Subject: [External] SAW-2021-00619 / UPS Mebane / NWP 39 / Corps Receipt of Individual
401 WQC
Attachments: GC4263 for NWP39_StateWQC.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Afternoon:
North Carolina Division of Water Resources (NCDWR): After review of the submitted UPS Mebane Nationwide
Permit 39 request, part of the larger North Carolina Commerce Park, dated March 19, 2021, and the enclosed
Nationwide Permit 39 Water Quality General Certification (GC) 4263, dated December 18, 2020, it appears
that an individual 401 water quality certification (WQC) is required from the NCDWR for the proposed
activities. The ePCN received by our office on March 19, 2021, provided the 9 required elements for an
individual WQC. This permit application/ePCN, dated March 19, 2021, constitutes the Corps initial receipt of
the 401 WQC application. Unless NCDWR is granted a time review extension, a waiver will be deemed to occur
if the NCDWR fails to act on this request for certification within 120 days from the date of the complete 401
request. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days. The
date upon which the waiver will occur if you fail or refuse to act on the certification is August 31, 2021.
If our assumption is incorrect and this proposed activity does not require an Individual WQC, please respond
to this notification as soon as possible in order for our office to meet the Corps' Nationwide Permit 45-day
review requirement.
Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401 WQC, you will
receive a provisional general permit verification from the Corps. Once a 401 WQC is issued or waived by the
DWR, the Corps will provide you with a final general permit verification. Your proposed work shall not
commence until after the 401 WQC has been issued or waived AND until a final general permit verification has
been provided to you.
Christopher D. Hopper
Regulatory Specialist
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 35
1
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can
be accessed by copying and pasting the following link into your web browser:
https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and
complete the survey.
2