Loading...
HomeMy WebLinkAbout20130063 Ver 1_Application_20130123V q �P ,141V STATE OF NORTH CAROLINA 441�r�8,�, DEPARTMENT OF TRANSPORTATION ^ /�y PAT McCRORY P. O. Box 25201, Raleigh, NC 27611 -5202 TONY TATA GOVERNOR PHONE: 919- 733 -2520 SECRETARY January 23, 2013 Mr. Monte Matthews U. S. Army Corps of Engineers Q 3 0 Q e Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Subject: Nationwide Permit #14 S R I 111 (Big Flatts Church Road) Ashe County, North Carolina Project Number: 11C.005138 (DWQ Permit Fee: $570) Dear Mr. Matthews: The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1111, Big Flatts Church Road in Ashe County. Total project length is approximately 1.41 miles. Impervious surface area will increase by about 0.69 acres. Mitigation will be provided through EEP. This project will require the replacement of one wet pipe as shown below: Stream Impacts: -- - - ?:'•' - , ,..��,,,,� ^ ^:.. "'u6r'�', f f, =' ,r'F`;:,�ry;: .7:,:$xe a ab;;: •:.y , ,,.:,. ;�,,.,.r,.gs;;4" }i'"r a 47 +82 3 30 "x 30' 3 36 "x 220' 3 30 4 40 2 260 Permanent Fill/Riprap I Impacts =220 feet J. T Total project Impacts = 2 260 feet As illustrated in the pipe data sheet, the extreme pipe length is due to the extreme skew of the pipe. We are eliminating approximately 150 linear feet of ditch line which the creek is currently running through. We cannot relocate the stream to the east because there is a mountain there. Relocating the stream to the west will create.stream slopes too steep for us to reasonably stabilize. We also have right -of -way issues on the west side. Due to the 9% grade on the pipe, we will place the pipe at grade since it will not backfill. "Phis pipe may remain perched after replacement due to excessive slope. In addition, we will address scour concerns with a "natural" rock energy dissipater (see attached detail). P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667 -9111 FAX (336) 667 -4549 Mr. Monte Matthews SR 1111 (Big Flatts Church Road, Ashe) Page 2 The replacement of the above noted wet pipe will require temporary dewatering. An impervious sandbag dike will be constructed upstream of the proposed pipe to create a small pool. Clean water will temporarily be pumped around the construction area and will be discharged downstream. Any dirty water located inside of the construction area will be pumped into a silt bag if necessary. Once the new pipe is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. The wet pipe in question carries a UT to Mill Creek (Class: C; Trout +). This project was reviewed for the presence of threatened and endangered species on December 17, 2012. This project will have no effect on any federally listed endangered plant or animal species. Historic compliance work will be scheduled and concurrence with the State Historic Preservation Office will be obtained if required. The project impacts should not remove or degrade existing water quality uses. Stormwater will be routed through grass or rock lined ditches, depending on the ditch line slope. By utilizing the .erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Overall water quality in the area will be improved by paving the ABC travel lanes. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this electronic letter, it is requested that Mrs. Marla Chambers with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this electronic letter, it is requested that the Division of Water Quality, 401/Wetlands Unit, issue the appropriate permit for constriction of this project. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further irtformation is required, please let me know. Your early review and consideration will be appreciated. Sincerely, 4 1t4k 11�17 Heath Slaughter Division Environmental Officer Enclosures Mr. Monte Matthews SR 1111 (Big Flatts Church Road, Ashe) Page 3 cc: Marla Chambers, NCWRC Amy Chapman, Division of Water Quality Amy Euliss, Division of Water Quality Mike Pettyjohn, PE, Division Engineer Doug Tetzlaff, District Engineer Randall Miles, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Chase Threlkeld, Roadside Environmental Field Operations Technician o�oF wAT,! Pq � v Im o Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit E] Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No -' -' 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes N No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: SR 1111, Big' Flatts Church Road 2b. County: Ashe 2c. Nearest municipality / town: Mill Creek 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 11 C.005138 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 801 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: 336- 903 -9202 3g. Fax no.: 336- 667 -4549 3h. Email address: hslaughter @ncdot.gov Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address. 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax-PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude- 36.31499 Longitude: - 81.55123 (DD.DDDDDD) ( -DD DDDDDD) 1c. Property size: 8.6 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UT to Mill Creek 2b. Water Quality Classification of nearest receiving water. C; Trout + 2c. River basin: New 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Unpaved road in a rural area. 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 90 linear feet 3d. Explain the purpose of the proposed project: Upgrade roadway._ 3e. Describe the overall project in detail, including the type of equipment to be used: See attached cover letter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ❑ Yes ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes �ZNo��EF]Un�known 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number – Type of impact Type of wetland Forested Type of jurisdiction (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ – non -404, other) (acres) Temporary T ❑ Yes ❑ Corps W1 ❑P ❑T E] No ❑DWQ El Yes El Corps W2 ❑ P ❑ T ❑ No ❑ DWQ El Yes El Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes W4 ❑P ❑T ❑No EDWQ ❑ Yes JEEIJ W5 ❑ P FIT ❑ No ❑ Yes ❑ Corps W6 ❑P ❑T No E] DWQ.___ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or irifermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 39 Stream impact Type of impact Stream name Perennial — Type of jurisdiction Average Impact length number - _._ (PER) or (Corps - 404, 10 stream width (linear Permanent (P) or intermittent DWQ – non -404, (INT)? other) (feet) feet) Temporary (T) Piping, Riprap & UT #1 to Mill ® PER ® Corps 2 260 Si ®P ®T Dewatering Creek ❑ INT ® DWQ ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ I NT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑P ❑INT E] DWQ ❑ PER ❑ Corps S6 ❑P ❑INT F-1 DWQ 3h. Total stream and tributary impacts 260 3i. Comments: 40 linear feet of the impacts are temporary Page 4 of 10 PCN Form –Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Z. 4c. 4d. 4e. Open water impact number — Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or 6c. 6d. 6e. 6f. Temporary T Buffer impact number — Reason Buffer 01 ❑P ❑T Zone 2 impact Permanent (P) or for Stream name 02 ❑P ❑T (square feet) (square feet) Temporary T impact 03 ❑P ❑T required? 04 ❑P ❑T El Yes 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded T Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWG) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? El Yes B1 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No ❑Yes B3 ❑P ❑T ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. We considered stream relocations but it just was not feasible. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be used during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ® Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 220 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ®cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of.the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ® No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES-NOT require a Stormwater Management Plan, explain why: Secondary Road Project 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ❑ HQW ❑ ORW ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes E] No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS and visual observation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? WRC will comment 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Project submitted to HEU 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? ncfloodmaps J. Heath Slaughter 1/23/13 Applicant/Agent's Printed Name Date Applicant/Agent's Sign re (Agent's s/ature is valid only if an authorizatt letter from the applicant is Droviderl . Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version t n \ N v 0'N 10 O /�Q+ y c 0. C7 cc col IN r r cc O < OI T) N m T m. 0 \ CA 3 ^I �I N "�•� _a_ � � �A O T 1'I �� 6 9 O O N _ O O _ Cal — .,,g , 00 4, 'NJ - y ti cn rt —N 0 —d - - -- �\ (' > t 6 .3 6� dael 0 eelsr o. ° (O / T e 3 �' OI cD N h TI �p y �I NI A 9 �I C ate# \ / T �' .- B oo N O r. NI 6• Gee - a m O T OI m co A a J�ry I Nl -� to a a$ o m e 0 N _ ml e. Ui I CM L il a' r N J 1.A / TI N T7� W) . }N t 4 n wt to T 0 �I NT o} ^I / '041, LU N1.0 ap N V• � O�O� � U C TIf7 CN N N �I C p m TOI r L ry N D T 1 O U e rl 4. N O ^I 6• .. �OD Lo P r w N � co ^• T T I eT-I � N W U N O p S T NI' O OI 8 3 02 ^I T Z• ,sir a T l CM M ij3 ' 2 / w x IF o m� o� cs� \ice iyA f VA i/ �; acim c--.2 ® `S.w A Eb • Q H u ; .L .L 8 ..A A b b all ®� w0 ®ffi ®i h pw F Y H tpr p e •g �a 4t,® ®•gip � ®� ® °n, e w � GA °a. 'a .� � ca e �. •..� a u a .sA MR ®c� ®%E3q8�� OZ Ogg 4 VA i/ �; MATCHUNE SEE SHEET 3 O \ I I � � I rr99�� 3 pR Wcn 1 OJ Of UJ Q X O M O U 1 Q LUa 1 WW Q Q Z nj I Z Q I W Q � I J 1 I � tt ®® N O 1 1 Xm�r I I NQ � M r 6V 0 e � S I I I � I , Of a � o I o I G V k n Q WSW W CO Q Z Ln ti b I I Z MATCHUNE SEE SHEET 4 o Z 5i "' co Zi Qc: ,, b Lo � J W� W JJ Qa� OZ �� c d `S WJ UW� :5mw 1=a+0 fnZW O = � W d \d 1 o U g� W�a �FQ_ w_m �-Oz ° cn \� \� u� n LLJ (n ®"O mom nmZ LLCn Q�SCC! °N� W JQ O 0m W� x r \� UCL mpY O+ =mom Z r9 O ' wo ¢w_ IL°Wa 02 o Wd �. Z oc�a W�Ci _~ �D wW aWw MW O Z�W DO o"� w" aary r cn2w I C) J M G oW� a 1 1 O W UW= 1 W w �mF- O I 1 Q z a� 1 wQ ® , , o 0 , r O' N o ' ' a ! /^P [Y w / u r CD O r r a o'? zN Oa � ° V r 1 ! M x m J O 1 M $ 1 x 1 M N 1 1 I 1 � O � X r a I v� 0 I Z 133HS 33S 3NnHJlbN z 111ATCHUNE SEE SHEET 5 Ln \ OW p(C.%W 2uJ) ZOZ i I W= �g� p- WZm <vv)i °w 00 1 � QV a.F-W OMO ) � k o vt g z O / wa. 0 -i0 LL� Dim Q o m JWW WO �N� �v 0 Z woo Q / ! F-EL OWD =to WJo Z 0 Y- o �-m0 a / // COW amp w 0 - wai¢ w <t / �°/ LL— gYW _rn 0 }2 � / ,/ OCR aWUJ CL:2 Z.J- LLj HW Ow< OCw WR Z03: aLL QZU d vp2W O owl / r UWg WMM ! / JF-LL. 0 / ! / 1 I I 1 1 D Q 1 d O CC O �U ' XQ r I 1 N O -1 I M Z o O ® I Q M , � (wD a ' a z LLI w cn ®1 t (D Q � w a� ao OI z w <c + am ® , o00 a 1 t a + t t �\ 5 \ O \ \ £ 133HS 33S IN171401VH MATCHUNE SEE SHEET 6 o _ ® 1 - w � � p �W w � U) z} QQ� �, Wn a � 1 wI W]Er JJ �� O\11 p J U i�(+Mw w w i °j w V) \ \o \ U� gF J =W aHa pC �� W =m pFZ ?�O� r� Q z a N Ln Q \� \\ co Wt1 pJW Ow wZ� O w a \ \ m� �mz 00 wt- �w 0 MOD N \\ mOY off o W Ln \\ \ cow mL1J IL W�Q \\ \\ LL wD (LwW 112 ZHIC \\ \ ww F- QO Z \ s o Jlz O(i� aLL wz� LL \ \ Zw-:z Owp \� cL OWT ® wcq- � lL Qj0 \ I �rN nll 1 1 1 1 1 OI 1 1 �1 1 � CD Z I '7 LU o O 00 ® Fm um� 1 ww �c.D U- \ < a z_ ZU&Z L 1 w Q < LU 1 \ 0 We wcn Xw OI\ \ 1 z ° a° ad \ Nm0 <� \ �<t 02 -12 w< 11 \ °� F =W C7 0ued 1 \ Qm d V Z N 1 \ \ ° 1 1 1 1 1 \ 1 . 1 t L - - to 13314S 33S 3NI714JIM Z MATCHUNE SEE SHEET 7 - s�o O p Or 01 T a C-5 W pW�W it EL- LU s X N r�)IC zO Z 0. x ' ® \ �� \\� �'1 WZ� 1 � (Mn N � Zvi � J U N \ � w O 09 O z rn O 11 � a � 0 ------ - - - - -- ---------- as z \\ w Q z° cl�Q r` O 0 O w W W N O cl� \� S Q U 1 W Q o o� \ 2 Q ,� O 0 Q Lz 1 O J 1 CO 1 Z}6 <az 1 ZO chw 1 O 1 0 WZm =C7 t n p w lLZ pOm 1 XO Z W F- 0- w Z JJ J� , 1 nN -J Z �N� _� o o F-+ =J U+ 0'r =COp i a— Um 1—N mQ �F 0 mF OF WmU 0>.z 1 t I i ap p0 ma pm ILcn LLp 00 ��� OI 1 Wco 0g wo �o wWJ I 1 1 W �+ F-a- UR �� j� QQU �� Ci ®._ # a• Cdo w Wp Q Ci WN � zw �° X � p Ir mW co Q QC m� W� C09 uwp - _ QCD -m Z� wm� I li Pw Q2 1 �w dLL -J�0 t e 5 13314S 33S 3NI714JIM 001/ S WR KR 2f . §fq Ln -j-j « ■ \ \\ 1-ƒ & °W \\ \\ / 9 LN on w -� ®® © o S\ \ ƒ w 2/ 3/ %�? % \y% / 0� w� \WD \ \� / U �G WG ��� ƒ + 2+ w�0 » sco Sq =aO & E\ it �/ƒ Ste? §�� k� �� �Lu � _ ®% �a k� %2w _ - 3w§ a % qLU� % w@F- m / / U)O \ 4 ° " m �0 2 u Lq < 0 < C) / \ \ % /o ƒ G <E u < ® ZQ < LLJ - \ < - )¥ Lj \g /m \2 ®/� m < z� 0-1 � <g b< . • 0-) S ' # . 2R 3 2 c 9 }]/G/ 77/ \q7 JI 4 MATCHIINF SFF SHFFT 9 IC a ww Ctf C�� Q U wQ U Q, Q N z a 0 � w \ \ o p \ \ J CO a- N \ dpi O WW a z wa a I ao Of a-7 3 e68 W o I � z I� I to IC4 I J I Of o L 133HS 33S 3N1714JIM w �Q Q xLn O r U 0 Qu LQ Z O t r f ! r 7� , w r � ! r O s ! , r r ^ c,4 'N c� 3AIYG 7311 1 Ln K m ® Co C Xmo r r N m 1 r ` _ L 133HS 33S 3N1714JIM w �Q Q xLn O r U 0 Qu LQ Z O t z MATCHLINE SEE SHEET 10 _ w ?: — wP— Z% W b ' \ ¢ 0 + gcn + °C9 (7chw w k ' ~ oLLJ �, E I > Q —C �-m w?m Q C) �� a Q o�(g r-,��o O w�a� O owe mNW m + Mai9 d G N c s o Xi X wm(7 O o o>-z 1 U. Qza ww r I I zw� F= 3 n2 1 �' Owl Mco� ND r N r, Jl Wm= wcoF- 1 J�� I � I °o4S Od 9f I I ld r� z o U a I ww I Qa z_ I < \ ao — � z Q \ \ a o \ �a 00 (yw \ a� U \ w a � \ �. a� �� ►� CO Q � teh \ Q_ i 8 133HS 33S 3NI7H01dW , o MATCHLINE SEE SHEET lI z Q ZOO ® ®or O \\ t-w FV-o UWg U -'cciW ® ®� 3� ptt,w OQ �Q VU aF=—w x ca � \\ � m cvn co Q dp nM(D ® \\ = ° co U-M O 0) O mO� C06 (n Ww Dom O \ O N c i M g OM i`d Oa°> mNC7 wJ v M M _ U� NOY _ �mZ Q W W \ o� MW �m� W�Q Q \\ Co CD V) U-5 ®.HOC ZJz W Q \ \ 2 2 WO Rum 0 D�o< Ww a m N O w cr � - QQU z \ LL OW� t-LL-W wm \ \ \ \ u4-1-- JU)O Q \ \ N N 1 � 1 N W W Q� Q� Q U W Q T \ \ I� O M W W W/ Z ZN �� a U / >- O J Q W Q / M O LLJ ° ®, � Ol a 3M xm In Q� �N / / aW �U _ Z p O I / W Q ao in O \� OM \ \ z 1 1 ` O O r I a W W IY C 7 p 1 a a z -o z ° X Q / Q0 n n �- V II 0 O I\ MATCHLINE SEE SHEET l0 c -i �uz mm O O 100 m \ =mm mrn.5 Alp � 03 mmn max•° C-n K v� in o \\ \ -lmp >M° mm D D D Dm� v O MKCD 7v �n o v � r a \\ 11 rzD C� ' -1 V N W fA X G mZx 45 M--iz Mmp Tm O O O o o zip NAB vv cn cn D m -ohm D \ a z nn vN �D D D v U -1 Oo - + + + \ `\ D m 5jjNco tEm mo 0 or o C) D COQ 0=z �m rriZ �Z -rig— woo m z \` m m oo�D m m =v Z7 \ \ D -1 ° > \ \\ O u, mZm DD \� \ fi7pZ Z �D \�Q \ ZD 77 \ ° \ V! Z zm \ \� �v DD \ \ mm \ \ D O \ Z W \ -c° \ vex \ a ° W 0 Z \ 0 ° N � o A \ \ D_ \ D \ M to \ D m to D n n \ D o_ \ mm D ADf•1 M �Im C> W C> 1pQ \ ° Mo ��r o m 0 (� C) c W m 0 00 D Z7 0 0D N c 01 133HS 33S I N171401V M C) PlO7�IS Nk � (n Fri \ 2 � @` rn�mo 12.7% \ wm a Cn \ \ © 9 W CD rn cn ZI: D X O \ \\ © N D Qo rn y > \ \ © c, m D C7 > \ \ Z77 \ \ �o m m Q Eo- \ ® x E AREA 30 m " AINAGE ONLY \\ m ® e �C) X �a C C ocorr- 9CF`�9 O =wm Imo O MKw �' O r vmm Z >X m� -n � is MM --o—o cw K f ' (;)(AM �00 mw N- , wo v� D o OEM ;UNw cam= ZwC m--1 O N Wvo Mr-v mm 0 p T *� owow am 0 m �ir� im 0' I _ w—M mca— KmD r z cn a" ��� i o �o z_m zv _ Z �v o o= S �(jv m�v vaZ �� r AZ M , Q cn �aS 0 0 m 11 4 MATCHLINE SEE SHEET 12 PI 13314S 33S 3Nl7HJIVn o N D t_n U' D 1 N Z D x 1 � m D > Fn n D n 1 1 1 70 M m \ lJ \ 1 \ O\ \ N O 'o \ QT \ N \ \ N Z D \o \ \ \ D m \ \ C7 D \ \ M mm D 00 D �J \ \ \ \ N O O D \ \ D \ \ \ \ �D cr D O m \ \ \ \ imn mm m,U -j =!m0 D q \ v \ \ ®wx MMU) r- C:) oW n \ \ \ \ � 'M f7y D -n mm O O o n \ \ \ exa >z X-ic >M0 mm_a CA K z z G)w)m WX Kw� 5j-n w \- \ \ > A >M -n x 0 mw Ox D D \ \ pR= Xn ° W \ \ \ \ O nr 3iNo mo Zwc r Mo o °o \ \ D Nz rn mvD wwOV 0 \ \\ \ \\ © 0 _� *j Z=i w w ��m v_v �� w w m - \ \ D m n o =v m -IT �_� n 2m D D w - \\ D n z p apz� m �m r cn °� cn °° � \ \ m m y FTI 6?0� xm �- zZ o o \ \ \ \ D < w rn ��z v =Z 7oAA -lz �m U,:--llm \ PI 13314S 33S 3Nl7HJIVn MATCHUNE SEE SHEET l3 Dwz m \\ \\ Otcnrr- -q mm m- � � ao \ \ o n w mm a cm ) -n z ��=i mw rn W D D MKW 700) we) 00C FAM z� O o -r. a \ o Tzm rm cm W m -i O --1 O \ \ \ \ M-1c rZ OCDv (nOW -u*m OT -11D t/J D \ \ m� m-1 MEa nn mm 072 a zc + IE: - Arnow �- mZ o .rr �vv m0 =z �a ,2 \ \ WAD Z=i'd m , \ \ \ Oxm \ \ mzln \ \ G)wG) zpz , \ \ \ ADD \ \ COO D D \ \ m \o \ O \ \ D N D OQ \ \ ® �m m �D cry t7D oD �� °\ mm D O 1 D _ m Z D D I N I N C-) �Q , to mm D 7 1 2 C O 1 1 zw 1 1 0 Cl) \ QZ o Q p z 5l 133HS 335 3N17H01M ° MATCHLINE SEE SHEET 14 Ocnr m fn r "rl 7o m r Z n m -n--4 -�i mmrno D -�1 D � D \ / ' -mo a / ��� AD A mmm o f� o • ima'iN /, / �,•z ---I -�c O -i O 00m, p NNW r p / c mo mvv lm �z / Z=l =m , m4'mzcn � �OZ U'�z mo / y / / ' ' X s / / / p r D f N z O r r r r co G) r r m Xr r n D mm I r D 1 1 N I 1 W 1 I O r � 1 0 I 1 70 _ N 1 I Z o y Q 91 13314S 33S 3N17N91d{N MATCHUNE SEE SHEET 15 _ 1ij i �Mrr- rn � -n � -n x N rn 1 1 1 1 Off/ - oy U4 =morn n ��mo tit -m0 . D D 11 It (M/) KMZ y o) 1 "! n Y r-Zw + o + 0 + 0 m 1 1 �Z -Ic 0 O O O O 0 1 1 O � z1-o G) M D w D . -4 1� � `la 11 G)�m ��� o= o -Az -m (3 o -qZ - w COvo 11 111 O o ca*> rn rn °r ®. ® w G)=v 1 M Zc �oZ z 1 1 czi�vyn p � <z �v i O °t7 L °OIS Od 1 ZO 0 n_ 1 f z 1 1 0 1 n M X 1 I z � 1 n n m O70 m 1 1 (T1 D m I N 1 O 1 tN 1 Z W GO ---{ T� 1 O 1 ! n O nm X CD / mM D O Ln rn .1° Q / 0 0 z � x k 1 ' ` 1 0 z u 12 M L \ n CNA -9N17 cz Cb ® ® C9 + w ® b r4 W o m N ® C� ai W l �v� �Nllslx3 � _ 'r UU I l el I ' OS — T /�/- srmmm O RL � N H O /� v, y� Ga O O N po H m M 3NN 1=i WON M0 0 ^ m a m � W y� O v a ° ° W s nl � mos. _ Y V w O � N O m ppii a°C4a Ci�ZM V O ° J 01C J � . a F `O ag N � L i' � WLL • Z W • � W r Z Z C 0 � J z co H � 1 w F % N z � J d W W m LL � W Q h ao �i J 1 � � 3 1. 2. 1 & 2) Outlet and downstream view of UT to Mill Creek on SR 1111, Ashe. 3) Creek running through ditch line. 4 \1 l 1 f} r , .-,✓ '-`� Asti f ,' t' °� � � be 1 C N no ,r 1 < ct j L rte-- /�_ .- � 1 ■ r ■ � - - -,,_