Loading...
HomeMy WebLinkAbout20201993 Ver 1_USACE Correspondence_20210429Homewood, Sue From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Thursday, April 29, 2021 10:12 AM To: Sullivan, William; sandersen@pgrenewables.com Cc: Homewood, Sue Subject: [External] NWP 51 verification; Pelham Solar Farm / Caswell County; SAW-2020-02138 Attachments: 2021NWP51.pdf; Pages from 20210330 PCN and Plans.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Based on the PCN and additional information you submitted on 3/30/2021, the above referenced project appears to be authorized under Nationwide Permit (NWP) 51 and does not require notification to the Corps. Attached is a copy of the NWP 51 including the applicable permit conditions. Please note that the project must be accomplished in strict accordance with these conditions and your submitted description, and any violation of the conditions or deviation from your submitted description may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. The Action Identification Number for this project is SAW-2020-02138. Although it is our understanding that this project fits Water Quality General Certification No. 4271 (issued 12/18/2020), it is also possible that the project may trigger one or more of the Individual 401 WQC thresholds or circumstances listed on Pages 2-3 of this Certification. It is your responsibility to contact the North Carolina Division of Water Resources (NCDWR) Winston Salem Regional Office to determine the 401 requirements for this project. Please note that, if an Individual 401 WQC is required from NCDWR, the conditions of the Individual 401 WQC once issued are also conditions of the NWP referenced above. You may not conduct the activity authorized by the above referenced NWP without a valid 401 Water Quality Certification. Lastly, in reviewing Sheet Number EX 1.0 and Figure 6.0: Impact Figure Overview Map from the PCN package (see "Pages from 20210330 PCN and Plans.pdf", attached), I noted a possible overlap of a portion of a solar array with a stream (Stream IS-5). Please note that no discharge of dredged or fill material has been proposed or authorized for any portion of this project other than the road crossing described in the PCN. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 1