Loading...
HomeMy WebLinkAbout20200010 Ver 2_Pre-Filing Meeting Request_20210401DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20200010 Version * 2 Asheville Regional Office - (828) 296-4500 Amy Annino Pre -Filing Meeting Request submitted 4/1/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Rachel Smith rachel.smith@ncagr.gov Bishop Streambank and Shoreline Protection Eliza Bishop Caldwell Owner Address: Street Address 5335 Grandin Rd Address Line 2 City State / Rovince / Region Lenoir NC Fbstal / Zip Code Country 28645 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit fJ Modification r Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* DWR# 20-0010 Do you know the name of the staff member you would like to request a meeting with? Amy Annino Please give a brief project description below and include location information. * The Bishop's would like to add 100 linear feet to the original project to address bank failure immediately adjacent and adjoining to the original project. The proposed stabilization will be the same as the method used in the original 401 approval. Please give a couple of dates you are available for a meeting. 4/6/2021 4/7/2021 4/12/2021 4/13/2021 4/14/2021 Please attach the documentation you would like to have the meeting about. BISHOP_REPAIR_PRELIM_3-1 8-21. pdf 3.61 MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature k-,EE;c Submittal Date 4/1/2021 Scale In Feet EARTH FILL TO BANKFULL STAGE @ EL = 1096' INSTALL BANKFUL BENCH. SLOPE AT 2:1 TO TOP OF BANK (SEE CROSS SECTION AND MATTING DETAILS) STAGE TO BE VERIFIED BY THE ENGINEER PRIOR TO CONSTRUCTION STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 TOE WOOD PER DETAILS SHT 5-9 OR ALT. 5'X3'X2' BOULDERS TO 3 BANKFULL STAGE 2007 1101.32 NAIL PILE NO EQUIPMENT IS TO BE STORED, FUELED, OR OTHERWISE REPAIRED IN THE 25' FROM THE TOP OF THE EXISTING STREAMBANK. 0+00.00 0+1,0.00 i 0+40.00 0+50 00 +60.00 ,5301101. 0 \ �i 2.5 BENCHMARK NLS REPAIR 0+80.00 0+90.00 0+95.71 STREAMBANK STABILIZATION - YADKIN RIVER 1 - BISHOP REPAIR - SITE PLAN CALDWELL COUNTY, NORTH CAROLINA NO 2 3 4 5 BY DATE ENCHMAR LS REPAIR 2 STREAMBANK STABILIZATI• APPROX. 100 LINEAR EET 3008 0 1100.81 BENCHMARK NLS EA EW NDISTURBED NATIVE VEGETATION PLANTED 1' BEYOND FILL MATERIAL PLACED. MIN. WIDTH IS 25' HORIZONTALLY FROM BANKFULL ELEVATION (SEE DETAIL) REVISIONS DESCRIPTION PROJECT #: bishop, ty SCALE: 1 INCH = 20 FEET DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 1 OF 8 FILENAME: BIHSOP_REPAIR-3-18-21.dwg PLANTING MIXTURE CONTENT *Apply seed mixture at a rate of 20 pounds per acre. Seed content ratio may vary WITH APPROVAL but is limited to grasses listed below with a minimum of 2 species of herbaceous FLOWERING PLANTS. GRASSES Sorghastrum nutans (Indian Grass): 25% Hordeum spp. (Baney): 22% Panicum clandestium (Deer Tongue): 12% Panicum virgatum (Switchgrass): 12% Elymus virginicus (Virginia Wild Rye): 22% FLOWERING HERBACEOUS PLANTS (7%): Rudbeckia laciniata (Cutleaf Coneflower) Lobelia siphilitica (Great Blue Lobelia) Helianthus angustifolius (Swamp Sunflower) Lobelia cardinalis (Cardinal Flower) Asclepias incarnata (Swamp Milkweed) Asclepias syriaca (Common Milkweed) LIME AND FERTILIZER. Lime: 2,000 pounds / acre of finely ground, dolomitic limestone Fertilizer: 400 pounds/ acre of 10-10-10 or equivalent *These rates also apply when hydroseeding MULCHING Six (6) feet width of 700 g/m^2 coir matting shall be installed from the stream's edge to beyond TOP OF BANK AT LEAST 5' UPSTREAM AND DOWNSTREAM OF TIE IN PONTS. Blankets shall be anchored with wood stakes in accordance with the MATTING DETAIL. Remaining surfaces may be mulched with dry, unchopped, unweathered small grain straw or hay free of seeds of competing plants. Spread at the rate of 1-2 tons per acre depending upon the season. Evenly spread mulch over the area by hand or mechanical equipment. Apply mulch uniformly so that 25% of the ground surface is visible. Temporary Seed shall be applied to establish ground cover based upon the following planting frame: Rye Grain Aug 15 - May 15 Browntop Millet Urochloa ramosa 10 Ibs/ac May 15-Aug 15 Secale cereale 25 Ibs/ac GENERAL VEGETATION PLAN NOTES A. GROUND COVER, SOIL PREP, TEMPORARY AND PERMANENT VEGETATION SHALL BE INSTALLED ON ALL AREAS DISTURBED DURING STABILIZATION, GRADING AND STRUCTURAL WORK. B. LIVE STAKES, TRANSPLANTS AND / OR CONTAINERIZED PLANTS SHALL BE LOCATED WHERE SHOWN ON PLAN. A VEGETATED BUFFER SHALL EXTEND A MINIMUM OF 35 FT FROM THE WATERS EDGE OR AS SHOWN ON THE PLANS. C. ADJUSTMENTS TO THE VEGETATION PLAN SHALL BE MADE ONLY IF APPROVED BY THE PROJECT ENGINEER. LIVE STAKES AND CUTTINGS D. CUTTINGS SHOULD BE INSTALLED THE SAME DAY THEY ARE CUT. THE STAKE SHOULD BE ORIENTED WITH THE BUDS POINTED UP, AND THE BOTTOM SHOULD BE CUT AT AN ANGLE FOR EASY INSERTION INTO THE GROUND. E. ABOUT 3/4 OF THE LENGTH OF THE STAKE SHOULD BE BELOW GROUND AND ANGLED DOWNSTREAM. AN IRON BAR CAN BE USED TO MAKE A PILOT HOLE TO PREVENT BARK FROM BEING DAMAGED DURING INSTALLATION. 1" = 10' Scale In Feet 10' 0 10' 20' TRANSPLANTS AND CONTAINER STOCK F. STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. G. CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. H. THE DIAMETER OF THE PLANTING HOLES (PITS) FOR EACH PLANT SHOULD BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. SCARIFY THE PLANTING PIT PRIOR TO EACH PLANT INSTALLATION. I. SET PLANTS UPRIGHT IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. J. PLACE BACKFILL AROUND BASE AND SIDES OF ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. ELEVATION 1120.00 1118 00 1116 00 1114 00 111200 1110.00 1108 00 1106 00 110400 110200 1100.00 1098 00 1096 00 1094 00 1092 00 1090.00 1088 00 1086 00 1084 00 108200 1080.00 1078 00 1076 00 1074 00 107200 1070.00 0 1 0 Stream: Basin: Drainage Area: Location: Latitude: Longitude: Date: Valley Type: Bankfull Width (Wbkf): Bankfull Depth (Dbkf): Bankfull X-Section Area (Abkf): Width/Depth Ratio (Wbkf/Dbkf): Maximum Depth (Dmax): Width of Flood -Prone Area (Wfpa): Entrenchment Ratio (ER): Channel Materials (D50): Water Surface Slope (S): Channel Sinuosity (k): STREAM CHANNEL CLASSIFICATION: TYPICAL SECTION Yadkin River 69.6 square miles Caldwell County, North Carolina 36.05954 -81.43790 September9, 2017 VIII 97 feet 3.1 feet 305 feet 23 6 feet 1000 feet 10 6 mm 0.0039 feet/feet 1.4 C4 42' OF UNDISTURBED WOODED BUFFER (MIN. OF 25' FROM BANKFULL ELEVATION) •••••• LIVESTAKES 2' TO 3' ON TREES AND SHRUBS CENTER - 5 ROWS �' 4 ROWS INSTALL FIRST ROW AT AIL A �� BOULDER - EARTH FILL w v ��R INTERFACE 1 700 COIR MATIT TIN III II PRIOR TO PLACING FILLII r'".�// ��//1::1/%% %//_I -:_"//r 1=11d11C11C=111M111=111C1111=I11euen= " sfji.�i!'i%�T �__� �,1 I 1=—=—III I I I=1 11=1 EN I I ip 11=1 11=1 I I, :ANKF LL -,TAB �•^' �����iri��% /.��! ���� =III— _ =I _ x i A ������� ��������..Alan n I_� -i i i _ �I me =I I I I I O :E FIELD VERIFI D DUR • ST"UCTION �����// �r /�////%v-- _ 2 — III —III —III I I I I I I =_ _ I I I 1I _II I I1-1I1-1I —III —I —I I r In 1-1I-1 _ _ _—__—_"all! 11-111E11-111 __�� 11 = 3 BANKFULL 1 11=1 I I I I I I .IYii — =III I I I I I� —I �I I —I —I I� —III I 11-111� II 11 I I III I I I ICI I I III I III I I _ I1=III=+ -III=III1I I III=III=III=1I I _-111 III=� _ - =NON WOVEN COIR MATTING =III=III=1 111E11 = 1111,1111, IIGi11E 111 = IIGi11G�111 11 181 _ _ = _ _ — _ _ _ —I I I I= I I III= WITHOUT NETTING TO=1I1 CREATE A GEO-LIFT :III=I 11=1 _ I I � � I I1=11I„I I II,I I—,III I —II I I 1 I I„ —111—I I I III I 1 —1 I I„III, 1= I1= I I I„ TOE WOOD STRUCTURE PER DETA LS SHT 5-9—"— —,I ;III=,1 ( III 11 Approx 8-10 rootwads depending on width of root fan, with II footer and header logs, laps and limbs fit► p .O OR ALT 1. using 5'x3'X2' Boulders, , Approx 60 boulders placed on non -woven geotextile t II , %q -��` I' ' i.. Top of footer boulder to be placed at existing bed elevation. • ,, I I I I I I. �� STATION STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 STREAMBANK STABILIZATION - YADKIN RIVER 2 - BISHOP REPAIR - TYPICAL SECTION CALDWELL COUNTY, NORTH CAROLINA NO 2 3 4 REVISIONS BY DATE DESCRIPTION PROJECT #: bishop, ty SCALE: 1 INCH = 10 FEET DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 2 OF 8 FILENAME: BIHSOP_REPAIR-3-18-21.dwg 1120.00 1118 00 1116 00 1114 00 111200 1110.00 1108 00 1106 00 110400 110200 1100.00 1098 00 1096 00 1094 00 1092 00 1090.00 1088.00 1086.00 10 D0 1080.00 MATTING, TYPICAL (SEE NOTE 1) TOP OF BANK ANCHOR (SEE DETAIL) DEAD STOUT STAKE, TYPICAL (SEE DETAIL) MATTING OVERLAP (SEE DETAIL) TOP OF BANK / /\/ \/ /\\/\ \/\/ /\ MATTING STAKE, TYPICAL (SEE NOTE 6) TOE OF BANK ANCHOR (SEE DETAIL) MATTING WRAP (SEE NOTE 2) TOE OF BANK DEAD STOUT STAKE, TYPICAL (SEE DETAIL) TOE OF BANK MATTING ANCHOR DETAIL 6" BACKFILL (SEE NOTE 2) TOP OF BANK TOP OF BANK MATTING, TYPICAL (SEE NOTE 1) / CROSS-SECTION 6" APPROXIMATE BASE FLOW WATER LEVEL TOE OF BANK 24" 24" 12" DIRECTION 10OR 02 MATTING OVERLAP (SEE NOTE 5) DIRECTION OF STREAM FLOW 02 DIRECTION DOWN THE BANK SLOPE MATTING OVERLAP DETAIL 6" I I L TOE OF BANK ANCHOR (SEE DETAIL) 0 0 PLA (SEE 1 FLOW v 12" MATTING, TYPICAL. (SEE NOTE 1) 1 0 0 r r 0 0 NOTES: 1. EROSION CONTROL MATTING SHALL CONSIST OF 700 GRAM COIR FIBER EROSION CONTROL MATTING. MATTING SHALL BE INSTALLED FLAT AND STAKED AGAINST A SLOPE AND/OR A STREAM BANK. 2. MATTING SHALL BE ANCHORED IN A TRENCH AT BOTH THE TOE AND TOP OF THE STREAM BANK. DEAD STOUT STAKES AND CLEAN SOIL BACKFILL SHALL BE USED TO SECURE THE MATTING INTO THE TOE AND TOP OF BANK TRENCHES. TO PREVENT EROSION OR "WASHING OUT" OF BACKFILL IN THE TOE OF BANK ANCHOR TRENCH, MATTING SHALL BE INSTALLED SO THAT IT WRAPS OVER THE DEAD STOUT STAKE AND BACKFILL, THUS POSITIONING THE REMAINING MATTING FOR INSTALLATION UP THE STREAM BANK. 3. THE SLOPE AND/OR STREAM BANK SHALL BE PREPARED (GRADED, TILLED, SMOOTHED, ETC.) AND SEEDED AND MULCHED AS SPECIFIED BY THE DESIGNER PRIOR TO THE PLACEMENT OF THE MATTING. 4. THE MATTING SHALL BE INSTALLED SO AS TO NOT BE IN TENSION, BUT BE PLACED NEATLY, FLUSH AGAINST THE SOIL, AND WITH NO GAPS OR WRINKLES. ADDITIONAL STAKING SHALL BE INSTALLED BY THE CONTRACTOR AS NEEDED ENSURE CONTACT WITH THE SOIL. 5. ANY MATTING OVERLAPS NECESSARY SHALL BE OF A LENGTH SPECIFIED BY THE MANUFACTURER OR AS OTHERWISE SPECIFIED BY THE DESIGNER. ALSO, OVERLAPS SHALL BE ORIENTED IN A DOWN -SLOPE DIRECTION, DOWNSTREAM DIRECTION, OR OTHERWISE "SHINGLE -STYLE" IN ACCORDANCE WITH THE DIRECTION OF THE DOMINANT EROSIVE ACTION SO THAT THE MATTING END IS PROTECTED AGAINST MOVEMENT. 6. THE FIELD OF THE MATTING OVER THE SURFACE OF THE SLOPE AND/OR STREAM BANK SHALL BE SECURED WITH MATTING STAKES OF A SIZE AND TYPE, IN A PATTERN, AND WITH SPACING DIMENSIONS AS SPECIFIED BY THE MANUFACTURER OR AS OTHERWISE SPECIFIED BY THE DESIGNER. 7. MATTING SHALL BE NEATLY SECURED AROUND ANY PROJECT STRUCTURES, STRUCTURE ARMS, AND/OR SILLS TO PREVENT ANY LOOSE OR FRAYED EDGES. 8. THERE SHALL BE NO LOOSE ENDS OR UNSECURED MATTING ON THE COMPLETED WORK. 9. THE PLAN VIEW ILLUSTRATES A PERPENDICULAR PERSPECTIVE OF EACH SURFACE DEPICTED IN THE CROSS SECTION. THERE IS NO FORESHORTENING OF THE STREAM BANK (OR ANY OTHER SLOPED SURFACE) IN THE PLAN VIEW. MATTING OVERLAP (SEE DETAIL) 0 0 0 0 0 u 0 0 0 0 a 6" iz—TOP OF BANK MATTING, TYPICAL (SEE NOTE 1) MATTING STAKE TYPICAL (SEE NOTE 6) APPROXIMATE BASE FLOW WATER LEVEL iz— iz—TOE OF BANK DEAD STOUT STAKE TYPICAL (SEE DETAIL) NOT TO SCALE 4" UNTREATED 2" X 4" (NOMINAL) _itBOARD 12" 0" - 1/2" OO CtJIAIII►IIIII =offFEss�o / Pcs„C"E � NO` V //1111111111�� STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 STREAMBANK STABILIZATION - YADKIN RIVER 3 - BISHOP REPAIR MATTING DETAIL CALDWELL COUNTY, NORTH CAROLINA REVISIONS NO BY DATE DESCRIPTION 2 3 4 5 PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 3 OF 8 FILENAME: BIHSOP REPAIR-3-18-21 MA NG.dwg January 24, 2020 STREAMBANK STABILIZATION - YADKIN RIVER BISHOP FARM CONSTRUCTION NOTES AND SEQUENCE 1. Obtain plan approval and other applicable permits. 2. Delineate property boundaries within project area, buffer limits, and limits of construction. 3. All equipment is to be stored and fueled in a protected area outside the designated buffer 4. Hold preconstruction conference at least one week prior to starting construction. 5. Install temporary gravel construction entrance as the first construction activity. 6. Improve crossing of UT to Yadkin River to allow for equipment and truck access. 7. Remove trees designated during preconstruction meeting to allow access to channel. 8. Begin installation of rip rap toe at the upstream location of the tie into existing bank. 9. Place non -woven geotextile as indicated in the typical section leaving enough width to wrap the fabric on the back of the rip rap. 10. Place the rip rap as indicated on the plans and as directed by the engineer or her delegate. 11. When the equipment can no longer reach from the top of the bank, install access ramp on bank behind the installed rip rap so no active flow can reach the disturbed material. In lieu of building the ramp, a long reach excavator may be used. 12. Continue the rip rap toe to the tie at the downstream end of the project. 13. Wrap geotextile around back of rock toe. 14. Place fill material such that all new material is placed, compacted, seeded, mulched, and matted within the same day it is placed. 15. Begin to place fill material behind the rock toe which will act as a berm to protect newly placed fill from active flow. 16. When fill material reaches the elevation of the top of the rip rap toe, place woven coir matting backed by non -woven coir to create a lift on top of the rock toe, as indicated on the plans. 17. Continue to place fill material to bankfull elevation. 18. Lime, fertilize, seed (temporary and permanent) and straw mulch all disturbed areas along channel as specified in construction documents. 19.Secure matting with stakes as indicated on the plans. 20.Install remaining fill to existing grade at no more than 2:1 slope. 21.Lime, fertilize, seed (temporary and permanent) and straw mulch all disturbed areas along channel as specified in construction documents. 22.Install matting to a minimum of 2' beyond the top of the bank. 23.Plant woody vegetation if soil and plant conditions permit. 24.AII erosion and sediment control practices will be inspected weekly and after each rainfall event. Needed repairs and maintenance will be conducted immediately. 25.After site is stabilized, remove all temporary measures and install permanent vegetation on the road and staging area. 26.Estimated time before final stabilization shall be approximately 2 weeks. STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 STREAMBANK STABILIZATION - YADKIN RIVER 4 - BISHOP REPAIR - CONSTRUCTION NOTES CALDWELL COUNTY, NORTH CAROLINA REVISIONS NO BY DATE DESCRIPTION 2 3 4 5 PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 4 OF 8 FILENAME: BIHSOP_REPAIR-3-18-21.dwg DIVERT FLOW FROM BANK PRE DIG CHANNEL BED FOR TOE WOOD ANGLE OF FOUNDATION LOGS 15° TO 25° MEASURED FROM THE CONVERGENCE OF THE BANK TANGENT TO THE INSIDE OF THE LOG TANGENT FLOW L LOG 1 INSIDE OF LOG TANGENT ❑❑p❑❑❑❑❑❑❑❑ 16' LOG as as CUT OFF SILL r 2 LOG WRAPPED WITH GEO-TEXTILE FABRIC PER ENGINEERS ON -SITE INSTRUCTIONS FOUNDATION LOGS TOE WOOD STRUCTURE BUILD IN 20 FT TO 30 FT SECTIONS LOGS SHOULD BE NO HIGHER THAN 50 % OF WATER 80 % OF THE LOGS SHOULD BE BEDDED BEHIND CHANNEL PLACE ROOT WAD LOGS CANTILEVERED OVER FOUNDATION LOGS. FOR 8 FT CHANNELS ROOT WADS SHOULD EXTEND INTO THE CHANNEL 2 FT 3 FT FOR 12 FT CHANNELS DESIGN DETAILS ARE CREDITED TO DR. DAVE ROSGEN WITH WILDLAND HYDROLOGY ROOT WAD LOGS IF THERE ARE LOGS WITHOUT ROOT WADS PLACE THEM CLOSER TO THE BANK. STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 STREAMBANK STABILIZATION - YADKIN RIVER 5 - BISHOP REPAIR TOE WOOD - DETAIL CALDWELL COUNTY, NORTH CAROLINA REVISIONS NO BY DATE DESCRIPTION 2 3 a 5 PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 5 OF 8 FILENAME: ToeWood.dwg PLACE FILLER MATERIAL (SMALL LOGS, LIMBS, TREE TOPS AND BRUSH) PARALLEL TO ROOT WADS FILLER MATERIAL STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 TOE WOOD STRUCTURE BUILD IN 20 FT TO 30 FT SECTIONS ADD TEMPORARY COUNTER WEIGHT (I -BEAM ETC...) TO SUBMERGE LOGS DESIGN DETAILS ARE CREDITED TO DR. DAVE ROSGEN WITH WILDLAND HYDROLOGY COUNTER WEIGHT STREAMBANK STABILIZATION - YADKIN RIVER 6 - BISHOP REPAIR TOE WOOD - DETAIL CALDWELL COUNTY, NORTH CAROLINA REVISIONS NO BY DATE DESCRIPTION 2 3 a 5 `4 O PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 6 OF 8 FILENAME: ToeWood.dwg ADD SHALLOW BACKFILL FROM DRAINAGE MATERIAL CLEANED OUT FROM THE CHANNEL SHALLOW BACK FILL STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 TOE WOOD STRUCTURE BUILD IN 20 FT TO 30 FT SECTIONS REMOVE TEMPORARY WEIGHTS AND PLACE CUTTINGS DESIGN DETAILS ARE CREDITED TO DR. DAVE ROSGEN WITH WILDLAND HYDROLOGY LAYER CUTTINGS STREAMBANK STABILIZATION - YADKIN RIVER 7 - BISHOP REPAIR TOE WOOD - DETAIL CALDWELL COUNTY, NORTH CAROLINA REVISIONS NO BY DATE DESCRIPTION 2 3 a 5 PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 7 OF 8 FILENAME: ToeWood.dwg TOE WOOD STRUCTURE BUILD IN 20 FT TO 30 FT SECTIONS PLACE A SHALLOW BACKFILL LAYER OVER CUTTINGS ANOTHER LAYER OF BACK FILL STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION WESTERN HEADQUARTERS 1301 FANNING BRIDGE ROAD, FLETCHER, NC 28732 PHONE: (828) 687-1213 INSTALL SOIL LIFTS UP TO BANKFULL STAGE WITH LAYERS OF CUTTINGS PLACED BETWEEN THE SOIL LIFTS II -II :II :II —II_ 1=11=11=11=11=1 II-11-11-11-11-1- 1=11=11=11=11=1=11- . 11�11�11�11�11�7�11., PROPOSED 111 i. CHANNEL =t1: 11.1 1=11=II=11=11-11-11-11' 11=11=11=11=11=11=11#11#11-11-11 1=11=11=11=11=11=1=11=11=11=11=11 11=11=11=11=11=11=11#11#11=11=11=11 I=II=II=II=II=11=1=II=II=II=II=II=11=1. 11=11=11=11=11=11=11#11#11=11=11=11=11=.1, 1=11=11=11=11=11=1=II=11=11=11=11=11=11=11- 11=11=11=11=11=11=11#11#11=11=11=11=11=11=11- 1=11=11=11=11=11=1=11=11=11=11=11=11=11=11=11=11 '" 11-11—II=11 11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11 _ _-,1=11=11=11=11=II=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11= 1=11=11=11=11=11=1=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11-11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11= 11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11= 1=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11= 11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11= 1=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11= 11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=11= I.=II.=II.=II.=II.=II=11=11=11=11=11=11=11=11=11=11=11=11=11=11=11#11#11=11=11=11=11=11=11.=11.=11.=11.=11,=,.11,=,.11,=,11,=,11,=,.11.=,11=,11.=,11.=,1i 1i 1i 1i 1i DESIGN DETAILS ARE CREDITED TO DR. DAVE ROSGEN WITH WILDLAND HYDROLOGY n==1r ,11=11=n11= ri==n=1r d 41III 11n1111= =11 ,'" .' ,-1f11=11=11=11=11=11=11=11=11=11. g/ =11=1f 1f 1f � i1=n=n=.n=.n=n=1r 1111711-11-11.-11._-.11._-.11- 11111=IL I1 11__1 COIR II= 11= 11=11=11'WOODEN 11=11=I#II#II11= „"II=11=: r , .11-71-71-11-4—u—a—u—it =11 1,11=11—II-11=11=11-11=11-11 . 1== -1-7I-7I—T-7I-11-1T71-d=11=11.=1=11-IIII=1 FABRIC 11= 11=11=11. 11=11=11:II 11=1I STAKES .11=11= 11=11= 11=11=11 11=11-11-11—II-11-1—11-11— -:d=II=II=II=II=II=II=II=II=11= 1111=11—r,=11=11=11=11=11=11=11=11=11= „-11=11=11=11=11=11=11#11#11=11=11=11=11=11=11=11=11=1f 11=11=1L"—""—"—"="="""=11=11=11=11=11=11=11= " •11=11=11=11=11=11=11=110 1=11=11=11=11=11=11=11= BANKFULL STAGE CUTTINGS II. 11= If-,. LOW FLOW Z� 1�11=11 —11—II-11 lT STREAMBANK STABILIZATION - YADKIN RIVER 8 - BISHOP REPAIR TOE WOOD - DETAIL CALDWELL COUNTY, NORTH CAROLINA ROOT WAD LOG BURRITO SOIL LIFTS REVISIONS NO BY DATE DESCRIPTION 2 3 a 5 4.0 PROJECT #: bishop, ty SCALE: N/A DRAWN BY: RACHEL E. SMITH, PE DATE: March 18, 2021 CHECKED BY: DATE: SHEET NO. 8 OF 8 FILENAME: ToeWood.dwg