HomeMy WebLinkAboutWQ0023261_Monitoring - 03-2021_20210430Monitoring Report Submittal
...........................................................................................................................................
Permit Number #* WQ0023261
Name of Facility:*
Onslow Water and Sewer Authority, Swansboro WWTF
Month:* March
Year:* 2021
Report Information
Type*
Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR Swansboro NDAR & NDMR 2.58MB
March 2021.pdf
FDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address:* sjones@onwasa.com
Name of Submitter: * Sherry A Jones
Signature:
Date of submittal: 4/30/2021
This will be filled in automatically
Initial Review
Reviewer: Williams, Kendall N
Is the project number correct?* WQ0023261
Is the monitoring report t: Yes r No
accepted?*
Regional Office* Wilmington
Accepted Date: 5/3/2021
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page / of .3
Permit No.: WQ0023261
Facility Name:
Swansboro WWTF
County:
Onslow
Month:
March
Year: 2021
PPI: 001
Flow Measuring Point: E) Influent E] Effluent
❑ No flow generated
Parameter Monitoring Point:
Ej Influent
Effluent
[:] Groundwater Lowering E] Surface Water
Parameter Code ---
00076
OQ400_
50060
00310
31616
00625
00600
-066'"'
00530
40360,�_,
00940
m
>
0
E
0
< E
CL
0 dr 0
0
0
0
o o1
0
o
F
U. 0
=
Z
" ,
4
0
0
z
24-hr
Inns
GPCi
NTU
mgJL
#/100mL
mg/L
mg/L
m IL
mg/L
mg/L
m9 /L
1
06:45
1
476;705-
1.32
T32:
0
,��4XT
<1.00
<2. 00
3
2
06:45
3.5
1.31
001
-6-
<1.00
<2.00
3.4
43.2
3
06:45
335
1.29
71
0.02
4
06:45
3.75
1.26
0.02
5
06:45
5.75
i �3V 017� 1
1.27
'L,%-�1,1
0.02
:`x
6
4,4$Q
1.36
7
41
1.44
8
06:30
3
1.49
_7.
0.02
<1.00
o5q,00
2
23.7
<2.50
9
06:30
134,29,
1.48
Tl
0.03
10
07:00
1.25
1.41
0.02
<1.00
$00'%,
2.54
26.2
4.4
11
07:00
0.5
1.72
0.02
12
06:45
1
3t 6, 05
1.41
1,2`
0.04
13
07:00
8
1.46
14
07:00
8
%312,2_
1.51
16
06:00
05
3611 406,-
1.49
0.01
136
<2.00
27
4.8
16
06:30
1 . 25
A2
4,
1.48
0.02
17
06:30
1 5
1 .
1.44
7%18'�'
0.01
<1.00
�go.$bo
<2. 00
47, 1%%%%
27.2
-3 _j%-%:
4. 6
18
06:45
5 9.2
1.52
'0
0.02
19
06:15
1.75
2.87
7.
0.01
20
;359;371-'%
1.56
21
47
22
07:00
1.5
U016,7'
1.59
19%
0.03
<1.0
<3.00
28.1
3.4
7,
23
07:00
0.5
1.47
0.02
24
07:00
1
1.78
0,02
�3
< 1 .00
7,
<3.00
29.5
3.7
25
06:45
2.25
36
1.84
1
0.02
26
06:45
1.5
7,9�_,
2.45
T 1
0.01
27
07:00
8
2.8
28
07:00
8
36,1;942:
3.24
291
07:00 1
3.5
300�638
2.85
T22,
0.01
136
�4506,
3.3
29.4
4,46,
21
301
07:00 1
1.75
23 3J�3,_ 1
2.66
7.2
0
136
311
07:00 1
10
`257 846
3.3
7,2
0.01
10,1v'
<1.00
<0,$06
<3.00
22.2
23.1
4A 5
17.4
Average:
, 337j049'
1.79
0.02
&06
3.82
7%
0.78
,,23:9j
26.78
413-
6.57
�108.00
43.20
Daily Maximum:
�05%,
3.30
T32-1
0.04
Q.10-
136.00
3.30
29AD
29.50
4.46:
21,00
43.20
Daily Minimum:
2H,_W,
1.26
7,09%
-7Crab'
0.00
,2.00
1.00
0.60`, i
2.00
16.911
23.10
'124
2.50
308.00
43.20
Sampling Type:
Reco i
Recorder
Grab
Coto posite
Grab
Compo site'
Composite,
c0m
Composite
C 6-m%p 0%site
Composite
Compositei,
Composite
Monthly Avg. Limit:
600,006 j
14
5
Daily Li
10
6 = 9'
25
6
10
Sample Frequency: _To=ntin,,,,
Continuous
5,xweek ,
5xweek
2 x 'week i
2 x week
2%k%week:j
2xweek
2 x week
2xwepk I
4Xweek' j
2xweek
3x year„
3 x year
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page Z of
Permit No.:
WQ0023261
Facility Name:
Swansboro WWTF
County: Onslow
Month: March
Year: 2021
PPI:
002
Flow Measuring Point:
❑ influent
❑ Effluent
❑ No flow generated
Parameter Monitoring Point: ❑influent ❑ Effluent g Groundwater Lowering R/ Surface Water
Parameter Code
SpDSp`
31616
:,703tI0": ;
00400
;' 60680"'
00940
{?06 0 ;'
00620
00i5 5'
c
E.:
a,
<C ECL
c,o
S
tt
U
a?
E =
z
o
.t" ,
or
AM,
24-hr
hrs
GPD",,` C
� #1100 mL `
, ittgt ".
su
mg/L
rat tt:'< ".'
mg/L
1
06:45
1
2
06:45
3.5
43.1
1$2 ,'.
6.52
8;5&:
26.9
40.500';
3.21
3
06:45
3.75.t
"
4
06:45
3.75
5
06:45
5.75
.;,.
06:30 3
06:30 1
07:00 1.25
07:00 0.5
06:45 1
07:00 8
07.00 8
06:00 0.5
06:30 1.25
06:30 1.5
06:45 9.25
06:15 1 1.75
07:00 1.5
07:00 0.5
07:00 1
06:45 2.25
06:45 1.5
07:00 8
07:00 8
07:00 3.5
07:00 1.75
07:00 10
Average:
€DIVltil "-`
43.10
152.00
8.56
26.90
0:00 "'
3.21
0.20 ;
Daily Maximum:
:0'
43.10
' 15Z0Q,1
6.52
=8.56
26.90
; ; 0.50 .'
3.21
0.20 ,
Daily Minimum:
0
43.10
.152.01i""
6.52
8.66
26.90
"0;50
321
Sampling Type:
Grab
Grabill"
Grab
Gib
Grab
Grab..;
Grab
Grab
Monthly Avg. Limit:
Daily Limit:
Sample Frequency:
3 x Year
3 x Year
3 x Year
3 x Year
3 x Year]-3
x Year
3 x Year
3 x Year
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 3 of 3
Sampling Person(s)
Name: Mark Young, Randall Riggs
Name: Craig Green
Certified Laboratories
Name: Onwasa Laboratory Cert# 539
Name: Envirochem Cert# 94
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant Q Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessarv.
The plant had 3 daily violations for fecal coliform for the month and 2 TSS violations. The plant was compliant for the month on fecal but not TSS. Upon notiification of the exceedences effluent flow was routed
to the upset ponds for re -treatment. In addition, UV disintfection was increased to 100%, increased waste volumes, and cleaning of the plant's treatment works was conducted by staff. However, effluent flow
that was sent to the upset ponds seeped through an opening in the upset pond liner and entered an underdrain pipe connected to the plant's stormwater system on Tuesday 3/30/21. Flow from the basin exited
the stormwater gutter upstream of the stormwater pond (near the plant entrance). The flow occurred for approximately 1 hour. On 3/31/21 collection crews from ONWASA assisted us with videoing the
underdrain pipe beneath the upset pond and we conducted dye and flow tests to determine if the flow was in fact from the upset pond. Around 1430 in the afternoon a staff member was observing the flow at th
inlet pipe of the upset pond and spotted the location of the opening in the pond liner. Crews placed an inflatable plug in the underdrain pipe to prevent any flow from entering the stormwater system. Chlorine
sticks were placed in the stormwater gutter as a precaution due to the uncertainty of the source of the water. Quotes have been obtained to repair the liner and work will be scheduled soon. The violations and
liner damage have been communicated to the Wilmington Regional Office.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Mark Young
Permittee: Onslow Water and Sewer Authority
Certification No.: WW4: 1001105
Signing Official: Dave Mohr
Grade: 4 Phone Number: 910-545-6877
Signing Official's Title: Chief Operations Officer
Has the ORC changed since the previous NDMR? ❑ Yes ❑J No
Phone Number: 910-937-7521 Permit Expiration: 10/31/2026
zo z
Sig 4a Date
jtu
Signature ate
By this signature, I certify that this report is accurrale and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-2 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-2) Page I of
Permit No.:
WQ0023261
Facility Name:
Swansboro WWTF
County:
Onslow
Month:
March
Year:
2021
Did infiltration occur atitel+lajnne
".
1>: ;,., " "
site Name:
2A
B
Site Name:
3
this faCliltj/?cre)
`'
Area (acres):
2.88
Area (scree)
3 88;"" "`; ,
Area (acres):
3.48
❑ YES
❑ No13044
Rate (GPDift�):
0.9044}
Rate (GPD/ft):
0.9044 -�
Weather
Freeboard
it ir#f4iiiatad?
", OYES r"" Q"No
Site Infiltrated?
❑ ves
❑ No
541k 4rt iftiated
Qtr_S '
Site Infiltrated?
(] YES
❑ No
a
40
_" c
o
do
a
a
p
od
e0
as
n, oa
o
a
CL
>a
=
o p
a
o
I.-
oE
da
eECL
"�
c
u
>
�H
U.
E-
o
00
m
$
°F
in
ft
ft
�a4
m4n
GPpI
.ft """
gal
min
GPDIft�
ft
gad.
.rr11i1
Gf'A!f#.
.. .�
gal
min
GPDIft�
ft
1
CL
63
0
8.8
042 ":.."";:".`,
89,908
1440
0.72
121,300:"
,'" 14�#0
. `,0.T2" ""
,..; ;." :'
108,461
1440
0.72
2
R
43
0.04
8.9
144, 9,1,
"; "(440,
t1,6fi ,.
83,432
1440
0.67
112,5fi61440
100,648
1440
0.66
3
R
43
0.02
9
112;'7i)9_"
.144(f:a.52"
:8,00 ;
64,943
1440
0.52
4.10
$ 622 ".:
,'.1
78,344
1440
0.52
8.30
4
C
40
0
9.2
11,343 ":::.144i)
85,310
1440
0.52"88,117;;":'1"440"
' "0;2
78,787
1440
0.52
5
C
39
0
9.2
." Z42 ":
"" 1440
0:99 `
" .: '. = ,
61,9D1
1440
0.497g517,„
"=1440
0;49 ,.
". ,;;
74,674
1440
0.49
8
C
39
0
9.3
(Q;708
';, 1440`,
Rom, "�-
," : ;; :.
63,213
1440
0.50
$5,27_
,144 "-,
,0:50" "
,
76,257
1440
0.50
7
C
34
0
9.4
1Q3;851;
"144(i
rs8 :
: =. , : ""
59,841
1440
0.48
80;73?440
,:.? 48 ""
'; "" ; �`
72,189
1440
0.48
8
C
30
0
9.5
123;20 "`
".144(=`
"" t3;57; "::.
71,117
1440
0.57
95;951 "
" �.1440 "`
" 0:57
85,792
1440
0.57
9
C
36
0
9.5
h22,04 <
<";1440
:�0.5tr"=".::
70,786
1440
0.56
95 50
I+ Q °
:" ",Qs7
85,393
1440
0.56
10
C
45
0
9.5
1 ,18;,
" 144
541111
67,240
1440
0.54
4.60
90 739 ""
",0
81,115
1440
0.54
8.60
11
C
45
0
9.5
9$39" �"
; . 1440 �"
." . ,0 46
57,225
1440
0.46
69,033
1440
0.46
12
C
55
0
9.5
i(3t),435"'=,:149fi
57,873
1440
0.46
71i;082
.144ti"
0:46
69,815
1440
0.46
13
CL
61
0
9.5
`"t0�,035'
` �1440"
0:
'`
60,523
1440
0.48
81;659
�.1440°'
:{7.4$ ,
73,012
1440
0.48
14
C
52
0
9.5
"° :102,4i1a" .
4'40,"
"5147 <
. ,
59,008
1440
0.4779;614
71,184
1440
0.47
15
C
52
0
9.5
1,1 2
1440
"om°"
""
68,306
1440
0.54
92;15 ';144p
�.;0,55
82,401
1440
0.54
16
R
45
0.66
9.5
.1 f9,59S1";;1440","
-:055
. "
68,910
1440
0.55
92y974;
"1440 ",
;,055
83,129
1440
0.55
17
R
46
0.03
9.5
" 1,1.,154"
" , "194A"Q:55
"" ;
8»80," ,',
68,659
1440
0.55
5.60�
"9;63
","
82,826
1440
0.55
1 7.80
18
R
1 57
0.02
9.5
115,4Q5:.,,
1440 -
; " 0;53"
66,499
1440
0.53
$9;724 ";�
I4At?�""0:53
80,220
1440
0.53
19
R
57
0.06
9.5
1-11,429'.14d0,
0,5 '""
"
64,208
i440
0.51
SB,F30 "
`";140�" "
0:1
77,457
1440
0.51
20
R
40
0.02
9.5
". f17,874:
1440 '
".'(i:54" ""
67,921
1440
0.54
81,937
1440
0.54
21
CL
50
0
9.5
.1j4,g79;
""14 0
='�0.53_""
" "`.
66,080
1440
0.53
79,716
1440
0.53
22
R
55
0.09
9.5
64,369
1440
0.51
86,84
""`""1440 .<
: fl,51 ..
77,651
1440
0.51
23
R
55
0.21
9.5
." .94,132-;,
'1�140 "�
' ' ;0,4
54,241
1440
0.43
T3; T82
1A4fii =
,� (f."43
65,433
1440
0.43
24
R
63
0.04
9.5
107,292
" "1440 "
" 0.49
8:70'"" "
61,824
1440
0.49
6.30
83413"
1440"
" ,0,41; :"
.3,60
74,581
1440
0.49
7.00
25
PC
61
0
9.5
101,529;
'':1440:
"tlAfi."
58,503
1440
0.47
7$,983
`" 14%40."
"0147 "
;"
70,575
1440
0.47
26
CL
66
0
9.5
1t)2,723""
;i440 `.
"" 0;47 :�
;,"
59,191
1440
0.47
79,861:=;
": �44{l"
0.47 "
71,405
1440
0.47
27
R
61
0.06
9.5
.99,981 '
, 1440
0;46" .
57,611
1440
0.46
77,729 : `"
1440,"". `
.fl,46 ""
69,499
1440
0.46
28
R
66
0.08
9.5
11,43Z .
1440" ""
0,53 ""
66,517
1440
0.53
89,T4,
"1440" " .
0,53 °""
""", ;
80,243 1
1440
0.53
29
C
52
0
9.5
e98,6ti9,:
1440 "
"; t?;45"
56,821
1440
0.45
76,663 :"
1440, "°
0,45 :
68,545
1440
0.45
30
PC
52
0
9.5
76,464;
114 _
0,35
44,060
1140
0.35
9,446 "
1140
0.35
53,152
1140
0.35
31
R
64
0.04
9.4
84,573:"
1440"
0.39 ."
""" 8;90." -
48,733
1440
0,39
6.90
65,?50'"
<` 1440'" "
0.39"
%Monthly
_ 380 ,,
58,789
1440
0.39
6.60
Loading (GPD/ft2):
0,51
0.51
0.5 .+
0.51
RIM
Year to Date LoadingGPD/fe
:
179
1.79
1.70
179
FORM: NDAR-2 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-2) Page 2 of
Did the application rates exceed the limits in Attachment B of your permit?
If not a basin, were the sites kept free of vegetation and raked?
If not a basin, were there any instances of effluent ponding in or runoff from the sites?
If a basin, were there any instances of breakout from the berms?
Was the onsite automatically activated standby power source tested and operational?
❑� Compliant ❑ Non -Compliant
Q Compliant ❑ Non -Compliant
0 Compliant ❑ Non -Compliant
❑� Compliant ❑ Non -Compliant
❑2 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Mark Young
Permittee:
Onslow Water and Sewer Authority
Certification No.: VVW4: 1001105
Signing Official: Dave Mohr
Grade: 4 Phone Number: 910-545-6877
Signing Official's Title: Chief Operations Officer
Has the ORC changed since the previous NDAR-2? ❑ Yes [A No
Phone Number: 910-937-7521 Permit Exp.: 10/31/26
d4 z 6 koz
Sig a Date
Signature Date
, er
By this signalu fify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617