Loading...
HomeMy WebLinkAbout20190863 Ver 1_Pre-Filing Meeting Information_20210504Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Jordan Hessler jhessler@wildlandseng.com NCDMS/Wildlands Engineering, Inc Oak Hill Dairy Mitigation Site Gaston Street Address 167-B Haywood Road Address Line 2 aty Asheville Postal / Zip axle 28806 (- Yes c: No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express F Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* c: Yes (- No Please list all existing project ID's associated with this projects.* DMS ID No. 100120, USACE ID No. SAW-2019-00833, RFP#: 16-007704 State / Province / Pegion North Carolina Country United States Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below.* The Oak Hill Dairy Mitigation Site is in Gaston County approximately 2 miles northeast of Cherryville and 7 miles southwest of Lincolnton. The Site is within the NC Division of Mitigation Services (DMS) Lower Indian Creek targeted local watershed Hydrologic Unit Code (HUC) 03050102050010 and the NC Division of Water Resources (DWR) Subbasin 03-08-35, and will provide stream and wetland credits in the Catawba 03 Expanded Service Area. The project proposes to restore, enhance, and preserve impaired streams. Wetland re-establishment is proposed to restore a strearrrwetland complex, and best management practices (BMPs) are proposed at points of concentrated agricultural runoff. The existing streams are presented in Figure 2. The work proposed on the Site will provide 4,643 stream credits and 8 riparian wetland credits and will be protected in perpetuity by a 20.4-acre conservation easement. Army Corps of Engineers is conducting a pJD site walk on January 7th with Wildlands staff. Please give a couple of dates you are available for a meeting. 12/7/2020 12/16/2020 12/17/2020 Please attach the documentation you would like to have the meeting about. CHID Pre -Filing support data.pdf 9.08MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 11/30/2020