Loading...
HomeMy WebLinkAbout20121137 Ver 1_Approval Letter_20130125fi� AM �.� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E, Skvarla, III Governor Director Secretary January 25, 2013 DWQ Project # 12 -1137 Hyde County Ocracoke Youth Center, Inc. Bob Chesnut 35 Miss Elecia Lane Ocracoke NC 27960 Subject Property: Ocracoke Community Park and Recreational Field Pamlico Sound [TAR07 29- (40.5); SA, HQW] Approval of 401 Water Quality Certification (GC3900) and Authorization Certificate per the Tar - Pamlico River Buffer Protection Rules (15A NCAC 2B .0259) with Additional Conditions Dear Mr. Chesnut: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.19 acres of Coastal Wetlands, 0.31 acres of waters from fill, and 16,250 square feet of protected riparian buffers for the purpose of constructing a multipurpose recreational field for the local public schools at the subject property, as described within your CAMA Major application dated December 3, 2012and received by the N.C. Division of Water Quality (DWQ) on December 20, 2012. The impacts described in your application are covered by General Water Quality Certification Number(s) 3900 (GC3900). This Certification(s) is issued in conjunction with the CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0259. In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed North Carolina Division of Water Quality Internet: www.ncwaterquality.ore 943 Washington Square Mall Phone: 252- 946 -6481 One Washington, NC 27889 FAX 252- 946 -9215 NorthCarolliina An Equal Opportunity /Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper AM(rally Page 2of4 one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 2. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. 3. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing; 4. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and /or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 5. No Impacts Beyond Application Amount Approved (Units) Plan Location or Reference Stream (feet) CAMA Wetlands 0.19 (acres) CAMA Major Application and Plats Waters 0.31 (acres) CAMA Major Application and Plats Buffers 9,750 (square ft.) Zone 1 6,500 (square ft.) Zone 2 CAMA Major Application and Plats 2. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. 3. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing; 4. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and /or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 5. No Impacts Beyond Application Page 3 of 4 No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. Compensatory Mitigation Mitigation must be provided for the proposed impacts as specified in the CAMA Major application at a 2:1 ratio for Coastal Wetland impacts and 1:1 ratio for the unvegetated Section 404 impacts. A final compensatory mitigation plan must be approved in writing by this Office before any of the impacts approved herein are conducted. Additionally, the compensatory mitigation plan must be completely constructed and implemented according to the plans approved by this Office before any permanent building or road associated with the project is occupied or opened. The mitigation must be maintained according to the approved plan and permanently protected by the use of conservation easements or similar protections. Any repairs or adjustments to the mitigation site must be made according to the approved plan or must receive written approval from this Office to make the repairs or adjustments. 7. Re Opener Clause Ocracoke Youth Center, Inc. and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Ocracoke Youth Center, Inc shall require its contractors (and /or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and /or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWQ shall notify Ocracoke Youth Center, Inc and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Ocracoke Youth Center, Inc in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 8. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight /Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and /or civil penalties. The authorization to proceed with your proposed impacts or to Page 4 of 4 conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Tar - Pamlico riparian buffer protection rule as described within 15A NCAC 2B .0259. If you have any questions, please telephone Amy Adams of the Washington Regional Office at 252 - 948 -3917 or Karen Higgins of the Webscape Unit at 919 - 807 -6360 Si erely, For Charles akild Enclosures: Certificate of Completion GC 3900 cc: Corps of Engineers Washington Field Office DWQ 401 Oversight /Express Unit DCM, Doug Huggett, Morehead Office DCM, David Moye, Washington Regional Office File copy Brian Rubino (via email) brubino @quible.com File: 12- 1137_OcracokeRecFie ld_3900_Approva I /aa