Loading...
HomeMy WebLinkAboutNCC201949_Notice of Termination_20210503Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/3/2021 1:41:54 PM (NOT Submittal) Approve by Georgoulias, Bethany A 5/4/2021 10:03:55 AM (NOT Request Review- NCC201949) • Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 5/4/2021 10:03 AM The task was assigned to Morman, Alaina. The due date is: May 6, 2021 5:00 PM 5/3/2021 1:41 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC201949 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN May be blank (if not yet billed). Information associated with this permit: Project Name Chatham Park Thompson Street Subdivision - Lot 12 Address 165 Cottage Way, Pittsboro, NC County Chatham Latitude 35.7387 Longitude -79.2064 Permittee Listed Upton & Co., Inc. Legally Responsible Rudy Upton Individual NC Reference No. NCG01-2020-1949 E&SC Plan ID 2020-02998 Original NOI 25426 Tracking No. Date COC Issued 5/12/2020 Prior Rescission Date populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional Nbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation NlastbeRYforrrat Project Close-out Information: Final Close-out 5/3/2021 Inspection Approval Project Close-out CERTIFICATE OF COMPLETION_NCC201949.pdf 140.22KB Approval Must be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature W� Type Name* Rudy C Upton Title * Upton & Co., Inc. Organization * Owner / President Date * 05/03/2021 Email for office@uptonandco.com Confirmation * Contact Telephone* 919-387-9006 NOT Certification NCG01-eNOT-Certification-Form-20210305- Form 689.73KB DEMLR-SW.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email (Optional) Original Permittee Email 0Cd on Notification Errails office@uptonandco.com 0Cd on Notification Errails office@uptonandco.com Original Site Contact 0Cd on Notificaiton Errails Email uptonandco@aol.com