Loading...
HomeMy WebLinkAbout20070453 Ver 1_Triage Comments_20070523DWQ#: Date: Who Reviewed: Plan Detail Incomplete ^ Please provide a location map/most recent NRCS soil survey map/C1SGS 1:24,000 topographic map for the project. ^ Please provide cross section details showing the provisions for aquatic life passage. ^ Please provide the location of any proposed stormwater management practices as required by GC ^ Please provide detail for the stormwater management practices as required by GC ^ Please provide an inventory of proposed project imperviousness area based on the estimated built-out conditions. Please include all proposed building footprints, roads, driveways, sidewalks, gravel-surfaced areas, amenity areas, etc. ^ Please provide building envelopes for all lots (or lots ) on the site plans. ^ Please provide a signed and sealed geotechnical report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Division of Highways -Guidelines for Drainage Studies and Hydraulic Desien, prepared by A.L. Hankins, Jr., State Hydraulics Engineer - 1999. The contact for guidance for the technical evaluation of proposed bottomless culverts is Max Price at NCDOT (919-250-4100). ^ Please re-submit your site plans on full plan sheets at a scale of no smaller than 1"=50'. ^ Please provide a detailed planting plan for (standard format includes: scientific name, common name, source of the plant material, plant spacing, wetland indicator status, etc., as well as planting specifications). ^ Please indicate all proposed driveway crossings on your plan sheet (presently proposed and future proposed). ^ Please indicate proposed lot layout as overlays on the site plan. ^ Please locate any planned sewer lines on the site plan. ^ Please indicate all stormwater inlets and outfalls on the site plan. ^ Please indicate all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ^ Please indicate all wetland impacts including fill slopes on the site plan. ^ Please indicate all buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). ^ Please locate all isolated or non-isolated wetlands, streams, and other waters of the State as overlays on the site plan. ^ Please locate all of the protected buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2. Avoidance and Minimization ^ The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why it is necessary for this project. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the .Please revise the plans to avoid the impacts. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the .Please revise the plans to minimize the impacts. ^ Your proposed stream crossing appears to be aligned at approximately .Please re-configure your proposed stream crossing to show it aligned approximately perpendicular (between 75° and 105°). Other ^ The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please provide $ .This additional fee must be received before your application can be reviewed. ^ Please complete Section(s) on the application. ^ Please provide a signed copy of the application. ^ Please provide an agent authorization letter for the application signature. ^ Please provide copies of the application, copies of the site plans or other supporting documentation. ^ Please resubmit copies your information on the most current March 2005 Pre-Construction Notification form. You can download this format the following web address: http://h2o.enr.state.nc.us/ncwetlands/re~,cert.html ^ Please submit electronic CAD files showing ,via email to ian.mcmillanna,ncmail.net and provide a CD along with your response to the additional information requested. ^ Please provide documentation that DWQ or Forest Resources has made intermittent/perennial stream determinations on the site or contact DWQ to schedule intermittent/perennial stream determinations on the site. ^ Please provide a qualitative indirect and cumulative impact analysis for the project. ^ For areas in nutrient sensitive waters or buffered river basins fertilizer specifications for stormwater BMPs should state that that only an initial minimal application of fertilizer to establish the plants shall be used. ^ Please indicate whether or not the proposed impacts have already been conducted. DWQ#: Date: Who Reviewed: Mitigation ^ of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. ^ Please indicate which 404 Permit the USACE has authorized for this project. ^ Buffer mitigation is required for all road crossings that impact 150 linear feet of riparian buffer or more. Please submit a mitigation plan detailing the amount of buffer impact at crossing and how the impact will be mitigated. Stormwater ^ Please provide worksheets for the proposed on the site plan. ^ Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure worksheets and signed and a notarized Operations and Maintenance Agreement. ^ Please show detailed plans and profiles for all proposed stormwater management devices. ^ Please redesign your level spreader design(s) to reflect the January 1, 2007 DWQ guidelines. ^ Please specify your soil material and source for the extended detention wetlands. On-site soils may be unsuitable for use as a wetland both in terms of soil type and the amount of nutrients contained in the soils (particularly if former agricultural lands). ^ Please provide grading details for the extended detention wetlands that show the forebay, micropool, high marsh and low marsh. Notes: ~ ~ ~/ 9 ~., _ l~la,~5 Qtt.t_ l/~1514 n p~. ~u a ~ ~~ ,< 1 'n~e. _ , ~--rt_ ~-e~ ~ ;~ re s w r ~ ~- ~ ~~z~c-~. ~a. ~ n ~ I a. t~~ T ~ '~ ~~4Z~ ~ D(U D ~ ~ -,t, ~ ~ ~ t~tM ~/ ~~ r s n ~ ~ ~S t (~ - ~ ra~J.~`~ r~s (0 55~ b - ~ ~