Loading...
HomeMy WebLinkAbout20120908 Ver 1_Certification of Completion_20121204NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Waklid, P E Dee Freeman Governor Director Secretary DWQ Project No (',a — 69 69,1, County Applicant �� V) -?A K� A ( eL Project Name Date of Issuance of 401 Water Quality Certification (�� 1 I Z Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these Applicant's Certfcatian I, � f.) t -" , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Qualitv-Cerlification and Buffer Rules, the approved plans and specifications, and other supporting materials PL Signature Date l t'av` o Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date If this project was designed by a Certified Professional I, , as a duly registered Professional (i e , Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date 1650 Mall Service Center, Raleigh, North Carolina 27699 -1650 Location 512 N Salisbury St Floor 9 Raleigh North Carolina 27603 Phone 919-807- 63011FAX 919 - 807 -6494 Internet www ncwaterquality org An Equal Opportunity Affirmative Action Employer Registration No L k -gr�� -����' One � 1 NofthCafoliria gturr�ll� N