Loading...
HomeMy WebLinkAbout20210557 Ver 1_W-5710AI_Permit Drawings_20210412_20210430(Version 2.08; Released April 2018)44856.3.37TIP No.:W-5710AICounty(ies):UnionPage 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future:Year:2043Existing:Year:Aquatic T&E Species?NoComments:NoNoN/AN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.The existing roadway has two 10' lanes in the North/South direction, and two 12' lanes in the East/West direction.25,900jcbrooks@ncdot.govProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyBuffer Rules in Effect:N/ANone20,200The proposed roadway will be a roundabout, with varying width concrete truck mountable aprons, and varying width monolithic concrete islands, and 1'6" curb and gutter along all aprons at the existing intersection. Waterbody Information2021NCDWR Stream Index No.:44856.3.37Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)This is a roadway project constructing a roundabout at the intersection of NC 218 and Sikes Mill Rd. (SR-1606). There are 2 impact sites where impacts occur. Site 1 WA impacts occur at a collar and extension of an 18" RCP into a wetland site. Site 2 impacts occur at another collar and extension of an 18" RCP. NCDOT will attempt to avoid and minimize impacts to streams to the greatest extent practicable during project construction. 716 West Main StreetNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:716 West Main StreetAddress:General Project InformationW-5710AIWBS Element:OtherWBS Element:Jason Brooks, NCDOTNCDOT Contact:704-983-4400Albemarle NC 28001Contractor / Designer:704-983-4400smepperson@ncdot.govAddress:3/11/2021UnionFairviewSean EppersonAlbemarle NC 28001River Basin(s): City/Town:1.2Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoResedential, CommercialUnnamed Tributary to Grassy Creek13-17-230.80.24 miProject DescriptionProposed ProjectNoneSupplemental Classification: Wetlands within Project Limits? NC 218NC 218S IKE S M ILL RD (SR 16 0 6 )SIKES MILL RD (SR 1606) DEPARTMENT OF TRANS POR T AT IO N S TATE O F NORTH CAROLINA D IV I SI O N OF HIGHWAYS DI V I SION 10DIVISION DESIGN CONS T R UC T UN IT STATESTATE PROJECT REFERENCE NO.STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTIONNO.TOTALSHEETSN.C.$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$SHEET1PROJECT:PROJECT ENGINEERPROJECT DESIGN ENGINEERGRAPHIC SCALESSTATE OF NORTH CAROLINADIVISION OF HIGHWAYS PLANSPROFILE (HORIZONTAL)PROFILE (VERTICAL)0 0 0 DHVDTV====== %%%MPHADTADT LOCATION: TYPE OF WORK: 5010050100510P.E.R/WCONST.TIP:VICINITY MAP NOT TO SCALEENGINEERROADWAY DESIGNSIGNATURE11+76.53BEGIN CONSTRUCTION12+31.48BEGIN CONSTRUCTION18+18.5218+68.52END CONSTRUCTIONEND CONSTRUCTIONUNION COUNTYINTERSECTION OF NC 218 ANDSIKES MILL RD (SR-1606)44856.3.3744856.1.37HSIP-0218(016)HSIP-0218(016)HSIP-0218(016)44856.2.3744856.3.3744856.3.37 DONALD HARWARDJASON BROOKSLENGTH OF ROADWAY PROJECT = MILES 0.24TOTAL LENGTH OF STATE PROJECT = MILES 0.24PRO F ESSIONALENGINEER NO R T HCAROLINASEAL NOSREPPE LEAHCIM NAES034357(218E State Highway 218E State Highway 218E State Highway 218E State Highway 218Grassy LnOld Ferry RdSikes Mill RdBrief Rd EOld Ferry Rd Carriker Williams RdUnionville-Brief RdBrief Rd EAlexander Farm RdCrooked Creek Church RdSikes Mill RdUnionville-Brief RdOld Fish RdLove Mill RdTesh RdOld Fish RdBrief Rd ECarriker RdLove Mill Rd Unionville-Brief RdSikes Mill RdCarriker RdClontz Long RdClontz Long RdLove Mill RdA G R Nance RdRushing Benton RdSikes Mill RdHaigler RdBraswell-Rushing RdUnionville-Brief RdUnionville Rd Zebulon Williams Rd(218(218PROJECTNCDOT STANDARD DRAWINGSMETHOD III AS DESCRIBED IN THE TO THE LIMITS ESTABLISHED BY CLEARING ON THIS PROJECT SHALL BE W -5710AI MONOLITHIC CONCRETE ISLANDS AND THERMOPLASTIC PAVEMENT MARKINGSGRADING, PAVING, MILLING, DRAINAGE, PAVEMENT REMOVAL,1606WETLAND AND SURFACE WATER IMPACTS PERMITSHEET 1 OF 4PERMIT DRAWINGSITE 2SITE 1 WAPROJECT LENGTHRIGHT OF WAY DATE: LETTING DATE:DESIGN DATAPrepared in the Office of:PROJECT LENGTHDIVISION OF HIGHWAYSDIVISION TENDIVISION DESIGN / CONSTRUCT UNIT2018 STANDARD SPECIFICATIONS 1"=50'JCBF.A. PROJECT NO.REVISIONSSCALEDATEDWG. BYDESIGN BYAPPROVED DEPARTMENT OF TRANS POR T AT IO N S T ATE O F NORTH CAROLINA D I V I SI O N OF HIGHWAYS DI V I SION 10DIVISION DESIGN CONS T RUC T UN IT JCBJDH44856.3.374PROJECT NO.SHEET NO.HSIP-0218(016)5-2020NC 218 AND SIKES MILL RD. (SR-1606)ROUNDABOUT AT THE INTERSECTION OF SEE PLAN SHEET 5MATCHLINE -Y- STA. 11+50SHEET 2 OF 4PERMIT DRAWINGIMPACTS= 0.02 AC.PERMIT SITE 1 WA IMPACTS= 34 LFPERMIT SITE 2PI Sta. 15+50.00 -Y-REMOVEREMOVE15" RCP-III 18" RCP-III 18" RCP-III 401408407405406403404402GRADE TO DRAIN1 5 " R C P -III 18" RCP-IV 409EXTEND 32'COLLAR AND EXTEND 24'COLLAR AND 02030405060001020202030402020202CCWNC 218NC 218SIKES MILL RD (SR 1606)18" RCP 18" RCP15" RCP15" RCP18" RCP12" METALWSE=577'PONDWSE=577'PONDCONC PADRACKTRANSFORMERRACKTRANSFORMERCYNTHIA F. BAUCOMAND SPOUSE,KELVIN L. BAUCONDB 7227 PG 309DB 7227 PG 309DB 7227 PG 309PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PC L FILE 744PC L FILE 744HHCYNTHIA F. BAUCOMAND SPOUSE,KELVIN L. BAUCOMEXISTING R/W100.00'100.00'60.00'EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WFFFFFFFFFFFFCCCCCCCCCCC 1"=50'JCBF.A. PROJECT NO.REVISIONSSCALEDATEDWG. BYDESIGN BYAPPROVED DEPARTMENT OF TRANS POR T AT IO N S T ATE O F NORTH CAROLINA D I V I SI O N OF HIGHWAYS DI V I SION 10DIVISION DESIGN CONS T RUC T UN IT JCBJDH44856.3.374PROJECT NO.SHEET NO.HSIP-0218(016)5-2020NC 218 AND SIKES MILL RD. (SR-1606)ROUNDABOUT AT THE INTERSECTION OF SEE PLAN SHEET 5MATCHLINE -Y- STA. 11+50SHEET 3 OF 4PERMIT DRAWING575575575 5755805805805 8 0 58058058 0580 580 580 580 580580580580580 580580 580 585585 585585 IMPACTS= 0.02 AC.PERMIT SITE 1 WA IMPACTS= 34 LFPERMIT SITE 2PI Sta. 15+50.00 -Y-REMOVEREMOVE15" RCP-III 18" RCP-III 18" RCP-III 401408407405406403404402GRADE TO DRAIN1 5 " R C P -III 18" RCP-IV 409EXTEND 32'COLLAR AND EXTEND 24'COLLAR AND 02030405060001020202030402020202CCWNC 218NC 218SIKES MILL RD (SR 1606)18" RCP 18" RCP15" RCP15" RCP18" RCP12" METALWSE=577'PONDWSE=577'PONDCONC PADRACKTRANSFORMERRACKTRANSFORMERCYNTHIA F. BAUCOMAND SPOUSE,KELVIN L. BAUCONDB 7227 PG 309DB 7227 PG 309DB 7227 PG 309PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PATSY HYATT BAUCOMDB 114 PG 407PC N FILE 108PC L FILE 744PC L FILE 744HHCYNTHIA F. BAUCOMAND SPOUSE,KELVIN L. BAUCOMEXISTING R/W100.00'100.00'60.00'EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/WFFFFFFFFFFFFCCCCCCCCCCC HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 WA 17+11 -L- (LT) 18" RCP 0.022 16+98 -L- (RT) 18" RCP<0.01 34SUBTOTALS:0.020.00 34PERMIT DRAWINGSSHEET 4 OF 4NOTE: Rounded totals are based upon sum of actual impacts.ATN Revised 3/31/05SHEET 4/12/2021WBS - 44856.3.37 (W-5710AI) WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSUNION COUNTYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS