Loading...
HomeMy WebLinkAbout20090229 Ver 3_Staff Comments_20121205A� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary MEMO To: Stephen Rynas, AICP, Federal Consistency Coordinator Through: Amy Adams, Supervisor Surface Water Protection C4 From: Roberto L. Scheller, Senior Environmental Speciali� Subject: Comments on Review of Heritage of Faith Family Church Dare County, NC (DWQ #20090229 Ver.3) Date: December 4, 2012 This project was originally submitted to this Office to review for issuance of Water Quality General Certification. The proposed wetland impacts were equal to one acre and this Office placed project on Hold and recommended reduction of wetland impacts. The project was withdrawn and resubmitted with reduced wetland impacts. The following items will be required for clarification on the proposed project for permit consideration: • Mitigation letter from NCEEP expires on December 13, 2012 for mitigation of 0.64 acres of wetland impacts. It is necessary that the project mitigation through EEP be updated before project can be considered for permitting. • Proposed project should have stormwater management plan. • The proposed project will require a Sediment and Erosion control plan. Thank you for providing copy of the proposed project to this Office for review and commenting. If you should have any questions in regards to water quality and the proposed project please contact Roberto Scheller in the Washington Regional Office at roberto.scheller(a�ncdenr.gov or by phone at 252- 948 -3940. North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Phone: 252 - 946 -6481 1 FAX: 252 - 946 -9215 Internet: www.ncwaterquality.orq An Equal Opportunity 1 Affirmative Action Employer NorthCarolina ;Vaturallrf AI- A 12= � NCDENR North Carolina Department of Environment and Natural Resoruces Division of Coastal Management Beverly Eaves Perdue Braxton C. Davis Governor Director MEMORANDUM 11/20/2012 TO: Amy Adams (401 Water Quality) Division of Water Quality 943 Washington Square Mall Washington, NC 27889 -1638 FROM: Stephen Rynas, AICP; Federal Conistency Coordinator SUBJECT: Heritage of Faith Family Church APPLICANT: Army Corps of Engineers (ACOE) Dee Freeman Secretary Comments Due: 12/14/2012 Project: 20120111 LOCATION: Heritage of Faith Family Church, Frisco, Dare County, North Carolina PROJECT DESCRIPTION: Mm GG; NOV 2 8 2012 The proposed fill of 1.0 acres of Section 404 wetlands to facilitate the construction of a church. This document is being circulated for CONSISTENCY review and comment by the response date above. If the proposed project does not conform to your regulatory requirements, please identify the measures that would be necessary to bring the proposed project into conformance. Your response will assist us in determining whether the proposed project would be consistent with the States's Coastal Management Program. Please inform me of any corrections, additions, or deletions. If you have any additional questions regarding the proposed project you may contact me at stephen.rynas @ncdenr.gov or 252 - 808 -2808 x209. REPLY: No Comment This agency supports the project as proposed. Comments to this project are attached. Thi agency objects to the project as proposed. SIGNED: DATE: ) s, l , ,T� RETURN COMPLETED FORM TO: Stephen Rynas, Federal Consistency Coordinator North Carolina Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 -3421 400 Commerce Ave., Morehead City, NC 28557 -3421 �TOne Phone: 252 - 808 -28081 FAX: 252 - 247 -3330 Internet: www.nccoastalmanagement.net � �I orth Caxo find. An Equal Opportunity 1 Affirmative Action Employer Naturally