HomeMy WebLinkAbout20090229 Ver 3_Staff Comments_20121205A�
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman
Governor Director Secretary
MEMO
To: Stephen Rynas, AICP, Federal Consistency Coordinator
Through: Amy Adams, Supervisor Surface Water Protection C4
From: Roberto L. Scheller, Senior Environmental Speciali�
Subject: Comments on Review of Heritage of Faith Family Church
Dare County, NC (DWQ #20090229 Ver.3)
Date: December 4, 2012
This project was originally submitted to this Office to review for issuance of Water Quality General
Certification. The proposed wetland impacts were equal to one acre and this Office placed project on Hold and
recommended reduction of wetland impacts. The project was withdrawn and resubmitted with reduced wetland
impacts. The following items will be required for clarification on the proposed project for permit consideration:
• Mitigation letter from NCEEP expires on December 13, 2012 for mitigation of 0.64 acres of wetland
impacts. It is necessary that the project mitigation through EEP be updated before project can be
considered for permitting.
• Proposed project should have stormwater management plan.
• The proposed project will require a Sediment and Erosion control plan.
Thank you for providing copy of the proposed project to this Office for review and commenting. If you should
have any questions in regards to water quality and the proposed project please contact Roberto Scheller in the
Washington Regional Office at roberto.scheller(a�ncdenr.gov or by phone at 252- 948 -3940.
North Carolina Division of Water Quality
943 Washington Square Mall
Washington, NC 27889
Phone: 252 - 946 -6481 1 FAX: 252 - 946 -9215
Internet: www.ncwaterquality.orq
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
;Vaturallrf
AI- A
12= �
NCDENR
North Carolina Department of Environment and Natural Resoruces
Division of Coastal Management
Beverly Eaves Perdue Braxton C. Davis
Governor Director
MEMORANDUM
11/20/2012
TO: Amy Adams (401 Water Quality)
Division of Water Quality
943 Washington Square Mall
Washington, NC 27889 -1638
FROM: Stephen Rynas, AICP; Federal Conistency Coordinator
SUBJECT: Heritage of Faith Family Church
APPLICANT: Army Corps of Engineers (ACOE)
Dee Freeman
Secretary
Comments Due: 12/14/2012
Project: 20120111
LOCATION: Heritage of Faith Family Church, Frisco, Dare County, North Carolina
PROJECT DESCRIPTION:
Mm GG;
NOV 2 8 2012
The proposed fill of 1.0 acres of Section 404 wetlands to facilitate the construction of a church.
This document is being circulated for CONSISTENCY review and comment by the response date above.
If the proposed project does not conform to your regulatory requirements, please identify the measures that
would be necessary to bring the proposed project into conformance. Your response will assist us in determining
whether the proposed project would be consistent with the States's Coastal Management Program. Please
inform me of any corrections, additions, or deletions. If you have any additional questions regarding the
proposed project you may contact me at stephen.rynas @ncdenr.gov or 252 - 808 -2808 x209.
REPLY: No Comment
This agency supports the project as proposed.
Comments to this project are attached.
Thi agency objects to the project as proposed.
SIGNED: DATE: ) s, l ,
,T�
RETURN COMPLETED FORM TO:
Stephen Rynas, Federal Consistency Coordinator
North Carolina Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557 -3421
400 Commerce Ave., Morehead City, NC 28557 -3421 �TOne
Phone: 252 - 808 -28081 FAX: 252 - 247 -3330 Internet: www.nccoastalmanagement.net � �I orth Caxo find.
An Equal Opportunity 1 Affirmative Action Employer Naturally