Loading...
HomeMy WebLinkAboutSW8161011_Current Permit_20170118Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY, January 18, 2017 Mr. Wilson Ki, Manager. Lumina Realty of North Carolina, LLC 1804 Martin Luther King Parkway, 4209 Durham, NC 27707 Subject: State Stormwater Management Permit No. SW8 161011 Deer Crossing Phase 3 High Density Subdivision Infiltration Basin New Hanover County Dear Mr. Ki: ROY COOPER Governor WILLIAM G. ROSS, JR. Acting Secretary TRACY E. DAVIS Director The Wilmington Regional Office received a complete State Stormwater Management Permit Application for Deer Crossing Phase 3 on January 13, 201�7. Staff review of the plans and specifications has determined that the project, as proposed, will`co*iply with the Stormwater Regulations set -forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8=161011 dated January 18, 2017, for the construction, operation} and maintenance of the BMP's and built ;upon area associated with the subject project. 0 This permit shall be effective from the date of issuance until January 18, 2025, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP, recordation of deed restrictions, certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter.150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions itgarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are: made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson in the Wilmington Regional Office at (910) 796-7215. Sincerely, I 11 Tracy Davi ,, Ptor Division of Energy, Mineral and Land Resources GDS/kpj: \\\StormwateAPermits & Projects\2016\161011 HD\2017 01 permit 16101.1 cc: Phil Tripp, PE, Tripp Engineering Inspector, New Hanover County Building Inspections New Hanover County Engineering Division of Coastal Management Wilmington Regional Office Stormwater File State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, IBC 28405 910 796 7215 State Stormwater Management Systems Permit No. 161011 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Lumina Realty of North Carolina, LLC Deer Crossing Phase 3 Deer Hill Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of one (1) infiltration basin (hereafter referred to as infiltration system or stormwater control measure) discharging to Class SA waters in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter referred to as the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until January 18, 2025, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The subdivision is permitted for 39 lots, each allowed a maximum of 3,000 square feet of built -upon area. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control measure. The stormwater control has been designed to handle the runoff from 152,615 square feet of impervious area. 4. The maximum built -upon area allowed for the entire subdivision is 152,615 square feet. 5. The drainage area will be limited to the amount of built -upon area indicated in Sections 1.2 and 1.8 of this permit, and per approved plans. The built -upon area for the future development is limited to 0 square feet. Page 1 of 8 State Stormwater Management Systems Permit No. 161011 6 The infiltration system is permitted per the Alternative Design Criteria under Section .1008 (h). The proposed system provides equal or better control, equal or better protection of surface waters and results in no increased potential for nuisance conditions. The infiltration system has been designed to handle the 10 year 24-hour design storm without discharging therefore neither an LSNFS nor an offline bypass are required. 7. A 50' wide vegetative buffer must be provided and maintained adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 8. The following design criteria have been permitted for the infiltration basin and it must be provided and maintained at the design condition: Infil Basin a. Drainage Area, acres: 7.42 Onsite, ft2: 323,215 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 152,615 Onsite, ft2: 152,615 Offsite, ftz: 0 C. Design Storm, inches: 3.8 1 yr24hr 7.0 10yr24hr d. Basin Depth, feet: 7.00 e. Bottom Elevation, FMSL: 15.50 f. Bottom Surface Area, ft2: 6,998 h. Permitted Storage Volume (greater than 10yr24hr), ft3: 98,833 i. Predevelopment 1 yr-24 hr. discharge rate, cfs: 5.79 J. Type of Soil: Sand k. Expected Infiltration Rate, in/hr: 7.40 I. Seasonal High Water Table, FMSL: 13.50 m. Time to Draw Down (10yr24hr), hours: 1.73 n. Receiving Stream/River Basin: Everett's Creek / Cape Fear, o. Stream Index Number: 18-87-29 p. Classification of Water Body: SA; HQW II. SCHEDULE OF COMPLIANCE No person or entity, including the permittee, shall alter any component of the approved stormwater system shown on the approved plans unless and until the Division has approved of the revised plan. 2. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 2 of 8 State Stormwater Management Systems Permit No. 161011 3. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system is used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 4. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 161011, as issued by the Division of Energy, Mineral and Land. Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. The maximum built -upon area per lot is 3,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the stormwater system or street, grading the lot to drain toward the street or directly into the stormwater system, or grading perimeter swales and directing them into the stormwater system or street. h. Built -upon area in excess of the permitted amount will require a permit modification. i. All affected lots shall maintain a 50' wide vegetative buffer adjacent to surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters. j. Any individual or entity found to be in noncompliance with the provisions of a. stormwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143, Article 21. 5. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 6. If permeable pavement BUA credit is desired, the permittee must submit a request to modify this permit to incorporate such language as required by the Division. The request to modify must include a proposed amendment to the deed restrictions and protective covenants for the subdivision, and a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements shall submit the necessary forms and documentation to the permittee, or a designated agent, and receive approval prior to construction of the permeable pavement. Page 3 of 8 State Stormwater Management Systems Permit No. 161011 7. The permittee shall review all lot plans for new construction and any subsequent modifications and additions, for compliance with the conditions of this permit. The permittee shall not approve any lot plans where the maximum allowed built -upon area has been exceeded, or where revisions to the grading or to the storm drainage system are proposed unless and until a permit modification has been approved by the Division. 8. The permittee is responsible for the routine monitoring of the project for compliance with the built -upon area limits, grading, and the storm drainage system established by this permit, the permit documents, the approved plans, and the recorded deed restrictions. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing, and shall require timely resolution. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition. The approved Operation and Maintenance Agreement is incorporated by reference into this permit and must be followed in its entirety and maintenance must occur at the scheduled intervals. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 12. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 13. All stormwater collection and treatment systems must be located in either public rights - of -way, dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such rights -of -way, common areas and easements, in accordance with the approved plans. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 14. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. Page 4 of 8 State Stormwater Management Systems Permit No. 161011 15. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The project and the stormwater facility must be in substantial compliance with all permit conditions. Any items not in substantial compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules, is subject to enforcement action as set forth in NCGS 143, Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 3. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 4. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division .of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except.in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 5. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 6. The permittee grants DEMLR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. Page 5 of 8 State Stormwater Management Systems Permit No. 161011 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Approved plans, calculations, supplement forms, operation and maintenance aareements and specifications for this proiect are incorporated by reference and are. enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee. Permit issued this the 18t" day of January 2017. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .X; f racy is, F'.t., Uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 161011 Page 6 of 8 State Stormwater Management Systems Permit No. 161011 Deer Crossing Phase 3 Stormwater Permit No. SW8 161011 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. 161011 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Wilmington Regional Office Inspector, New Hanover County Building Inspections Page 8 of 8 Permit Number,:5/ ' A� ,V/ (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BUT elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. - Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: , ... Potentialproblem: How I will remediate theproblem: The entire BN[P. Trash/debris is present. Remove the trash debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration'basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -.me fertilizer appfication. The inlet device: pipe or The pipe is clogged (if _ Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion Form- SW40 14nfiltration Basin O&M-Rev.3 EGE.IVE OCT 1 1 2016 SY: Page 1 0 BMP element: Potentialproblem: How I will remediate theproblem: I he f o rebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than s ra in . The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, rvegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. The embankment Shrubs or trees have started -spray). Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the .sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality.401 Oversight Unit at 919- outlet. 733-1786. EGEIJ26 OCT 1 1 2 Form SW401-Infiltration Basin O&M-Rev.3 qy: P3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Deer Crossing Phase 3 BMP drainage area number:1 Print name:Wilson Ki Title:Member Manager Address:1804 Martin Luther King Pkwy. #209, Durham NC 27707 Signature: Date:_ q 4— ff Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, I *vj. 16, C.q i �(� , a Notary Public for the State of (Afl G lc(.tiW— County of �p�►�P� , do hereby certify that wl w KG personally appeared before me this day of , 201 (a , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, Z%& C - lvt�c<- 'TA J SEAL My commission expires ECEIVE OCT 1 1 2016 Qv: Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 DEMLR USE ONLY D to Rec.,01yed Fee Pai Permit umber Applica e Rul s: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post tonstiuction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan 11 ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION E C E I V 1. Project Name (subdivision, facility, or establishment name - should be consistent pro ect name on l specifications, letters, operation and maintenance agreements, etc.): OUT 1 1 2016 2. Location of Project (street address): Deer Hill Road City: Wilmington County:New Hanover Zip:28412 3. Directions to-project.(from nearest major intersection): - From the: intersection of. SR 1492 (Myrtle Grove Road) and SR 3113 (Deer Hill Drive), travel aEyrox 300 If west on Deer Hill Drive. Project entrance is on the right. 4. Latitude:34* 06' 47" N Longitude:77° 53' 04" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): NNew ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU--102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: []Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type'of project (check one): ❑Low Density NHigh Density ❑Drains to an Off -site Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained'by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major.:.:. NSedimentation/Erosion Control: 8 ac of Disturbed Area ❑NPDES Industrial. Stormwater . ❑404/4.01 Permit: Proposed Impacts b.If any_of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? NNo ❑Yes If yet,' see S:L. 2012-200) Part-W.- http://portal.nc-denr.org/web/lr/rules-and-regulations Form SWU-101' Version Oct.'31; 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): V%) T- e rr Applicant/Organization: mina Realty of North Carolina, LLC Signing Official & Title:Wilson Ki, Member Manager b. Contact information for person listed in item 1a above: Street Address:1804 Martin Luther King Pkwv. #209 City:Durham State:NC Zip:27707 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 232-3730 Fax: (866 ) 910-2988 Email:wilsonki77®gmail.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( 1 Email: State: Zip: State: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's person who can answer questions about the project: Other Contact Person/ Zip: Signing Official & Title: I g`y OCT 1 12016 b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: Email: 4. Local jurisdiction for building permits: New Hanover County Point of Contact: Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. sheet flow to drop inlets then conveyed to an infiltration basin 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph li - Post Construction 3. Stormwater runoff from this project drains to the Cane Fear River basin. 4. Total Property Area: 7.42 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:7.42 acres + Total project area shall be calculated to exclude the following: the normal ool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High .Hater (NFiV1>J line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHi� line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included, in *,. total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 47.2 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP.- For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than. four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area Drainage Area Receiving Stream Name Everetts Creek Stream Class.* :..: SA;HQW Stream Index Nuif tber * 18-87-29 Total Drainage Area (sf) 323,215 On -site Drains a Area (sf) 323,215 Off=site Draina a Area (sf) 0 Proposed Impervious Area** s 152,615 % Impervious Area** total 47.2 Impervious** Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _, Drains Area On-site'$uildin s(Lots (sf) .' 117,000 On -site Streets (sf) 31,000 Ori-site Parkin -'(sf)', , 0 RECE On -site Sidewalks . (sf) 4,615 Other on -site. (sf) . 0UV 112016 Future (sf) 0 Off -site (sf) 0 ExI tin BUA*** (sf) :`' • .. 0 Total -(sf): _ 152,615 * Stream CIass and Index Number can be determined at:-htUZ.Y&ortal.ncdenr.orgAgt&g&s/cstt/dassiacations I . ,eroious-area is defined as -the built upon: including, but not limited to, buildings, roads, parking areas, _:.. walks,.gravel.areas, etc. Form SWU-101- Versio n Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing B UA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DF.AER Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements asper I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BUT specified for this project. The latest versions of the forms can be downloaded from htty://portal.ncdeiu.orR/web/wa/ws/su/bmy-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from htW://portaLncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at h=://12ortal.ncdenr.org/web/wa/ws/su/maps.) Please indicate that the following reouired information have been provided by initialing in the space provided for each item All ori&4. 1, documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htW://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. 1. Original and one copy, of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VIT below) 3. .Original of:.the .applicable Supplement Form(s) .(sealed, signed and dated) and O&M agreement(s)-for each" BMP.. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to httb:/%www.�envheliJ.org/12a&es/onestopexpress.html for information on the Express program and the associated fees., Contact the appropriate regional office Express Permit Coordinator for addit�ozial mformation and to schedule the required application meeting:) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project This is required in addition to the brief summary provided in the Project Information; item 1. . 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving'tream .draMs to class SA waters within 1/2mile of the site boundary, include the 1/z mile radius on'the mad. 7. Sealed; signed and dated'calculations (one copy). g.. Twq sets of plan., folded to 8.5" x 14 (sealed, signed, & dated), Lncluding. A... Lleyeloli ent Pr ect name. ._ ./ •.col... b. Engineer and firm. c. Location map with. named streets and NCSR numbers. d. I eger<d e, North_ arrow. f. Scale.. g. Revision number. and dateq. h Identify all surface waters on the plans by delineating the normal pool elevation of nnpounded'structtires, the banks of streams and rivers; the MHW or NHW line of tidal waters; and any coastal wetlands landward of the MHW or NHW lines. • 'Delineate the vegetated buffer landward from the normal. pool elevatio structures, the. banks of streams or rivers, and the MHW (or NHW) of tiwaters. i:. Dimensioned property/project boundary with bearings & distances. OCT i I j. Site I;ayout wiWall BUA identified and dimensioned. k. Existing eorltours,:liroposed contours; spot elevations, finished floor elevati 1. :Details of xgads drainage features, collection systems, and stormwater contro& Form SWiJ-101. ,Versiot Qct, 31, 2013 Page 4 of m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition t;, depths) as well as a map of the 00ring locations - ith the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book 5260 Page No:1619 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. ft://www.secretary.state.nc.us/Corl2orations/CSearch.a§px VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA, allocations` vary; az liable' listing each lot number, lot size, and the allowable built -upon area must be provided as an attaAni6hft0tine'c6mpleted and notarized deed restriction form: The appropriate deed restrictions and protective'coveian#s'forfs can be downloaded from http:/lportal.ncdenr.o:rg/web/lr/state-stormwater- forms d6es:'.136N"ad'the latest versions for each submittal. : J. In the instances where the applicant is. different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrichons'are recorded By the notarized signatures) below, the permit holder(s) certify that the recorded property restrictions and protective°°covenants for,thir'project,:if required, shall include all the items required in the permit and listed on the -forams: available on the website, that the covenants will be binding on all parties and persons claiming under them; that`theiwill_ron with the'land that the required covenants cannot be changed or deleted without coheurrende from .the. NC DEMLR, and that they will be recorded prior to the sale of aEIVE lot. VIII. CONS_ ULTANT 1Pq RMATION AND. A f u wish to deli to authority to another AUTHORIZATION TT 1 Applicant' Complete thLs. tion if yo gna ty r inif a br irfn consulting engineer 16hd/ for firm) so that they may. provide information on your br this project (such as addressmg�'equests for additional=mforinatiori): Consulting En eg:.PlullW G Tri1212P.E. Consulting Firm. Tripp En ' eering Mailing Address:419 Chestnut Street. City:Wiixniiigton '. State.NC Zip:28401 Phoney {91a. 763r5100 Fax; .(9.10 ) 763-5631 Email:trippenQQee �r cony , IX.. PROPERTY, OWNER, AUTHORIZATION -.(if Contact Information, item 2 has been filled out, complete this section). I, (print or type name ofperson listed in Contact Information, item 2a) certify that I own the property ielentified to this`permit application, and thus give permission to (print or type name of person listed in Cofit0 �Infotmcrtton;.Item Via) with (print or type name of organization listed in Contact InforinatCon,, item a . to develop the project as currently proposed. A copy of par responsible for the o eration and maintenance of the been provided with the submittal, which indicates the the lease eemenpQ �eandrng property:sales contract has partyp e stormwater system. Form SWLJ-101 Y_ersion Oct, 3.1, 2Q1. 13 . Page 5 of 6. i_ . . As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day; pursuant to NCGS 143-215.6. Signature: Date: I� —..._ _�.... a Notary Public for the State of . County of do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION'' I;. (print ar..t_ype:name Qf person., IisteAl n Contact Information, item,..1a) Wilson Ki , certify that the information included on this permit application form is, to the best of my knowledge, correct and project that the will be constructed in conformange With the. approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable'stormwater M6 under'15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature �/1J' a Notary Public for the State of Wcot,v of r do hereby certify that � 11 see,) ka , V personally appeared before me this.( day of : Y' Z®) and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, �D i f� C wd _..waeeeeeeeer,��. . SEAL Form SWU-101,.-- Version Oct. 31, 2013 . Page 6 of 6 Permit No. .1y W010 1 (to be provided by DWQ) 09A �ot W A rE9 G 0 w..� STORMWATER MANAGEMENT PERMIT APPLICATION FORM HCDEHR 401 CERTIFICATION APPLICATION FORM o f Y INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required items Checidist (Part 111) must be printed, filled out and submitted along with all of the required information. iNF(WMA7IQN Project Name Deer Crossing Phase III Contact Person Phillip G Tripp, PE Phone Number 910-763-5100 Date 1/12/2017 Drainage Area Number 1 If. DESiGi+C �VF1)RI MAT.tt3N —�-- —_ — —1 Site Characteristics - Drainage area 323,215.00 fe Impervious area 152,615.00 fe Percent impervious 47.22 % Design rainfall depth 3.80 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.80 in 3.90 in/hr 5.79 fe/sec 15.63 ft3/sec 9•84 ft3/sec ft3 ft3 1716900 1? 5,11800 fe 48,613.00 fe 43495.00 ft3 68,529.00 fe OK sand 7.40 in/hr 11.50 fmsl 0.95 days OK 3.00 :1 OK 15.50 fmsl OK 21.00 fmsl 18,422.00 ftz 22.50 fmsl 19500 It 45.00 ft 6,998.00 fe RECEIVED JAN 13 zan BY - Form SW401-Infiltration Basin-Rev.5 11Apr2011 Parts I. & H. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separatlen fr^,m 1^ p�rYivuS I layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 2.00 ac-in OK n/a It OK 18,60 It OK 50+ It OK 100+ ft Oi': 3.00 ft Oi( 300 It OK y (Y or N) OK y (Y or N) 0;( y (Y or N) OK y (Y or N) OK droD inlets ECIEIVE JiAN 13 2017 BY: Form SW401-Inf@ration Basin-Rev.5 11Api2011 Parts I. & Ii. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) II REQUIRED ITEMS CHECKLIST — —� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C1 1. Plans (l" 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and - Boundaries of drainage easement. 114W_ C4 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. ., _ C4 3. Section view of the infiltration basin (1" 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. attached 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. attached 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. I' C4 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. i,1A_ attached attached 1/ attached 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). ECEIVE OCT 1 1 2016 BY: Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page i of i High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. 1, Wilson Ki , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 9. The following covenants are in a o: n ure ngoing compliance with State Stormwater Management Permit Number ', as issued by the Division of Energy, Mineral and Land Resources under the Stormwater management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. 6. The maximum allowable built -upon area per lot is 3,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limiteo to, structures,' asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or. grading perimeter swales to collect the lot runoff and directing them into A.component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. Signature: Wr a,1C.J.- Date: /,�, % b I,(C (_, J ire , a Notary Public in the State of Wcy*l rani ylir, , County of f do hereby certify that Wlwn personally appeared before, -me this the day.of 20 f _, and acknowledge, the due execution of the foregoing instrument. Witness my hand and official seal,CA M )AL S ig ure �: �,T J My Commission expires /6— lSkeFormDRPC-3 Rev.2 05Nov2009 Page 1 of 1 ��: