Loading...
HomeMy WebLinkAbout20200485 Ver 1_Modification no impact_20210427Strickland, Bev From: Megan Bollero <megan@cws-inc.net> Sent: Tuesday, April 27, 2021 2:00 PM To: Roden Reynolds, Bryan K CIV (US); Johnson, Alan Subject: [External] SAW-2019-02005; DWR# 20-0485 Milton Road Affordable Attachments: 2019-0121_MiltonRoadAffordable_CulvertReplacementMemo_4.20.21.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bryan and Alan, I have attached a memo for your records regarding the Milton Road Affordable project (SAW-2019-02005; DWR # 20-0485). Let me know if you have any questions. Thanks, Megan Bollero, WPIT Project Scientist Carolina Wetland Services Inc. 550 E Westinghouse Boulevard Charlotte, NC 28273 Cell:(757)-576-6433 www.cws.net i CAROLINA WETLAND SERVICES, INC. 550 E. Westinghouse Blvd. Charlotte, NC 28273 704-527-1177(office) 704-527-1133 (fax) To: Ms. Bryan Roden-Reyolds U.S. Army Corps of Engineers, Charlotte Regulatory Office 8430 University Executive Drive Charlotte, NC 27604 Mr. Alan Johnson NCDWR, 401 & Buffer Permitting Unit 512 N. Salisbury., 9th Floor Raleigh, NC 27607 Subject: Milton Road Affordable (SAW-2019-02005, DWR# 20-0485) Charlotte, North Carolina CWS Project No. 2019-0121 Dear Mr. Roden -Reynolds and Mr. Johnson, Date: April 20, 2021 The Milton Road Affordable site (Mecklenburg County Tax Parcel Nos. 09921101 and 09917101) is approximately 16.6 acres in extent and is located southwest of the Milton Road and North Sharon Amity Road intersection in Mecklenburg County, North Carolina (Figures 1 and 2, Attachment A). Winterwood Development, LLC has contracted Carolina Wetland Services, Inc. (CWS) to provide Section 404/401 permitting services for this project. A Nationwide Permit No. 29 was issued by the USACE on June 22, 2020, and a 401 Water Quality Certification was issued by NCDEQ on May 21, 2020 (Attachments B and C). As noted in the original impact figures, the client intended to extend an existing culvert by 25 linear feet (S3 and S4; Sheet 3; Attachment D). Upon construction it was determined that the existing culvert was deteriorated more than anticipated, therefore the replacement of the culvert is required. All work will take place in the footprint of the previously permitted impacts, and no additional impacts will occur (Attachment E). This memo has been prepared for records only. ATTACHMENTS INCLUDED: DESCRIPTION Attachment A - Figures 1-7 Attachment B - Nationwide Permit No. 29 SAW-2019-02005 Attachment C - NCDEQ Water Quality Certification DWR # 20-0485 Attachment D - Original Impact Drawings Attachment E - Culvert Replacement Details Please do not hesitate to contact Megan Bollero at 757-576-6433 or megan@cws-inc.net should you have any questions or comments regarding this request. Sincerely, T;prl_ Megan Shelton, Project Scientist ►N= Z4,� 4v��� Aliisa Harjuniemi, PWS Senior Project Manager Milton Road Affordable Attachments April 21, 2021 CWS Project No. 2019-0121 Attachment A: Figures (1-7) Kentucky Tennessee South Carolina Georgia Virginia Par k n - C n •P 4• 0 C 4y River Rd Reedy Creek filature Pre se rre F- s L 2 Q e r � 'A 4 e86n Arri ;r GhurGh Rd Aug � sg a �hroc-f 4 C Charlotte ��,d `\ q Country c C luh Pen co qa Mrrkory Grova Rd ~ r r1•,r�rs U. ��ol} ��[•ursa G t;r Ewe rg ree r1 Eastland Ce rnetery hU I a - R lhn _�- rnarlekd tl x Co Is +a MpnrDe as t 2 � Rry �R r ¢ e fy S� � r, ^- Legend Project Limits (16 ac.) s REFERENCE: BACKGROUND VICINITY MAP PROVIDED BY ESRI, 2019. 5,000 2,500 0 5,000 Feet SCALE: 1 inch = 5,000 feet DATE: 3/8/2019 FIGURE NO. Vicinity Map CWS PROJECT NO: DRAWN BY: Milton Road Affordable Mecklenburg County 2019-0121 DJZ CAR ❑ L I N A COORDINATES: CHECKED BY: 35.234239,-80.744545 CAG I WETLAND SERVICES. Charlotte, North Carolina G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure1_Vicinity_ESRllayernotloading.mxd _us BrfC CrY — -- r• 7FtF PLAZA Bnartvood KIPP AC .0 � pECr+l r' A Elem • Charldfe + •YF q9.. - I I r L� Ue[ta lake 11 . :Acrid Acad F i nQ `pELfVAt1 DR '7F - �}.�����p £� r� FOR - FpaP , 6 Da A�LG1INYQR I— / 2 SYONEFIAVEN p I .�W - � Qfi Y '1 pQ till O �j4 Gqp PkRK6IVD ff a- O nWILIAR" � SZRo- �Y E � pOBhjis " '1 DR OIl OFT TE CRARL AS PTI�N Shc ISLAMIC A[ed LEAS fJi��1 50M£RaALELNI� C. �,�P oW EierrnJ, PENCE EkmSdr �`RaVEgp —JJ DRY GRgI �AP'n T RISTIAN Sch ,71 1 - `•ti � U JJI — i 0y � HA q A(E• 1 D R1i p � Y � �_.� • B E W IC LN . � y Legend Project Limits (16 ac.) REFERENCE: USGS 7.5 MINUTE TOPOGRAPHIC QUADRANGLE(S): DERITA, HARRISBURG, MINT HILL, AND CHARLOTTE EAST, NC (2017). 2,000 1,000 0 2,000 Feet lI SCALE: DATE: FIGURE NO. 1 inch = 2,000 feet 3/8/2019 USGS Topographic Map CWS PROJECT NO: DRAWN BY: 2019-0121 DJZ �r Milton Road Affordable COORDINATES: CHECKED BY: CAR ❑ L I N A Mecklenburg County 35.234239,-80.744545 1 CAG WETLAND SERVICES. Charlotte, North Carolina 1 21 G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure2_USGS_ESRllayernotloading.mxd GATeam Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure3_Aerial.mxd H CUB I► MO HeB CeB2 CeB2 B HeB CeB2 B CeB2 ATI C W500 MOLegend Project Limits (16 ac.)HeB Helena sandy loam, 2 to 8 percent slopes No 52.4HuB Helena -Urban land complex, 2 to 8 percent slopes No 47.6Streets .. . . 00 REFERENCE: USDA-NRCS SOIL SURVEY OF MECKLENBURG COUNTY, NC, DATED 2013. O , 000 Feet SCALE: 1 inch = 1,000 feet 3/7/2019 Y DATE: USDA-NRCS Current Soil Survey FIGURE NO. CWS PROJECT NO: DRAWN BY: of Mecklenburg County ount 2019-0121 DJZ Milton Road Affordable COORDINATES: CHECKED BY: C A R O L I N A Mecklenburg County 4 35.234239,-80.744545 CAG WETLAND SERVICES Charlotte, North Carolina G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure4_CurrentSoil.mxd Ur Ur He-B HuB 2 t1B H t3B CeB2 � H�.�B CeB2 CUD VaB w CeB2 CuB MQ CUB e0' � � u.f Hub HeB '1. CUB CUB Lou v s TTE DSTl B C,,�cr, H e B HUB V aB 1 s HuB eB2 He as H e B 2 CUB CeB2 CUB EnB Va S N Heg CeB2 H Ce02 CLAD CeB2 V 38 M0 m t,F 0 Legend •Coverage HeB Helena sandy loam, 2 to 8 percent slopes No 52.4 HuB Helena -Urban land complex, 2 to 8 percent slopes No 47.6 Project Limits (16 ac.) Totals for. 00 1,000 500 0 1,000 Feet REFERENCE: USDA-NRCS PUBLISHED SOIL SURVEY OF MECKLENBURG COUNTY, INC, SHEETS 7 AND 8, DATED 1976. SCALE: DATE: FIGURE NO. 1 inch = 1,000 feet 3/7/2019 USDA-NRCS Published Soil CWS PROJECT NO: DRAWN BY: Survey of Mecklenburg Count 2019-0121 DJZ Milton Road Affordable COORDINATES: CHECKED BY: CA R O L I ICI A Mecklenburg County 5 35.234239,-80.744545 CAG WETt_AND SFPVI _FS Charlotte, North Carolina G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure5_HistoricSoil.mxd Dr Boyce my Roth o a Penh Ct — r Bette ►'iarn — (PP Vinetta Ct co a s F°tee� 0 a epotn C'j 9 Sto Fokforq At d ao�% o Or dun � �pAe�9ate �n woody Dr Stran hAa 9foroq � /e R ey Linda Lake Dr evf Y � s 0 Vie Way Dr �S p a ° o -A isty Morn Dr CD Q Mar ay Dr y IS r U Delivau Dr 1 Deliah Ln o Y Randy Dr r ston Ct L of UN of G E qj e �r a 0 0 � a 5 O co fnity ointe Rd 2 ydr/SSG o )J 'Zro'gh�ityCt �^ /�� Ct a/ e r ° Lo r 0�/�90r ire• shd'hr �n a oodRd O T� am c C�.Or did/'7 end Legend o Kavanaugh Dr ° Project Limits (16 ac.) o p� Streets m Hancock Tr �C National Wetlands Inventory o Ivanhoe 1 P�\ce ® Freshwater Forested/Shrub Wetland t2 eo Freshwater Pond r 44) Riverine REFERENCE: NATIONAL WETLAND INVENTORY DATA PROIVDED BY UNITED STATES FISH AND WILDLIFE SERVICE FOR NORTH CAROLINA, ACCESSED 2019. BACKGROUND LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIS DEPARTMENT, DATED 2019. �� m 1,000 500 0 1,000 Feet 0 SCALE: 1 inch = 1,000 feet DATE: 3/7/2019 National Wetlands Inventory FIGURE NO. CWS PROJECT NO: DRAWN BY: 2019-0121 DJZ Milton Road Affordable 6 COORDINATES: CHECKED BY: C A R O L I N A Mecklenburg County 35.234239,-80.744545 CAG WETLAND SERVICES Charlotte, North Carolina G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure6_NWl.mxd _j O Intermittent Stream E 180 If i O Intermittent Stream A 401 If . S t� � (.� \ A SCP2 • DP1 � �'SCA � 7 SEP7 � SCP4 •� Intermittent Stream C � • D P2 �-"-�"-" 157 If DP3•ell `51 A SCP6 ,� SCP3 �f0 I Legend Wetland AA I Project Limits (16.6 ac.) 0.003 acre Perennial Stream - - - Intermittent Stream 151 Pipe ® Wetland Stream D Roads Intermittent Flow: 204 If Perennial Stream B Parcels Perennial Flow: 147 If 865 If Total Flow: 351 If *DP Data Point c ♦ SCP Stream Classification Point N Photo Location and Direction REFERENCE: BACKGROUND GIs LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIs DEPARTMENT, DATED 2018. Indicates Flow NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED IN THE FIELD), CLASSIFIED, AND MAPPED USING A SUB -FOOT CAPABLE GPS 0 UNIT BY CWS, INC., ON MARCH 8, 2019. JURISDICTIONAL FEATURES HAVE NOT C/2 200 100 0 200 Feet BEEN VERIFIED BY THE USACE. `�SQ SCALE: DATE: FIGURE NO. 1 inch = 200 feet 3/19/2019 Jurisdictional Boundaries CWS PROJECT NO: DRAWN BY: 2019-0121 JKM Milton Road Affordable COORDINATES: CHECKED BY: C A R O L I N A Mecklenburg County 7 35.234239,-80.744545 CAG WETLAND SERVICES Charlotte, North Carolina G:\Team Drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0121 Milton Rd Affordable\JD\ArcGIS\Figure7_JD.mxd Milton Road Affordable Attachments April 21, 2021 CWS Project No. 2019-0121 Attachment B: Nationwide Permit No. 29 (SAW-2019-02005) U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-02005 County: Mecklenburg U.S.G.S. Quad: NC -Mint Hill GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Winterwood Development, LLC Zach Worsham Address: 1390 Olivia Lane, Suite 100 Lexington, KY 40511 Telephone Number: 859-276-5388 E-mail: zworsham(&winterwoodonline.com Size (acres) 16.6 Nearest Town Charlotte Nearest Waterway Brier Creek River Basin Santee USGS HUC 03050103 Coordinates Latitude: 35.23423 Longitude:-80.74454 Location description: The proiect area is located on the east side of Village Green Drive, 0.13 miles south of the intersection of Milton Road and Village Green Drive. PINs: 09921101 and 09917101. Description of projects area and activity: This verification authorizes the grading and placement of fill material in 232 linear feet of stream to facilitate the construction of a multi -family residential development. The proiect would result in the loss of 192 linear feet of stream from the installation of a culvert and temporary impacts to 40 linear feet of stream for construction site dewatering. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 29. Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 6/15/2020, and the enclosed plans Sheets 1-4 dated 4/20/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David L. Shaeffer at 704-510-1437or david.l.shaefferna,usace.army.mil. �• �� Digitally signed by SHAEFFER.DAVID.LEIGH.1260750573 Corps Regulatory Official: Date: 2020.06.22 14:19:02 -04'00' Date: 06/22/2020 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/Pp=l 36:4:0 Copy furnished: Agent: Carolina Wetland Services, Inc. Megan Shelton Address: 550 East Westinghouse Boulevard Charlotte, NC 28273 Telephone Number: 757-576-6433 E-mail: megan(&cws-inc.net SAW-2019-02005 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2019-02005 County: Mecklenburg Permittee: Winterwood Development, LLC, Zach Worsham Project Name: Milton Road Affordable Date Verification Issued: 06/22/2020 Project Manager: David L. Shaeffer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David L. Shaeffer Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or david.l.shaeffer@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Compensatory Mitigation Responsibility Transfer Form Permittee: Winterwood Development, LLC, Zach Worsham Project Name: Milton Road Affordable Action ID: SAW-2019-02005 County: Mecklenburg Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03050103, Catawba River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 192 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03050103 Expanded Service Area Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 672 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 4/7/2020 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David L. Shaeffer USACE Field Office: Charlotte Regulatory Office US Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 Email: david.l.shaeffer@usace.army.mil Digitally signed by ' SHAEFFER.DAVID.LEIGH.1260750573 �' f 9- Date: 2020.06.22 14:20:07-04'00' USACE Project Manager Signature 06/22/2020 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil 4/20/2020 EYgRRpyGT ` ,\ srnyG60, �NORIVE 1 SHEET C-3.1 / C-3.3 N/F 1 DAVID LUTHER WILLIAMS & KAREN B WILLIAMS DEED BK 2]564 PG 202 1 PARCEL-ON21126 ZONING: 1-1, 0-1 CURRENT USE: VACANT 1 / CJ - WOODFIELD COLLINS LLC \ DEED BK 22280 PG 793 1 PARCEL: ON21129 \ ZONING: R-1] MF 1 CURRENT USE: RESIDENTIAL NOTES: 1. CO ORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. 2. ALL ROAD IMPROVEMENTS AT WESTERLY HILLS DRIVE ARE TO BE COORDINATED WITH THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. 3. DEVELOPER WILL PROVIDE STREET SIGNS PER CLDSM# 50.05 (9- SIGNS ONLY) 4. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. 5. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. 6. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. ]. IN OR DER TO ENSURE PROPER DRAINAGE KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. 8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 9. CURB AND GUTTER SHOWN ON PLANS MAY BE ADJUSTED BASED UPON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MANALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. 10. HIGH -DENSITY POLYETHYLENE (HOPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT-OF-WAY MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT-OF-WAV. 11. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. 12. ANY BUILDING WITHIN THE 100+1 STORMWATER ELEVATION LINE IS SUBJECT TO THE RESTRICTION OF THE (CITY OF CHARLOTTEIMECKLENBURG COUNTY) SUBDIVISION ORDINANCE, SECTION 7.200.8. 13. ANY CONSTRUCTION OR USE WITHIN THE FUTURE CONDITIONS FLOOD FRINGE LINE IS SUBJECT TO THE RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF THE CITY OF CHARLOTTE AND MECKLENBURG COUNTY. 14. ALL OPENINGS E.G. DOORS WINDOWS VENTS IN STRUCTURES SHOULD BE LOCATED A MINIMUM OF ONE FOOT ABOVE THE ADJACENT FINISHED GROUND SURFACE APPLIES TO LOTS WHICH MAY EXPERIENCE SIGNIFICANT OVERLAND FLOW NOT CONSIDERED IN THE WIN FLOOD ANALYSIS) 15.RE 'ASEALED SHOP DRAWINGSFOR RETAINING WALL MUST BE SUBMITTED L CITY ENGINEER PRIOR S, CONSTRUCTION. 16. TO SUBDIVISION DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM. INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY/COUNTY SUBDIVISION ORDINANCE. 17. PRIOR CO SURVEYOR SEALED AB -BUILT DRAWINGS OF ALL WATER QUALITY BMP'S AND DETENTION SYSTEMS MUST BE PROVIDED. 18. PRIORTO PLATEOF THE'IOFFOFFSITE RANAND/OR CONSTRUCTIONEASEMENTSARE REQUIREDTO TI OBTAINED ACCORDING TO THE ONGUIDELINESTHROADWAHE'OFF IMPROVEMENT ACQUISITION PROCESS'. THESE NEEDED RNJ AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN TI THE ROADWAY IMPROVEMENT PLAN. 19. PER SECTION E OF CITY CODE AND SECTION OF THE CITY'S POST CONSTRUCTION CONTROLS ADMINISTRATIVE MANUAL, ALL REQUIRED NATURAL AREAS AND/OR POSTST CONSTRUCTION CONTROLS EASEMENTS (EDGES) MUST BE RECORDED PRIOR THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 20. THE DEVELOPER SHALLCONTACTSI THE CHARLOTTE DEPARTMENT OFTDAYS WILSPORTATIONL REQUIRGUS ED COORD7N.3INATE RELOCATION. A IDENTIFY ANY CONFLICTS WITH TRAFFIC SIAE FOR ALL EQUIPMENT. OCA DAYS WILL BE REQUIRED RO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIVLE FOR ALL RELATED RELOCATION COST AND/OR ABT REPAIR COST CAUSED BY THE GERTRICATIO AND PER. 21. CERTIFICATION AND STREET CUT PERMITS ARE REQUIRED FOR UTILITY CUTS ON CITY STREETS. ALLOW ]DAYS PROCESSING FOR PERMIT. FOR INFORMATION CONTACT CHARLOTTE DEPARTMENT OF TRANSPORTATION E/H0ME.HTMI) OR VISIT HTTPON-ST M1NW.CHARMS (IE: PAVERS, IRRIGATION T ION SYSTEMS, ETC.) IN THE -MAINRIGHT- TENA Y REQUIRE A R 22. NONSTANDARD ITEMS EM PAVERS, IRRIGATION SYSTEMS. ETC.) DEPARTMENT THE RIGHT-O RTA I REQUIRE A RIGHTINA DEPV ENCROACHMENT AGREEMENT WITH THE CHARLOTTE FCHARLO OF MAINTAINED STREETS, RTHCON CARACT C NA DEPARTMENT 88 TRANSPORTATION BEFORE INSTALLATION. FOR CITY OF CHARLOTTE MART OFT HE DEVETS,CONTACTCOOTAT(]04)338-3888. 23. SIDEWALK WITHIN THE D BE HA THAT REQUIRES REPLACEMENT AS PART R THE DEVELOPMENT AND/OR STREET IMPROVEMENTS SHOULD BE PHASED IN SUCH AWAY AS TO MINIMIZE THE DURATION OF THE SIDEWALK REPAIRED AND REOPENED FOR PUBLIC UBE WITHIN IT DAYS OF REMOVAL. 24. ANY WORK WITHIN THE USE PERMIT RMITHATREQUIRESCLOSURE OFASIDEWALK ORTRAVEL LANE MUST BE APPROVEDBYCOOTAND WILL REQUIRED ARAN USEPERMITS AND LEASE DEPENDING UPON THE PROPOSED DURATION ST CLOSURE .THESEAPPROVALS ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH COOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT CLOT AT ACT COOT 62 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FIR IMPACTS LESS THAN R DAYS. CONTRACTOR SHALL CONTACT COOT AT 704 OVEM48AS BOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 25.RIGHTICCONTCLOSURE S LONGER THAN ODAYS REQUIRE ARANLEASE AGREEMENT WHICH WILL INCLUDE THE SUBMITTAL E A TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLANS REQUIRED THROUGH SUBJECT AGREEMENT MAYBE DIFFERENT FROM THE ONE REQUIRED DURING ESUBMITDEVELOPME OFTH EASE AANDGRE ARE MENTPOESS REVISIONS. THE REVISED TRAFFIC CONTROL PLANS MUST BE SUBMITTED AS PART OF THE LEASE AGREEMENT PROCESS FOR APPROVAL PRIOR TO START OF RAN CLOSURES. CONTRACTOR IT CONTACT COOT AT G M RE TH48. 26. CONSTRUCTION STAGING (7N) 3 4348. N LASTING MORE THAN 30 0AV5 REQUIRES A RNJ LEASE AGREEMENT. CONTRACTOR SHALL CONTACT COOT AT (ALF 338-8348. 27. DEVELOPER T CONTACT RTHI D PROJECT. . COORDINATE DURING SITE PLAN PREPARATION TO DISCUSS STREET LIGHTING REQUIREMENTS, , ANV, LIGHTING LAYS PROJECT. COORDINATE WITH DUKE ENERGY AND COOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. 28. PRIVATEDEVELOPMENT UTILITYRELOCATIONCOORDINATE -FORUTILITY COORDINATIONRELATED TO BOTH EXISITNG UTILITY RELOCATION NEEDS AND PROPOSED UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, COOT ROW UTILITY COORDINATIONLE 71MMEET-ME MAN OLE)RTRIST TO PROVIDED V. 29. AJOINT MANHOLE (MEET -ME MANHOLE) IS TO BE PROVIDED C THE DEVELOPER TO PROPERTY UT IALL UTILITY CITY RIG TR SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BELOCATED D PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT-0E-WAY. 30. ALL ACCESSIBLE PARKING SPACES MEET VAN ACCESSIBLE STANDARDS. / WF \ / DAVID LUTHER WILLIAMS \ / & KAREN B WILLIAMS DEED6K27564PG 202 PARCEL 0992 ZONING: E 01 AC - � CURRENT USE: VACANT \ r-----1------------------------f-- - 1 1 SHEET C-3.2 / C-3.4 1 1 1 1 1 1 1 J Culvert Extension 1 See sheet 4 for 1 1 1 E 1 I PRIVATE - ENDSTREET STREEEET B WE I WOODFIELD COLLINS LLC I DEED SK 22280 PG 793 1 PARCEL: 09921130 ZONING: R-17 ME I \ CURRENT USE: RES\IDENTIAA 1 - Road Crossing - See sheet 2 for proposed - - - impacts (S1 and S2) 1 1 TREE SAVE N/F PHYLLIS S WORTHY \\\ DEED BK 15233111 PG 694 PARCELZONING Rs7M POTENTIAL ZONING: R E MF TREESAVE CURRENT USE: RESIDENTIAL \AREA( TYP. NINVE \MER DEED BK 30265 PG 117 PARCEL: ON21116 ZONING: R-17 ME, R4 Q CURRENT USE: RESIDENTIAL) S O. A c - - G NI1F c / Q JAMES ECALDWELLB I DEVELOPMENT SUMMARY: @'!y 'PjL� SHIP—E CALOWELL DEED BK 05353 PG 030 F 1. TAX PARCEL1710, 0 PARCEL: 09921115 ) -09I C ION 09921101 ZONING: R-0 2. SITE JURISDICTION I CURRENT USE: RESIDENTIAL ) -CITY OF CHARLOTTE 3. TOTAL SITE ACREAGE `16.16 ACRES / ( I 4. PROJECT SITE ACREAGE TO BE DEVELOPED -t 16.61 ACRES 5. EXISTING ZONING & USES J WE -R]MF, R-9 ME CO. -1 oilASSOCIATION MILTON -VAACANT I COMMONS HOMEOWNERS OWNSWNERS 6. DIMENSIONAL REQUIREMENTS I DEED BK 08099 PG 722 -1]' SETBACK FROM ROW PARCEL: 0991]361 -10'SIDE YARD lI I ZONING: R-0 -50, REAR YARD(ADJACENT TO SINGLE FAMILY) \ 1 \ CURRENT USE: VACANT -4 REAR YARD (ADJACENT TO NON SINGLE FAMILY) ]. TOTAL RESIDENTIAL UNITS -168 UNITS 13. VEHICLE PARKING B. DENSITY PER ZONING: REQUIRED: 294 SPACES 1.75 SPACES PER DWELLING UNIT PER QAP ALLOWED: UP TO 247 M13.60FAMILY RESIDENTIALCRE = 231 UNITS PROVIDED: 294 TOTAL SPACES(1.75COUNT S PER SUBJECT TO CHANGE B R-C] ME: DL P ACRES I it UNITS/A REZONING M-39 UNITS FINAL PARKING COUNT SUBJECT TO CHANGE BASED O R-9 MF ABLE PER PREVIOUS REZONING 8CON THE FINAL ENGINEERING ALLOWABLE UNITS HAS ALREADY BEEN CONSTRUCTED = 0 25 ACCESSIBLE SPACES -1: 1.15 ACRES X 0 UNITS/ACRE = 0 UNITS 17 HC SPACES FOR TYPE A (1 PER TYPE A UNIT) PROVIDED: 168 UNITS/16.62 ACRES=10.10 UNITSIACRE 4 HC SPACES FOR TYPE B 2%OF TYPE B UNITS) ) 9. BUILDING HEIGHT 0HC SPACES FORD02SPACES=45PACE5 ( ) MAXIMUM RALLOWTABLED: 3 ST )(A) O T + 1' FOR EVERY 2' FROM SETBACK AND 3 HC SPACES FOR DUMPSTERS YARDS PER TABLE 9W06(3)(A) OF THE ZONING ORDINANCE. (ADJACENT TO 1 HC SPACE FOR CLUBHOUSE MAX PROVIDED 460 WHEN ADJACENT VATINON S FORRESIDENTIAL EIGH USES LI ZONING) 14. BIKE PARKING MAXPROVIDED: 46'-11'(REFER TO ELEVATIONS FOR HEIGHT COMPLIANCE) REQUIRED: N/A - LOW INCOME HOUSING 10. BUILT UPON ARE 15. SOLID WASTE PROVIDED: 5.Sfi ACRES (242,132 SF) 33% REQUIRED: ONE 8 CU. YD. DUMPSTER PER 30 UNITS 11. NATURALAREA: PROVIDED: 188 UNITS I30 UNITS=6-B CU. YD. DUMPSTERS REQUIRED: 10% OF SITE ACREAGE =0.1 x16.56=1.66 ACRES 16. RECYCLING PROVIDED: 4.52 ACRES REQUIRED: 3 x 144 SF FOR 168 UNITS (432 SF) 12. TREESAVE: PROVIDED: 432 SF REQUIRED: 2.49 ACRES 17. NOT ALL UTILITIES WILL BE UNDERGROUND PROVIDED: 4.52 ACRES 18. ESTIMATED COMPLETION DATE POTENTIAL TREE SAVE TO BE DETERMINED DURING FINAL DESIGN JANUARY 2022 MAr - WF impacts EMA TI 1 proposed ED BK 32MARTIN DEED5]8 PARCEL: ONN698 (S3 and S4) ZONING IV CURRENT USE: VACANT / - � 1 1 � 1 1 1 � 1 ) � 1 � � 1 N/F / CLTCAR LLC DEED BK 323M PG 881 1 1 / PARCEL.09920549 / ZONING. R-D) CURRENT USE: MULTI -FAMILY MULTI - 1 � � 1 N/F SHARON E JOHNSON DEED BK M329 PG 923 PARCEL: ON20128 WF RADIANT PROPERTIES LLC DEED BK 252N PG 049 / PARCEL: 009920121 ZONING: R-3 7EIE8> : AL )NING: R-3 USE: RESIDENTIALI 0 I BUILDING INFORMATION BLDG TYPE BLDG TYPE OLM BUILDING CONSTRUCTION TYPE I &A LA5-B USE GROUP R-2 R-2 A-3B MAX HEIGHT 45'-3- 46'-11- 29'-0' SPRINKLER SYSTEM NFPA I3R NFPA I3R NONE WE UNIT TYPE TABULATION A&M INVESTMENTS OF THE CAROUNASLLC GREAT WAGON RO uNITBLOGa 1 2 a TOTAL DEED BK 26466 PG 553 50' PUBLIC RIW 1 12 12 24 BEDROOM TABULATION PARCEL: 126 ZONING:G: R-3 2 12 12 24 # OF BEDROOMS TOTAL % OF TOTAL R- 48 . CURRENT USE: RESIDENTIAL 3 12 12 24 1 2 8 6% 4 1212 24 2 36 21.4% 5 12 12 24 3 84 50.0% I 8 12 12 24 168 100% 12 12 24 \/ 1\\/\\ TOTALS 48 38 84 10 LEGEND N/F 1 PROP. RIGHT OF WAY MARVIN PONDS & ROCHELLE PONDS El DEED BK D4723 PG 976 ) PROP. SETBACK - - - PARCEL :09920125 WF/ CURRENT R-3 PARKING COUNT 1® T USE: RESIDENTIAL SHELTON BLACKWELL PROP. TREE SAVE DEED BK 16575 PG 820 PARCEL: ON20112 EX. FENCE -x x- ZONING: R-3 CURRENT USE: RESIDENTIAL NOTE: N 1. BASE MAP DATA FROM SURVEY PROVIDED BY R.B. PHARR DATED O OCTOBER 22 2019 AND SUPPLEMENTED WITH CITY OF CHARLOTTE PLANAMETRICS GIS TOPO AND PARCEL DATA. o E O BEFORE YOU DIGI CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! LmdDesip- 223 NORTH GRAHAM STREET CHARLOTTE, NC28202 704.333,0325 W W W.LANDDESIGN.COM NC ENG. FIRM LICENSE # G0658 EAL - 03]]]3 4/20/2020 C-015 :*_ BARRINGTON AFFORDABLE APARTMENTS WINTERWOOD DEVELOPMENT, LLC 1390 OLIVIA LANE SUITE 100 LEXINGTON, KY 40511 I-D-Icn v6 1 1019183 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 LAND DEVELOPMENT 1..12.20 DESIGNED BY: RS DRAWN BY: RS CHECKED BY FJM sc VERT: N/A HOPI V=N' OVERALL LAYOUT & MATERIAL PLAN s6E���NaE6 C-3.0 4/20/2020 r P. 1 •tea :,-4 FIR �PA000�� �P/., A 1.1-L.o aryo s..� oFPOPosEos.oA. / 21 ;�\ ,III / ---------- --- ---- _ T -- 4/20/2020 Impact No. S3 -25Ifof permanent fill Culvert \\ �' extension) \\ 60" RCP INV. IN: 741.50 (PROP. S ^p/IT�II\\``/ 741 749 / 25 LF OF 60" RCP @ 3.00% I I I III \ PROP. STMH (REPLACE EX. HW) I I III \ RIM: 755.50 60" INV. IN: 744.91 (EX. HW) 60" INV. OUT: 742.24 (HW-3) I\ I I I I I r\ 81 LF OF EX. 60" RCP @ 0.20% \ Impact No. S4 -20 If temporary disturbance (Dewatering system; 10 If both upstream and downstream) -See sheet 5 for details 75114 ° p 0 EX. . � HW \ \ J 60" RCP INV. OUT: 745.07 (HW-2) \ 10' 0' 10' 20' 40' SCALE: I" = 20' LLJ JM W Q o�C F_ Qm LL = Q LU z F_ U O H d C7 Z z Z L" j3c LU o Q ./ � J LLI CISQ U U) Sheet 4 of 5 4/20/2020 Milton Road Affordable Attachments April 21, 2021 CWS Project No. 2019-0121 Attachment C: NCDEQ Water Quaility Certification (DWR # 20-0485) ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Mr. Zach Worsham Winterwood Development, LLC 1390 Olivia Ln. Ste. 100 Lexington, Kentucky, 40511 NORTH CAROLINA Environmental Quality May 21, 2020 DW R# 20-0485 Mecklenburg County Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions Milton Road Affordable Dear Mr. Worsham: You have our approval, in accordance with the General Certification and those conditions listed below, for the purpose proposed in your application dated April 7, 2020, and received by the Division of Water Resources (the Division) on April 15, 2020 and subsequent information on May 18, 2020. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 4139 which can be viewed on our web site at https://deg.nc.gov/about/divisions/water-resources/water-resources- Permits/wastewater-branch/401-wetlands-buffer-permits/401-401-isolated-wetlands-waters- program The General Certification allows you to use Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers (COE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. It is advised that all conditions of the Certification are reviewed prior to initiation of the project. In addition to the requirements of the Certification, you must also comply with the following conditions: This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new Certification. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 300 linear feet, compensatory mitigation may be required. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. 15A NCAC 02H .0506 and 15A NCAC 02H .0507 2. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 15A NCAC 02H .0502 (e) D E QUA North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 voH.�r..R::o:.�tiA o•o•" •m" E""w"�"��a°•r` /� 704.663.1699 3. Approved Impacts: Type of Impact Amount Approved Temporary Impact Amount Approved Permanent Impact Stream 40 linear ft. 192 linear ft. Wetland 0 acre 0 acre 4. Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This includes interior/exterior slopes of sediment basins. 15A NCAC 02H .0506 (b)(3) and (c)(3) 5. Bare/fill slopes in excess of 10 feet in height and within 50 feet of surface waters shall be matted. 15A NCAC 02H .0506 (b)(3) and (c)(3) 6. Water Quality/Stormwater: Please provide documentation showing that water quality from the development will not be impaired. A storm water management plan in lieu of such documentation is acceptable if approved by a delegated or state authority. 15A NCAC 2H .1000 7. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. 15A NCAC 02H .0506(b)(5) 8. Use of native vegetation and other soft stream bank stabilization techniques is recommended where practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not be placed in the streambed, unless approved by DWR 9. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 15A NCAC 02H .0506(b)(3) 10. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this Certification. 15A NCAC 02H.0506(b)(3) 11. The permittee shall report to the Mooresville Regional Office any noncompliance with this certification, any violation of stream or wetland standards [including but not limited to sediment impacts, and any violation of state regulated riparian buffer rules. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. 15A NCAC 02B .0200 12. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 15A NCAC 02H .0507 (c) and 15A NCAC 02H .0506 (b)(2) and (c)(2) 13. Upon completion of the project, the applicant shall complete and return a "Certificate of Completion" form to the 401/Wetlands Branch of the Division using the following link: https://edocs.deq.nc.gov/Forms/Certificate-of-Completion. 15A NCAC 02H .0507(c) This Certification can be contested as provided in Articles 3 and 4 of the General Statute 150B by filing a written petition for an administrative hearing to the Office of the Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/or by calling the OAH Clerk's Office at (919) 431-3000. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday, 8:00 am to 5:00 pm, excluding state holidays). The petitions may be faxed to the OAH at (919) 431-3100, provided the original and one (1) copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc.) Office of Administrative Hearings 1711 New Hope Church Rd. Raleigh, NC 27609-6285 One (1) copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699. Sincerely, Doc `uS"ign'ed by: Af- for F 165 F B12Q84A3... Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DEQ Attachment cc: Army Corps of Engineers, Charlotte, email Megan Bollero, CWS, megan@cws-inc.net DWR 401 & Buffer Permitting Branch file MRO, Land Quality CERTIFICATE OF COMPLETION NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion County: Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Milton Road Affordable Attachments April 21, 2021 CWS Project No. 2019-0121 Attachment D: Original Impact Drawings \ \ BucV VV \\\ _l r - - - - - - - - - - - -\t - - - - = �� 1 SHEET C-3.1 / C-3.3 N/F , 1 DAVID LUTHER WILLIAMS & KAREN B WILLIAMS DEED BK 2]564 PG 202 1 PARCEL-ON21126 ZONING: 1-1, 0-1 CURRENT USE: VACANT 1 N/F \ WOODFIELD COLLINS LLC \ ' 1 DEED BK 22280 PG 793 PARCEL: ON21129 \ ZONING: R-1] MF 1 � CURRENT USE: RESIDENTIAL � I NOTES: U 1. CO ORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. 2. ALL ROAD IMPROVEMENTS AT WESTERLY HILLS DRIVE ARE TO BE COORDINATED WITH THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. 3. DEVELOPER WILL PROVIDE STREET SIGNS PER CLDSM# 50.05 (9- SIGNS ONLY) 4. SIGHT TRIANGLES SHOWN ARE THE MINIMUM REQUIRED. 5. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. 6. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF SITE GRADING PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. ]. IN OR DER TO ENSURE PROPER DRAINAGE KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. 8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED NECESSARY BY THE INSPECTOR. 9. CURB AND GUTTER SHOWN ON PLANS MAY BE ADJUSTED BASED UPON FIELD STAKING BY CITY ENGINEERING. ASSOCIATED STORM DRAINAGE MAYALSO REQUIRE MODIFICATION BASED UPON FIELD CONDITIONS. 10. HIGH -DENSITY POLYETHYLENE (HOPE) STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING OR PROPOSED PUBLIC STREET RIGHT-OF-WAY MUST BE APPROVED BY THE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC STREET RIGHT-OF-WAY. 11. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. 12. ANY BUILDING WITHIN THE 100+1 STORMWATER ELEVATION LINE IS SUBJECT TO THE RESTRICTION OF THE (CITY OF CHARLOTTE�MECKLENBURG COUNTY) SUBDIVISION ORDINANCE, SECTION 7.200.8. 13. ANY CONSTRUCTION OR USE WITHIN THE FUTURE CONDITIONS FLOOD FRINGE LINE IS SUBJECT TO THE RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF THE CITY OF CHARLOTTE AND MECKLENBURG COUNTY. 14. ALL OPENINGS E.G. DOORS WINDOWS VENTS IN STRUCTURES SHOULD BE LOCATED A MINIMUM OF ONE FOOT ABOVE THE ADJACENT FINISHED GROUND SURFACE (APPLIES TO LOTS WHICH MAY EXPERIENCE SIGNIFICANT OVERLAND FLOW NOT CONSIDERED IN THE 1.WIN FLOOD ANALYSIS) 15. "A SEALED SHOP DRAWINGS FOR RETAINING WALL MUST BE SUBMITTED L CITY ENGINEER PRIOR TO CONSTRUCTION. 16. TO BUILT' DRAWINGB AND PLANS OF THE STORM DRAINAGE SYSTEM. INCLUDING DESIGNED DITCHES, MUST BEE CITY/COUNTY PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY/COUNTY SUBDIVISION ORDINANCE. 17. PRIOR CO SURVEYOR SEALED AB -BUILT DRAWINGB OF ALL WATER QUALITY BMP'S AND DETENTION SYSTEMS MUST BE PROVIDED. 18. PRIORTO PLAT RESOF THE-TOFF-OFFSITE OFFSITE RNJANDIOR CONSTRUCTION EASEMENTS ARE REQUIRED TO TI OBTAINED ACCORDING TO THE ON THE ACQUISITION PROCESS'. THESE NEEDED RNJ AND CONSTRUCTION LIMITS ARE CLEARLY SHOWN TI THE ROADWAY IMPROVEMENT PLAN. 19. PER SECTION REQUIRED E OF CITY CODE AND SECTION POST OF CITY'S POST CONSTRUCTION CONTROLS ADMINISTRATIVE MANUAL, ALL REQUIRED NATURAL AREAS ANDIO F POST CONSTRUCTION CONTROLS EASEMENTS (PCCES) MUST BE RECORDED PRIOR V THE ISSUANCE OFTHE CERTIFICATEOFOCCUPANCY. 20. THE DEVELOPER SHALLTRAFFIC SI NALTHE CHARLOTTE DEPARTMENT OFTDAYS WILSPORTATIONL REQUIRGUS ED COORD7�3INATE A IDENTIFY A CONFLICTS WITH TRAFFIC SIVUE FOR ALL ELATE RELOCATION ION C WILL BE REQUIRED RO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIVLE FOR ALL RELATED RELOCATION COST ANDIOR AST REPAIR COST CAUSED BY THE CONTIFI O NANDLOPER. 21. CERTIFICATION AND STREET CUT PERMITS ARE REQUIRED FOR UTILITY CUTS RT CITY STREETS. ALLOW ]DAYS PROCESSING FOR PERMIT. FOR INFORMATION CONTACT CHARLOTTE DEPARTMENTST TRANSPORTATION E] HOMEHTMI OR VISIT HON-WAND.CHARMECK.ORAVERS, IRRIGATSffION SYSTEMS,EC.)STREET+MAINTENANCEEQUIR AR 22. NON-STANDARD ITEMS EUE:M PAVERS, IRRIGATION SYSTEMS, ETC.) N THE RIGHT-OF-WAYRTI REQUIRE A RIGHT-OF-WAY DE V ENCROACHMENT AGREEMENTWITH THE CHARLOTTE DEPARTMENTOFTRTAINED STREETS, CONTACT NADEPARTMENT 88 TRANSPORTATION BEFORE INSTALLATION. FOR ICITYOF REPLACEMENT PART OFT HE DEVELOPMENTACTCOOTAT(]04)338-3888. 23. SIDEWALK WITHIN THE DBE PHASED REQUIRESREPLACEMENT AS PART AND/OR REPAIRED IMPROVEMENTS SHOULD BE PHASED IN SUCH A WAY AS TO MINIMIZE THE DURATION OF THE SIDEWALK REPAIRED AND REOPENED FOR PUBLIC USE WITHIN IT 'S F OF REMOVAL. 24. ANY WORK WITHIN THE USE RMITHATREQUIRESCLOSURE OFASIDEWALK ORTRAVEL LANE MUST BE APPROVEDBYCOOTAND WILL RARE QUIREDADDITION ARNJEA PERMIT OR RMSAND LEASESHOULD DEPENDING BE NATED HE WITHCDO PRIOR TOCED DURATION T CLOSURE THESE ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH COOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT CLOT AT ACT COOT 62 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FIR IMPACTS LESS THAN R DAYS. CONTRACTOR SHALL CONTACT COOT AT 704 336EMENAS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 25.RIGHTICCONTCLOSURE S LONGER THAN ODAYS REQUIREARANLEASE AGREEMENT WHICH WILL INCLUDE THE SUBMITTAL E A TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLANS REQUIRED THROUGHS LEASE AGREEMENT MAY BE DIFFERENT FROM THE CONE ONTROL REQUIRED DURING MUST E SUBMIT DEVELOPMENT PLAN REVIEWSAANDGREEMENT ARE MENT PROCESS REVISIONS. THE REVISED TRAFFIC CONTROL PLANS MUST BE SUBMITTED AS PART OF THE LEASE AGREEMENT PROCESS FOR APPROVAL PRIOR TO START OF RAV CLOSURES. CONTRACTOR TOIT CONTACT R I-ASTI (] MORE THAN 26. CONSTRUCTION STAGING (704) 3 CITY RNJ LASTING MORE THAN 30 0AV5 REQUIRES A RNJ LEASE AGREEMENT. CONTRACTOR SHALL CONTACT COOT AT (ALF 338-8348. 27. DEVELOPER T CONTACT RTHI D PROJECT. . COORDINATE DURING SITE PLAN PREPARATION TO DISCUSS STREET LIGHTING REQUIREMENTS, , ANV, LIGHTING LAYS PROJECT. COORDINATE WITH DUKE ENERGY AND COOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. 28. PRIVATEDEVELOPMENT UTILITYRELOCATIONCOORDINATE -FORUTILITY COORDINATION RELATED TO BOTH EXISITNG UTILITY RELOCATION NEEDS AND PROPOSED UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, COOT ROW UTILITY COORDINATION LE (MEET -ME OLE)ISRTRUITTTCHARROVIDED V. 29. AJOINT MANHOLE(MEET- J MANHOLE)ISTOBEPROVIDEDBY CTHE DEVELOPER TO PROPERTY UTIALL UTILITYTELECOMS SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BELOCATED D PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT-OF-WAY. M. ALL ACCESSIBLE PARKING SPACES MEET VAN ACCESSIBLE STANDARDS. / WF \ / DAVID LUTHER WILLIAMS \ / 8 KAREN B WILLIAMS DEEDBK27564PG 202 PARCEL 0999920 ZONING: I-1, -1 - � CURRENT USE: VACANT \ r-----1------------------------f-- - 1 1 SHEET C-3.2 / C-3.4 1 1 1 1 1 1 1 J Culvert Extension 1 See sheet 4 for 1 1 1 E 1 I PRIVATE - ENDSTREET STREEEET B WE I WOODFIELD COLLINS LLC I DEED SK 22280 PG 793 1 PARCEL 099211" ZONING: R-1] MF I \ CURRENT USE: RESIDENTIAL 1 - Road Crossing - See sheet 2 for proposed - - - impacts (S1 and S2) 1 1 TREE SAVE N/F PHYLLIS S WORTHY \\\ DEED BK 15233 PG 694 POTENTIAL PARCEL: 09921117 \ ZONING: R MF TREE SAVE CURRENT USE: REE SIDENTIAL \AREA TYP. N\MERA INVESTMENTS LLC DEED BK 11211 PG 117 PARCEL...9 116 ZONING: R-17 ME, R4 QN, CURRENT USE: RESIDENTIALI S O. A c - - G ! 1 ! .l c NIF / Q JAMES ECALDWELLB I DEVELOPMENT SUMMARY: @'!y 'PjL � SHRIL11 E CALOE DEED DEED BK 535 03 PC 03. F 1. TAX PARCEL NUMBER PARCEL 09921115 -11117101,09921101 ZONING: R4 2. SITE JURISDICTION I CURRENT USE: RESIDENTIAL I -CITY OF CHARLOTTE 3. TOTAL SITE ACREAGE -t 16.56 ACRES I 4, PROJECT SITE ACTO BE DEVELOPED -t 16.67 ACRES oil I5. EXISTING ZONING & USES N/F -R-9 ME CD, I-1 ASSOCIATION MI VAC NTLTON -VACANT I COMMONS HOME OWNERS 6. DIMENSIONAL REQUIREMENTS I DEED BK 0 PG ]22 - iT SETBACK FROM ROW PARCEL:CEL: 090991]361 -10'SIDE YARD lI I ZONING: R4 -50, REAR YARD (ADJACENT TO SINGLE FAMILY) \ 1 \ CURRENT USE: VACANT -40'REAR YARD ADJACENT TO NON SINGLE FAMILY ]. TOTAL RESIDENTIAL UNITS - UNITS 13. VEHICLE PARKING PER B. DENSITY ALLOWS ZONING REQUIRED: 2N SPACES AC SPACES PER SPACES PER DWELLING WE LIT UNIT) ALLOWED: UP TO 24] M13.60FAMILY RESIDENTIA CRE = 231 UNITTS PROVIDED: 294 TOTAL SPACES 1. COUNTPER DWELLIN CHANGE B R-C] E (13.60 ACRES I it UNITS/A REZONING =239 UNITS FINAL PARKING COUNT SUBJECT TO CHANGE BASED O R-9 ME ABLE PER PREVIOUS REZONING 8CON THE FINAL ENGINEERING ALLOWABLE UNITS HAS ALREADY BEEN CONSTRUCTED = 0 25 ACCESSIBLE SPACES I-1: 1.15 ACRES X 0 UNITS/ACRE = 0 UNITS 17 HC SPACES FOR TYPE A (1 PER TYPE A UNIT) PROVIDED: 168 UNITS/16.62 ACRES =10.10 UNITSIACRE 4 HC SPACES FOR TYPE B 2% OF TYPE B UNITS) ) 9. BUILDING HEIGHT 0HC SPACES FORD 02 SPACES =4 SPACES MAXIMUMALLOWED' TABLED:3ST)(A) O T+1'FOREVERY2'FROMSETBACKAND 3 HC SPACESFORDUMPSTERS YARDS PER TABLE 9W06(3)(A) OF THE ZONING ORDINANCE. (ADJACENT TO 1 HC SPACE FOR CLUBHOUSE MAXPROVIDED:4W-WHENADJACENTTO VATINRESIDENTIALS FOREIGN USESLI ZONING) 14. BIKE PARKING MAXPROVIDED: 46'-11'(REFER TO ELEVATIONS FOR HEIGHT COMPLIANCE) REQUIRED: N/A -LOW INCOME HOUSING 10. BUILT UPON AREA 15. SOLID WASTE PROVIDED: 5.58 ACRES (242,132SF)33% REQUIRED: ONE 8ITS VD. UNITS= -PER 30UNITS 11. NATURAL AREA: PROVIDED: 188 UNITS I30 UNITS=6-B CU. YD. DUMPSTERS REQUIRED:10E ACREAGE=0.1x16.56=1.68 ACRES 16. RECYCLING PROVIDED: 4.52 ACRESACRES REQUIRED: 3 z 144 SF FOR 168 UNITS (432 SF) 12. TREE SAVE: PROVIDED: 432WILL BE REWIRED: 4.52 ACRES 18. ENOT STIMATED UTILITIESSETION UNDERGROUND PROVIDED: TREE ACRES 18. ESTIMATEDUARY 2022 DATE POTENTIAL TREE SAVE TO BE DETERMINED DURING FINAL DESIGN JANUARV 2022 MAr - WF proposed impacts ED BK 32MARTIN DEEEMA TI 578 1 PARCEL: ONN698 ZONING IV (S3 and S4) CURRENT USE: VACANT / - � 1 1 � 1 1 1 � 1 � 1 � � 1 N/F / CLTCAR LLC DEED BK 32384 PG N1 1 1 / / PARCEL: 09920549 ZONING: R-12MF(CD) CURRENT USE: MULTI -FAMILY 1 � � 1 Z_ N/F SHARON E JOHNSON DEED BK M329 PG 923 PARCEL: ON20128 WF RADIANT PROPERTIES LLC DEED BK 252N PG 049 / PARCEL: 009920127 ZONING: R-3 7EIES> : 1lLL )NINE: R-3 USE: RESIDENTIALI 0 I BUILDING INFORMATION BLDG TYPE I BLDG TYPE I OLM BUILDING CONSTRUCTION TYPE &A &A 5-B USE GROUP R-2 R-2 A-3B MAX HEIGHT 45'-3- 46'-11- 2M' SPRINKLER SYSTEM NFPA I3R NFPA I3R NONE WE UNIT TYPE TABULATION A&M INVESTMENTS OF THE CAROLINASLLC GREAT WAGON RD UNITMUDG# 1 2 3 TOTAL DEED BK 26486 PG 553 50, PUBLIC RIW 1 12 12 24 BEDROOM TABULATION PARCEL: 09920126 2 12 12 24 # OF BEDROOMS TOTAL % OF TOTAL ZONING: R-3 3 12 12 24 1 CURRENT USE: RESIDENTIAL 8 6% 4 1212 24 2 38 21.4% 5 12 12 24 3 84 50.0% I 6 12 12 24 188 100% ] 12 12 24 1 \\/\\ TOTALS 48 36 84 186 LEGEND N/F 1 PROP. RIGHT OF WAY MARVIN PONDS & ROCHELLE PONDS _ - - DEED BK 04723 PG 976 ) PROP. SETBACK PARCEL: 09920125 WE CURRENT R-3 PARKING COUNT T USE: RESIDENTIAL SHELTON BLACKWELL PROP. TREE SAVE DEED BK 16575 PG 820 PARCEL: R-312 G: EX. FENCE -x x- ZONING: 20 CURRENT USE: RESIDENTIAL NOTE: N 1. BASE MAP DATA FROM SURVEY PROVIDED BY R.B. PHARR DATED O OCTOBER 22 2019 AND SUPPLEMENTED WITH CITY OF CHARLOTTE PLANAMETRICS GIS TOPO AND PARCEL DATA. o E O BEFORE YOU DIGI CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! ImODesig - 223 NORTH GRAHAM STREET CHARLOTTE, NO 28202 704.333,0325 W W W.LANDDESIGN.COM NO ENS. FIRM LICENSE # C-0658 FAIL 03]]]3 4/20/2020 C-015 :*_ BARRINGTON AFFORDABLE APARTMENTS WINTERWOOD DEVELOPMENT, LLC 1390 OLIVIA LANE SUITE 100 LEXINGTON, KY 40511 -DDEscN P-.1 1019183 REVISION / ISSUANCE NO. DESCRIPTION DATE 1 LAND DEVELOPMENT 4M112020 DESIGNEDBY: RS DRAWN BY: RS CHECKED BY FJM sc VERT: N/A HOPI V=N' OVERALL LAYOUT & MATERIAL PLAN s6E���NaE6 C-3.0 r P. I I I it __1-- —� — \� 1 •tea :,-4 In �PA000�� / � oFMo .o aryo s..— oFPAOPosEos.oA. / ;�\ ,III / ---------- --- ---- _ T -- Impact No. S3 -25Ifof permanent fill Culvert \\ �' extension) \\ 60" RCP INV. IN: 741.50 (PROP. S 741 749 / 25 LF OF 60" RCP @ 3.00% PROP. STMH (REPLACE EX. HW) I I III \ RIM: 755.50 60" INV. IN: 744.91 (EX. HW) 60" INV. OUT: 742.24 (HW-3) I\ I I I I I r\ 81 LF OF EX. 60" RCP @ 0.20% \ Impact No. S4 -20 If temporary disturbance (Dewatering system; 10 If both upstream and downstream) -See sheet 5 for details 75114 ° p 0 EX. . � HW \ \ J 60" RCP INV. OUT: 745.07 (HW-2) \ 10' 0' 10' 20' 40' SCALE: I" = 20' LLJ JM W Q o�C F_ Qm LL = Q LU z F_ U O H d C7 Z z Z L" j3c LU o Q ./ � J LLI CISQ U U) Sheet 4 of 5 ENERGY DISSIPATION ►~ FLOW IMPERVIOUS DIKE PROJECT ❑EWATERING DEVICE NOTE: ANCHOR ALL PUMPS AND PIPES SECURELY DISCHARGE HOSE SUCTION HOSE f- FLD TOP OF BANK WORK AREA NOT TO SCALE BYPASS PU v PING Milton Road Affordable Attachments April 21, 2021 CWS Project No. 2019-0121 Attachment E: Culvert Replacement Details L,.ndDe%,,rn- 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 ■ �� SS ■ � � � � ` \ \\ �� � \ I I ' � 'sue \ / 755 �sd 756 752 55 ol Po N \ / PROP. CLEANOUT (TYP.) PROP. 8" HDPE PIPE, CONTRACTOR TO INSTALL MIN. 2' OF COVER AND MIN. SLOPE OF 1% (TYP.) \ I I / I / I / r /PROP. STORM DRAINAGE, REFER TO C-6.2 (TYP.) / / / / / / STORM DRAINAGE NOTES: 1. REFER TO SHEET C-1.0 FOR STORM DRAINAGE DEMOLITION AND UTILITY DEMOLITION INFORMATION. 2. CONTRACTOR TO FIELD VERIFY HORIZONTAL AND VERTICAL LOCATION AND SIZE OF EXISTING UTILITY AND/OR STORM DRAINAGE CROSSINGS PRIOR TO INSTALLATION OF PROPOSED STORM DRAINAGE SYSTEMS. 3. CONTRACTOR TO COORDINATE WITH CITY OF CHARLOTTE REGARDING TEMPORARY OR PERMANENT WATER METER AND SERVICE RELOCATIONS. 4. ALL UTILITY COORDINATION TO TAKE PLACE THROUGH THE CITY OF CHARLOTTE UTILITY COORDINATOR. 5. PIPE DIMENSIONS AND SLOPES ARE MEASURED TO CENTERLINE OF STRUCTURES. 6. ALL STORM DRAINAGE PIPE TO BE CLASS III RCP UNLESS OTHERWISE NOTED. 7. ALL PIPING TO BE INSTALLED PER NCDOT #300.01 - METHOD OF PIPE INSTALLATION. 8. CONTRACTOR TO SUBMIT STRUCTURAL DESIGNED SHOP DRAWINGS FOR ALL STRUCTURES EXCEEDING A DEPTH OF TWELEVE FEET (12') FROM TOP OF BOTTOM SLAB TO TOP ELEVATION PER 2012 NCDOT STANDARDS AND SPECIFICATIONS. 9. CONTRACTOR TO MAINTAIN FIVE FEET (5') SEPARATION FROM UTILITY POLES WITH ALL EXCAVATION. 10. CONTRACTOR TO CONFIRM IF ANY PRIVATE DRAINS CONNECT TO EXISTING STORM DRAINAGE SYSTEM PRIOR TO DEMOLITION. 11. CONTRACTOR TO PROTECT IN PLACE ALL EXISTING UTILITY SET TO REMAIN DURING CONSTRUCTION OF STORM DRAINAGE SYSTEMS. BEFORE YOU DIG! / CALL 1-800-632-4949 / N-C. ONE -CALL CENTER IT'S THE LAW! KEY MAP SEAL CA EAL - - 037773 - 7/27/2020 PROJECT BARRINGTON AFFORDABLE APARTMENTS WINTERWOOD DEVELOPMENT, LLC 7156 BARRINGTON DRIVE CHARLOTTE, NC LANDDESIGN PROJ.# 1019183 REVISION / ISSUANCE NO. DESCRIPTION DATE 0 LAND DEVELOPMENT 5/18/2020 1 NCFHA SUBMISSION 6/23/2020 2 LAND DEVELOPMENT 7/10/2020 3 LAND DEVELOPMENT 7/27/2020 DESIGNED BY: RS DRAWN BY: RS CHECKED BY: FJM SCALE NORTH VERT: N/A HORZ: 1 "=30' 0 15, 30' 60' SHEET TITLE STORM MANIFOLD SYSTEM 7/27/2020 12:41 PM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CD SHEETS\CIVIL\SHEET-24X36.DWT ORIGINAL SHEET SIZE: 24" X 36" SHEET NUMBER C-6.4 \ / I PROP. CB-30 18MI INV. 747.65 (PROP. CB-29) / ' \ PROP. HW RIM: 755.00 60" INV, OUT: 744.07 (PROP. HW-38) STREAM BED INV. OUT:\07 I I I / / [27�97 LF OF 18" RCP @ 1.00% 1 I X x x x x x x � /� / x x x x �- \ 1' I i X X/ / X x X x� X i� \ PROP. V HIGH CONCRETE SILL AT UPSTREAM AND DOWNSTREAM INVERTS OF PROP. 60" RCP BEFORE YQU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! LandDesign. 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 KEY MAP SEAL 10 Es EAL 037773 0311912021 PROJECT BARRINGTON AFFORDABLE APARTMENTS WINTERWOOD DEVELOPMENT, LLC 7156 BARRINGTON DRIVE CHARLOTTE, NC LANDDESIGN PROJ.# 1019183 REVISION / ISSUANCE NO. DESCRIPTION DATE 0 LAND DEVELOPMENT 5/18/2020 1 NCFHA SUBMISSION 6/23/2020 2 LAND DEVELOPMENT 7/10/2020 3 LAND DEVELOPMENT 7/27/2020 4 FOR CONSTRUCTION 8/26/2020 5 NCHFA REVISIONS 02/01/2021 6 NCHFA REVISIONS 03/16/2021 DESIGNED BY: IRS DRAWN BY: IRS CHECKED BY: FJM SCALE NORTH VERT: N/A H O RZ: 1 "=10' 0 5' 10, 20' SHEET TITLE REVISED STORM PIPE 4/14/2021 9:54 AM DAPHNE BRICE Z:\TEMPLATES\SHEETS\CDSHEETS\CIVIL\SHEET-24X36.DWT ORIGINAL SHEET SIZE: 24" X 36" SHEET NUMBER BD-1