Loading...
HomeMy WebLinkAbout20181393 Ver 1_More Info Received_20210421Strickland, Bev From: Suzanne Herron <Suzanne.Herron@eli-Ilc.com> Sent: Wednesday, April 21, 2021 4:45 PM To: Homewood, Sue; David.E.Bailey2@usace.army.mil Cc: Lemons, Elizabeth Pressley; Keith Gualtieri; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com); Suzanne Herron Subject: [External] RE: DWR #20181393, SAW-2018-00885, Piedmont Natural Gas Line 446 Gas Line Attachments: Stream fix cover letter 4-9-2021.pdf; 1.7.1_1626546_20210412_LINE 446_STREAM 34 STABI LIZATION_REVA.pdf Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. David and Sue — I'm following up on this stream bank stabilization plan to ask about comments or questions. We are interested in moving forward with this proposed plan and are wondering if we need to amend permits. Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NC) 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne.Herron@eli-Ilc.com From: Suzanne Herron Sent: Monday, April 12, 2021 3:12 PM To: Homewood, Sue (sue.homewood@ncdenr.gov) <sue.homewood@ncdenr.gov>; David E. Bailey (David.E.Bailey2@usace.army.mil) <david.e.bailey2@usace.army.mil> Cc: Lemons, Elizabeth Pressley <Elizabeth.Lemons@duke-energy.com>; Keith Gualtieri (keith.gualtieri@eli-Ilc.com) <keith.gualtieri@eli-Ilc.com>; Alicia DePalma - Piedmont Natural Gas (alicia.depalma@duke-energy.com) <alicia.depalma@duke-energy.com>; Woodward, Tina <Tina.Woodward@duke-energy.com> Subject: DWR #20181393, SAW-2018-00885, Piedmont Natural Gas Line 446 Gas Line David and Sue — Please see the attached cover letter and concept plans for a stream fix along the Piedmont Natural Gas Line 446, Belews Creek gas line project. 1 Please let me know of questions or comments. Thanks! Suzanne Suzanne Herron, PE, CPESC Environmental Practice Lead Energy Land & Infrastructure, LLC (PLLC in NC) 1420 Donelson Pike, Suite A-12 Nashville, TN 37217 (615) 383-6300 Office (615) 477-8286 Cell Suzanne.Herron@eli-Ilc.com % ENCRGr LAND F INFRASTRLICT URE PRIVILEGED AND CONFIDENTIAL COMMUNICATION - This electronic transmission, including any attachments, may contain confidential and/or privileged information. This communication is to be used only by the intended recipient. If you received this email in error, please notify the sender and delete the email. Any disclosure, copying, distribution, or use of information received in error is strictly prohibited. 2 ENERGY LAND & INFRASTRUCTURE April 9, 2021 Mr. David Bailey, PWS Regulatory Project Manager U.S. Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Ms. Sue Homewood North Carolina Department of Environmental Quality, Division of Water Resources Winston-Salem Regional Office 450 W. Hanes Mill Rd., Suite 300 Winston Salem, NC 27105 RE: PIEDMONT NATURAL GAS, LINE 446 BELEWS CREEK GAS LINE PROJECT STREAM 34 SLIDE FIX ROCKINGHAM COUNTY, NORTH CAROLINA DWR #20181393 SAW-2018-00885 Dear Mr. Bailey and Ms. Homewood: The Line 446 Belews Creek Gas Line project was permitted in 2018 and subsequently constructed. The permit numbers are referenced above. Recent inspections of the project have revealed that the stream bank along Stream 34 has slumped on the south side and a large crack has developed as a potential slope failure on the north side. Reference the photo of the failure on the south side below. Slumped area on south side of Stream 34 The proposed plan to stabilize the bank is to regrade the south side at a 2:1 slope and place Flexamat Plus or an approved equal product along the bank. An area upslope has sunk as well, therefore, it 1420 DonElson Pike, Suite A-I2, Nashville, Tennessee 37217 www.Eli-Ilc.com 615.383.6300 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL will also be regraded to bring it back to its original slope (approximately 6:1) and stabilized with Recyclex TRM or an approved equal product. The north bank will be regraded to a 1.5:1 slope and stabilized using the Flexamat Plus product. The proposed plans are attached. Several of the streams along the project were subject to the Jordan Lake Buffer Rules. Stream 34 was not one of those streams. Due to the modifications to the stream bank with the proposed work, we are presenting this plan for concurrence per the conditions of the permits. Please let me know of any comments or approval of the plan. If you have questions or need additional information, please contact me at (615) 383-6300 or by email at suzanne.herron©eli-IIc.com. Sincerely, ENERGY LAND & INFRASTRUCTURE, PLLC ibI(/‘-Z Suzanne . Herron, P.E., CPESC PE 040556 Enclosures cc: Ms. Alicia DePalma, Environmental Siting and Licensing, Piedmont Natural Gas W:\17-31-3003 Belews Creek\3_CAD\Production\STREAM 34\PNG-G-446-0001017.dwg 4/12/2021 7:28 AM CONSTRUCTION PLANS FOR LINE 446 - STREAM 34 RE -STABILIZATION BEGIN PROJECT LAT: N 36.278139° LONG: W 80.055796° Mig 0-4 Crl • Pal dyl,nsjxJJ cook F4-17,q. 0 • �TM 5eje141CreelA I p 1 V. :1540 rM s °-fir, Rd • 494'1)s Rd 24" LINE 446 ROUTE CE reo Olk NO''0I3 �}5 STREAM 34 LAT: 36.261516° LONG: -79.955954° ROCKINGHAM COUNTY GUILFORD COUNTY K4L-r END PROJECT LAT: N 36.237654° LONG: W 79.922224° 4.2 237 LOCATION MAP NOT TO SCALE 60% DESIGN PLAN ISSUE DATE: 4/12/21 Sheet List Table Sheet Number Sheet Title PNG NO. 01 COVER SHEET PNG-G-446-0001017 02 EPSC NOTES AND DETAILS PNG-G-446-0001018 03 LOCATION PLAN P N G-C-446-0001107 04 SLIDE FIX P N G-C-446-0001108 05 AS -BUILT PLAN & PROFILE PNG-C-446-0001109 DESIGN CONSULTANTS: CIVIL ENGINEER: W. KEITH GUALTIERI, P.E. ENERGY, LAND, & INFRASTRUCTURE, LLC. 4250 NORTH FAIRFAX DRIVE, SUITE 60 ARLINGTON, VA 22203 703-994-0429 SURVEYOR GARY C. CLARK, PLS ENERGY LAND & INFRASTRUCTURE, LLC 1015 PASSPORT WAY CARY, NC 27513 919-234-1974 ENERGY LAND & INFRASTRUCTURE ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL • NASHVILLE, TENNESSEE CARY, NORTH CAROLINA ARLINGTON, VIRGINIA NC LICENSE# P-I289 © 2021 ENERGY LAND & INFRASTRUCTURE. LLC.. ALL RIGHTS RESER\ED PRELIMINARY PLANS NOT FOR CONSTRUCTION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO A ■ ■ • DATE REVISION(S) DESCRIPTION 4/12/21 60% PLAN SET SUBMISSION BY CHK APPD JB DESCRIPTION SBH WKG WKG WKG AREA CODE ACCOUNT NUMBER PROJECT NUMBER WKG DRAWING BY 9335 0107000 1626546 JB WKG CHECKED BY APPROVED BY SBH WKG APPROVALS DATE DATE SIGNATURE / INITIALS SIGNATURE / INITIALS REGIONAL ENGINEER MGR TECH REC & STD DATE 4/12/2021 WKG PRINCIPAL ENGINEER PaGY. tarPiedmont Natural Gas COPYRIGHT 2018 LINE 446 - STREAM 34 COVER SHEET STOKESDALE, NC RESOURCE CENTER REIDSVILLE REF. DWG(S) SHEET 01 OF 05 DWG SCALE: AS SHOWN DWG DATE 4/12/2021 SUPERSEDED DRAWING NUMBER PNG- G - 446 - 0001017 REVISION A PNG-DISCIPLINE-RESOURCE CENTER -NUMBER W:\17-31-3003 Belews Creek\3_CAD\Production\STREAM 34\PNG-G-446-0001018.dwg 4/12/2021 7:28 AM PROJECT DESCRIPTION THIS EROSION AND SEDIMENTATION CONTROL PLAN WILL DISCUSS A PROPOSED PROJECT TO REPAIR THE STREAM BANK ALONG STREAM 34 OF THE PROJECT. IN ROCKINGHAM, NORTH CAROLINA. THE DISTURBED AREA FOR PROJECT IS APPROXIMATELY 1.56 ACRES. SITE DESCRIPTION THE SITE IS COMPRISED OF HILLY TERRAINS AND THE USE IS VACANT RESIDENTIAL LAND. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN MAY 2021 AND BE COMPLETE BY JULY 2021. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 7 OR 14 DAYS AFTER CONSTRUCTION HAS CEASED PER THE GROUND STABILIZATION CHART. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONSTRUCTION ENTRANCES SHALL BE UTILIZED AT ALL INGRESS/EGRESS LOCATIONS FROM PUBLIC ROADS. CONTRACTOR SHALL TAKE NECESSARY ACTION TO MINIMIZE THE TRANSPORT OF MATERIAL FROM THE CONSTRUCTION SITE ONTO R.O.W. PERIODIC TOP DRESSING WITH FRESH STONE MAY BE REQUIRED. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM SITE TRAFFIC ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 6. STREAM AND WETLANDS SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. TEMPORARY BRIDGES OR MATS SHALL BE USED FOR ALL STREAM AND WETLAND EQUIPMENT CROSSINGS. 7. SILT FENCE SHALL BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAMS AND/OR WETLANDS. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A LOSS OF DRILLING MUD IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT/MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. 12. ANTI -SEEP COLLARS SHALL BE PLACED AT WETLAND BOUNDARIES AND AT 150 FEET (MINIMUM) INTERVALS BETWEEN THE BOUNDARIES (INSIDE THE WETLAND). 13. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THE PROJECT MUST COME FROM A SITE WITH AN APPROVE EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LAND FILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. 14. TRASH/ DEBRIS FROM DEMOLITION ACTIVITIES MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, LATEST EDITION. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. REMOVE SLIDE SOIL AND RE -GRADE STREAM BANKS TO 2:1 AND 1.5:1 SLOPE AS DESIGNATED. 3. PLACE EXCAVATED SOIL IN ERODED/SLUMPED AREA AS DESIGNATED AND GRADE TO MEET EXISTING SLOPE. 4. INSTALL FLEXAMAT PLUS OR APPROVED EQUAL PER MANUFACTURERS INSTRUCTIONS FOR RIVERBANK OR STEEP SLOPES USE. INSTALL RECYCLEX TRM OR APPROVED EQUAL PER MANUFACTURES INSTRUCTIONS. 5. INSTALL RIP -RAP AT PIPE OUTLET. 6. SEED AREA USING APPROVED SEED MIX. i i COMPOST SOCK AREA TO BE PROTECTED WORK AREA FLOW ///\ ////\ \ /N ` ` 12" MIN. MULCH OR COMPOST FOR UNTRENCHED SOCKS PLAN 2" X 2" STAKES 8" DIA. COMPOST SOCK AREA TO BE PROTECTED /' UNTRENCHED INSTALLATION /\///` // INSTALLATION: 1. COMPOST SOCKS SHOULD BE LOCATED AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN. 2. PRIOR INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND OTHER DEBRIS GREATER THAN ONE INCH THAT MAY INTERFERE WITH PROPER FUNCTION OF THE COMPOST SOCK 3. FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM. 4. OAK OR OTHER DURABLE HARDWOOD STAKES 2"X2" IN CROSS SECTION SHOULD BE USED. STAJES SHOULD BE PLACED AT A MAXIMUM INTERVAL OF 4 FEET AND SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3 INCHES PROTRUDING ABOVE THE COMPOST SOCK. 5. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD I IN PLACE DURING RUNOFF EVENTS. 6. IF THE COMPOST SOCK IS TO BE LEFT AS PART OF HE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR ESTABLISHMENT OF PERMANENT VEGETATION USING THE SEEDING SPECIFICATIONS IN THE EROSION AND SEDIMENTATION CONTROL PLAN. 7. COMPOST SOCKS ARE NOT TO BE USED IN PERENNIAL STREAMS. MAINTENANCE: INSPECT COMPOST SOCKS WEEKLY AFTER EACH SIGNIFICANT RAINFALL EVENT (1 INCH OR GREATER) REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. DISPOSAL/RECYCLING: COMPOST MEDIA IS COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS. ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEN COMPLETED,THE COMPOST MATERIAL MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR LEFT ON THE SOIL SERVICE TO AID IN THE PERMANENT SEEDING AND LANDSCAPING. LEAVING THE COMPOST MEDIA ON SITE REDUCES REMOVAL AND DISPOSAL COSTS COMPARED TO OTHER SEDIMENT CONTROL DEVICES. THE MESH NETTING MATERIAL WILL BE EXTRACTED FROM MEDIA AND DISPOSED OF PROPERLY. THE PHOTODEGRADABLE MESH MATERIAL WITH DEGRADE IN 2 TO 5 YEARS IF LEFT ON SITE. BIODEGRADABLE MESH MATERIAL IS AVAILABLE AND DOES NOT NEED TO BE EXTRACTED AND DISPOSED OF, AS IT WILL COMPLETELY DECOMPOSE IN 6 TO 12 MONTHS. USING BIODEGRADABLE COMPOST SOCKS COMPLETELY ELIMINATES THE NEED AND COST OF REMOVAL AND DISPOSAL. COMPOST SOCK INSTALLATION DETAIL NOT TO SCALE GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION will not dislodge the soil. Use one of the Stabilize the ground sufficiently so that rain techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Rolled erosion control products with or without temporary grass seed • Appropriately applied straw or other mulch • Plastic sheeting • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil reinforcement matting • Hydroseeding • Shrubs or other permanent plantings covered with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. o\ ,o o> <d o> <o _A PLAN ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER SECTION AA r.FEIAL LOCATION DETERMINED IN MELD 75% OF THE STRUCTURES CAP POI, BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE PLAN PrAtlIC LINING 11 SIDE SLOPE SECTION &B rATCETTJAL LOCATION DETERMINED IN FIELD AND/OR SOLID REACHES 75, OF THE MINIMUM 12 INCHES OF FREEBOARD VOTING DEDICE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. 2. Create designated hazardous waste collection areas on -site. Place hazardous waste containers under cover or in secondary containment. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 _„,,,_-,,,_ { A t _____,F7,„,,,,,,- dian ter I r 1..1 No . - 2 - 3 times the l'I r � =_, „ diameter Min • .OW = '• 'I ! Pipe outlet to well -yti-+ defined channel PLAN VIEW N.T.S. Key in 6"-10" (150-230 mm), L r recommended for entire 1 perimeter. II ;' 1 - } ' �' d=5' (1.5m) max _ rock dia. 401' gift--'-' _ • • I I �r l lnLI i 6" (150 mm) Min Filter Fabric - - SECTION A -A N.T.S. Adapted from: Virginia Erosion & Sediment Control Handbook, 1992 Pipe Diameter in (mm) Discharge ft 3/s (rn /s) Apron Length, L ft (m) Rip -Rap D50 Diameter Min in (mm) 12 (300) 4.9 (0.14) 9.89 (0.28) 10 (3) 13 (4) 4 (100) 6 (150) 18 (450) 9.89 (0.28) 20.13 (0.57) 30.01 (0.85) 39.90 (1.13) 10 (3) 16 (5) 23 (7) 26 (8) 6 (150) 8 (200) 12 (300) 16 (400) 24 (600) 30.01 (0.85) 39.90 (1.13) 50.14 (1.42) 60.03 (1.70) 16 (5) 26 (8) 26 (8) 30 (9) 8 (200) 8 (200) 12 (300) 16 (400) For larger or higher flows, consult a registered civil engineer Source: Adapted from USDA-SCS OUTLET PROTECTION DETAIL NOT TO SCALE SOIL AMENDMENTS (TEMPORARY UPLAND SEEDING) NOTE AMENDMENT APPLICATION RATE (LBS/ACRE) FOLLOW RECOMMENDATIONS OF SOIL TESTS OR AT A MINIMUM APPLY LIME AND FERTILIZER AT THE SPECIFIED RATE GROUND AGRICULTURAL LIMESTONE 2,000 LBS/ACRE 10-10-10 FERTILIZER 750 LBS/ACRE MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY UPLAND SEEDING SPECIFICATIONS LOCATION SEED MIX APPLICATION TYPE AND RATE (LBS/ACRE) MULCH, TACKIFIER OR FGM APPLICATION RATE NOTES SLOPES <10% AUGUST 15 - APRIL 15 ANNUAL RYE GRAIN 120 LBS/ACRE MULCH (4,000 LBS/ACRE) APPLY MULCH BY ROVING, NETTING, OR ASPHALT TACKING AT 400 GAUACRE. SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING MULCH. APRIL 15 - AUGUST 15 GERMAN MILLET 40 LBS/ACRE SLOPES >10% TO <25% ANNUAL RYE GRAIN 45 LBS/ACRE TACKIFIER - PLANTAGO (4,000 LBS/ACRE) OR GUAR (150 LBS/ACRE) SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING TACKIFIER. SLOPES >25% ANNUAL RYE GRAIN 45 LBS/ACRE FGM - PROMATRIX (1,500 LBS/ACRE) SEED AND SOIL AMENDMENTS WILL BE BROADCAST PRIOR TO APPLYING FGM. NATIVE RIPARIAN SEED SPECIFICATIONS APPROVED EQUIVALENT FOR RIPARIAN AREAS NOTE: THE RECOMMENDED APPLICATION RATE FOR THE RIPARIAN SEED MIXTURE ABOVE IS 20-LBS PER ACRE. APPLY SEED MIXTURE TO DISTURBED UPLAND RIPARIAN AREAS, EXTENDING 10-FEET LANDWARD. SOIL AMENDMENTS APPLICATION OF SOIL AMENDMENTS WITHIN RIPARIAN AREAS SHALL BE CONDUCTED AT AGRONOMIC RATES AND SHALL COMPLY WITH ALL OTHER APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS. SOIL AMENDMENTS SHALL BE APPLIED IN A MANNER THAT MINIMIZES CONTACT WITH SURFACE WATER. MULCH MULCH MAY BE APPLIED WITHIN RIPARIAN AREAS AS PER THE GENERAL SEEDING SPECIFICATIONS. MULCH IS NOT TO BE APPLIED IN WETLAND AREAS. MAINTENANCE RESEED/OVER SEED IF GROWTH IS NOT FULLY ADEQUATE. GROUND STABILIZATION SHALL BE PERFORMED PER TIME FRAMES OUTLINED IN GENERAL SEEDING SPECIFICATIONS. THE PERSON TO CONTACT SHOULD ANY EROSION AND SEDIMENT CONTROL ISSUES ARISE DURING LAND -DISTURBING ACTIVITY: MICHAEL REIKOWSKY PH: (336) 468-0654 EMAIL: michael.reikowsky@duke-energy.com PRELIMINARY PLANS NOT FOR CONSTRUCTION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG - G - 446 - 0001017 NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS A 4/12/21 60% PLAN SET SUBMISSION JB SBH WKG AREA CODE 9335 ACCOUNT NUMBER 0107000 DATE SIGNATURE / INITIALS REGIONAL ENGINEER PROJECT NUMBER 1626546 DRAWING BY JB DATE SIGNATURE / INITIALS MGR TECH REC & STD CHECKED BY SBH APPROVED BY WKG DATE SIGNATURE / INITIALS PRINCIPAL ENGINEER PaRGY. tarPiedmont Natural Gas COPYRIGHT 2018 LINE 446 - STREAM 34 EPSC NOTES AND DETAILS STOKESDALE, NC RESOURCE CENTER REIDSVILLE SHEET 02 OF 05 DWG SCALE: AS SHOWN DWG DATE 4/12/2021 SUPERSEDED DRAWING NUMBER PNG- G - 446 - 0001018 REVISION A PNG-DISCIPLINE-RESOURCE CENTER -NUMBER 2 T2 N 0 N 0 0 0 z 2 co 0 0 O 0 0 0) 0) 0 0 LEGEND Z CL ' '' .... .' / •-- s.\ / _ _ - / /' / / � -' \ y J" ` ` -' ✓ V � \ ••- •• / ' ^ ` - - \ • rCD 1 1 i /• I •• ` / / \ / • `� / /• ' /• / 1 1 \ t/ •�\ '- \ { ^ '1l�-' \\ ` )' AREA CALCULATED AS CODE TCE TEMPORARY CONSTRUCTION ENTRANCE :����� CHECK DAM O LOD LIMITS OF DISTURBANCE - LOD - SF SILT FENCE — SF — SFJ SILT FENCE JHOOK SF SFO SILT FENCE OUTLET 0 SS SILT SOCK ,� 0 SSIP SILT SOCK INLET PROTECTION SFB SEDIMENT FILTER BAG SFB TSC TEMPORARY STREAM CROSSING L--J TWC TEMPORARY WETLAND CROSSING L--J SB SLOPE BREAKER-•/w./.. TB TRENCH BREAKER ® TTP TEMPORARY TRENCH PLUG Q CX CURLEX PLACEMENT j// PS PERMANENT SEEDING PS \ I \\� ; -,-„- _/ '�/��--�,-,> \l, • ,= LOD FOR STREAM 34 ,/��._,,'^\�• ,_,,, _ 1 !� \� '�°; ,, ,,'r r /, I `\l r' /, -' RE-STABILIZATION��� / f N l // / ' / 1 1 ( l 1 -., -,/-\, , / /, (PART OF EXIST. LOD) \ N , I\ // /-- \ , ; / \ N (�• 1 j j I ^ �' y /> J' l `I- 11! \• •• / / / /'^- ~1 I "- �--�' /, 1 \•,� `\ /�' `\, /' ( / I' EXISTING DRIVE RAP." SCALE (IN FEET) \ \n I J ' l/ > J 1 • / / 1 / f' ' 50 ` 25 50 100 / / \ / .-.-�-' - / TO ACCESS NORTH l\\ \\\ 1 / \� l f{ • / `\ / \\ I / -`� I\ /` �o /1 I ( /' / i 1 inch = 50 ft. ' SIDE OF STREAM ' -\ ,I r .- , \\ y \l / N r\ + r S \ \ ,'' !' j �1 1 )� \ „> / �1 *--- `• \I ,' \ \ -.. - / // • l 1 {• _\ 1 / ( ��.�, / , (I ��, 1 t j \ ` I\ `-, _ _-� // ,' ( 1 ) 1 1 \ (/ / \ ` ^' - ! % /^\ / / ( t l ,I \ \ \1 L\ / - /- /I / \ l\ ' 1 1 / / / 1 ' 1 1 \ ` / / ' / \ - ) 1 \ \ \ / i I / / ) j / -- \ �\ �/ / / -/- \ / 1 / / f f 1 / / (.1 �/' / / ` l \\ •� •' ` ' ) 1 / i / r' < / \...` ` \ _ -' -� - - _ - - ' - �/ / ( 1 / ,- i� 1 �> pi1 \\.� \ - --r. Ii '' / /! 1 - 1 / / / / I / \c'\ \ \\ ` \`� \ •' / / (` 1 1 / / / 1 / \ \ s' ` 1 Ir • 1 h ,/ /J 1 / 1 \ , .r,.. 1' ''. / / ..,"' l'''''''''' N. / `'° '�J ''' '�� �z 1\ / , �, �1;' --`\\ N. CTWO CONCRETE TRUCK WASHOUT PT PORTABLE TOILET TEMPORARY EASEMENT THROUGH WETLAND PERMANENT EASEMENT THROUGH WETLAND EXISTING STREAM THROUGH EASEMENT CWD CLEAN WATER DIVERSION — SWC TEMPORARY STORMVVATER \ ❑ PT ---- ������` j/, CWD — / CONVEYANCE / \ /\1/\ c STREAM 34 // a ;'l ^��__ , ( :_ 11 (/ 1 ' `� �.° ,.- / ( • f / /--' , • • / I \ \ , ,; _. _ \)j' / I \ \ \•/ t / ,1 /> / 1 \ 1 \ // , ,- 1 \ /\\\�\ / ) / ' / 1 � \ s/'/ (, �N� ;� � '.� \`, , ADDITIONAL TCE AND LOD �° 1 • I \\ \ \ 1 \ �H EAD = 3?�'2+50.57 �z ( ,/1 \ v I 1 NOT IK-OR`I.oINAL / \ \• \ ,"! BACK = 322+49.63 f .- 1 c 1 , ,` ,� \'� ;' LINE 446 PROJECT `�\\ `,, ( Q, - •/• / r /l \,Jfr / L I / .-, _ � - l l /"v...A.•V , v Pi' f l -/ -mil ) // -' -' �' 1 , r ,/ �/ 1 I. • \ \ ,, ,.,; , �f / I -- 1 \ ',� , -1 // f/ ( , .-,—/�'oo ;,'''', / ;`1� / / ' ,/ /r -,. ! _\ / • v// ,_ v // ,�\ ,, I / 1^I\ I r , / - ,' / 7' / \ A: ' / / / \ \ I J , / // // f/> , / / 1 —/2,, / / / / II / / 1 CD /, - CDa o ♦41.8 0,i7.w�1,��i/�' ' 4; ♦/ ,.�s'j',INLET W111� ,s01"',, p ,,,Ji< / ♦'.;'OA� :`ACTIVECONS o 4♦°~'� o ; / ,ic< f ° 1 ° ` .♦♦. ,, , ,\ . _ _`l _ *A -i\.,`�— is • —1— —/— _ \ 0, < ..„.e..., r r , ...,/ ilh. OtOr t \yI��.-`-,/ / is/ 1 (, �_ _ _ / / �` `-. / / r / / �,' ,/ /,�/ f I / (-/ 1 I 1 \ / / j /, // it C'� ,-� _I ( / // `S�.l ,/ /'`�� \ \ !/ / / \ / / • p \ S F / \ / \,/ / ,, ,.--' /,•--- / /' / / / // ,,_-�/- 1 �/ ° ENT , 06 .- / ,' / ;/- .-� / / /_ ,' ,/ �, . �. / �,Ji� N3 i 50, / .' 1 / �/ / / /l /-\ ( / / . / /�/// (1/> % / /' O/P0�9 P %�// % ,/ -��, , 1, '' y-` '-�- Jai //�^ (// II �`, f,J /�,' �/ > /�f/ // j.- • • / �,- / ' / ' / ._J1 II IlI / ' � , x / ; ; ) �th_ti/,,,\v! UCTf3.\ ;/ '% ;%, STD AHEAD = 34+05.9 ' I 1 \ ; I,1 ,STA- ACK = 33280.89 I/ / I I _ \ \ \ ( \ 1/ �' ,/ ( / \ .\ \ v I I v, • ) l \ /� *-,� ' (.�_ - \• , C. \ \ \ ( 1 I , \ , \ \ , ,-�' / \�-.�-. f' (' �, ,._� �' / �"/i \\ \ ���; N. • \\� „ ,.. \ \ , / \� / ; ' \ \ a / \ r ��` �_I 1 \ , \ l ) \ / / /\\ , �� / / (\\- •i\ 1\ 11_ �, / %. ', 1 (,L. / , :-/' �' .---'E ISTIN __= - // ; -�. '' "`,,-. �p�,ACCESS _ --��J ,; — -�'� -'SIDE O,'� -- , / /--- / ,-. .- ,. 1. k \ ,' i Sao 1 / / .� / �-_ / / c.� ' / / // / / ,. ,bRIVE 1- ; ; ,-'r ,'' '' ,% %� / !-' // /; J// l SOUTH /'' / 1 // - f / // '' °/'' .4)V '' ' /'� f / 3 ` �' i `` STREAM /'" /,, / '� , 1_ -' '''� / /7_77/ /o__ / - f ---- / // / ,.1 \ l `I / \ / / / \ I / / r• I �. — , � / �./ / , y \l ' _ ' � f / / / / 1 1 , -//// `- \ ) I 11 , • -I / —, \ / / i• / / / ////)....... /. \-_,, . _. .. ; ..-,.. I I I•• / I ( �\• ,\,\ `\ '.1 • • 1 / p — / I 1 / / / / / 1 . , / • , ''1 / / / / / / l , / / / // /' \ \ �. \ \�/ • , J / 1 / , L, \ / /0 / / /--'\ /l \ / N. l\ i'•.\_l �„ JJ / I rl / /• / ' 1 / / / / / / / 00 '/// 11 / 7/7 / V \\ '�\ \\ 0) u / / / / , l /, , , / / . N_ \_ PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-446-0001017 PRELIMINARY PLANS NOT FOR CONSTRUCTION NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET 03 OF 05 DWG SCALE: AS SHOWN A 4/12/21 60% PLAN SET SUBMISSION JB SBH WKG AREA CODE 9335 DATE SIGNATURE/INITIALS REGIONAL LINE 446 -STREAM 34 DWG DATE 4/12/2021 SUPERCEDED ACCOUNT NUMBER 0107000 ENGINEER .'DUKE P LOCATION PLAN P N DRAWING NUMBER G C 446 0001107 REVISION A PROJECT NUMBER 1626546 DATE SIGNATURE/INITIALS MGR TECH ENERGY® roil Niedmont atural Gas DRAWING BY JB REC & STD STOKES DALE NC CHECKED BY SBH DATE SIGNATURE / INITIALS WKG PRINCIPAL COPYRIGHT 2018 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER APPROVED BY 4/12/2021 ENGINEER RESOURCE CENTER REIDSVILLE W:117-31-3003 Belews Creek 13_CAD1Production\STREAM 341PNG-C-446-0001108.dwg 4/12/2021 7:31 AM i J / / I I I I 1 1 1 / \ \ l OVERHEAD ELECTRIC rn OHE-1 \ TRACT 19.004 N/F RALPH & BARBARA MORGAN DB 1280, PG 1530 PB 44, PG 29 ROCKINGHAM COUNTY, NC PROPERTY ID: 791100851090 I � , I I I I I 1 I I I \ \ \ \\�- \," OUTLET PROTECTION (SEE SHEET 2 FOR DETAIL) — 1 1 II 1 1 1\ I / I 1 I I I I I I I PULL SLOPE BACK 2:1 AND I TIE-IN BY 885 \ \ \ \\ \ \ \\ \ \ N\ \ \ \ N \ \ \� N N \ \ \ N \ \ �_ \ \�- 895 --- 1i�iII1' \ \�\�\ \�\\ \ �\ I III 1 1 11I11111\ \\I\\\ \\\\ 1 \ 1 \ 11 III l 11I I I \ 1 \I \\ \\ 11\\\ \\\\\\11IIII1\\\1 11\w1\ \ 11\\\\ \\ \I 11111 \ \\I111 I\ III\ \\ \ I III �\\ I1 \ I 1 \\\ \ 900- \ t TRACT 19.003 N/F RALPH & BARBARA MORGAN DB 1278, PG 2334 ROCKINGHAM COUNTY, NC PROPERTY ID: 791100853152 \ 111 1 11\\1\ \�\ \ \ \\\'\ \-- \ II111\11111 1 �\ \\11� N\ \\ \I 1 II\\1\1\\\\\ \ N \ \ \ � \\ \ \\ NN \ \ \\ \ \ \ \ \ \\ \\\ N \ PULL SLOPE BACK 1.5:1 AND _ TIE IN BY883 \1\\\\1\1\\\\\\\ \ \\ \ \ \ \ \ \\ \ \\\ N \ \ \\ \\ \ \ ��� \ \ \ \ TRACT 22.001 N/F JOSEPH RYAN THACKER & JONATHAN ALAN THACKER DB 1493, PG 1966 PB 37, PG 32 ROCKINGHAM COUNTY, NC PROPERTY ID: 791100757641 \ \ N \ \ \\\\ \ --4114t, 41 4=- .41 -890 NC HIGHWAY 68 \ \ OHE \1(\�� \\\\\\ \/ _ I ;\\\^\1 J / EXISTING CULVERT TDOT ROW OHE \\ \ OHE - \ \ 1 CFS TO BE PLACED AT INLET WHILE UNDER ACTIVE CONSTRUCTION \ GAS LINE EASEMENT OHE GAS LINE OHE• GAS LINE EASEMENT LEGEND PROPOSED AREA OF FLEXAMAT PLACEMENT APPROX. AREA OF RECYCLEX TRM OR APPROVED EQUAL TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS AREA TO BE PULLED BACK IN RE -GRADING AND FLEXAMAT PLACEMENT RIP -RAP OHE- 880 OVERHEAD ELECTRIC GAS LINE GAS LINE EASEMENT PROPERTY LINE CONVEYANCE - STREAM OR PIPE NEW CONTOUR 10 GRAPHIC SCALE (IN FEET) 0 5 10 20 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095)* DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO A DATE 4/12/21 REVISION(S) DESCRIPTION 60% PLAN SET SUBMISSION BY CHK APPD JB SBH WKG DESCRIPTION AREA CODE ACCOUNT NUMBER PROJECT NUMBER DRAWING BY 9335 0107000 1626546 JB CHECKED BY APPROVED BY SBH DATE DATE DATE 4/12/2021 APPROVALS SIGNATURE / INITIALS SIGNATURE / INITIALS MGR TECH PRINCIPAL ENGINEER PaGY. rapPiedmont I Natural Gas COPYRIGHT 2018 LINE 446 - STREAM 34 STREAM 34 - SLIDE FIX STOKESDALE, NC RESOURCE CENTER REIDSVILLE REF. DWG(S) SHEET 04 OF 05 DWG SCALE: AS SHOWN DWG DATE 4/12/2021 SUPERCEDED DRAWING NUMBER REVISION A PNG-DISCIPLINE-RESOURCE CENTER -NUMBER COUNTY, STATE GUILFORD, ROCKINGHAM, AND STOKES, NORTH CAROLINA OWNERSHIP FOOTAGE ,- 446 ROCK-005-000 + r--- + ,......A r--- N 4 \ 446 ROCK-008-000 co STATIONING o t W LO Q H U) 0 CO CY W 0 1._ + Q H CO [1 O I� t W LO Q H (/) [1 N W t W LO Q H (/) [1 O t 6) LO Q H (r) [1 6) M t 6) LO Q H (/) 0) 6) I� t 6) LO Q H (/) 0 CO CY W 0 6) LO + O „DO Q H (/) 0 CO CY W 0 _ N + O Q H U) 0 m Et W 0 I� LO + Q H (/) 0 CO CY W 0 CO 6) + Q H (/) 0 CO CY W 0 0 CO + M O Q H (r) d LO V + V O Q H (/) (9 co co 6) + V CO Q H U) 0 CD U) 6) + LO CO Q H U) 0 W CO CY W 0 V 6) + LO O Q H U) 0 W CO CY W 0 _ V + CO (0 Q H (/) C9 co CO (S) + CO O Q H U) C9 co co V + I� O Q H U) Cl W N + W O Q H U) Cl 446-ROCK-006_HW3 V N + 00 r Q H (r) N 0 U) LO N + r Q H (/) z O Q H U) CD W I - CO LO + O r Q H (/) o_ O I� I� + O r Q H (/) o_ O W + O r Q H CO H -, CO W + O r Q H (/) H 0 (S) + r Q H (/) d CO 0 + N r Q H (/) 0 W CO CY W 0 446-ROCK-007_000 V CO + N r Q H (/) C9 U) W N + M r Q H (/) d N LO + V r Q H (r) (9 U) H + r Q H (O 0 W CO CC W 0 LO V + Ln r Q H U) 0 W m CY W 0 I� + CO r Q H U) (D U) CO LO + CO r Q H U) (D U) V 0 + I"- I"- Q H U) (D U) N V + N- r Q H U) 0 W CO CY W 0 CO W + r r Q H (/) 0 W CO CY W 0 N + W r Q H (/) 0 W CO CY W 0 LO + W r Q H CO 0 Wz m Et W 0 0) + CA r Q H CO (9 CO 0 + O r Q H (/) ( CD 6) + 0 Q H (O Cl V •I� + W Q H U) (9 U) LO t M 00 Q H U) 0 W CO CC W 0 00 V t M 00 Q H U) (9 U) V O t M 00 Q H U) 0 W CO CC W 0 LEGEND z J a vbe / rR, / / / 78. \ /h��: / / I \ / I I \/ 7S \ �o ory //� � I I / \ / / 3xQQ XR- co '� / o ' / / /\ \ \ \ J / .� / \ - / / .� 7 / To \ / kQ / O OOk v �/// ,// °`� - / / y y1-F�p�" // °N / ,� � - o / E / ' \ *O n 74, K 2/0? . Jj \ Off, X 1587 \ \ O 1ye2a� / ��`� '' 407. \MTh 155g / / •� \\ 0�' ?OA \ ✓T 40 8 Am, 7565 �0 405 1i_7555 �7 EXISTING GAS cns PROPOSED GAS PROPOSED TEST STATION O OVER HEAD UTILITIES off EXISTING EASEMENT — — — — PERMANENT EASEMENT — — — — TEMPORARY N o ��m \ / / yy y, �T *t .-: co 'r �O ,\ XR-E-'B-006 X \ \ t�4J \ • \ \ \ gp \ \ \ F O r \ N \ \ \ s7�02 /YN \ `_ _ _ _ \ p�' 2 \ _ _ — NCt +Q= cycL° 1 \�Q'�� "',? 6'7 / XOO \ / 1 _ _ — _ / i // / \ / / \ ' / Q x O / / 7Q / / / / / / N 7 ' / / 0' / / °N 0g y QQk / / 10 p / / /' / . / / °Ne 1y92 \ 9 O . 1y /1y � s, - f� 2� / 7 0 / �' / o 7 /' / / ,03 40. 7 /' \ \ \ 4 �T#�-7 gyp/ m %h`- / cr :\ 40�7, aj ' x \ \ �� co \ ca \-� x \ \ CY \ EASEMENT (TCE)OSTRUCTION _ — _ ABANDONED GAS LINE PROPERTY LINE — - - — UNDER GROUND TELEPHONE ucr WATER LINE w SANITARY SEWER LINE SA FORCE MAIN SEWER LINE FM TREE LINE ��/ �1' \ ^ I\ / T 0 \ pro / \•T 20i, 0 9 �� yT 1O '6','00� ` _ \��F�o^ / tiT /\ 1 1 �/ \ YQ` J �� / +\ \ � O 2. os \ / / 1' 2'R� / / \ F; Q� / / 1- \ `'6'90sr / / /' \\ O^� / \ tir -.. --_, / +� / 8os�9 / / \ ` / s- , / �Q� ✓2, /xi.'kyo / \ \ \ \ �. ' 7 O O • / / /O`�' / / 2 ' / / / 19,x / / / oNe )"C y..� p1 / .<. P C�r' / J f� j / Q / / O /' 9 �/ f'A 7'9 / oN� ,� 1y / / � O / 7 oN / /' �13 �i / AP n / // fC �,s/ / b / / ' \ f� P / / c� / / 0 / FENCE LINE x WETLANDS WET STREAM UTILITY POLE UTILITY POLE WITH LIGHT LAMP POST GUY WIRE FIRE HYDRANT/ WATER VALVE WATER METER STORM INLET GAS VALVE GAS MARKER GAS RECTIFIER GAS METER SANITARY MANHOLE HDDENTRY/EXIT.-...,. EXISTING IRON ROD 11 ��� © IIIII 0 0 © # / / + 7 `\\ / 7 �X� / / 7 �� Rio.'? /� 0b / 9� T, v / ' R 71i09• / / p'� / +e-r / .,/ A'(`'�1y o / 0A6P // A01 % / 1 ��� � / �' / / y . / / f'A 7 13 / / / \ ���� GRAPHIC SCALE (IN / 7 / $ FEET) / / / \ / h1 ' �' Q"�� (,) cy0 , 4' m k� a �� %rn %�� �� /' m sy /' 50 0 25 50 100/ 7 \;� AREA OF SLIDE FIX 1 inch =50 [ 7 i tia \ PROFILE H: 1 "=100' / V: 1 "=50' \ 1040 1020 1000 980 960 — — — — — — — — — 940 _,- — -- — — — -__ — - — _ _. _ — 920 — -- — 900 880 , 860 840 3.88' — 820 800 780 760 740 720 STREAM 34 700 g6gg80 159+00 160+00 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+00 171+00 172+00 173+00 174+00 175+00 MAOP=1,000 PSIG MATERIAL SUMMARY PIPE SAWL FBE 24 x 0.500 API 5L X-65 DRL PIPE SAWL FBE 24 x 0.500 API 5L X-65 DRL ANSI RATING=600 PIPE SAWL FBE /PC 24 x 0.500 API 5L X-65 DRL DESIGN FACTOR=0.50 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO PIEDMONT 'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-G-446-0001017 PRELIMINARY PLANS NOT FOR CONSTRUCTION NO DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET 05 OF 05 DWG SCALE: AS SHOWN A 4/12/21 60% PLAN SET SUBMISSION JB SBH WKG AREA CODE 9335 DATE SIGNATURE/INITIALS REGIONAL LINE 446 -STREAM 34 DWG DATE 4/12/2021 SUPERSEDED ACCOUNT NUMBER 0107000 ENGINEER DUKRE % Piedmont AS PLAN &PROFILE PNG-C DRAWING NUMBER 446 0001109 REVISION A PROJECT NUMBER 1626546 DATE SIGNATURE/INITIALSMGR TECH ENEram Naturralalnt Gas -BUILT DRAWING BY JB REC & STD STO KES DALE NC CHECKED BY SBH DATE SIGNATURE/INITIALS WKG PRINCIPAL COPYRIGHT 2018 PNG-DISCIPLINE-RESOURCE CENTER -NUMBER APPROVED BY WKG 4/12/2021 ENGINEER RESOURCE CENTER REIDSVILLE