Loading...
HomeMy WebLinkAbout20201847 Ver 1_More Info Requested_20210426Strickland, Bev From: Homewood, Sue Sent: Monday, April 26, 2021 4:26 PM To: michael Brame Subject: Kings Crossing SD; DWR# 20201847 Mike, I have reviewed the 401 application for the above noted project and have a couple items that need to be addressed: 1. The PCN notes that for stormwater purposes, the Town of King will review the project, however the location of the project makes it subject to Phase II NPDES Stormwater regulations implemented by DWR Central Office Stormwater Unit. Please confirm that this project will be submitted to the DWR Central Office for a State Stormwater Phase II permit. 2. The outlet of culvert crossing #2 appears to not be in alignment with the natural stream and instead is directing flow towards the outside of a meander bend. Please review this alignment in more detail and provide either an alignment that is more in line with the natural channel, or provide a revised plan that addresses long term stability of the streambank at this location. I will place this project "on hold" until receipt of a response to this email. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 1