Loading...
HomeMy WebLinkAbout20120313 Ver 2_Application_20130128Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version .v11l� n Pre- Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 198200031 (Permit Modification) 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Bridge #6, SR 2014 (North Main Street) Modification for Additional Fill Impacts for Temporary Trestle (Work Bridge) Supports 2b. County: Gaston 2c. Nearest municipality / town: Cramerton 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: B -4752 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Right of Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Mike Holder 4c. Business name (if applicable): N.C. Department of Transportation, Division 12 4d. Street address: 1710 East Marion Street 4e. City, state, zip: Shelby, NC 28151 4f. Telephone no.: 704- 480 -9020 4g. Fax no.: 704- 480 -5401 4h. Email address: mholder @ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Trish Beam 5b. Business name (if applicable): N.C. Department of Transportation, Division 12 5c. Street address: 1710 East Marion Street 5d. City, state, zip: Shelby, NC 28151 5e. Telephone no.: 704 - 480 -9044 5f. Fax no.: 704 - 480 -5401 5g. Email address: pdbeam @ncdot.gov Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NA Latitude: 35.23566 Longitude: - 81.65465 1 b. Site coordinates (in decimal degrees): (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 1.08 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to South Fork Catawba River proposed project: 2b. Water Quality Classification of nearest receiving water: WS -V 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Heavy urban development around site; Vegetated riparian buffer along river and ponds identified as Piedmont Bottomland Forest 3b. List the total estimated acreage of all existing wetlands on the property: 0.09 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 86 feet 3d. Explain the purpose of the proposed project: To replace a structurally deficient and functionally obsolete bridge 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 420 -foot six -span bridge with a 442- foot four span bridge at existing location over the South Fork Catawba River. The permit modification request is to allow temporary trestle support construction (i.e. 44 piles). 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No ❑Unknown ® Comments: Ajurisdictional determination memo to Liz Hair and Polly Lespinasse, dated October 24, 2011, requested a written JD be issued. 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Project Authorized under General Permit No. 19820031 (Authorized by Default per Carla Dagnino, NCDOT). DWQ 401 Water Quality Certification and Riparian Buffer Authorization issued April 26, 2012 (DWQ #12 - 0313). Permit/Certification authorized replacement of existing bridge with like bridge and buffer impacts for roadway approach, bridge, and bridge pier with temporary buffer impacts for a temporary work pad. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a Is this a phased project? ❑Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T ❑ Yes ❑ Corps W1 E] P F-1 T ❑ No ❑ DWQ ❑ Yes ❑ Corps W2 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W4 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W5 ❑ P ❑ T ❑ No ❑ DWQ ❑ Yes ❑ Corps W6 ❑ P ❑ T ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear feet) Temporary (T) (INT)? other) (feet) Temporary Fill S1 [:]PET due to trestle support South Fork Catawba River ® PER E] INT ® Corps ® DWQ 120 -200 .000321 acres construction (44 piles) ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S4 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ .000321 3h. Total stream and tributary impacts acres 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact number - Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar-Pamlico E] Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? El Yes B1 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No ❑ Yes B3 ❑ P ❑ T ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ® No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ® Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6 c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ® Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? NA % 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? NA ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes El No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? , 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval Yes ❑ No letter.) Comments: Attached in original submittal 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Minimal transportation impact resulting from bridge replacement. This project will not influence land use or stimulate growth; therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. na. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area withIederally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Biological Conclusion of No Effect 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ® Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA maps Trish Beam for M.L. Holder 12/27/12 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version C � z � i � � Q O f1 � 1 a � LP d ti � jl i� 1 C � C � � Q � 1 a � LP S � ti 17--0113 v. z f\ ,Q Iz z e a „r