Loading...
HomeMy WebLinkAboutNCC205281_MODIFICATION Supporting Documents_20210503ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality May 3, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Piedmont Natural Gas ATTN: Pinkney Bynum, Project Manager 4720 Piedmont Row Dr. Charlotte, NC 28660 RE: Project Name: Piedmont Natural Gas Line 328 Extension Project Acres Approved: 94.28 (0.28 newly approved) Project ID: FORSY-2021-005 County: Forsyth City: Winston-Salem Address: Hilltop Dr. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: AECOM Date Received by LQS: May 3, 2021 Plan Type: Revised Dear Mr. Bynum: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. D North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Winston-Salem Regional Office I 4S0 Hanes Mill Road, Suite 300 1 Winston-Salem. North Carolina 27103 m+► 336.776.9800 Letter of Approval Piedmont Natural Gas May 3, 2021 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Si erely, Zachary entz, I Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: Rick Douglas, PE of AECOM (via email) WSRO file Letter of Approval Piedmont Natural Gas May 3, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Piedmont Natural Gas Line 328 Extension Project Project ID: FORSY-2021-005 County: Forsyth Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. This ESC plan was approved based on information submitted via E-mail to Zachary Lentz on April 30, 2021. For inspection purposes, two copies of revised plans reflecting the E- mailed information must be delivered to this office by May 10, 2021 or prior to beginning work in the newly approved area, whichever date is earlier. Please reference Project Number FORSY-2021-005 in your cover memo. [15A NCAC 4B .0107(c)] Additional Comments: 1. Please note that this approval is only for the additional area proposed in the current revision. All other areas must continue to follow previously approved plans. 2. If it is found additional area will be required for stockpiling of topsoil, contractor staging, temporary access, haul roads, erosion control measures or other land -disturbing activities associated with this project, a revised erosion control plan reflecting the additional area must be submitted to this office. [15A NCAC 413.0118] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities