HomeMy WebLinkAboutNCC212701_ESC Approval Submitted_20210504ROY COOPER Governor DIONNE DLLLI-GATTI Secretary BRIAN WRENN Director !NORTH CAROLINA Environmental Quality April 16, 2021 LETTER OF APPROVAL N.C. Dept. of Health and Human Services ATTN: Mr. Rodney Axtman 3026 Mail Service Center Raleigh, NC 27699 RE: Project Name: New Broughton Hospital Acres Approved: 69.07 Project ID: BURKE-2011-017 County: Burke City: Morganton Address: 1000 S. Sterling Street River Basin: Catawba Stream Classification: Hunting Creek - WS-IV Submitted By: Ms. Jamie Powless, P.E. Date Current Revision Received by LQS: April 14, 2021 Plan Type: Institutional Dear Mr. Axtman, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annettelucas@ncdenr.goa or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. D W-11) North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 Us. Highway 70 I Swannanoa, North Carolina 28778 u ' n` oROervi �m.m�Lwaty 828.296.4500 N.C. Dept. of Health and Human Services ATTN: Mr. Rodney Axtman April 16, 2021 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections trade during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincer Z Mi hael Smi Assi ant Regional Engineer Division of Energy, Mineral, and Land Resources NPDES NCG01 Fact Sheet cc: Ms. Jamie Powless, P.E. Jamie.Powless@nvS.com cc: Regional Office file act Sheet on the New NCGO1 Permit A E Q 5 April f The NC Construction General Permit (also known as "NCGOV) was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage.under an NCG01 permit through an electronic process, DEMLR worked with a broad team of stakeholders.to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucasEncdenr.gov or (919) 707-3639. Organizational Updates The new permit: Repeats state requirements for E&SC Plans and organizes them with .federal construction activity requirements; Is clearly organized by topic; and . Has iess text and more tables. Technical updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 101; • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);z • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously OS inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). ' This list is based on website guidance by the DEMLR.Sediment Program. Z The number of calendar days was selected to be as equivalent as possible with the previous permit. ' The intent is to provide predictability to the inspection schedule Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCG01 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application farm for the NCG01 permit e-NOT: Notice of Termination, form for closing out the NCGO1 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 The NCGO1 Process The new NCGO1 applies to permits.opproved on or after April 1, 2019. Perm ittees will no longer receive a copy of the NCG01 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NO[ on each construction project and issue each construction project its own CDC. Under the new NCG01 process, Construction sites will Continue to receive approval for E&SC Plans from either DEMLR or the delegates! local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCG01 by completing an e-Nol (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCG01 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D. DEMLR is working on creating a single application farm that will allow an applicant to simultaneously apply for an E&SC permit and an NCG01 COC. That effort is part of a larger Permit Transformation project at DEMLR. .E . About the N Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific CQCto every construction site that disturbs one acre or more_ DEMLR is working to create a.form that combines the E&SC plan approval and a-NOI processes, but that will take more time. For now, DEMLR has created an efficient a-NOI process. If an E&5C Plan is approved before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCGO1 permit, but will not need to fill out an a-ND1 or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deq.nc.gov/NCG01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-N©I submittal and COC process work? Permittees will apply for E&SC Flan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the permittee to visit deg.nc.gov/NCGOI to submit an a-NOI form to DEMLR. The permittee may begin the construction activity after receipt of the CDC (within three days*). The permittee must print and retain a copy of the permit and the COC on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an a-N©I form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.B.6 of the NCG01 permit_ Additional signatory options are set forth in IV.B.6 of the perfMit. it is possible for consultant to prepare the e-NOI, save it as a draft, and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit deg.nc.gov/NCG01 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&5C Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an a-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How dues the new NCGO1 affect the delegated local.£&SC Programs? Local programs will continue to review and approve E&SC plans. However, they will no longer send copies of the NCGO1 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an a-NOI to DEMLR. Local programs are not required to check if permittees have'submitted e- NOls to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for there to view a list of construction projects that have submitted a-NOIs. When local programs close out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&5C plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCG01 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully -comply with the ground Stabilization, materials handling, and nspection, record -keeping and -eporting portion of the NCG01 permit. Or 24 business hours for a project approved under the DEMLR Express review program.