Loading...
HomeMy WebLinkAbout20210688 Ver 1_Shoreline Stabilization_20210504Shoreline Stabilization Application Form 15ANCAC 02H .0500 — Water QualityCertification, Shoreline Stabilization FORM SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TINE Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request here: BLACK PREFILE.pdf 52.27KB Pre -fling Meeting or Request Date 3/29/2021 ID# 20210688 I. Applicant Information [15A NCAC 02H .0502(a)] Version 1 Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * HAGER@LAKEPERMIT.COM ',lease provide an email address for payrrent and requests for pore information here. Owner Information: Name:* Email: * Phone Number:* Mailing Address:* LKN VENTURES LLC JBLACK@BLACKPEST. COM (704)200-0108 (xxx)xxx-xxxx Street Address 190 Points End Drive Address Line 2 CitY Mooresville Rbstal / Zip Code 28117-7303 State / Rovince / Region NC Country US Is there an agent working on the project? * Agent/Consultant Information ....................................................................................................... Name:* Company Affiliation: * Email:* Phone Number:* • Yes ✓ No Tamara hager LKN DREDGE & MARINE CONSTRUCTION HAGER@LAKEPERMIT. COM (704)575-2227 (x)m- Mailing Address:* Street Address PO BOX 5335 Address Line 2 C lty State / Province / Region MOORESVILLE North Carolina Fbstal / Zip Code Country 28117 United States Asigned and dated copy of the Agent Authorization letter:* black auth.pdf 1.2\IB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* LKN VENTURES LLC If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* ✓ Upload File ✓ Look up address Upload Map: black survey.pdf 1020.65KB Latitude:* 35.495505 Longitude:* -80.940737 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* black sketch.pdf 1015.39KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* black pics.pdf 2.42MB 4. Location of the property (where work is to be conducted) Nearest Town:* MOORESVILLE County:* Iredell Lake/ river/ ocean adjacent to NORMAN/CATAWBA property: Subdivisions name or site address:* CRESENT LAND & TIMBER LOT # 442 hclude phase/lot number Directions to site:* FROM MARSHALL STEAM STATION TURN LEFT ONTO HWY 150 FOR 5.4 MILES, TURN RIGHT ONTO MORRISON PLANTATION PKWY FOR 1.1 MILES, TURN RIGHT ONTO BRAWLEY SCHOOL RD FOR 8.0 MILES TO END OF BRAWLEY SCHOOL RD. PROPERTY STRAIGT AHEAD. Rease include road narres and nun hers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* RESIDENTIAL Residential, undeveloped, etc. 6. Property Size Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 8. How will the work be done?* r From Land V From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nurrber of trees, for instance) NONE Sketch: black sketch.pdf 1015.39KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Signature: JON BLACK/ LKN VENTURES LLC f9 Wet/ Llf, MO 1 LLC Initial Review Is this accepted into the review fr Yes 0 No process?* Project Number:* 20210688 Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Version:* 1 Alan Johnson:eads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received C' Need Fee - send electronic notification C' $240.00 r $570.00 Pit- Pro:feet lil reJer ress; LK4kJ i pr]-irR.x Lt.,6 jeei r"D' Cowry: i aCta, °UMW: LfrAki Vdl?t14 ej LtL Print rfil !•4.rCzetOr 3 Clgent.: Drat e/ Sig /1 r �r[n% .1-1446 ,Lew .4t- Signature i The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided In the application. [2.5A NlC-- 02H .0506 and 15A NCAC 0.)B .0, 3(8)! Trees ere not 2llolived to be- removed from lane 1 of the Buffer (within30 ft of the full pond elevation), un€ess approved. Exception., those trees that ere severely undermined along the imrnediate shoreline can be removed. Mllinimel shaping and sloping clang the immediate shoreline is allowed. ; =5A NCAC 02B .0243(6)1 Benching, areding in the buffer is not 8Hawed_ Excessive disturbance of ground cover_ i15A NCACO28.02 3 (6)] 3e=lches, [rnpervious patios, impervious walkways, etc. 2re notcllowed in the busier unless specifically approved by the Division_ There are limitation on si%e for docks. r?5A NCAC 0 B _0743(4) grid (6)] Work. to be conducted from lend must indicate 2n 2CCCSS and indicate any trees tact ere to be removed. € he work corridor should be dcscrfbed. The approved access corridor shall be restored. Steging, spoil, constructor: material must be outside the buffer_ [15A. NCAC 02H .0502 cnd 25 :, NCAC 07B _0743 (4), (5), (d); Storrnweter C2nnot be piped or channeled for direct discharge to the lake. All constructed or r; ,1J ar discharges must be et the natural elev.tron end discharged prior to entering the buffer directed es dii: use or she_t,"low et non --erosive velocities to the fake. [ 5A NCAC 0 B .0243(5), (6); Acknowledge eni; of Notification , hereby state that I hove been informed of the Catawba •Ri ri - t11 e use. Any work conducted in the buffer, not specifically stated in the application and 'approve by the Division of Water ReSOUrcas (DWR), is a violation and subject to enforcement. Due diligence 1nf1II be t2i(en such th2t the construction l.Nlll 5e built within Substanti I compliance end intent of the 401 Water Quality Ce s tific tion and Buffer Rules, the 2pprovei pier-1(s) end specif ication(s), end othersupportinc (materiels_ 5(gnetur a (owner)-L' Date: / 2. i i` Q 9 464 a67 oai a V-9 .1 •ox 4.10 OLIO 'll 1x34 196 0IIQ0x DIM,CA1.,1 ,31906 neA1.1f107:in114311103f4 d1H$HN01 1.311131 49.-££b S101 9 NOI1039 Si.01 NOP1b3N7311 16 rtp IrvI ot3 311v1 'rlrlp 1137/411 or, aNei 13:1711i0 /..••1 YLtYl ryfi 1ww,y • f19 r Iri.• VrdY IWO, el 11111 mom s• �.r...1--dam%! �rl.swf7. ��N.ru.e..4rc1 .... reae.'w�"•r. 11 iwAylevoty4 2(0 civ -v `°d Fb V Z hhQ 7 kiAv vlS) A .O 1110! 01 031aanap Jiff 63301rJ.i' k 1.114.r.4 313r 63 344 110Y0 431403 113011 111 01 C1. 'exur4 13.31144401 34076 09 r03 7110- 03 910414 1334 04'11401 4.0 30 411.311 0.00 193r/ 4734 06 304 1p111 3091131 644411110 41e1'1 AC+l 011'N 441 2014'e.111000 0333 A600 6341.1: II 61e01 111 t .u3 01 41.444) H.010r 4410 .1100 Yn1101 r7 uu.b. 1-1U1133• 14411143,. 111 46 1.:001010 431711441.4 .lf1.1 PO 11014.11,W1 1.111,41.001>O.M 041. 111P1 3111.47. 11 Oa Sd *0- l -n i ex;rxllxx„�l e0 [ ENO] 11313111 Si a4V1 111.3.0$3Y3 .p0J0Ir-�.• ..q,e.e•�gr �'F .r6 sr 'tit. 'tor cbr, 3fr. r tt4 6e/% 74 1 9! a1S 0 3Y]Y 11'0 170,101 F Q.,ex r� Aft. •rj 4'°► o�r.r t4. ..ya 4.P1a .'1•rl. 4'�ltvr .nl3r. x,tsr. e1! i f'). 2440 01'0 "+ Dee 101 t. 347i44 f 9t0 • 1a1 1r: I0i -114tt 111100A'7'■'Mini d!!b3 il16,Ri19 Mtn iii1053Ei7 3107 11'0 4 .S ' n r tr.'', r� � � 4347Y 01'I 107 151 . •p1w 1.1.,.w A•!'x,.x' ; r+.a"1i9�m r_ E!o EaBed l/tii -2 v)SVQQ'/ co?I--r toi EIDZ-Q% dESS:t Od uop enapa Iana�{ ra,e IeruUaN /A d ua SJop!..uoa ssaaae UO .0a suoo�.o uo!ieao] •9 find a1I4 nnopq .9 paap JO uorTeneaxa huelo uop,eaol 'S •a1.a `swop `slf2M2urule/.a1 `sSurpI!nq se Lans saJn1anlys pasodaud AueJo uor1eao -i7 uap.enala lanai aaleivk feua.roN puo uop7ena!a [anal .�azeM feu.r�o�p uod Ilnd a�4 n�ofQp q paaerd aq off. PIfigao del duo uop�.eaai / d Ilnd a a ano e aaepd aq o4 [114Jo dP� lip to uarleaoi •z . UUe p u011.24.22an pasodojd Il , . i y��aJa suaisuacu�p aP/ Qid) uefd S!p4 uo UOl,eur�o�Ur�UI O *(g0OiX f0TSD LDns `urali ' 11 , q; yaq.a>ps h!aiewpxo.rdde aseald - 1 2f°21;CI7 Cam`°Lpb�Z 5=L - Q-N 40 r ANIE NM ME Ma NM J �Q; 1,11•ETtgE, (iana-I�azeM peLUJON/Puod !IN=b1 a31- ti, i LI]]G.10l.1K AM S %]auod Iln� Vim' 5,.f.f.dL Ac LAW Veertgeel LObr svi ik Tamara Hager 704-575-2227 Lake Permit LLC hag slake rmi . m S irde 1( V;t41./ 1f j\Atb•es vvae 11/41, E!o EaBed l/tii -2 v)SVQQ'/ co?I--r toi EIDZ-Q% dESS:t Od uop enapa Iana�{ ra,e IeruUaN /A d ua SJop!..uoa ssaaae UO .0a suoo�.o uo!ieao] •9 find a1I4 nnopq .9 paap JO uorTeneaxa huelo uop,eaol 'S •a1.a `swop `slf2M2urule/.a1 `sSurpI!nq se Lans saJn1anlys pasodaud AueJo uor1eao -i7 uap.enala lanai aaleivk feua.roN puo uop7ena!a [anal .�azeM feu.r�o�p uod Ilnd a�4 n�ofQp q paaerd aq off. PIfigao del duo uop�.eaai / d Ilnd a a ano e aaepd aq o4 [114Jo dP� lip to uarleaoi •z . UUe p u011.24.22an pasodojd Il , . i y��aJa suaisuacu�p aP/ Qid) uefd S!p4 uo UOl,eur�o�Ur�UI O *(g0OiX f0TSD LDns `urali ' 11 , q; yaq.a>ps h!aiewpxo.rdde aseald - 1 2f°21;CI7 Cam`°Lpb�Z 5=L - Q-N 40 r ANIE NM ME Ma NM J �Q; 1,11•ETtgE, (iana-I�azeM peLUJON/Puod !IN=b1 a31- ti, i LI]]G.10l.1K AM S %]auod Iln� DWR Pre -Filing Meeting Request Form ID#* Regional Office * Reviewer List* 20210688 Version* 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre -Filing Meeting Request submitted 3/29/2021 Contact Name * TAMARA HAGER Contact Email Address* HAGER@LAKEPERMIT.COM Project Name* LKN VENTURES LLC Project Owner* JON BLACK Project County* Iredell Owner Address: Street Address 194 POINTS END DR Address Line 2 City State / Rovince / Region MOORESVILLE NC Fbstal / Zip Code Country 28117 US Is this a transportation project?* C Yes ( No Type(s) of approval sought from the DWR: I— 401 Water Quality Certification - W 401 Water Quality Certification - Reg ula r Express I— Individual Permit I— Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes ( No Do you know the name of the staff member you would like to request a meeting with? NONE NEEDED Please give a brief project description below and include location information.* REFURBISH RIP RAP SHORELINE FOR STABLIZATION Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 3/29/2021