Loading...
HomeMy WebLinkAbout20210689 Ver 1_PreFiling 30-Day Clock Reached Email_20210502Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, May 2, 2021 12:00 AM To: dvance@geosyntec.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Asheville Regional Airport Area 1 Structural Fill Permanent Cap System - 20210689 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Asheville Regional Airport Area 1 Structural Fill Permanent Cap System that you submitted on 4/1/2021. The ID number for that project is 20210689, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210689 Version* Central Office - (919) 707-9000 Sue Homewood Pre -Filing Meeting Request submitted 4/1/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: 1 David Vance dvance@geosyntec.com Asheville Regional Airport Area 1 Structural Fill Permanent Cap System Duke Energy Progress, LLC Buncombe Street Address 526 South Church Street Address Line 2 City State / Province / Region Charlotte NC Ibstal / Zip Code Country 28202 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit I— Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * Duke Energy Progress, LLC (Duke Energy) is proposing to install a remedial nonpermeable permanent cap (permanent cap) over coal combustion residuals (CCR) used as structural fill at Area 1 of the Asheville Regional Airport (ARA) in Buncombe County, North Carolina. Area 1 is an 18-acre, CCR structural fill situated near the northeastern ARA property boundary and was previously constructed to expand airport operations. As -built drawings prepared by Charah in 2010 indicate that Area 1 was constructed with a geosynthetic clay liner (GCL) base liner and soil cap system. Soil backfill was compacted on the GCL above and within 50 feet of the 60-in. RCP that divides the Area 1 structural fill into western and eastern components. The existing soil cap system was constructed with approximately 6-ft and 2-ft thick soil layers on the top deck and side slopes, respectively. In August 2019, NCDEQ requested that a permanent cap system be designed to "abate the infiltration of groundwater and/or precipitation into Area 1" and "to abate or control ...seepage water". Duke Energy is proposing to construct a permanent cap for Area 1 to comply with NCDEQ Solid Waste regulations for containment of CCR and to achieve required stormwater runoff capture requirements (Project). The proposed Project consists of a composite soil geomembrane liner system designed to prevent and minimize surface water infiltration into Area 1 structural fill, manage surface water, and limit hydraulic head on the geomembrane. The proposed Project is comprised of two components: 1) permanent non -permeable cap layer system and 2) sediment and stormwater surface water ponds (dry detention). The permanent cap will be installed entirely within uplands and is designed to shed surface water and to drain water infiltrated within the cap to minimize potential ponding atop the geomembrane layer. Stormwater drainage is designed to limit route length and will be conveyed in three general directions off the cap: (i) east-northeast to stormwater pond 1; (ii) west then northwest to stormwater pond 2; and (iii) south to an existing stormwater channel towards Wright Brothers Way. Two existing sediment basins will be redeveloped and re -graded to manage the construction and post -construction stormwater runoff and sediment. The re -graded basins will also facilitate installation of the permanent cap and achieve stormwater runoff capture requirements. The surface water ponds are also designed as dry ponds to release stormwater within 48 hours pursuant to Federal Aviation Administration (FAA) regulations as not to attract nuisance wildlife. An existing underground stream (Unnamed Tributary to French Broad River) daylights at the northwest toe of Area 1 and contributed to erosion of the existing perimeter pond dike structure. As such, a rock drain is proposed to convey the base stream flow beneath the pond; while an outlet control structure and perimeter berm is proposed to retain stormwater runoff prior to release into the existing stream. The redevelopment and re -grading of the stormwater ponds will result in approximately 0.56-acre of impacts to a non -tidal freshwater marsh by stormwater pond and the installation of the outlet control structure WI! result in 12 linear feet of permanent fill impacts to the Unnamed Tributary to French Broad River). Please give a couple of dates you are available for a meeting. 4/29/2021 4/20/2021 4/19/2021 4/28/2021 4/27/2021 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 4/1/2021