HomeMy WebLinkAbout20201847 Ver 1_More Info Requested_20210426Strickland, Bev
From: Homewood, Sue
Sent: Monday, April 26, 2021 4:26 PM
To: michael Brame
Subject: Kings Crossing SD; DWR# 20201847
Mike,
I have reviewed the 401 application for the above noted project and have a couple items that need to be addressed:
1. The PCN notes that for stormwater purposes, the Town of King will review the project, however the location of
the project makes it subject to Phase II NPDES Stormwater regulations implemented by DWR Central Office
Stormwater Unit. Please confirm that this project will be submitted to the DWR Central Office for a State
Stormwater Phase II permit.
2. The outlet of culvert crossing #2 appears to not be in alignment with the natural stream and instead is directing
flow towards the outside of a meander bend. Please review this alignment in more detail and provide either an
alignment that is more in line with the natural channel, or provide a revised plan that addresses long term
stability of the streambank at this location.
I will place this project "on hold" until receipt of a response to this email.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
1