Loading...
HomeMy WebLinkAbout20210805 Ver 1_PreFiling 30-Day Clock Reached Email_20210430Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, April 30, 2021 12:05 AM To: barrett@mcmullanproperties.com Cc: Snider, Holley Subject: Pre -Filing Time Clock has been reached for 4425 Brantley sand dredge - 20210805 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 4425 Brantley sand dredge that you submitted on 3/30/2021. The ID number for that project is 20210805, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Internal Use only: Non Transportation i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20210805 Version * 1 Wilmington Regional Office - (910) 796-7215 Holley Snider Pre -Filing Meeting Request submitted 3/30/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Barrett McMullan barrett@mcmullanproperties.com 4425 Brantley sand dredge Barrett McMullan Brunswick Street Address 4425 BRANTLEY CIR SW Address Line 2 City State / Rovince / Region Shallotte NC Fbstal / Zip Code Country 28470 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: r 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express fJ Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Brendan O'Brock or Megan Faulkner Please give a brief project description below and include location information. * The scope of this excavation project includes removing up to 972 cubic yards of sand and spoil from the vicinity of the dock located at 4425 Brantley Circle SW, Shallotte, NC 28470 out to the navigable waters of the Intercoastal Waterway. Excavation will be pinpoint through use of an excavating machine placed on top of a steel barge. Excavated material will be placed on the barge in a contained area. Once excavation is complete, the material will be hauled via barge to 43 Causeway drive, Ocean Isle Beach, NC where it will be transferred to a clearly marked silt fence containment area more than 30' landward of the mean high water line. The spoil will be dried in this location and then used as backfill for a bulkhead on the same parcel. The purpose of the excavation is to allow the property owner to regain water access for use of boating where shoaling has occurred in recent years. The existing mean low water depth in this area is - 0.5' with a goal to make the mean low water depth -3.5'. The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Please give a couple of dates you are available for a meeting. 4/5/2021 4/6/2021 4/7/2021 Please attach the documentation you would like to have the meeting about. 4425 Brantley Circle Major Application.pdf 9.05MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature eQ.•r` {rcllasr Submittal Date 3/30/2021