HomeMy WebLinkAbout20210438 Ver 1_USACE Permit_20210429U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW 2019-01299 County: Surry U.S.G.S. Quad: NC -Copeland
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Timmons Group
Lauren Noris-Heflin
Address: 5410 Trinity Road Suite 102
Raleigh, NC 27607
Telephone Number: (919)866-4943
E-mail: lauren.norris-heflin(a,timmons.com
Size (acres) 364.3 Nearest Town Dobson
Nearest Waterway West Double Creek River Basin Upper Pee Dee
USGS HUC 03040101 Coordinates Latitude: 36.287611
Longitude: -80.658471
Location description: 437 Dobson Spring Trail Dobson, NC 27017. Project site consists of several PINS:591300006143,
591200199241,591200380130, 591200282009,591200268707, 591200172708, and591200074640
Description of projects area and activity: The Applicant has identified this site as an ideal location for a solar facility due to its
location along an existing transmission line. This Project has been evaluated and meets the necessary requirements to
economically produce electrical power through the use of photovoltaic panel arrays. This verification authorizes the
installation of culvert impacting 7OLF of stream
Applicable Law(s): ❑X Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 14. Linear Transportation Projects
SEE ATTACHED NWP GENERAL CONDITIONS and Comments from North Carolina
Wildlife Resource Commission
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 3/26/2021. Any violation of the attached conditions or deviation from your
submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or
appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact Brandee.C.Boggs at 8282717980x4224or brandee.c.boggs@usace.army.mil.
Corps Regulatory Official: �� ( 9gggd. Date: 04/28/2021
Expiration Date of Verification: 03/18/2022
CF via email. James McRacken, Andrea Leslie, Sue Homewood,
Action ID Number: SAW 2019-01299 County: Surry
Permittee: Timmons Group, Lauren Noris-Heflin
Project Name: Stony Knoll Solar
Date Verification Issued: 04/28/2021
Project Manager: Brandee.C.Boggs
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Brandee.C.Boggs
Asheville Regulatory Office
U.S Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801
or
brandee.c.boggs@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
Path: Y:\805\43264-Stony_ Knoll_ Solar\GIS\Common Shared Exhibits\43264-VIC.mxd
STONY KNOLL SOLAR
SURRY COUNTY, NORTH CAROLINA
FIGURE 1: VICINITY MAP
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS. •
••0=•
•
•
TIMMONS GROUP JOB NUMBER:43264
PROJECT STUDY LIMITS:364.3 ACRES
LATITUDE:36.287611
LON GI TU DE:-80.658471
U.S.G.S. QUADRANGLE(S): COPELAND
DATE(S): 2016
WATERSHED(S):UPPER YADKIN (UPPER PEE DEE RIVER BASIN)
HYDROLOGIC UNIT CODE(S):03040101
Th
ese p ans an ocuments are the exclusive property of TIMMONS GROUP and may not be reproduced in whole
limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.
d shall no[ be used fo
or in part an r any purpose whatsoever, inclusive, but not
d associated d