HomeMy WebLinkAbout20130062 Ver 1_CAMA Application_20130122�� 20130062
1� =_
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Braxton C. Davis John E. Skvarla, III
Governor Director Secretary
MEMORANDUM
TO: Ms. Cyndi Karoly
Env. Biological Supervisor
Division of Water Quality Wetlands Unit
FROM: Doug Huggett Respond to Doug Huggett
Major Permits Processing Coordinator Morehead City Office
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE: 18 January 2013
SUBJECT: CAMA Application Review
APPLICANT: Newman Family LLC.
PROJECT LOCATION: Project site is located off Landing Road (SR 1136) adjacent a man made
basin/canal off Fodery Creek and Swan Quarter Bay in the Town of Swan Quarter, Hyde County, North
Carolina.
PROPOSED PROJECT: Applicant proposes to undertake maintenance excavation in a man -made canal,
construct a bulkhead and a dock for "side to" mooring of small outboard powered commercial fishing
boats and fill 404 wetlands to create high- ground for storage of commercial fishing equipment.
Please indicate below your position or viewpoint on the proposed project and return this form by 7
February 2013. Please contact Steve Trowell at 252- 948 -3854, if you have any questions regarding the
proposed project. When appropriate, in depth comments with supporting data are requested.
REPLY This office has no objection to the project as proposed.
Signed
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended changes
are incorporated. See attached.
This office objects to the proposed project for reasons described in the attached
comments.
Date
943 Washington Square Mall, Washington, NC 27889
Phone: 252 - 946 -64811 FAX. 252 - 948-0478 Internet. www.nccoastafmanagement.net
An Equal Opportunity 1 Affirmative Action Employer
JAN b 2013
D NR - WATER. QUALITY
Fetlands & Stonrnwatpx R..rk
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Newman Family, LLC
2. LOCATION OF PROJECT SITE: Project site is located off Landing Road (SR 1136) adjacent a man made
basin/canal off Fodery Creek and Swan Quarter Bay in the Town of Swan Quarter, Hyde County, North
Carolina.
Photo Index - 2006:112 -8569; B -8 2000:112 -1178; X -17 1995:112 -1184; P -10
State Plane Coordinates - X: 2,793,600 Y: 612,400
Swan Quarter Quad. (lower left comer)
3. INVESTIGATION TYPE: CAMA/Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 10 January 2013
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received -14 January 2013
Office - Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Hyde County
Land Classification From LUP - Community
(B) AEC(s) Involved: EW, ES, PTA
(D) Water Dependent: Yes
(D) Intended Use: Private Commercial
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing - Man made basin and dock.
Planned - Maintenance excavation, wetland fill, bulkhead and dock.
(G) Estimated Annual Rate of Erosion: Unknown
7. HABITAT DESCRIPTION: [AREA]
DREDGED EILLED OTHER
(D) Total Area Disturbed: 7,448 ft2 (0.2 acres)
(E) Primary Nursery Area: Yes
(F) Water Classification: SA HQW
Open: NO
8. PROJECT SUMMARY: The applicant proposes to undertake maintenance excavation in a man made canal,
construct a bulkhead and a dock for "side to "mooring of small outboard powered commercial fishing boats
and fill 404 wetlands to create highground for storage of commercial fishing equipment.
1,088 ft2
(A) Vegetated Wetlands
( 404 Wetlands)
(B) Non - Vegetated Wetlands
2,300 ft2
Canal bottom
(c) Other
32200 ft2 (Spoil
860 ft2 (Shaded by
dock)
Uplands
Disposal)
(D) Total Area Disturbed: 7,448 ft2 (0.2 acres)
(E) Primary Nursery Area: Yes
(F) Water Classification: SA HQW
Open: NO
8. PROJECT SUMMARY: The applicant proposes to undertake maintenance excavation in a man made canal,
construct a bulkhead and a dock for "side to "mooring of small outboard powered commercial fishing boats
and fill 404 wetlands to create highground for storage of commercial fishing equipment.
Newman Family LLC.
Man Made Basin off Fodery Creek
Hyde County
Project Setting
The 20 acre project site is located off Landing Road (SRI 136) adjacent a man made
canal/basin and Fodery Creek off Swan Quarter Bay in the Town of Swan Quarter, Hyde
County, North Carolina. The tract is dominated by a large expanse of Juncus roemerianus marsh
with some limited highground between the marsh and SR 1136. The L- shaped man made canal
off Fodery Ceek was dug from this marsh prior to permit requirements and has an adjacent
highground spoil bank that is used by small boat commercial fishing operations for parking and
loading/off loading. There is a larger piece of highground south of the canal that resulted in part
from filling activities authorized by Major CAMA/Dredge and Fill permit No. 20 -93 issued on
11 February 1993. The highground areas have varying amounts of gravel and levels of soil
compaction resulting from vehicular traffic. These areas are vegetated with fescue grass. The
upland wetland interface is vegetated with some woody vegetation mainly wax myrtle. The
marsh adjacent the relic spoil bank and the larger area of highground to the south has been
impacted by its prior use as an area to dispose of various types of trash. The Newman Family
LLC purchased the property in 1993 after obtaining the aforementioned Major CAMA/Dredge
and Fill permit. Activities undertaken as part of the permit included the recovery of the
discarded trash in the marsh. The impacts associated with the trash dumping and prior filling
have lead to the invaisive nonnative Phragmites W. reed gaining a hold along the edges of the
filled areas outcompeting the native marsh grasses in some areas.
Water depths in the canal range from 2.5 to 3.5' below the normal water level (NWL).
The canal and Fodery Creek are designated as Primary Nursery Areas (PNA) and Coastal Waters
by the Marine Fisheries Commission and SA HQW by the Environmental Management
Commission.
Project Description
The applicant proposes to improve the use of the canal and adjacent highground area by
small boat commercial fishing operations participating in the local blue crab, gill net and oyster
fisheries. The applicant proposes to undertake maintenance excavation in an area of the canal
20' wide x 115' long removing an average of 1' of material for a consistent water depth of 3.5'
below the NWL. The spoil will be placed in a closed body dump truck for placement on the
larger highground area to the south of the canal. The applicant will then construct a 3' tall x 172'
long bulkhead along the edge of the canal at the NWL. Once the spoil material from the
maintenance excavation is dry it will be placed behind the bulkhead as backfill. A 5' wide x
172' long wooden dock is proposed along the landward edge of the proposed bulkhead. The
applicant also proposes to construct a 2' tall x 44' long retaining wall from the relic spoil berm
adjacent the canal to the larger area of highground to the south. The retaining wall is to be
constructed across a wetland area along the interface of a homogenous stand Phragmites W. and
the large expanse of Juncus roemerianus marsh. The wetland area to be filled landward of the
retaining wall is 1,088 ft2 in size and is surrounded on three sides by highground. The
Newman Family LLC.
Man Made Basin off Fodery Creek
Hyde County
Page Two
Phragmites W. wetland substrate is slightly higher in elevation and was part of the area impacted
from the earlier trash disposal activities.
Anticipated Impacts
The project as proposed disturb 2,300 ftZ of canal bottom. The project will result in the
filling of 1,088 ftZ of 404 wetlands vegetated with Phragmites sp. and the filling of 3,200 ftZ of
uplands associated with the temporary spoil disposal area. The wooden dock will shade 860 R2
of uplands. The development activities will promote the use of this area by small commercial
fishing operations and their associated impacts.
Steve Trowell — Washington Regional Office- -17 January 2013
Newman Family, LLC.
C/O Dell Newman
PO Box 101
Swan Quarter, NC 27885
Steve Trowel
Division of Coastal Management
945 Washington Square Mall
Washington, NC 27889
Dear Mr. Trowel:
As our business continues to grow and expand we are in the need of expansion
and maintenance of some of our property. This maintenance and expansion is needed to
facilitate the influx of small fishing vessels we have seen in the recent years. We are
proposing to you to undertake maintenance excavation, bulkhead and dock construction
as well as some minor wetland fill. We are proposing to excavate approximately 85 cubic
yards or material from our basin to give it an approximate depth of 3.5 feet. Along with
this excavation we propose to construct 172' bulkhead and 142' dock along this basin.
With our spoil from the basin we are also proposing to fill 1088 square feet of 404
wetland. We will construct a retaining wall approximately 2 foot in height to keep the
spoil from encroaching on the surrounding wetlands. The purpose of these development
activities is to provide more space for commercial fishing operation participants in the
crab pot, small boat oyster, and gill net fisheries. The bulkhead and dock will provide
"side to" Mooring and the wetland fill will be used for temporary storage of seasonal
fishing gear. The wetland area to be filled is highly impacted and vegetated with
Phragmities.
Accompanying this letter you will find a full application as well as drawings of
our proposal.
Sincerel
Dell Newman
MWI
NFUUTIONfor
Maier Development IFF at
gm wwra.a ist:sM)
North Catroflna DMSION OF COASTAL MANAGEMENT
1. primary Applicand Landowner Information
,4
Business Name
Project Name (if appficeble)
�oa
�43
L c
,. a.M�1 —
L W o
Agent! ConVactor 2: First Name
MI
Applicant 1: FW Name MI
Last Name
PO Boot
City
State
Applicant 2: First Name MI
last Name
Phone No.1
_
H edditnel aPloJlceMs, please Mach an additional page($) with names listed.
Phone No. 2
- - eX
Address
PO Box Cfly
State
I
7eui Set a. , [� o
Amp G
m4n r�
ZIP Coup"
Phone No.
I FAX No. 2,S 2
q W s's lK • S •
a-Ta I e4-
/4
12
Street Address (Hdllferent from above)
City State
DP
10�L1 (�oa�
eZ ?8$
Email AkW ` ���►
G 4• c e
I AgeIWCon>bractor Inforrn8VOn
Business Name
,4
AgeW ConfractDr 1: First Name
MI
Last Name
Agent! ConVactor 2: First Name
MI
Last Name
Matting Address
PO Boot
City
State
ZIP
Phone No.1
_
exL
Phone No. 2
- - eX
FAX No.
Contractor #
Street Address (d different from above)
City
State
ZIP
Emed
Oonn continues on back>
.. s d .. n � � it h r _ � :) � l'; _ 4'f �: ., i � . i r, r. . - - a : •^i . r G � .
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. IPrgJect Location
County (can be multiple)
Street Address
State Rd. fi
�}^( �•1 C o
A10-
AV SR (13 to
Subdivision Name
Gty
State
yoy N/C'r� �JeF Icy,. cis �k rN P
A
wQL ,� �Q
DS e
aTgs-S
Phone No.
Lot o.(s) (if many, attach adddonal page wNh list)
- - BA
. I .
a. In which NC river basin Is the project located?
b. Name of body of water nearest to proposed project
Tu- P2^ L r c
-r
c. Is the water bodfiderriffied in (b) above, natural or manmade?
d. Name the dosW major water body to the proposed project Bite.
ONatural Qftnmade OUnlonown
L Sew
e. Is proposed work within city limits or planning Jurisdiction?
f. if applicable, Rd the planning jurisdiction or city Irnit the proposed
Ofee ONo
work falls Wift.
7
4. Site ftwrlptlon
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.fL)
1 .5 U6 1
a O Ct-cyes
c. Size of individual k►t(s) a .� QC r eS
` Ci � C� C
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal wafer W64
+
(!f marry lot Sims. Please attach additional page with a list)
3 l ❑NHW or�NWL
e. vegetation on tract Lv 10- ncl s �@ r trx �d c- � `r C Z 5
�oa�t�F'
yoy N/C'r� �JeF Icy,. cis �k rN P
C 0 CL :5 4z4-Q t-) .-AL /\ - c- (e jZ —z k
f. Man-made features and uses now on tract Fisk
L. ��mr�ac�c.•�
ALLcldnitS 9 dncic a- SSael�`%ad
6 rc �. n r►S
g. Identify and describe the exWM land uses adeaml to the proposed Project site.
�myt.Qrcaef ►$�►i+q
C-0 r0% ^-,e W- C- I Z. I iY o,.rariq ei t7 +
D Per&- k%,e r►s
h. How does local government zone the tract? I.
Is the Proposed protect consistent wtih the applicable zonhV?
(Aftech zoning compliance certificate, 9 applicable)
OYes ONo W
J. Is the proposed activity part of an urban waterfront redevelop pent proposal? Oyes Wo
k. Has a professional archaeological assessmed been done for the tract? if yes, attach a copy. Oyes Q4o ONA
If yes, by whom?
I. Is the proposed project looted in a National Registered Historic District or does it Involve a Oyes SINo ONA
National Register listed or elloble property?
<Fotm continues on next pago
t�ti
3 t1G i L`?•F -4T? C, s,Y4S 7
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Pennit
m. (1) Are there wetlands on the site?
es ONo
(ii) Are there coastal wetlands on the site?
024as ONo
(hi) If yes to either 0) or (h) above, has a delineation been conducted?
OYes ONo
(Aftach documentation, ff avadeble)
at C e-&--6 (4e *Q R. Cg ice..► • ar .
n. Describe exiting wastewater treatment facilities.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where g b be stored. a y(- C r_ o c- to r m d rs rt- � +.,r , 't a
Sw4r-' 41 ALA rt Se We A
(IL- ^ del-
(3c.�sr:rl�cfc�.-
o. Describe existing ddnidng water supply source.
p. Describe exilting storm water management or treatment system.
��
14 Il e
rr-� A�
5. Activities and Impacts
a. Wig the project be for commercial, public, or private use? WOrnmercial
13PUWIdGovemment
OPrivate/Community
b. Gt7 brief description of purpose, use, and dally operations of the project when complete. $ w 01 we LL- Wh t D d aC-k and JmW-N
00 44s %, C f-0
at C e-&--6 (4e *Q R. Cg ice..► • ar .
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where g b be stored. a y(- C r_ o c- to r m d rs rt- � +.,r , 't a
c k
cQ U u.) o %- �.. • - Y'Ca Ja- t o r -tD CS 4J
�euJertools 10L"f t
(IL- ^ del-
(3c.�sr:rl�cfc�.-
SF.e�ES °�- �lr► head �or' '&�{►
d. List all development activities you propose.
e tr� a� �,•. �, -•Q.h� t,t...�c. Cam-- Ja- -} � n.r h�a, -�
da �� `6y t
rr-� A�
r_t t3.a11� iv�.� c_ K \` �d
.�o_r° r, i 404
Lda Inds \f e9 i0, t- P!. -cc- 5r� ►4 4'e's 5p
e. Are the proposed activities maintenance of an existing project, new work, odw
(5.&t4 bt4 —
L What is the approximate total disturbed land area resulting from the proposed project?
QS1•Ft or QAcxes
1-4 O t. 5-
g. Will the proposed project encroach on any public easement, public ac cessway or other area 13yes ONo
NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
S111- � -�1111. A
I. Will wastewater or stormwater be discharged into a wetland? OYes '®No
[]NA
If yes, will this discharged water be of the same salinity as the receiving water? OYes &4o
QNA
J. Is there any mitigation proposed? Dies PNo
QNA
If yes, attach a mitigation proposal.
,cForrn continues on bw*>
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
S. Addidonal informadon
In addition to this completed applk elion form, (MP-1) the fallowing items below, if , must be submOd In order for tine eppricadon
package to be complete. /banns (a) — M are always applicable to any major deg wopment eppawoon- Please consttit tine appffcadon
tnshrxdlon booklet on how to properly prepare the required Items below
a. A project narrative.
b. An accurate, dated work plat (Including plan view and drawings) drawn b scale. Please give the present status of the
proposed project. is any portion already complete? If previously authorized work, dearly Indicate on maps, plats, drawings to distinguish
between work oompleted and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the dead (with state application only) or other Instrument under which the applicant deems title to the aftadad properties.
a. The appropriate application tee. Check or money order made payable to OENR.
t A list of the names and complete addresses of the adjacent waftdront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and pieta by certified mail. Such landowners must be advised that they have 30 days In
which to submit comments on the proposed project to the Division of Coastal Management
New M R s- A /tee L. D "••s Coo Ten- rJ a. Phone No.-&-Z 12- G 3 7 t( �
Address 00 (60K &')I
Ot&,& r. Q u.w r Ea.. N c- A �& S Phone No. -
Name MA. L 4- I,.)Ea r`I.et r" +0 0%
Address
��I � `� K7 b
Name X77 \\ Phone No.
Address
g. A fist of previous state or federal pemniis Issued for work on the project tract Include permit numbers, pennittee, and issuing dates.
.10 -q,; l 53a..1 Fe 6 1 l l i Q3
l W 2t - Qy I Sstkad f4o U Z 4 -11 9 14
h. Signed consultant or agent authorization form, if applicable.
I. Welland delineation, If necessary.
J. A signad AEC hazard notice for projects In oceanfront and Intel areas. (Must be signed by property owner]
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S.113A 1 -10),1 necessary. If the project Involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. CerWcadon and Permission to Enter on Land I
I understand that any permit Issued in response to tnis appueanon wnl arrow onry me aeveropmenr aeuscxuoeo in umr appocanon.
The project will be subject to the conditions and restrictions contained In the permit
1 certify that 1 am authorized to grant, and do in fact grant permission to representatives of state and faderal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monftoring of the project.
I further certify that the information provided In this application is tnAhful to the best of my knowledge.
Data 1 Z' (� Print Name 0 C I I A-1 t 0 01"n-
Signature Qdtl
Please indicate application attachments pertaining to your proposed project.
j]DCM MP -2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
QDCM MP -3 Upland Development
MCM MP-4 Structures Information
Fri
Form DCM MP -2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit. Form DCM MP -1. Be sure m complete all other sections of the Joint
Application that relate to this proposed projeclL Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feel
1. EXCAVA77ON 13 This section not appkaWe I
a. Amount of material to be excavated from below NHW or NWL In
cubic yards.
c. (I) Does the area to be excavated include coastal wedandshnarsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? 9 any boxes are checked, provide the
number of square feet affected.
(]CW ❑SAV ❑SB
❑WL done
(g) Describe the purpose of the excavation in tinge areas:
Mar . 46 e.r um,,..,C. -e-4 c 4U Q }a e'..
Type of material to be excavated.
YY\ L�.C—l5
d. High-ground excavation in cubic yards.
,(/on e-
2. DISPOSAL Of EKCAVATED MATERIAL
a. Location of disposal area.. b.
an 5L.e
a 0) Do you claim We W disposal area? d.
Byes []No ❑NA
(g) If no, attach a letter granting permission from the owner.
e. p) Does the disposal area include any coastal wetlands/marsh f.
(CW). submerged aquatic vegetation (SAV), shag bottom (SB),
or other wNlands (WL)? If any boxes are decked, provide the
number of square feet affected.
❑CW ❑SAV ❑SS
❑WL ER None
(11) Describe the purpose of disposal in these areas:
[]This section not appikabie
of disposal area. f
yo X 80
(() Willi as disposal area be available for future maintenance?
(H) If yes, where?
Vnsifte-
(1) Does the disposal include any area in the water?
Dyes []No ❑NA
(g) If yes, Crow much water area is affected?
eJG•EiUFb -1W r � �$tl•`'.r `:r: �L �rJ4 ryr. c5 ^C`<_ ^.ct �c,.�Z:i3f• -� - -.F4;r. c`;ien� -,7'vr '�`
Access
Other
Channel
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
(exduding
shoreline
NWL )
stabilization
Length
Width
ao
Avg. Exlsting
NA
NA
Final Project
Depth,
3 S
NA
NA
.
1. EXCAVA77ON 13 This section not appkaWe I
a. Amount of material to be excavated from below NHW or NWL In
cubic yards.
c. (I) Does the area to be excavated include coastal wedandshnarsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? 9 any boxes are checked, provide the
number of square feet affected.
(]CW ❑SAV ❑SB
❑WL done
(g) Describe the purpose of the excavation in tinge areas:
Mar . 46 e.r um,,..,C. -e-4 c 4U Q }a e'..
Type of material to be excavated.
YY\ L�.C—l5
d. High-ground excavation in cubic yards.
,(/on e-
2. DISPOSAL Of EKCAVATED MATERIAL
a. Location of disposal area.. b.
an 5L.e
a 0) Do you claim We W disposal area? d.
Byes []No ❑NA
(g) If no, attach a letter granting permission from the owner.
e. p) Does the disposal area include any coastal wetlands/marsh f.
(CW). submerged aquatic vegetation (SAV), shag bottom (SB),
or other wNlands (WL)? If any boxes are decked, provide the
number of square feet affected.
❑CW ❑SAV ❑SS
❑WL ER None
(11) Describe the purpose of disposal in these areas:
[]This section not appikabie
of disposal area. f
yo X 80
(() Willi as disposal area be available for future maintenance?
(H) If yes, where?
Vnsifte-
(1) Does the disposal include any area in the water?
Dyes []No ❑NA
(g) If yes, Crow much water area is affected?
eJG•EiUFb -1W r � �$tl•`'.r `:r: �L �rJ4 ryr. c5 ^C`<_ ^.ct �c,.�Z:i3f• -� - -.F4;r. c`;ien� -,7'vr '�`
F01-M DCM MP -2 rE'sr� aw,::zio s and FOS, Page 2 of z)
3. SHORELINE STABILIZATION
(If development is a wwd groin, use MP-4 - Sbvctums)
a. Type of shoreline stabilization:
Wulkhead ❑PiPrap 138makwated/SUI ❑Other.
c. Average distance waterward of NHW or NWL
G r
[I This section not AppW10
b. Length: LU
Width:
d. Maximum distance waterward of NHW or NWL•
1�
e. Type of stabilization material: f. (1) Has there been shoreline erosion during preceding 12
06 0A D t— vin y L months?
❑Yes EV4o ❑NA
(0) It yes, state amount of erosion and source of erosion amount
inI matron.
g. Number of square feet of fill to be placed below water level.
Bulkhead bacdill Ripmp
SmakwatedSill Other
I. Source of fig material.
A4—
h. Type of fill material.
�'n,41• un� � r e M t'1r14 � n� a r. c.r
e- V. C.A. V4 +$s d%
4. OTHER FILL ACTIMES ❑This section not appUcable
(Exduding Shoreline Sbblllzation)
a. 0) Will fill material be brought to the site? Mae Flo ETNA b. (1) Will fill material be placed in coastal wetiandslmarsh (CW),
If yes,
pi) Amount of material to be placed In dw water
(hil) Dimensions of fig area
(iv) Purpose of fill
& GENERAL
a. How will excavated or fill material be kept on site and erosion
controlled?
De eY Vcn o B
G r&. d.a 4 It a i d C► .1
c. (i) OYnavigational ❑a� be required as a result of the project?
Pi) If yes, explain Nn what type and how they will be implemented.
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
aft j,-0,9 ❑None
(il) Describe therpose of jhe fig in tfhQse areas - - -
b. What type of construction equipment will be used (e.g., dragline,
bacdhoe, or hydraulic dredge)?
Awi*.%A
d. 0) Will wetlands be crossed In transporting equipment to project
site? ❑Yes ❑No ❑NA
(g) If yes, explain steps that will be taken to avoid or minimize
environmental Impacts.
Data
Project Narne Applicant Signature
5 n.936,4 C
252-808-2e08:. ?- �;�3c- .FRCQ)lis> wv ,c.asr ^ -a51= Prna 4t,ce� s�cE "Y.
Form DCM MP-4
STRUCTURES
(Consftutlon within Public Trebel Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental Information.
1. DOCKING FACIUTYMMINA CHARACTERISTICS
❑This section not appkable
a. 0) Is the docking faclAty/mardna:
b. M Will the fatty be open to the general public?
qW4mirmcial ❑PublidGovernment ❑Private/Community
Oyes Ob
c. (i) Doc k(s) and/or er(s) O U e r l ex A.1
d. (1) Are Flnger Piers included? OYes IgNo
pi) Number
If yes:
(Ai) Length a.
(A) Number
(Iv) Width to
(iii) Length
(v) Floating Dyes PNo
(iv) Wkfth
(v) Floating ❑Yes ❑No
e. p) Are Pladorns included? ❑Yes ❑No
f. p) Are BoatAfts included? ❑Yes Wo
If yes:
If yes:
(A) Number
(A) Number
(III) Length
(IA) Length
(Iv) Width
(iv) Width
(v) Floating ❑Yes ❑No
Note: Roofed areas are caktdated from drfpime dimensions.
g• (I) Number of slips proposed
h. Check all the types of services to be provided.
0
❑ Full service, Including travel lift and/or rall, repair or
(it) Number of slips existing
maintenance service
❑ Dockage, fuel, and marine supplies
1;-&Dockage Vwet sips") only, number of sips:
❑ Dry storage; number of boats:
❑ Boat ramp(s): number of boat ramps:
❑ Other, please dewft:
I. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water, dredging for basin and/or channel
❑Open water, no dredging required
'Other, please describe:
Mar, rrX& A, e-. r\.k,
(1"1 a r r1 le Q-r s Q e--t Cat/
k. Typical boat length: Ansr, ze
m. p) Will the facility have be pilings?
❑Yes INNo
(A) if yes number of tie pilings?
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sell boats, mixed types).
•�M a-1 ! a ci a and 'j a -Je rF.af
e-0 m %—e�cLc.f SK % acs
1. 0) Will the facility be open to the general public?
Dyes W
�;:t- Ffi4 -L t i ^• E`? 3 C14 � a +A'G >_'.k _ _ = ��or_� y Sag 2`_ 5 ".$,n,z :,�. ;; �d .1 T 4r.. vas
r,
C7
_u
z�
�t
a
.�9
e �
a 'm
E3 0 80
F,- C,- r( ? CM' 9FI F- Page ..S of 4)
m. Is the madWdocidng facUfty proposed within a primary or secondary nursery area?
[]Yes []No
n. Is the marinaldoddng facility proposed within or adjacent to any shellfish tmrves" area?
OYes []No
o. Is the maMWdoddng facility proposed within or adjacent to coastal wetiandslmarsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are dredwd, provide the number of square feet affected.
13CW []SAV OSB
OWL ONone
p. Is the proposed marina/doddng facility located within or within dose proximity to any shellfish leases? []Yes ONo
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered trice) Mfhis section not applicable
a. n) Is the boathouse structure(s):
OCommaraal OPublkJGovemment OPrivate/Communfty
(ii) Number
(UI) Length
(Iv) Wldtir
Note: Roofed areas are calculated from dnpline Ownsions.
t GROIN (e.g., wood, shaeoile, etc. if a rock groin, use MP -2, Excavation and till.) 9015 section not applicable
a. (I) Number
(II) Length
(ill) Width
15. BREAKWATER (e.g., wood, ~is, etc.) 19 his section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6 MOORING PILINGS and BUOYS Spins section not apptrc" I
a. is the sir u bze(s):
I]Commerdai [3120WGovemment 012firate/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, lfpresent
e. Are of the swing
b. Number
d. Description of buoy (color, Inscription, size, anchor, etc.)
252-1A18 %.z.DS '06
H,r` 4 Ft I TC- A Of 4)
7. GENERAL
Pro)dmhy of structure(s) to adjacent riparian property lines
+ I 0C) I
Allots- For buoy or mooring piling, use arc of swing kcWng length
of vessef
Width of water body
-03�
Q) Will navigational aids be required as a result of the project?
❑yes FNo ONA
(9) if yes, explain what type and how they wM be Implefforded.
b. Proximity of structure(s) to adJaoent doddng kcilitles.
-f 016 .0 /
Water depth at waterward end of structure at NLW or NWL
3'
I & OTHER ❑This mcibn not applicable I
a. Give complete description:
�Y'b Om c ru'-r z C-_Dil k 4
06-1[1 rar\ 5 tV-U_C�2 LA _01N :LL L4 D e-cas
L CS 4C
A: e r _—S c 12 &,
,z I_-0ye_ C* ,.I cv, rv'o _" C_ (I & C1 T-
J
I /L / o-
Dale
6 yv"tA, q
P1011d NSMG. A
t I AA iv re-&—
APT!5*
_eZI I V"'
Applicant Sigrohn
tl/'e
N e0YN\4t ) =gym; ly LLC_
p /C,N
aL-
l �
._POD
oSzC
S �, 11 3b
We
ALI
C&
c
hoof -r
h ro Pea e p 'C"(1
to v'w.a
L�
�A f0 .r
PO
Ilk
�Y 4��
i�p a r
J,y �,► l
,F7
<- (bS3 Se(Xi ON
Nor m sc,&Jif
cr se
$l.ae.r 2 e t Z
To see all the details that are visible on the
next to the Map-
screen, use the "Print" link n ;;;;;]
Driving directions to 644 Landing Rd, Swan Quarter, NC 27886 13D
Washington Square Mall
719 West 15th Street
Washington, NC 27889
(252) 946-1625
1. Head southeast on 15th St toward Washington St
---- - -- — ------------ - -- —
-- - - - - -- - --------------------- -- - - - - -- 0 7 m
2. Turn right onto N Market St
- ----- ----- - - - - -- ---------- -- - - - - -- 0.7 rrd
3. Turn left onto E 5th St
— ---- ----------------------- -- -- --------- ----------- - --- --- - - - - -- 0.2 rd
4. Continue onto US-264 E/John Small Ave
Continue to follow US-264 E
8 6 ni
5. Keep left at the fork
Continue to follow US-264 E
20.Om
6. Turn left to stay on US-264 E
1 of 2 1/2/2013 12:38 PM
- — ---- - - - - -- -- - - -- - — - - -- - - -- 24.4 rn
7. Turn right onto N Carolina 45 S
8. Turn right onto Landing Rd
Destination will be on the right
0.6 mi
` 644 Landing Rd
r Swan Quarter, NC 27885
These directions are for planning purposes only You may find that construction projects, traffic, vreafher, or other everts may
cause conditions to differ from the map results, and you should plan your route accordingly You must obey all signs or notices
regarding your route.
Map data 02013 Google
1/2/2013 12:38 Pb
2 of 2
North Carolina
jJ11D212
RINGTON, L. H.
.1 BOX 476
LOT f 60 n On
HARSH GRASS
PRIVATE RD
0.00001 0 1 0 1 1004; 1" I 0
NO IMW Found
OPERMW
12
lay
Coat Neer SLUE
M2
3yde County, North Carolina
M AA�M MM Po 99 &M QWMr NC Gees
2=100 Pin J11D 212
s
ATHERINGTON, L. H.
.1 BOX 476
tal Acres 4 / Acre
L
HO PUBLIC
Land Use Value
K
0 Land Value
0.
$2, ®m
Total Parcel Out Building 6 Other Improveaents Value t
p MMS VALVE
J2,000 SED VA
LVE
p ffiV"Vm
$2,000