,,,,"""„ HIGH POINT STA 8+83.73 " _ """""", """"""""""""""""""", """"""",,,,,,,,. ,,,,,,,,,,,, 6 � = " ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,"""", w ,, "",,,","", - "",",„ ","", ""„"",,,,"",,, ,"„",,,,,,,,"",,,", ""„"",,,,""„""„", ""„"",,,,""„", , ",',,,,,,""„ �i ,,,,,,,,,,,, -'t�N, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,, °° ,,,,,,,, o ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, N N ,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,. PVI STA = 9+28.70 ","",,,, ""„"",,,,""„""„", ,,,,,""","""„ N I 00 NZ O ,,,,",,,,,,,, +0>> ""„"",,,,""„""„ ""„"",,,,""„""„", ""„"",,,,""„""„"" ,,,,,"""",,. J v -cli 0 _L "",",„ ","", �.., """""""""""""", """"""""""""""""""", """"""""""""""""""", """"""""""""""", """""","""",", OMNF """"""""""", """"""""""""""""""", """"""""""""""""""",,. I"o ,,,,,,,,, �nC5FN ,,,,,,,,,,,,,,,,,,,, �U)�zz ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,"""","""","," ,,,,,"""," '" ...,,,,, ""„"",,,,""„""„", ""„"",,,,""„""„", ""„"",,,,""„""„", ,,,,,"""", PVI ELEV = 216.72 A.D. = -1.50% ","",,,, ""„"",,,,""„""„", ,,,,,""",""„ O=�_^. ,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,",". rn ., n v't N N `� O It0`°zo N 0�NF K = 179.10 0 coCO 00 N- tT O r. NOi M O rn N tT O rn M (D „ + U co N � Z N ,,cp 269 VC ^ I ,tT O N O tT N �- ~ O tT UNF Z Z -- �o I > > OZ O N M N W N N W � •N � Z M 't - O N �z - O II ..N... UHF Z -- I 1 v, J UU .-j I w... O�. .. 1 I - +N ".' I r>0 Z I + + » U �..II. .". """""""""""". ....o. 0 O N ^ ................. �. .................... ................. �, .................... .. ......., Co 00. � O=�?? - OAF zz „ln,,W.,, > ,,, 1 C> O O „O„ ,N N „N ,N- „^ r- 1 - O , ��ON J �� �,"M I I U ���000 O ONc�� 1 U W C> U U`' W I v - N MONK O . 00 LoM N "..""....""..""..". "..""...."".."".","," - - .,.. J UU `�`�L .................... ................... MEZZO O N- - O ..... ,,.0 - """"""""". v M O .......... „ �� 0_ U) N ....""".".." O �O O O 0T v O M ,,,.0 n .....,....... tT �ZO CO N- O ......"""".."..... "..""....""..""..". "..""...."".."".."" ,M M .,, J ,,, „r7,,, "",",„ ","„ ,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,, M ,,,,,,,,,,,, '6 NN ,,,,,,,,,,,,,,,,,,,, ""„"",,,,""„"", ",",,. O U)U)7"., ,,, O ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, "I +U»> ",",", 0_ ,,,,,,,,,, O Ln ,,,","""," '" ...,,,,, ""„"",,,,""„""„", ,""",,,, O N ", ,,,,,,,,, O NN ,,,,,, N ",,,,,,,""„ ,",,,,", M OTC ,,,,,,,,,,,,,,,,,, ,,, O M c0 ", """""", 1 - + » ,,,,,,,,,,,,, O U """","""",","",,,, ""„"",,,,""„""„", ,,,""„"",,,""„""," ,,," ", 1 - ", �„ ,,,,,, „+„ M .. O MN♦- CO MM�ON - ZZZ r6 O N MAN � � N �N♦- UHF--- Z Z ,,, U 00 M,,, r7 „N,,,. ,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,, ,,,,,,,,,,,,, �ONzO. ,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,. � ,,,, � .NNE ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,, J.. ,,,,,,,,,,,,,,,,,,,, N � In ,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,, (0� ♦- rn�0 ,,,,,,, N F- � CO ,,,,,,,,,,,,,,,,,, z0. ,,,,,,, ���z0. tT M CO O ,,,,,,,,,,,,,,,,,, ,,, N��N,,, In N ♦- � 0,,, ,,,,,,, J ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,. CO � ,,,,, � � r �,, ,,,,,, 11,,11,,, �� I >> r-E)� N�ZZO O O ., Ni, NO N,N- NNN- OOM�ZO �.,, Oi OC* ... 1.589; "" - UNF--- + U Z Z I N -- O » > " 0o N NLOO � O N r I > -+ U z I U00 » U Z Z ♦--- I UO>♦--- » U Z Z NON- I - + » o U M O - N n M00 M00 O N .. Q ♦- (n . "> > w J \�.,�.\ O \ z z `-6- �? EXISTING 15 --- --- „ „-,,,,,,,,,,,, --- -- -� ,,,,,,,,,,,,,,,,,,,, �� _`_ „ ,,�,,,,,,,,,,,,,,,,, - - - - rnr>o. � - - -0 c+o - GR o _ UND --� Nco r>p MONo o r�0 w w=z nz a.. "",",„ ","", ,,,,,,,,,, RCP ,,,,,,,"„",""„""", ""„"",,,,""„""„", - ,"","", - -- ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,�,,�, ,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,, I tT N ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, """,,,,,, �„ _" ,,, "" ,,,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,, ,,,,,," M Oi� „"„"""",,,,,,,,,,,, 00 ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,, - + ,,, M U z ,,, ,,,,,, ,,, 126.00 LF C� 0.50% 18" RCP , o .5 W w �z .,. 0.50% _ w 1. 0 > o " z 43.43 LF C� 0.97% 30" RCP F INI SH ED GR OU ND �20 36.77 LF C'I 0.52% 18" RCP I 16 �� 0 74 LF 0.50% 18 RCP "" 77 0 5 LF 48% . 36 C� RCP I � 36 MINIMUM COVER 102.20 LF C� 0.34% 15" RCP 87. 57 LF C� "" 0.34% 15" RCP 75.80 LF (� 0. 49% . 18 RC p 0.5 0 _"_""_ _ "" " LF 6 DI CENTERED " " "" "" " " I CD i 6" SDR 21 PVC .,.. 26.00 LF @ 0.50% 18" RCP 82.50 LF C� 0.51 % 18" RCP """" UNDER STORM __ "" "" " " " " " "" "" " " "" "" " " "" "" . 26.00 LF @ 0.50% 30 RCP " I "" 52.90 LF C� 0.34% 15" RCP 2„ SDR 21 PVC �3> "" 20 LF 6 DI ".""..""...."".."" ......"""" 50.00 LF C� 0.50% 15" RCP ".""..""....""..". i i "..""...."".."".."" "... 31.67 LF C� 0.79% 18" RCP ., . N CENTERED 45.14 LF C� 0.33% 36" RCP 26.00 LF C� " 0.58% 18 RCP 627. LF C� 0.53% 11 RCP o = m oo UNDER STORM ," 20 LF 6" DI ......... �"" 27.93 LF C� 0.61 % 18 RCP . __"".."" .... ".."" ?� + N � w "..""....""..""..". "..""....""..""..". "..""...."".."...". "..""....""".""..". CENTERED "..""....""..""..". "..""....""..""..". "..""....""..""..". "..""...."".."".."" "... ."""""""""". �""" w c0 o 1n . a o 0 .... ..UNDER STORM , cn F-� .. }.. �� �u " " "" "" " ��>� -± x00000 - . N,,p 1nr7 L,JLn M + "",","," ""„ ""„"",,,,""„""„", ""„"",,,,""„""„", ""„"",,,,""„""„", ,,,,,,,,, _ co _ .",,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,",""„"",,,,""" ,,,_ N x ,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,. 0_ _ rn > O ., ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,, ,,,,,,, N ,,,,,,,,,,,,,,,,,,,, cflr. 2 W� O " X+mQ., 0] N r7 J�-mQ N f1 + N !n , ,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, N - ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,, __ " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "" " " " "" "" " " " " "" "" "",,. O� O 00 n W r7 O r7 N � N � r7 r7 N N � N r7 r7 to r7 N N to r7 � N M � O n O � N CO O � 00 O c0 O c0 n � N � � N � a W �_ r_ r_ O �_ 00 o � O � O �_ In 00 O N -ri In O In Sri N O r i � r i In - - - - - - - - - N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 250 245 240 235 230 225 220 215 210 205 200 195 190 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11 +00 12+00 13+00 14+00 GRAPHIC SCALE 60 0 30 60 120 ( IN FEET ) I inch = 60 ft. 240 11 ■ IIII ■ e�ivft engineering I land suarveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com ��!�,\( \ IICAR9 ����i .•••• ••. ��� Q'.• S3 .. � ;;'. : SEA �� 0274 •• G ► NE .•° ���� � • ......• `�� ''''' �' C) 1 1111'6 �', ` oaiammabaoum oumwrmmuuuuuuuuuuuuuuuuuuuuuiui REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION SLADE CORNER ROAD PROFILE CLIENT J&K GENERAL CONTRACTORS 645 Laurinbur Hi hwa g g Y Raeford, North Carolina 28376 Phone: 910 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 x��l//��1abl���iiiii 11������11111111111111111 DRAWING SCALE HORIZONTAL: 1 "=60' VERTICAL: 1 "=6' DATE RELEASED MARCH 1, 2021 xmmr�,9111 um uumwemuuuuuuuuu SHEET NUMBER G5.0 Q. `0 ��. / CO / wM�k30 �co, 0 w k co 40' ^� WN`�k221 „ i\X n ov tix C5�jf ^XN + noo. 7 / N6. �83r20 , R </C� /jib v \ SNO\1 7 \ / °jig ^ (.10 5k00 Osr cb Jz Q , � / GJ pc <v W N 250 245 240 235 230 225 220 215 210 205 200 195 190 I U O 0 Cq, O N OU)N \1mN0 M �oC)? . N i J O OU)N MLON _(6 J0o MH ?? 36.77 LF @ 0.52% 18" RCP w C � co (0000 HAVELOCK HATCH DRIVE 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 8+00 LOW POINT ELEV = 215.55 LOW POINT STA = 3+38.15 PVI STA = 3+25.86 PVI ELEV = 215.24 A.D. = 2.65% K = 37.72 100' VC ��I I I v U U p 00 U? ,,,,,,,, CO CO N - - O In) O» > HIGH POINT ELEV = 217.18 .......... U n F-z i ? ... .................... .................... .......... HIGH POINT STA = 1+69.92............. ...... ........................ ^............. ................... .......... PVI STA = 1+96.68 = 00 CO L PVI ELEV = 217.37 �cn IU oo A.D. _ -2.15% � 6� K 46.48 00 -vv� O o 100' VC ....o �ocli.............. o. N ...................., co ,__.......... v U 00 O- Cj O �� r7 LO ��NF _ c6�Z O ��NZ O ......,. ................... 0_ Uv O �f N N �p I+ U» U M F- Z Z 00 M r- M N u? ... N NCOInc U n F- Z Z ,,,,,,,, r N ..,,,,,,,,,,,,,,...... N CD N (DO O,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,, ,,,,,,, O N N O O N j ...................... M N O O ,,,,,,,,,,,,,, U M 0 Z ,w +> ,,, 06 � Z O .................... I O > Z L,r0- +0>> UL0H? - U4F-ZZ EXISTING GROUND .... e -_. -0.50%_ --- _ - .................... 777 t-16 -_ - 1.00% F WISHED .. .. GROUND 79.35 LF 36" MINIMUM COVER 0.50% 18' RCP ............... i.,... .. 79.52 LF 0.86% 15" RCP 0 95% 15" RCP 26.00 LF @ 6.. SDR 21 PVC . ................... ... 15.00 LF @ 0.93% 15" RCP .,... 37.67 LF @ 0.80% 18" RCP 15.00 LF @ 1.00% 15" RCP ...................... 26.00 LF @ 0.58% 18" RCP o....�.......... uriq 0� 14-- 4 .................... a°nDNu ....... .................... L=i M (.0n.. M Q ......... .................... NN ............................... HIGH POINT ELEV = 217.79 HIGH POINT STA = 6+14.93 PVI STA = 5+98.26 PVI ELEV = 217.96 A.D. _ -1.50% K = 66.67 100, VC r-0.5D%- 72.98 LF @ 1.43% 18" 2" SDR 21 PVC .. 34.00 LF @ 0.74% 18" RCP----' 69.66 LF @ 0.65% 18" RCP--� ....0 ,,,,,,,,1111 co U-) 3 + m m Q M 0-0 N .. N 1n r- ..................... ................N WM5+86.5 .. WM5+96.9 00 I N � IQ I 3 Ot> IQ v O + 6' v0X6. 1-0+25 0+00 _ (onend) M/2i ,OS _ 2+00 _ A89 �s (0 ,,.. abf021 2131S210A O 0 WM 7+75.0 2 xg2 WM7+85.0: 'a O�� \ 10 1/ g / axe � \ .� • 1 � �6- sb + \' °c' \ o 250 240 245 235 240 230 235 225 230 220 M IU O 00) U)� N 215 CO z 0 _D N > > �Z Z 220 210 215 205 210 200 205 195 200 190 195 185 190 180 VORSTER ROAD 501 R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 3+00 N ..... N ,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,, N W ... I L, � Uv �. o ,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,_. N r7 O O ,,,,.,, o 0� N � . .,,,,, O , M ,,,,,,,,,,,,,,,,,,, ,,,,,, O ,,,,.. O Z I -ui L + U> > U N H Z Z „ ..N ................... ... ............, II .. 5..�! .................. ... J II. N.......... °' o 0 O Q II O N > 0 � ,,,,,, ,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,, ,� ,.., .. N ,,,, j O -..,.-.�,�.,,, ................................................ ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,N N N ,,, I u)ib- NF-> nu,) 0? .EXI.... ........................ ............... OUND .. oop -1.08% a �N FINISHED GROUND > NZ . 36" MINIMUM COVER ..................... .. .... ..... 2" SDR 21 �...... .. 7 . .............. PVC ......... 77.28 LF @ 0.50% 18" RCP .. .................. .................. Lo, .. ................... .. .. ................... ................... ................... .. ........... �� . .. o .. 25.36 LF @ .... 00 o 0.47% 18" RCP 00 0 0 X O > I m .,_ 00 ,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,, ,,. + O > N ..................... N V) J01) 00 + N 1n C1jj N 00 f\ . (0 M CO � Ln � M N r4) N N N N N N N N N N N N N 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 0+00 1 +00 240 235 230 225 220 215 210 205 200 195 190 185 180 2+00 3+00 GRAPHIC SCALE 60 0 30 60 120 240 ( IN FEET ) I inch = 60 ft 11 IIII solutions D s im t e e�ivft engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com 11DAR9 SEA • 0274 .• G ► NE ••°���� ooaiaiima�aoum oumwemuuuuuuuuuuuuuuuuuuuuuuu REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION HAVELOCK HATCH DRIVE & VORSTER ROAD PROFILE CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE HORIZONTAL: 1 "=60' VERTICAL: 1 "=6' DATE RELEASED MARCH 1, 2021 xmm031,90o um uumwemuuuuuuuuu SHEET NUMBER C-5m GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control producs with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NI,NORTHr , '', NOR° CAR- OL..IN Environmental Quality G..,,.. �• r,,.a,. . PlAtl. amocR wmwr mutuc ems m c EI.Ni �. •oc s rcaa.m �....� wrx m.� im.• c.•6. .�•,E wmwr :�� � m c armor �••.n wtx mri nW GRA% ,40MUT,STRUCTURE AR13VE GRAI& 4J UT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCG0I GROUND STABILIZATION AND MATERIALS HANDLING I EFFECTIVE: 04/01/191 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performingthe inspection, hours of a rain 4. Indication of whether the measures were operating event> 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event 2! 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. (pX' Itn NOR C D-I RLdN EnvironmentaIf Quaf t, PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGOI SELF -INSPECTION, RECORDr�EEPING AND REPORTING EFFECTIVE: 04/01 / 19 11 Illl solutions D s im t e eIMI. engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION EROSION CONTROL DETAILS CLIENT Jl GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE NOT TO SCALE DATE RELEASED MARCH 1, 2021 SHEET NUMBER C-602 METER BOX WITH NOTES: 1. ALL MATERIALS TO BE APPROVED BY RECESSED AMR READING HCPW. LID SET 1/4" ABOVE GRADE 2. SERVICE LATERAL SIZE 1" IPS VARIES 18" POLYETHYLENE UNLESS OTHERWISE r SPECIFIED Ow . ~ 3. SERVICE LATERAL INSTALLATION SHALL '-' ;::::;,, ,',. EQ. EQ p a BE APPROVED BY HCPW. PAVEMENT // , „ ""' - , CO VC CURB &GUTTER'„ a J 4. WATER SERVICE LOCK VALVE S BE LOCATED T FROM SANITARY SEWER CLEAN OUT STACK WHEN INSTALLED IN SAME DITCH. 5. WHEN INSTALLED IN A PAVED AREA, 1" FULL PORT ANGLE BALL VALVE---;'; METER BOX TO BE SET 1/4" ABOVE WITH ONE OR TWO STEP STYLE _ _ " FINISHED PAVEMENT GRADES AND z COMPRESSION FOR IPS PE INLET .. I " '�- PAVEMENT FEATHERED TO TOP OF BOX g AND FEMALE METER THREAD - TO PROVIDE DRAIN AWAY FROM BOX = CC SINGLE SWIVEL NUT WITH LOCK. ALL 6. C.I. METER BOXES SHALL BE USED r� STAINLESS STEEL INSERTS SHALL BE STAINLESS " " IN TRAFFIC AREAS SEE WAS. STRAP SADDLE STEEL 7. PERIMETER SOLID CONCRETE BRICK W METER COUPLING BASE WITH NO GAPS, DO NOT LAY WITH 3D FEMALE BRICK ON PIPE. SEE INSET "A" BALL CORPORATION STOP THREAD METER SWIVEL WITH AWWA INLETS, ONE NUT x 3/4" MIPT 8. WHERE ASPHALT CURB OR STRIP OR TWO STEP STYLE PAVEMENT EXIST, THE LOCATION OF COMPRESSION FOR IPS PE, 1 " x 7-1/2" SPACER FOR BOX SHALL BE AS DIRECTED BY HCPW WITH STAINLESS STEEL DOMESTIC SERVICE, REPRESENTATIVE. INSERTS. 1"x 10-3/4" SPACER FOR 9. DISTANCE FROM TOP OF LOCK VALVE IRRIGATION SERVICE OPERATING STEM TO TOP OF BOX 1" IPS POLYETHYLENE SHALL BE 8" MIN. TO 10" MAX. PIPE PE 4710, 250 PSI SIDR7 ASTM D2737 ASTM 10. RESIDENTIAL METER BOX SHALL BE SET D3350-445574E BRICK METER BOX BASE 18" FROM RAN TO CENTERLINE OF WATER p SEE INSET "A" METER BOX PERPENDICULAR TO THE RAN. MAIN 11. COMMERCIAL METER BOX TRACER WIRE LOCATION SHALL BE AS APPROVED (DO NOT CONNECT TO 12 GA SINGLE STRAND (PREFER NO METER BE INSTALLED CORPORATION OR BANDS) LESS THAN 5' FROM BLDG. TO EDGE COATED COPPER WIRE OR OF BOX). 2" SOLID BRICK COPPER CLAD STEEL 18" 12. LATERAL SHALL BE CENTERED METER BOX BASE TRACING WIRE EXTENDED ON LOT UNLESS OTHERWISE NOTED. D INTO METER BOX 6" AND EQ EQ WRAPPED AROUND LOCK 13. LATERAL SHALL NOT BE BACK FILL L < [ VALVE �G BACK FILLED UNTIL INSPECTED BY lil D BOTTOM 1l "1 0' HCPW PROJECT COORDINATOR. METER BOX I l 1 O 14. WATER MAIN AND LATERAL SHALL PASS I l l l HYDROSTATIC, LEAKAGEAND BRICK �� OF BOX O O STERILIZATION TESTS (200 PSI). 15. BARB -TYPE FITTINGS ARE NOT �I1�1'Y1 BRICK METER BOX BASE ACCEPTABLE SPACER SHALL 16. SHOULD IT BE NECESSARY TO CRIMP THE SECTION "A -A" INSET "A" BE CENTERED WATER SERVICE LATERAL, A FULL CIRCLE PLAN IN METER BOX REPAIR CLAMP SHALL BE PLACED ON THE CRIMPED AREA. NO. DATE REVISION PROPOSED 1" WATER SERVICE LATERAL N.T.S. SHEET NO. DWG. NO. W.2 1 OF 1 DATE JULY 01, 2016 7-5/16" _ I�^jl A Domo� A ��07� 5-3/4" Q 7" SECTION "A -A" PLAN 5-1/4" DROP LID 9.. 5-3/4" 7I - - I V max. 6-1/8" 6-1/2" r^' 10-1/4" _ I � TOP SECTION BOTTOM VALVE BOX N.T.S. SHEET NO. I DWG. NO. W 7 1 OF 1 DATE JULY 01, 2016 2016-W2 WLAT.dwg NOTES: 1. VALVE BOX SHALL BE 3 PART SLIP -TYPE MANUFACTURED BY SIGMA CORPORATION VB-462 TYLER UNION 6855 SERIES),STAR PIPE PRODUCTS (VB-0004), OR APPROVED EQUAL. 2. VALVE BOX SHALL BE 3-PIECE CLOSE GRAINED CAST IRON SLIP -TYPE VALVE BOX WITH A MINIMUM THICKNESS OF 3/16". 3. VALVE BOX SHALL HAVE RAISED LETTERS "WATER" CAST INTO COVER. 4. VALVE BOX SHALL HAVE 3/8" HOLE DRILLED IN TOP SECTION THRU WHICH A 1/4"xl-1/2" GALVANIZED BOLT SHALL BE USED TO SECURE MINIMUM 12 GAUGE, SINGLE STRAND, COATED COPPER OR COPPER CLAD DROP LID STEEL TRACER WIRE FOR NON-FERROUS pI PE. A 1/2" WASHER SHALL BE USED BETWEEN NUT AND INSIDE OF BOX. TIGHTEN HAND TIGHT. 5. SCREW TYPE VALVE BOXES ARE NOT ACCEPTABLE. 6. DIMENSIONS SHOWN VARY BASED UPON THE MANUFACTURER. ACTUAL DIMENSIONS SHALL BE APPROVED BY HCPW. 7. VALVE BOX SECTIONS ARE REQUIRED. THE TOP USE OF PIPE IN LIEU OF VALVE BOX SECTION SECTIONS SHALL NOT BE PERMITTED. 8. TRACING WIRE SHALL BE INSTALLED OUTSIDE OF BOX. 9. REFER TO HCPW DETAIL W.6 FOR INSTALLATION REQUIREMENTS. BOTTOM SECTION DATE I REVISION 2016-W7 VALVEBOX.dwg NOTES: 1. FIRE HYDRANT SHALL BE MODELS MANUFACTURED BY MUELLER CO. (CENTURIAN), 10. CONTRACTOR SHALL NOTIFY THE APPROPRIATE FIRE DEPARTMENT OF OUT OF AMERICAN VALVE AND HYDRANT CO. (MODEL MARK 73), CLOW MEDALLION OR SERVICE FIRE HYDRANTS PRIOR TO CONSTRUCTION. APPROVED EQUAL. 11. FIRE HYDRANT SHALL BE FIELD PAINTED IN ACCORDANCE WITH HCPW STANDARDS, 2. ALL VALVES AND HYDRANTS SHALL HAVE M.J. CONNECTIONS WITH IRON RETAINING BEFORE PROJECT IS ACCEPTED. HYDRANTS SHALL BE PAINTED WITH A GREEN GLAND M.J. RESTRAINT. BONNET AND YELLOW BODY. PAINT SHALL BE IN ACCORDANCE WITH HCPW REQUIREMENTS. THE CONTRACTOR SHALL PAINT ALL EXPOSED EXTERIOR FIRE 3. HYDRANT VALVE SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE MAIN BUT DO HYDRANT SURFACES PRIOR TO FINAL ACCEPTANCE BY HCPW. ALL PAINTING SHALL NOT PLACE VALVE IN PROPOSED OR EXISTING CURB AND GUTTER. IF THE STREET IS BE DONE IN STRICT ACCORDANCE WITH THE PAINT MANUFACTURER'S SOIL AND NO PAVING IS TO BE DONE AT THIS TIME THE LOCATION OF THE VALVE IS RECOMMENDATIONS AND SHALL BE SATISFACTORY TO THE HCPW. TO BE DETERMINED BY THE HCPW PROJECT COORDINATOR. 12. PROTECTIVE COVERING SHALL BE UTILIZED, AS NECESSARY FOR PROTECTION OF 4. HYDRANT BRANCH SHALL NOT BE BACK FILLED UNTIL INSPECTED AND APPROVED BY ADJACENT AREAS, EQUIPMENT, SHRUBBERY, OR OTHER ITEMS. AFTER PAINTING IS HCPW PROJECT COORDINATOR. COMPLETE, THE ENTIRE AREA SHALL BE THOROUGHLY CLEANED UP. 5. GATE VALVE AND BOX SHALL BE IN ACCORDANCE WITH HCPW STANDARD DETAIL. 13. ALL PAINT MATERIALS SHALL BE IN THE ORIGINAL SEALED CONTAINERS BEARING THE MANUFACTURER'S NAME. 6. HYDRANT EXTENSIONS AND/OR OFFSETS SHALL BE APPROVED BY HCPW PROJECT COORDINATOR. 14. WHERE NECESSARY, THINNING SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND AS APPROVED BY HCPW. 7. FIRE HYDRANT CONNECTIONS TO EXISTING WATER MAINS SHALL BE MADE USING A TAPPING SLEEVE AND VALVE BY WET TAP CONNECTION. THE TAPPING SLEEVE AND 15. ALL SURFACES TO BE PAINTED SHALL BE CLEAN AND DRY. VALVE SHALL BE HYDROSTATICALLY TESTED PRIOR TO STARTING THE TAP IN THE PRESENCE OF THE HCPW PROJECT COORDINATOR. 16. THE BONNET OF THE FIRE HYDRANT SHALL BE PAINTED A DARK GREEN UTILIZING AN ALKYD OR POLYURETHANE ENAMEL, WITH A FINAL DRY MIL THICKNESS OF 4 TO 6 8. THE PROPOSED LOCATION MAY BE RELOCATED BY THE HCPW PROJECT MILS. MULTIPLE COATS MAY BE NECESSARY TO ACHIEVE THE FINAL REQUIRED DRY COORDINATOR IF CONFLICTS EXIST (I.E. GAS SERVICES, UGE, TELEPHONE, ETC.). MIL THICKNESS. THE PAINT SHALL BE FOREST GREEN, AS MANUFACTURED BY THE SHERWIN-WILLIAMS COMPANY, PART NUMBER 822918, OR APPROVED EQUAL. 9. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING WATER MAIN MATERIAL, SIZE, SAMPLES SHALL BE SUBMITTED IN ORDER FOR HCPW TO CONSIDER ALTERNATIVE AND DEPTH FOR EACH FIRE HYDRANT LOCATION PRIOR TO ORDERING MATERIALS. PAINT MANUFACTURERS. THE CONTRACTOR WILL BE REQUIRED TO SUPPLY VARIOUS LENGTHS OF BARRELS AND HYDRANT EXTENSIONS ( NO MORE THAN ONE HYDRANT EXTENSION MAY BE 17. THE REMAINDER OF THE FIRE HYDRANT SHALL BE PAINTED SAFETY YELLOW USED PER HYDRANT). ADDITIONAL FITTINGS AND/OR HYDRANT EXTENSIONS OR UTILIZING AN ALKYD OR POLYURETHANE ENAMEL, WITH A FINAL DRY MIL THICKNESS OFFSET CONNECTORS MAY BE REQUIRED TO MAINTAIN PROPER COVER AS OF 4 TO 6 MILS. MULTIPLE COATS MAY BE NECESSARY TO ACHIEVE THE FINAL APPROVED BY THE HCPW PROJECT COORDINATOR. REQUIRED DRY MIL THICKNESS. THE PAINT SHALL BE YELLOW, AS MANUFACTURED BY THE SHERWIN-WILLIAMS COMPANY, PART NUMBER 3186, OR APPROVED EQUAL. SAMPLES SHALL BE SUBMITTED IN ORDER FOR HCPW TO CONSIDER ALTERNATE PAINT MANUFACTURERS. FIRE HYDRANT AND VALVE INSTALLATION N.T.S. SHEET NO. DWG. NO. W,13 2 OF 2 DATE: JULY 01, 2016 DATE I REVISION CONCRETE NOTES THRUST .�- BLOCK (TYP.) MIN. BEARING AREA EACH DIRECTION OF THRUST IN SQUARE FEET (based on soil supporting value of 2000 psf @ 200 psig test pressure) PIPE SIZE TEES & DEADENDS 900 ELBOWS 450 ELBOW & CROSSES 22-12° ELBOWS 6" 4 6 3 2 8" 7 10 5 3 12" 15 21 11 6 2016-W13-FHC( 1. THRUST BLOCKS SHALL BE INSTALLED ON PVC WATER DISTRIBUTION LINES 6" THRU 12" DIA. IN THE MANNER SHOWN. SEE HCPW STANDARD ALT. RESTRAINING DETAIL WA FOR ACCEPTABLE ALTERNATE RESTRAINING SYSTEMS. 2. PIPE GREATER THAN 12 INCH DIAMETER SHALL REQUIRE RESTRAINT JOINT PIPE FOR THE PROPER LENGTH. 3. COMPACT FITTINGS ARE NOT THRUST UNDISTURBED ACCEPTABLE. STANDARD FITTINGS ELBOW BLOCK i SOIL SHALL BE USED WITH CONCRETE M.J.PLUG" i AREA OF THRUST BLOCKING. i BEARING 4. THRUST BLOCKS SHALL BE INSTALLED N SEWER FORCE OMAIN IN THE MAN ER SHOWN. TT�� 5. IF SAC-CRETE IS USED, MIXING SEE BLOW -OFF DETAIL FOR MUST BE ON SITE UTILIZING A CLARIFICATION OF CONSTRUCTION ELBOWREQUIRED AT DEAD ENDS MECHANICAL MIXER. -"6. NO CONCRETE SHALL BE PLACED ON BOLTS. WRAP HORIZONTAL BEND DEAD END JOINT FITTINGS WITH PLASTIC. 7. CONCRETE SHALL BE A MINIMUM 3,000 psi. SIDE EXCAVATIONS 8. ALL BEARING SURFACES SHALL BE SIDE EXCAVATION S(TYP.) (TYP) AGAINST UNDISTURBED SOIL AND SHALL BE APPROVED BY HCPW PROJECT COORDINATOR PRIOR TO --�- .... .... .... �- � ";,; .... .... .... .... -� PLACEMENT OF CONCRETE. 9. USE OF RESTRAINED JOINT DUCTILE IRON WILL BE REQUIRED IF SOIL CONDITIONS DO NOT ALLOW THE USE - OF THRUST BLOCKS. 10. ALL VERTICAL BENDS SHALL BE RESTRAINED USING RESTRAINED %�- CONCRETE JOINT DUCTILE IRON PIPE. SHALL BE KEPT ALL BEARING SURFACES CLEAR JOINTOF O LEAR F PPIPE SHALL BE AGAI NST TAPPING SLEEVE TEE UNDISTURBED CROSS AND VALVE GROUND (TYP.) NO DATE REVISION CONCRETE THRUST BLOCK DETAIL SHEET NO. I DWG. NO. W.1 7 1 OF 1 DATE JULY 01, 2016 NOTES: 1. ALL MATERIALS SHALL BE APPROVED BY HCPW. SEE DWG. WA SHEET 2 OF 2 FOR METER BOX LID DETAIL. 2. METER BOX SHALL NOT BE LOCATED WHERE H-20 LOADINGS CAN IMPACT BOX OR COVER. 3. FOR 1" WATER LATERAL INSTALLATION SEE DETAIL W.2 4. DIM'S± 1/16 U.N.O TOP VIEW ----------------- PLAN 17-9/16" 12-5/16" ELEVATION Og ELEVATIONOA ELEVATION VIEW 1-INCH METER BOX DETAILS NO. DATE REVISION N.T.S SHEET NO. I DWG. NO. WA 1 OF 2 DATE JULY 01, 2016 2016-W4 11N METERBOX.dwg 2 RINGS OF #3 REINFORCING NOTES: 1. CONCRETE PROTECTOR RING SHALL BE DEFORMED BAR AS SHOWN 2500 P.S.I. PRECAST REINFORCED CONCRETE 2. VALVE BOX SHALL BE AT GRADE A A W/PROTECTOR RING EXTENDING 1/2" ABOVE GRADE 3. SEE GATE VALVE AND BOX DETAIL WATER 4. VALVE BOX PROTECTOR RINGS SHALL BE INSTALLED AROUND VALVE BOX IN UNPAVED NON -TRAFFIC AREAS. AND SHALL NOT CREATE A HINDERANCE / TO MOWING OPERATIONS. --- SHADED PORTION OF RING IS EXPOSED REMAINDER IS BURIED PLAN N.T.S. GROUND 9-1/2" MIN. REINFORCED CONCRETE PROTECTOR = z • • RING z a • N VALVE BOX 24" DIAMETER MIN. CUT AWAY VIEW N.T.S. SECTION A -A N.T.S. NO DATE REVISION VALVE BOX PROTECTOR RING SHEET NO. I DWG. NO. W 1 OF 1 DATE JULY 01, 2016 2016-W8 CONC PROTECTOR RING.dwg - - 3/4" GHT or 1", 1-1/4", o' 1-12", 2" or 2-1/2" MNPT or 1-1/2", 2", /// or 2-1/2" NST OUTLET FIN. GRADE VALVE BOX III III: DUCTILE PIPE. �z IIII o ry IIII IIII=i_ 2" VALVE _- =- BRICK SEE CONCRETE THRUST BLOCK M II1=III=I II- -II II DETAIL m 11=111-III : =1 11-I I I-111-1 11=1 11=1 U) a III=111-11 1 111=111 111 11: o 2 =11 I- - -11 1 -1- + 2" R.J.D.I. PIPE III=III= -III III-111 III-111-1 111- I-111=11=11= 1-_ -� 1 � III -I =111- -I 11- DI TEE, HYDRANT TEE -III III-I=III 111=111- (2", 2-12" + 3" FNPT OR %� j OR TAPPING SLEEVE _ - III=I -III III=III=III-I _ 2", 3" OR 4" MJ) INLET AS REQUIRED. SEE I I II I I -III -III I- - UNDISTURBED VARIES TAPPING DETAIL) SOIL M.J. CONNECTION WITH IRON 7 CU. FT. #57 STONE PLACED TO A LEVEL 4" RETAINING GLAND M.J. ABOVE DRAIN OPENING RESTRAINT HYDRANTS SHALL BE SELF -DRAINING, NON-FREEZING, COMPRESSION TYPE WITH 2-1/8" MAIN OPENING. INLET SHALL BE (2", 2-12" & 3" FNPT OR 2", 3" OR 4" MJ). OUTLET SHALL BE (3/4" GHT OR 1", 1-1/4", 1-12", 2" OR 2-12" MNPT OR 1-12", 2" OR 2-1/2" NST. HYDRANTS SHALL HAVE A (DUCTILE IRON (STD), GALVANIZED STEEL, STAINLESS STEEL, OR BRASS) EXTERIOR CASING PIPE, A (GALVANIZED (STD), STAINLESS STEEL OR BRASS) INTERIOR NON -TURNING OPERATING ROD WITH A HEAVY WALL (CAST IRON (STD), OR ALUMINUM) TOP STOCK. PRINCIPAL INTERIOR OPERATING PARTS SHALL BE BRASS, BRONZE AND ALUMINUM AND BE REMOVABLE FOR SERVICING WITHOUT EXCAVATING THE HYDRANT. HYDRANTS SHALL BE SET IN 4 CUBIC FEET OF CRUSHED STONE TO ALLOW FOR PROPER DRAINAGE OF THE HYDRANT. RECOMMENDATIONS OF THE AWWA SHOULD BE FOLLOWED WHEN INSTALLING THE HYDRANT. HYDRANTS SHALL BE #2 ECLIPSE POST HYDRANT AS MANUFACTURED BY JOHN C. KUPFERLE COMPANY, ST. LOUIS, MO OR APPROVED EQUAL. NTS ECLIPSE #2 POST HYDRANT BELL OD+8" MIN. BELL OD + 24" MAX. CONTINUOUS12GA. J SINGLE STRAND COATED COPPER WIRE OR COPPER CLAD STEEL TRACING WIRE REQUIRED FOR ALL NON-FERROUS PIPE (FROM VALVE BOX TO VALVE BOX) TYPE 3 TRENCH WATER MAIN BEDDING DETAIL SHEET NO. I DWG. NO. W.1 9 1 OF 1 DATE JULY 01, 2016 NOTES: 1. ALL EXCAVATIONS SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE CONSTRUCTION STANDARDS FOR 4"-6" TOPSOIL RESTORED TO EXCAVATIONS IN OSHA "SAFETY AND HEALTH REGULATIONS ORIGINAL GRADE AND SEEDED OR FOR CONSTRUCTION", CHAPTER XV11 OF TITLE 29, CFR, PART SODDED AS INDICATED ON 1926. THE CONTRACTOR SHALL HAVE A COMPETENT PERSON DRAWINGS. ON SITE AT ALL TIMES DURING EXCAVATION AND BACKFILLING. 2. CONTRACTOR SHALL USE TRENCH BOX SHORING IN ALL OPEN CUTS IN PAVED AREAS. TRENCH WIDTH SHALL BE MAINTAINED AT THE MINIMUM PRACTICAL WIDTH. 3. TYPE 3 TRENCH CONDITIONS AND A MINIMUM OF 4' OF COVER MUST BE MAINTAINED WHERE RESTRAINT JOINT --- PIPE IS SPECIFIED AND 3.5' OF COVER IN ALL OTHER LOCATIONS UNLESS SHOWN OTHERWISE ON THE PLAN PROFILE. -UNDISTURBED SOIL 4. LOOSE SOIL OR SELECT MATERIAL IS DEFINED AS "NATIVE SOIL EXCAVATED FROM THE TRENCH REMAINING TRENCH BACKFILL FREE OF ROCKS FOREIGN MATERIAL, AND COMPACTED TO 95% MAX DENSITY FROZEN EARTH IN MAX. 12 LIFTS FOR NON PAVED AREAS. SEE APPLICABLE PAVEMENT 5. BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH PATCH DETAIL FOR PAVED AREAS. WALLS AND TRENCH BOTTOM. BEDDING MATERIAL WILL NOT BE PAID FOR UNLESS SPECIFICALLY APPROVED BY THE PROJECT REPRESENTATIVE AND ONLY BACKFILL LIGHTLY TO 12" FOR THE AUTHORIZED QUANTITY. -ABOVE PIPE IN 6" LIFTS (95% 6. BEDDING MATERIAL SHALL BE PROPERLY RODDED MAX DENSITY COHESIONLESS SOILS AND COMPACTED AROUND THE PIPE HAUNCHES. 90% MAX DENSITY COHESIVE SOILS) 7. TEST FOR DENSITY OF COMPACTION MAY BE MADE AT THE OPTION OF THE ENGINEER AND DEFICIENCIES SHALL BE WATER MAIN MATERIAL SHALL CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST BE AS SPECIFIED AND SHOWN TO THE OWNER. THE ENGINEER MAY HAVE COMPACTION ON THE DRAWINGS. TEST PERFORMED AFTER THE BACKFILL IS COMPLETE. CONTRACTOR SHALL BE REQUIRED TO EXCAVATE TO 4" MIN SUITABLE LOOSE VARIOUS ELEVATIONS FOR DENSITY TESTING EXCAVATION, -SOIL BEDDING FROM TRENCH BACKFILL AND RECOMPACTION SHALL BE PERFORMED AT NO EXCAVATION (SEE NOTES 4 & 5) ADDITIONAL COSTS TO THE OWNER. UNDISTURBED SOIL DATE REVISION MI♦ ♦�k'�'k�'�k�'�k�'k�'�k� ♦ SIN ��k�kk�kk�k ME i♦♦♦��♦ �_ ♦♦ i i♦♦�9N �ffS1M&VA11 SOLID LID 1-INCH METER BOX LID N.T.S SHEET NO. DWG. NO. WA 2 OF 2 DATE JULY 01, 2016 J = SIDE VIEW SECTION A -A DATE I REVISION 2016-W4 11N METERBOX.dwc NOTES: NOMINAL PIPE BRANCH SIZE APPROX. WT. LBS. 1. ALL MATERIALS SHALL BE IN ACCORDANCE WITH HCPW STANDARDS. SIZE (INCH) 2. TAPPING SLEEVES SHALL BE AS MANUFACTURED BY ROMAC, 4" 3 4 28,30 SMITH-BLAIR, OR APPROVED EQUAL. 6" 3 4 6" 36,38,45 8" 3 4 6",8" 42 44,48,66 3. STAINLESS STEEL TAPPING SLEEVE MAY BE UTILIZED FOR ALL 10" 3 4 6",8 10' 45 48,55,70,80, TAPPING OF MAINS UP TO AND INCLUDING 24" DIAMETER WITH 12" 12" 3 4 6",8 10 ,12" 50 52,6Q81,96,143 OR LESS BRANCH. BRANCH GREATER THAN 12" SHALL REQUIRE 16" 3 4 68 10 ,12" 78 8Q85,10Q 115,172 FULL BODY D.I.M.J. TAPPING SLEEVE (SEE DETAIL WA 0) 24" 3,4',6",8,10',12" 1 85,87,90,10Q 145,230 ANSI CLASS 150 LB. v 304 AND SHELL D LUGS SHALL of STAINLESS STEEL PER ASTM A2 r� DRILLING FLANGE. DI FLANGE SHALL BE COATED TO PROTECT 5. BOLTS SHALL BE 5/8" UNC ROLLED THREAD, STAINLESS STEEL PER AGAINST CORROSION ASTM A 193 TYPE 304 4" NOM. PIPE SIZE SHALL HAVE MIN. 1/2" BOLTS. FLANGE GASKET 6. NUTS SHALL BE HEAVY HEX STAINLESS STEEL PER ASTM A-194, TYPE 7. WASHERS SHALL BE STEEL AND PLASTIC LUBRICATING WASHER. 8. GASKETS SHALL BE VIRGIN SBR PER ASTM D 2000 MAA 610, TEST PLUG / SHELL COMPOUNDED FOR WATER AND SEWER SERVICE. BOLTS 9. FLANGE SHALL BE DUCTILE IRON PER ASTM 536, GRADE 65-45-12, OR l;?;„=„;.J STAINLESS STEEL PER ASTM A-24Q TYPE 304. FULL -.,--,,.10. NUTS DIMENSIONS SHOWN ARE FOR REFERENCE AND MAY VARY BASED CIRCUMFERENTIAL - '"'\ GASKET � •,� UPON MANUFACTURER. SLEEVES SHALL BE SIMILAR IN NATURE TO THAT SHOWN AND SHALL NOT DEVIATE IN ESSENTIAL DETAILS. ,,.-" "`I i 11. PIPE SURFACES SHALL BE CLEANED THOROUGHLY TO PERMIT A GOOD SEAL PRIOR TO INSTALLATION. 1 , 12. ALL TAPPING SLEEVES SHALL BE HYDROSTATICALLY PRESSURE TESTED IN ACCORDANCE WITH HCPW SPECIFICATIONS. TEST SHALL ARMORS �,, I BE WITNESSED AND APPROVED BY HCPW PROJECT COORDINATOR PRIOR TO BEGINNING TAPPING PROCESS. 13. THE NUMBER OF BOLTS, NUTS AND WASHERS SHOWN ARE FOR .-p l ILLUSTRATION ONLY, ACTUAL QUANTITY SHALL BE AS RECOMMENDED BY THE SLEEVE MANUFACTURER FOR THE WASHERS REQUIRED SERVICE. LIFTER BAR STAINLESS STEEL TAPPING SLEEVE N.T.S. SHEET NO. DWG. NO. W.1 1 1 OF 1 DATE JULY 01, 2016 SLIP TYPE ( VALVE BOX CONCRETE COLLAR IN PAVED AREAS CONC. PROTECTOR RING IN NON -TRAFFIC AREAS. (SEE VALVE BOX DETAIL W.7) min. max. TRACER WIRE COMPACTED SOIL (TYP) o r r VARIABLE SIZE PLUG r: TAPPED 2" SLOTTED VALVE BOX r FITS ON TOP OF 2" PIPE ' BRICK TO BE PLACED UNDER PIPE / 2 O 12"LONG BRASS NIPPLE. WHEN REQUIRED PIPE BEYOND BRASS NIPPLE SHALL BE SCH 80 PVC CONNECTED w/ BRASS F.I.P. x PACK JOINT FOR PVC ADAPTOR 2"0 BRASS BALL VALVE 2"0 BRASS NIPPLE (12") 2" BRASS F.I.P. x PACK JOINT FOR PVC ADAPTOR 2" MAIN LINE VALVE 2" VALVE INSTALLATION N.T.S. DWG. NO. W.15A SHEET NO. DATE JULY 01, 2016 1 OF 1 DATE I REVISION 2016-Wl1 SSTAPPING SLEEVE.dwg ONCRETE COLLAR IN PAVED AREAS CONC. PROTECTOR RING IN ASPHALT NON -TRAFFIC in. @ (SEE VALVE BOX GRADE DETAIL W.7) �1 12 ' 4 min. 8 r 6"max. " TRACER WIRE VALVE BOX FLANGE BRICK COMPACTED SOIL TYP SLOTTED VALVE BOX FITS ON TOP OF 2" PIPE ' //. BRICK TO BE PLACED UNDER PIPE r 2" PVC SDR-21 WATER PIPE \_2" BRASS F.I.P. x PACK JOINT FOR PVC ADAPTOR 2 O BRASS NIPPLE (12") 2"0 BRASS BALL VALVE 2"0 BRASS NIPPLE (12") VARIABLE SIZE WATER MAIN VARIABLE SIZE MAIN LINE TAPPED 2" NO. DATE REVISION 2016-W15A 2 VALVE INSTALLATION.dwg TOP TO BE FLUSH WITH VALVE BOX PROTECTOR FINISH GRADE AND LEFT RING SHALL BE PLACED WHERE NOTES: EXPOSED VALVE IS LOCATED IN NOW TRAFFIC AREAS. SEE VALVE 1. ALL MATERIALS SHALL BE IN ACCORDANCE PAVEMENT BOX PROTECTOR RING DETAIL. WITH HCPW STANDARDS. 4" min. 2. RESILIENT WEDGE GATE VALVE SHALL BE AS 3000 PSI POURED IN PLACE CONCRETE I COLLAR I TURF 6"max. TRACER WIRE MANUFACTURED BY MUELLER CORP., AMERICAN DARLING OR CLOW CORP. 2" min. @ FINAL GRADE .- .''." ' """ '- 3. ALL VALVES SHALL HAVE 2" SQUARE OPERATING NUT AND SHALL OPEN COUNTERCLOCKWISE. __ CONCRETE COLLAR ' ' 4. VALVE BODY, BONNET AND GATE SHALL BE SHALL BE PLACED ""'' IN ACCORDANCE WITH AWWA C-509/C-515 WHERE VALVE IS IN A TRAFFIC AREA AND NSF61. 5. VALVE BODY AND BONNET SHALL BE ' w VALVE BOX " ' COATED ON ALL INTERIOR AND EXTERIOR SEE DETAIL ""�l J � _ ] ,;; SURFACES WITH A FUSION BONDED EPDXY NCDOT CONCRETE „ IN ACCORDANCE WITH AWdVA C-550-90. BRICK (4 REQUIRED EACH SECTION.) 6. ALL VALVES 24" AND SMALLER SHALL HAVE -- A SAFE WORKING PRESSURE OF 250 PSI. MIN 12 GAUGE, SINGLE 7. SEE VALVE BOX DETAIL FOR ADDITIONAL -, J-- STRAND, COATED COPPER .... TRACER WIRE (SHALL BE �,--- INFORMATION. _ INSTALLED BETWEEN 8. SEE VALVE BOX PROTECTOR RING DETAIL .. VALVES AND SHALL BE ""- FOR ADDITIONAL INFORMATION. '- INSTALLED ON ALL NON 9. VALVE BOX SECTIONS ARE REQUIRED. THE METALLIC PIPELINES.) USE OF PIPE IN LIEU OF VALVE BOX WATER SPLICES SHALL BE WATER SECTIONS SHALL NOT BE PERMITTED. ALV MAIN PPROVED BY THE ALV MAIN CPW PROJECT COORDINATOR. „ VALVE IN TRAFFIC AREA VALVE IN NON -TRAFFIC AREA GATE VALVE (N.T.S.) SHEET NO. DWG. NO. W.6 1 OF 1 DATE JULY 01, 2016 DATE V-6" HCPW STANDARD PENTAGONAL (TYP.) OPERATING NUT OPEN w COUNTER CLOCKWISE. (2) 2-1/2" NOZZLES & (1) 4-1/2" NOZZLE WITH FIRE HOSE COUPLING THREAD IN ACCORDANCE WITH = HCPW STANDARD. NOZZLE CAPS i SHALL BE SECURELY CHAINED TO THE HYDRANTS BODY. FIN. GRADE IJLUUI- VALVE BOX IIII IIII BIII ARREL w g = 1=. BRICK I 6" GATE VALVE - - SEE CONCRETE THRUST BLOCK m = I -III -III III I I1=11 I_ -III -_ III -III -II DETAIL -III-I III III -I � Q III =1 -I III=1 III I: c, = 2 1 I- _ _ } 6 R.J.D.I. PIPE + III -III- III--1 III=III-III III-III-1 ..I I= SEE NOTE #4 I I - III -III- -III - -III-III -I - UNDISTURBED DI TEE, HYDRANT TEE -III-II III III III=III-III= SOIL OR TAPPING SLEEVE 11-1 III I_I11- " AS REQUIRED. (SEE ,I VARIES TAPPING DETAIL) 7 CU. FT. #57 STONE M.J. CONNECTION WITH IRON PLACED TO A LEVEL 4" RETAINING GLAND M.J. ABOVE DRAIN OPENING RESTRAINT SEE NOTE 2 AND HCPW STANDARD RESTRAINING DETAIL. FIRE HYDRANT AND VALVE INSTALLATION N.T.S. SHEET NO. DWG. NO. W.13 1 OF 2 DATE: JULY 01, 2016 DATE REVISION 2016-W6 GATEVALVE.dwg REVISION 2016-W13 FHCC.dwg NOTES: 1. ALL MATERIALS SHALL BE APPROVED BY HCPW. 2. WHEN INSTALLED IN A PAVED CONCRETE COLLAR CONCRETE THRUST BLOCK AREA METER BOX SHALL BE CONIN PAVED AREAS PER DETAIL W.17 SET 1/4" ABOVE FINISHED RING I N NON -TRAFFIC PROTECTOR PAVEMENT GRADE AND RING PAVEMENT FEATHERED TO AREAS. VALVE TO BE TOP OF BOX. COMPOSITE METER INSTALLED IN 24" 181, BOX (DETAIL WAB) SHALL BE ACCORDANCE WITH ASPHALT USED IN PAVED AREAS. a DETAIL W.6. 2" SLIP ON CAP \_j 3. METER BOX AND VALVE BOX 2" BRASS SHALL BE IN ACCORDANCE -4" min. 4" ± 2" 900 ELBO 2" min. @ �6" max. JJ..44���---nnn����� WITH HCPW DETAILS. PROVIDE FINAL GRADE METER BOX SOLID METER BOX LID. 4. VALVE FOR BLOW -OFF TO BE INSTALLED AFTER LAST SERVICE. 24"x2" O BRASS 5. CENTER 2" SDR-21 PIPE IN METER TRACER WIRE BRICK NIPPLE BOX. BRICK BRICK 6. BLOW OFF ASSEMBLY NOT TO BE RE -USED UNLESS APPROVED BY 2" SDR-21 PVC HCPW. LENGTH AS 2" BALL VALVE 2" BALL VALVE 24"x2" O REQUIRED. TWO BRASS PIECES MAX.) 12" BRASS NIPPLE NIPPLE SCH 80 2" SDR-21 PVC SLOTTED MIPT 12" BRASS NIPPLE VALVE BOX ADAPTOR 2" BRASS F.I.P x PACK JOINT FOR PVC 2" BRASS ADAPTOR 2" BRASS F.I.P x PACK 900 ELBOW CONCRETE THRUST BLOCK JOINT FOR PVC ADAPTOR PER DETAIL W.17 2"SDR-21 PVC 2" BLOW OFF ON 2" WATER MAIN N.T.S. SHEET NO. DWG. NO. W.1 5C 1 OF 1 DATE JULY 01, 2016 DATE REVISION 2016-W15C 2 BLOWOFF. 411,,',D ■ raolutwnt% civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 910-426-6777 fax 910-426-5777 license number C-2354 I I I wwwAb site solutions.com PROJECT NAME WOODHAVEN SUBDIVISION WATER DETAILS CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 ,:��o00//ir1�7�d0VVl IIIIIIIW DRAWING SCALE NOT TO SCALE a700//G//N�7�d0VVl IIIIIIIW DATE RELEASED MARCH 1, 2021 a700///G/N�7�d0VVl IIIIIIIW SHEET NUMBER C-6m3 2016-W17 THRUSTBLOCK.dwg 2016-W19 WATER BEDDING.dwg v vM 0 Z 71y0C) O rZ� 1 ==Z>M in z=op n >D z 1- BACK OF CURB m C:N TW SECTION Y-Y D ^ _ `+ RISER HT. VARIES CD - - � 0 - > J� MIN. M>/� V/ z RISER HT. WHERE 30" TO 36" PIPE IS USED Z +n VARIES NOTES: MORTAR JOINTS 1/2"± 1/8" THICK. USE CLASS "B" CONCRETE THROUGHOUT. J USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB. DEDUCT FOR PIPE(S) FROM TOTAL CU. YDS. OF BRICK MASONRY. USE #4 BAR DOWELS AT 12" CENTERS. PROVIDE ALL CATCH BASINS OVER 3-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. USE BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS OF SECTION 840 OF THE STANDARD SPECIFICATIONS. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. FOR 8'-0" IN HEIGHT OR LESS, USE 8" WALL. OVER 8'-0" IN HEIGHT, USE 12" WALL TO 6'-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING 6'-0". QUANTITIES TO BE ADJUSTED ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1 ". DRAWING NOT TO SCALE. GRATE AND HOOD D. NO. 840.03 STEPS - STD. NO. 840.66 TOP ELEVATION / 6 B 8" E C D MIN 6" MIN.SECTION J-J WHERE 30" TO 36 PIPE IS USED _ WHERE 42" TO 54 PIPE IS USED OTE z O �n a<a Z ILLJO=t� OOaOz WaZ== HVaLL(7 fnH�ZJ WLL. Oa O Ofn 0C J zap 1 LU p I In O LL z � a a a o = a z U = H H N U) LL J m z W WHERE 42" TO 54" PIPE IS USED J- J- SHEET 1 OF 2 DETAIL SHOWING METHOD SHEET 1 OF 2 840.01 OF RISER CONSTRUCTION PLAN PLAN 840.01 BRICK CATCH BASIN NTS Ill v BACK OF CURB FRAME GRATE AND HOOD GENERAL NOTES: SEE STD. NO. 840.03 USE CLASS "B" CONCRETE THROUGHOUT. Z O � C X PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ~ < a N O O 5/g ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. Z O TI ;j rz (n o TOP ELEVATION OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. J � _ (� LL O = = Y Y j L - O z m O n D A - USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB. _ W = TI n Z > M C0 IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. a Z Q V r - _ 0 z ,5 -0O O 6 B 6" = USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. _ z J = O r Z FOR 8'-0" IN HEIGHT OR LESS, USE 6" WALLS AND BOTTOM SLAB. OVER 8-0" TO 16'-0" IN HEIGHT, USE 8" WALLS AND BOTTOM SLAB. ADJUST O a O n > , " QUANTITIES ACCORDINGLY. O N > CONSTRUCT WITH PIPE CROWNS MATCHING. p zPLAN X I 3„ SEE NOTE CHAMFER ALL EXPOSED CORNERS 1". r LU SECTION X-X DRAWING NOT TO SCALE. TOP ELEVATION m z W G) r C11) = = D v c � 0 v nova m N z ZO ;0 SHEET 1 OF 2 840.02 RISER HT. VARIES of5� 11 6" WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES 6" A WHERE 42" TO 54' PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION PLAN CONCRETE CATCH BASIN v vM G�z 43' >O-n� mz�=� B C) -n z=000-n o Z O ? O D O Cnn 0 M A 1 z a a � O � O � O � O B -n PLAN 0 -n m 'Y FRAME, GRATE, & HOOD ASS tnEr "'m�' O . _ 0 � D D z z v D � � v n Z D 0 z 2 = O 00 0 O LnvX Z SHEET 1 OF 2 840.03 FRAME GRATE AND HOOD SEE STD. NO. 840.03 STEPS - STD. NO. TOP ELEVATION 6" B E---4 6' C 6" D 6 SECTION J-J WHERE 30" TO 36" PIPE IS USED SEE NOTE J J B Q LL TOP ELEVATION STEPS - STD. NO. 840.66 E� 6" D fI o . SECTION M-M WHERE 42" TO 54" PIPE IS USED NOTE: USE TYPE 'E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED. N ONE OF THE FOLLOWING FISH LOGOS MUST APPEAR ON HOOD DUMP NO ,_ FLOWS TOOIINP NO WASTE! GRAINS TO WATERWAYS WAS El S`„ RIVER cnsr .wrmAry IRON wrnes uAnc IN usn uoinnr/m 2 1/8" 'da00 OdW 28 A?JONf10d 'S fl I� SECTION - LL A 3/4" 3/4"' 1� 1/16" 11/16" �� II qw*, 3 1/2 3 -01 �31/2- SECTION - KK ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT WALL SECTION M W LL O W z a Z a 0 0 a p U oU141) aQ= NUS U 0� z In W PLAN ISHEET 1 OF 2 840.02 z I k z ON �3/4" P i= Z ~ �P o Upzs< a(D co = Waz =SOW N N `��LLoa SECTION - MM O O c!) z > 2 3/8" a Wp _ I p SECTION - PP SECTION - NN 4 3/4" 13/4" N (V (V 113/4 0') � rLO o3/4" ibrl � _ N v rrcriiviZ- rLrXiv SECTION - JJ 5 5/8" 3-0 7/8" 1/2" R 3„ R v 1 1/2" I 6„ 2'-0" 6 1 /? //2" N �{ 3/4" 3/4" O 4 3/4" I 1/2" 2'-11 1/2" IlFfff 4 5/8" R HOOD ELEVATION SECTION - RR FRAME, GRATES, AND HOOD v M v - . z N 0 0 O rZ�=� == En Z>M z=o00 n*�z >>D Nz �r- S� 8" E �{ #4 BARS "V" I 6" 6" @3EQUAL SPACES 1 1/2" 1 1/2" 3" -{I R "' w R "' w U) D- U) o 0- LL 0-LL mD mD S� PLAN OF TOP SLAB SECTION S-S m z to O NT r Cn N 0 (p 8" E- #8 "W' BARS #4 BAR � D #4 BARS "V" 6" 0 zv @3 EQUAL SPACES - C D. 0 v - = C)#4 BARS "U" P11/2" 6" -a /D�� > SECTION R-R DOWEL V/ z ZO O SHEET 2 OF 2 840.01 EXPANSION JOINTS 4'-6" 4'-6" STD.840.03 FRAME, GRmmW HER HOOD WJuuWR MITI PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEVATION EXPANSION JOINT USE ON FLAT GRADES 2 o AND UNDER 3'-0" 3'-0"' DEPRESSED GUTTER LINE EXPANSION JOINT t � ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE 8 6„ EXPANSION JOINT USE ON GRADES OVER 2 EXPANSION JOINT 10" MAX 6'-0" DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES KCATCH INIMUM DIMENSIONS AND QUANTITIES FOR BBASIN (BASED ON MIN. HEIGHT, H, WITH NO RISER)* DIMENSIONS OF BOX AND PIPE TOP SLAB CU. YDS. CONC. IN BOX BRICK MASNARY DEDUCTIONS PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT DIMENSIONS BAR BARS-V BARS-W TOTAL TOP BOTTOM TOTAL BRICKMSNR. TOTAL ONE PIPE IN WALLS BRICKAND D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH LBS. SLAB SLAB CONC. CONCRETE C.M. R.C. 12" 3'-0" 2'-2" 2'-9" 0.281 0.281 0.883 1.164 0.020 0.042 15" 3'-0" 2'-2" 3'-0" 0.281 0.281 0.963 1.244 0.031 0.047 18" 3'-0" 2'-2" 3'-3" 0.281 0.281 1.043 1.324 0.044 0.065 24" 3'-0" 2'-2" 3'-9" 0.281 0.281 1.204 1.485 0.078 0.121 30" 3'-0" 2'-2" 3'-4" 4" 3" V-2" 4'-4" 4 V-6" 3 4'-l" 3 4'-l" 45 0.147 0.374 0.521 1.606 2.217 0.122 0.184 36" 3'-0" 2'-2" 3'-10" 4'-9" 1'-8" 4'-4" 4 2'-0" 4 4'-l" 3 4'-l" 49 0.187 0.415 0.602 1.914 2.516 0.176 0.261 42" 3'-0" 2'-2" 4'-5" 5'-3" V-5" 3'-6" 4 1'-9" 3 3'-3" 3 3'-3" 38 0.135 0.373 0.508 2.152 2.660 0.240 0.371 48" 3'-0" 2'-2" 5'-0" 5'-9" 2'-0" 3'-6" 4 2'-6" 4 3'-3" 3 3'-3" 41 0.173 0.410 0.583 2.415 2.998 0.313 0.477 54" 3'-0" 2-2" 5'-7" 6'-3" 2-7" 3-6" 4 3'-0" 6 3-3" 3 3'-3" 47 0.211 0.448 0.659 2.806 3.465 0.396 0.595 M S--I 6" E �{ 6 I " 3 1 1/2" 3" R w R D Q O < D- LL J ED D S� PLAN OF TOP SLAB 0 M S--I 6" E �{ 6 I " 3 1 1/2" 3" R w R D Q O < D- LL J ED D S� PLAN OF TOP SLAB 0 z 0� Z 0 Cl) N X -mom (p 6" E �{ #8 "W' BARS I D #4 BARS "V" = m z @3 EQUAL SPACES NN v c n > K:k - #4 BARS "U" L11 " -a 0 � m = D � SECTION R-R to 0 -n Z� SHEET 2 OF 2 840.02 v v-0 Z ;0NOO m_O�=D O�Z>M cn ;o Z=O0n 6��z 17- Cn z 1- z * RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT BRICK CATCH BASIN 6" 1 1/2" M co LU DQ [if J LL ED D u� T, #4 BAR DOWEL EXPANSION JOINTS 4'-6" 4'-6" STD.840.03 FRAME, GRATE &HOOD PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEV. 6„ USE ON FLAT EXPANSION JOINT GRADES2% AND UNDER DEPRESSED GUTTER LINE EXPANSION JOINT 3-0 00 i 3'-0" ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE EXPANSION JOINT 6„ 8" TOP USE ON GRADES OVER 2% ELEV. DEPRESSED GUTTER LINE 10" 6-0" EXPANSION JOINT 011 I - I MAX ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN (BASED ON MIN. HEIGHT, H, WITH NO RISER)* DIMENSIONS OF BOX AND PIPE TOP SLAB DIMENSIONS CU. YDS. CONC. IN BOX DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT BARS-U BARS-V BARS-W TOTAL TOP SLAB BOTTOM SLAB FR MPR MIN Nc UM HECHT,H D A B C G H E F NO. LENGTH NO. LENGTH NO. LENGTH LBS. C.M. R.C. 12" 3'-0" 2'-2" - - - - 2'-9" - - - - - - - - - - - - 0.281 0.772 0.015 0.026 15" 3'-0" 2'-2" 3'-0" 0.281 0.829 0.023 0.036 18" 3'-0" 2'-2" 3'-3" 0.281 0.887 0.033 0.049 24" 3'-0" 2'-2" 3'-9" 0.281 1.001 0.059 0.085 30" 3 0" 2 2" 3'-4" 4 3" 1 2" 4 0" 4 1 5" 2 3'-9" 3 3 9" 39 0.123 0.374 1.433 0.092 0.127 36 1 3 0 1 2 2 1 3 -10 1 1 4 9 1 1 8 1 4 0 1 4 1 1' 11 1 3 1 3-9 1 3 1 3-9 43 0.161 0.415 1.714 0.123 0.178 42" 3 -0" 2 -2" 4'-5" 5 -3" 1'-5" 3 -2" 4 1'-8" 2 2'-11 " 3 2 11 " 32 0.112 0.373 1.738 0.180 0.243 48" 3 -0" 2 -2" 5'-0" 5 -9" 2 -0" 3 -2" 4 2 -3" 3 2'-11 " 3 2 -11 " 35 0.145 0.410 2.052 0.235 0.317 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.180 0.448 2.387 0.297 0.401 * RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT CONCRETE CATCH BASIN DETAILS SHOWNING TYPES OF GRATES USE ACCORDING TO WATER FLOW. TYPE "G" TYPE "E" TYPE "F" WATER FLOW ---- SAG WATER FLOW f 2 3/4" 2'-11 3/4" 11- 1 1/2" B 4 A 1„ 9 7/8" M � 9 7/8" 11 B 1 1/2" 1 1/2" 5/8" SECTION B-B z O �n ZaF-a LLJO=c� OOaOZ WaZ== HVaLL(9 fAH�zJ WLLOa O O v5 _ Za> 1 LU I p O LL a a a c = (L OC 11) z U = H ~ N U) LL J m z W HEET 2 OF 2 840.01 NTS z ON aaa ILL JO=V OOaOz u)_ HVaLL� <=�Ow CnII-�-zJ itLLOa 0 0 co Z�� LU I p it Z O _ C LL U) za a = a o V a �aLn a v p W a III- � W N - Z �0 z V W HEET 2 OF 2 840.02 NTS z ON aaa Z_ LL J O = C� OOaOz wN= ��aLL� =�Ow NII.-t-ZJ Inc LL O a O O v5 = a zap 1 LU p I p Z O 1 3/4" 2 1/4" Z O O a z i it WATER FLOW SAG WATER FLOW f O O a LL 0 m D G)g E: SECTION A -A LL 0 m z c) m N z c) ?� Q z N TYPE "F" TYPE "E" TYPE "G" TYPE - E Q Ix a 0 � D RAISED FLOW ARROW a U p D D Z 2 3/4 Q 1/16" HIGH p Q p Z E D RAISED FLOW ARROW 2 3/4" N a H LU Z D 0 1/16" HIGH D N H Z a� v D O 0 N a Cn 0)0 Z D Z D 1 1/2" M 1 1/2" ram. N Z Cl) 2 = G� 1/8" O 1/8" m N W U a =)Cn oo O -n Z a/ �, D 0 0 P 1 1/2" Z LU (n ,"0 I 1/8" 1 1/2" R LL Q � 1 1/2" 1 3/4" - F� 1/8" W O W Z i'-11 I 3f/�4" LL 1 1/2 1 1/2" --1 f-t 1 3/4" SECTION A -A SHEET 1 OF 2 SHEET 2 OF 2 TYPE - F M SECTION A -A SHEET 2 OF 2 840.03 840.03 TYPE - G 840.03 NTS FRAME, GRATES, AND HOOD NTS IIII ■ IIII olut10% civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com ••••• ••• • 4� SEA • 0274 •• G ► NE ••°���� ' ��O oaiamma�aoum IlumwrmmuuuuuuuuuuuuuuuuuuuuuiT REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION STORM WATER DETAILS CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE NOT TO SCALE -i%O///////ir1171d11llllll IIIIIIIW DATE RELEASED MARCH 1, 2021 .:��o00/cr1171d0VVl IIIIIIIW SHEET NUMBER C-604