HomeMy WebLinkAbout20201993 Ver 1_USACE Permit_20210429Nationwide Permit 51
Land -Based Renewable Energy Generation Facilities
Effective Date: March 15, 2021 / Expiration Date: March 15, 2026
Authorities: Sections 10 and 404
Discharges of dredged or fill material into non -tidal waters of the United States for the
construction, expansion, or modification of land -based renewable energy production
facilities, including attendant features. Such facilities include infrastructure to collect
solar (concentrating solar power and photovoltaic), wind, biomass, or geothermal
energy. Attendant features may include, but are not limited to roads, parking lots, and
stormwater management facilities within the land -based renewable energy generation
facility.
The discharge must not cause the loss of greater than 1/2-acre of non -tidal waters of
the United States. This NWP does not authorize discharges of dredged or fill material
into non -tidal wetlands adjacent to tidal waters.
Notification: The permittee must submit a pre -construction notification to the district
engineer prior to commencing the activity if the discharge results in the loss of greater
than 1/10-acre of waters of the United States. (See general condition 32.) (Authorities:
Sections 10 and 404)
GENERAL CONDITIONS
Note: To qualify for NWP authorization, the prospective permittee must comply with the
following general conditions, as applicable, in addition to any regional or case -specific
conditions imposed by the division engineer or district engineer. Prospective permittees
should contact the appropriate Corps district office to determine if regional conditions
have been imposed on an NWP. Prospective permittees should also contact the
appropriate Corps district office to determine the status of Clean Water Act Section 401
water quality certification and/or Coastal Zone Management Act consistency for an
NWP. Every person who may wish to obtain permit authorization under one or more
NWPs, or who is currently relying on an existing or prior permit authorization under one
or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1
through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating
to the modification, suspension, or revocation of any NWP authorization.
1. Navigation. (a) No activity may cause more than a minimal adverse effect on
navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through
regulations or otherwise, must be installed and maintained at the permittee's expense
on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein
1
authorized, or if, in the opinion of the Secretary of the Army or his or her authorized
representative, said structure or work shall cause unreasonable obstruction to the free
navigation of the navigable waters, the permittee will be required, upon due notice from
the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions
caused thereby, without expense to the United States. No claim shall be made against
the United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life
cycle movements of those species of aquatic life indigenous to the waterbody, including
those species that normally migrate through the area, unless the activity's primary
purpose is to impound water. All permanent and temporary crossings of waterbodies
shall be suitably culverted, bridged, or otherwise designed and constructed to maintain
low flows to sustain the movement of those aquatic species. If a bottomless culvert
cannot be used, then the crossing should be designed and constructed to minimize
adverse effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be
avoided to the maximum extent practicable. Activities that result in the physical
destruction (e.g., through excavation, fill, or downstream smothering by substantial
turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve
as breeding areas for migratory birds must be avoided to the maximum extent
practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations,
unless the activity is directly related to a shellfish harvesting activity authorized by
NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by
NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car
bodies, asphalt, etc.). Material used for construction or discharged must be free from
toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water
supply intake, except where the activity is for the repair or improvement of public water
supply intake structures or adjacent bank stabilization.
8. Adverse Effects From Impoundments. If the activity creates an impoundment of
water, adverse effects to the aquatic system due to accelerating the passage of water,
and/or restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre -
construction course, condition, capacity, and location of open waters must be
maintained for each activity, including stream channelization, storm water management
activities, and temporary and permanent road crossings, except as provided below. The
2
activity must be constructed to withstand expected high flows. The activity must not
restrict or impede the passage of normal or high flows, unless the primary purpose of
the activity is to impound water or manage high flows. The activity may alter the pre -
construction course, condition, capacity, and location of open waters if it benefits the
aquatic environment (e.g., stream restoration or relocation activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable
FEMA-approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on
mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment
controls must be used and maintained in effective operating condition during
construction, and all exposed soil and other fills, as well as any work below the ordinary
high water mark or high tide line, must be permanently stabilized at the earliest
practicable date. Permittees are encouraged to perform work within waters of the United
States during periods of low -flow or no -flow, or during low tides.
13. Removal of Temporary Structures and Fills. Temporary structures must be
removed, to the maximum extent practicable, after their use has been discontinued.
Temporary fills must be removed in their entirety and the affected areas returned to pre -
construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained,
including maintenance to ensure public safety and compliance with applicable NWP
general conditions, as well as any activity -specific conditions added by the district
engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project.
The same NWP cannot be used more than once for the same single and complete
project.
16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the
National Wild and Scenic River System, or in a river officially designated by Congress
as a "study river" for possible inclusion in the system while the river is in an official study
status, unless the appropriate Federal agency with direct management responsibility for
such river, has determined in writing that the proposed activity will not adversely affect
the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic
River System, or in a river officially designated by Congress as a "study river" for
possible inclusion in the system while the river is in an official study status, the
permittee must submit a pre -construction notification (see general condition 32). The
district engineer will coordinate the PCN with the Federal agency with direct
management responsibility for that river. Permittees shall not begin the NWP activity
3
until notified by the district engineer that the Federal agency with direct management
responsibility for that river has determined in writing that the proposed NWP activity will
not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate
Federal land management agency responsible for the designated Wild and Scenic River
or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land
Management, U.S. Fish and Wildlife Service). Information on these rivers is also
available at: http://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights,
including, but not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to
directly or indirectly jeopardize the continued existence of a threatened or endangered
species or a species proposed for such designation, as identified under the Federal
Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely
modify designated critical habitat or critical habitat proposed for such designation. No
activity is authorized under any NWP which "may affect" a listed species or critical
habitat, unless ESA section 7 consultation addressing the consequences of the
proposed activity on listed species or critical habitat has been completed. See 50 CFR
402.02 for the definition of "effects of the action" for the purposes of ESA section 7
consultation, as well as 50 CFR 402.17, which provides further explanation under ESA
section 7 regarding "activities that are reasonably certain to occur" and "consequences
caused by the proposed action."
(b) Federal agencies should follow their own procedures for complying with the
requirements of the ESA (see 33 CFR 330.4(f)(1)). If pre -construction notification is
required for the proposed activity, the Federal permittee must provide the district
engineer with the appropriate documentation to demonstrate compliance with those
requirements. The district engineer will verify that the appropriate documentation has
been submitted. If the appropriate documentation has not been submitted, additional
ESA section 7 consultation may be necessary for the activity and the respective federal
agency would be responsible for fulfilling its obligation under section 7 of the ESA.
(c) Non-federal permittees must submit a pre -construction notification to the district
engineer if any listed species (or species proposed for listing) or designated critical
habitat (or critical habitat proposed such designation) might be affected or is in the
vicinity of the activity, or if the activity is located in designated critical habitat or critical
habitat proposed for such designation, and shall not begin work on the activity until
notified by the district engineer that the requirements of the ESA have been satisfied
and that the activity is authorized. For activities that might affect Federally -listed
endangered or threatened species (or species proposed for listing) or designated critical
habitat (or critical habitat proposed for such designation), the pre -construction
notification must include the name(s) of the endangered or threatened species (or
species proposed for listing) that might be affected by the proposed activity or that
4
utilize the designated critical habitat (or critical habitat proposed for such designation)
that might be affected by the proposed activity. The district engineer will determine
whether the proposed activity "may affect" or will have "no effect" to listed species and
designated critical habitat and will notify the non -Federal applicant of the Corps'
determination within 45 days of receipt of a complete pre -construction notification. For
activities where the non -Federal applicant has identified listed species (or species
proposed for listing) or designated critical habitat (or critical habitat proposed for such
designation) that might be affected or is in the vicinity of the activity, and has so notified
the Corps, the applicant shall not begin work until the Corps has provided notification
that the proposed activity will have "no effect" on listed species (or species proposed for
listing or designated critical habitat (or critical habitat proposed for such designation), or
until ESA section 7 consultation or conference has been completed. If the non -Federal
applicant has not heard back from the Corps within 45 days, the applicant must still wait
for notification from the Corps.
(d) As a result of formal or informal consultation or conference with the FWS or NMFS
the district engineer may add species -specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the "take" of a threatened
or endangered species as defined under the ESA. In the absence of separate
authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take"
provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any
person subject to the jurisdiction of the United States to take a listed species, where
"take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect,
or to attempt to engage in any such conduct. The word "harm" in the definition of "take"
means an act which actually kills or injures wildlife. Such an act may include significant
habitat modification or degradation where it actually kills or injures wildlife by
significantly impairing essential behavioral patterns, including breeding, feeding or
sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit
with an approved Habitat Conservation Plan for a project or a group of projects that
includes the proposed NWP activity, the non-federal applicant should provide a copy of
that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this
general condition. The district engineer will coordinate with the agency that issued the
ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and
the associated incidental take were considered in the internal ESA section 7
consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination
results in concurrence from the agency that the proposed NWP activity and the
associated incidental take were considered in the internal ESA section 7 consultation for
the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a
separate ESA section 7 consultation for the proposed NWP activity. The district
engineer will notify the non-federal applicant within 45 days of receipt of a complete pre -
construction notification whether the ESA section 10(a)(1)(B) permit covers the
proposed NWP activity or whether additional ESA section 7 consultation is required.
5
(g) Information on the location of threatened and endangered species and their critical
habitat can be obtained directly from the offices of the FWS and NMFS or their world
wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and
http://www.nmfs.noaa.gov/pr/species/esa/ respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for
ensuring that an action authorized by an NWP complies with the Migratory Bird Treaty
Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for
contacting the appropriate local office of the U.S. Fish and Wildlife Service to determine
what measures, if any, are necessary or appropriate to reduce adverse effects to
migratory birds or eagles, including whether "incidental take" permits are necessary and
available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act
for a particular activity.
20. Historic Properties. (a) No activity is authorized under any NWP which may have
the potential to cause effects to properties listed, or eligible for listing, in the National
Register of Historic Places until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied.
(b) Federal permittees should follow their own procedures for complying with the
requirements of section 106 of the National Historic Preservation Act (see 33 CFR
330.4(g)(1)). If pre -construction notification is required for the proposed NWP activity,
the Federal permittee must provide the district engineer with the appropriate
documentation to demonstrate compliance with those requirements. The district
engineer will verify that the appropriate documentation has been submitted. If the
appropriate documentation is not submitted, then additional consultation under section
106 may be necessary. The respective federal agency is responsible for fulfilling its
obligation to comply with section 106.
(c) Non-federal permittees must submit a pre -construction notification to the district
engineer if the NWP activity might have the potential to cause effects to any historic
properties listed on, determined to be eligible for listing on, or potentially eligible for
listing on the National Register of Historic Places, including previously unidentified
properties. For such activities, the pre -construction notification must state which historic
properties might have the potential to be affected by the proposed NWP activity or
include a vicinity map indicating the location of the historic properties or the potential for
the presence of historic properties. Assistance regarding information on the location of,
or potential for, the presence of historic properties can be sought from the State Historic
Preservation Officer, Tribal Historic Preservation Officer, or designated tribal
representative, as appropriate, and the National Register of Historic Places (see 33
CFR 330.4(g)). When reviewing pre -construction notifications, district engineers will
comply with the current procedures for addressing the requirements of section 106 of
the National Historic Preservation Act. The district engineer shall make a reasonable
and good faith effort to carry out appropriate identification efforts commensurate with
potential impacts, which may include background research, consultation, oral history
interviews, sample field investigation, and/or field survey. Based on the information
6
submitted in the PCN and these identification efforts, the district engineer shall
determine whether the proposed NWP activity has the potential to cause effects on the
historic properties. Section 106 consultation is not required when the district engineer
determines that the activity does not have the potential to cause effects on historic
properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district
engineer determines that the activity has the potential to cause effects on historic
properties. The district engineer will conduct consultation with consulting parties
identified under 36 CFR 800.2(c) when he or she makes any of the following effect
determinations for the purposes of section 106 of the NHPA: no historic properties
affected, no adverse effect, or adverse effect.
(d) Where the non -Federal applicant has identified historic properties on which the
proposed NWP activity might have the potential to cause effects and has so notified the
Corps, the non -Federal applicant shall not begin the activity until notified by the district
engineer either that the activity has no potential to cause effects to historic properties or
that NHPA section 106 consultation has been completed. For non-federal permittees,
the district engineer will notify the prospective permittee within 45 days of receipt of a
complete pre -construction notification whether NHPA section 106 consultation is
required. If NHPA section 106 consultation is required, the district engineer will notify
the non -Federal applicant that he or she cannot begin the activity until section 106
consultation is completed. If the non -Federal applicant has not heard back from the
Corps within 45 days, the applicant must still wait for notification from the Corps.
(e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C.
306113) prevents the Corps from granting a permit or other assistance to an applicant
who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally
significantly adversely affected a historic property to which the permit would relate, or
having legal power to prevent it, allowed such significant adverse effect to occur, unless
the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP),
determines that circumstances justify granting such assistance despite the adverse
effect created or permitted by the applicant. If circumstances justify granting the
assistance, the Corps is required to notify the ACHP and provide documentation
specifying the circumstances, the degree of damage to the integrity of any historic
properties affected, and proposed mitigation. This documentation must include any
views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the
undertaking occurs on or affects historic properties on tribal lands or affects properties
of interest to those tribes, and other parties known to have a legitimate interest in the
impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. Permittees that
discover any previously unknown historic, cultural or archeological remains and artifacts
while accomplishing the activity authorized by an NWP, they must immediately notify
the district engineer of what they have found, and to the maximum extent practicable,
avoid construction activities that may affect the remains and artifacts until the required
coordination has been completed. The district engineer will initiate the Federal, Tribal,
7
and state coordination required to determine if the items or remains warrant a recovery
effort or if the site is eligible for listing in the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-
managed marine sanctuaries and marine monuments, and National Estuarine Research
Reserves. The district engineer may designate, after notice and opportunity for public
comment, additional waters officially designated by a state as having particular
environmental or ecological significance, such as outstanding national resource waters
or state natural heritage sites. The district engineer may also designate additional
critical resource waters after notice and opportunity for public comment.
(a) Discharges of dredged or fill material into waters of the United States are not
authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52,
57 and 58 for any activity within, or directly affecting, critical resource waters, including
wetlands adjacent to such waters.
(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54,
notification is required in accordance with general condition 32, for any activity proposed
by permittees in the designated critical resource waters including wetlands adjacent to
those waters. The district engineer may authorize activities under these NWPs only
after she or he determines that the impacts to the critical resource waters will be no
more than minimal.
23. Mitigation. The district engineer will consider the following factors when
determining appropriate and practicable mitigation necessary to ensure that the
individual and cumulative adverse environmental effects are no more than minimal:
(a) The activity must be designed and constructed to avoid and minimize adverse
effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site).
(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating
for resource losses) will be required to the extent necessary to ensure that the individual
and cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one -for -one ratio will be required for all
wetland losses that exceed 1/10-acre and require pre -construction notification, unless
the district engineer determines in writing that either some other form of mitigation
would be more environmentally appropriate or the adverse environmental effects of the
proposed activity are no more than minimal, and provides an activity -specific waiver of
this requirement. For wetland losses of 1/10-acre or less that require pre -construction
notification, the district engineer may determine on a case -by -case basis that
compensatory mitigation is required to ensure that the activity results in only minimal
adverse environmental effects.
8
(d) Compensatory mitigation at a minimum one -for -one ratio will be required for all
losses of stream bed that exceed 3/100-acre and require pre -construction notification,
unless the district engineer determines in writing that either some other form of
mitigation would be more environmentally appropriate or the adverse environmental
effects of the proposed activity are no more than minimal, and provides an activity -
specific waiver of this requirement. This compensatory mitigation requirement may be
satisfied through the restoration or enhancement of riparian areas next to streams in
accordance with paragraph (e) of this general condition. For losses of stream bed of
3/100-acre or less that require pre -construction notification, the district engineer may
determine on a case -by -case basis that compensatory mitigation is required to ensure
that the activity results in only minimal adverse environmental effects. Compensatory
mitigation for losses of streams should be provided, if practicable, through stream
rehabilitation, enhancement, or preservation, since streams are difficult -to -replace
resources (see 33 CFR 332.3(e)(3)).
(e) Compensatory mitigation plans for NWP activities in or near streams or other open
waters will normally include a requirement for the restoration or enhancement,
maintenance, and legal protection (e.g., conservation easements) of riparian areas next
to open waters. In some cases, the restoration or maintenance/protection of riparian
areas may be the only compensatory mitigation required. If restoring riparian areas
involves planting vegetation, only native species should be planted. The width of the
required riparian area will address documented water quality or aquatic habitat loss
concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the
stream, but the district engineer may require slightly wider riparian areas to address
documented water quality or habitat loss concerns. If it is not possible to restore or
maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake
or coastal waters, then restoring or maintaining/protecting a riparian area along a single
bank or shoreline may be sufficient. Where both wetlands and open waters exist on the
project site, the district engineer will determine the appropriate compensatory mitigation
(e.g., riparian areas and/or wetlands compensation) based on what is best for the
aquatic environment on a watershed basis. In cases where riparian areas are
determined to be the most appropriate form of minimization or compensatory mitigation,
the district engineer may waive or reduce the requirement to provide wetland
compensatory mitigation for wetland losses.
(f) Compensatory mitigation projects provided to offset losses of aquatic resources must
comply with the applicable provisions of 33 CFR part 332.
(1) The prospective permittee is responsible for proposing an appropriate compensatory
mitigation option if compensatory mitigation is necessary to ensure that the activity
results in no more than minimal adverse environmental effects. For the NWPs, the
preferred mechanism for providing compensatory mitigation is mitigation bank credits or
in -lieu fee program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate
number and type of mitigation bank or in -lieu credits are not available at the time the
PCN is submitted to the district engineer, the district engineer may approve the use of
permittee-responsible mitigation.
9
(2) The amount of compensatory mitigation required by the district engineer must be
sufficient to ensure that the authorized activity results in no more than minimal individual
and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33
CFR 332.3(f).)
(3) Since the likelihood of success is greater and the impacts to potentially valuable
uplands are reduced, aquatic resource restoration should be the first compensatory
mitigation option considered for permittee-responsible mitigation.
(4) If permittee-responsible mitigation is the proposed option, the prospective permittee
is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan
may be used by the district engineer to make the decision on the NWP verification
request, but a final mitigation plan that addresses the applicable requirements of 33
CFR 332.4(c)(2) through (14) must be approved by the district engineer before the
permittee begins work in waters of the United States, unless the district engineer
determines that prior approval of the final mitigation plan is not practicable or not
necessary to ensure timely completion of the required compensatory mitigation (see 33
CFR 332.3(k)(3)). If permittee-responsible mitigation is the proposed option, and the
proposed compensatory mitigation site is located on land in which another federal
agency holds an easement, the district engineer will coordinate with that federal agency
to determine if proposed compensatory mitigation project is compatible with the terms of
the easement.
(5) If mitigation bank or in -lieu fee program credits are the proposed option, the
mitigation plan needs to address only the baseline conditions at the impact site and the
number of credits to be provided (see 33 CFR 332.4(c)(1)(ii)).
(6) Compensatory mitigation requirements (e.g., resource type and amount to be
provided as compensatory mitigation, site protection, ecological performance standards,
monitoring requirements) may be addressed through conditions added to the NWP
authorization, instead of components of a compensatory mitigation plan (see 33 CFR
332.4(c)(1)(ii)).
(g) Compensatory mitigation will not be used to increase the acreage losses allowed by
the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2-
acre, it cannot be used to authorize any NWP activity resulting in the loss of greater
than 1/2-acre of waters of the United States, even if compensatory mitigation is
provided that replaces or restores some of the lost waters. However, compensatory
mitigation can and should be used, as necessary, to ensure that an NWP activity
already meeting the established acreage limits also satisfies the no more than minimal
impact requirement for the NWPs.
(h) Permittees may propose the use of mitigation banks, in -lieu fee programs, or
permittee-responsible mitigation. When developing a compensatory mitigation proposal,
the permittee must consider appropriate and practicable options consistent with the
10
framework at 33 CFR 332.3(b). For activities resulting in the loss of marine or estuarine
resources, permittee-responsible mitigation may be environmentally preferable if there
are no mitigation banks or in -lieu fee programs in the area that have marine or estuarine
credits available for sale or transfer to the permittee. For permittee-responsible
mitigation, the special conditions of the NWP verification must clearly indicate the party
or parties responsible for the implementation and performance of the compensatory
mitigation project, and, if required, its long-term management.
(i) Where certain functions and services of waters of the United States are permanently
adversely affected by a regulated activity, such as discharges of dredged or fill material
into waters of the United States that will convert a forested or scrub -shrub wetland to a
herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may
be required to reduce the adverse environmental effects of the activity to the no more
than minimal level.
24. Safety of Impoundment Structures. To ensure that all impoundment structures
are safely designed, the district engineer may require non -Federal applicants to
demonstrate that the structures comply with established state or federal, dam safety
criteria or have been designed by qualified persons. The district engineer may also
require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications made to ensure safety.
25. Water Quality. (a) Where the certifying authority (state, authorized tribe, or EPA, as
appropriate) has not previously certified compliance of an NWP with CWA section 401,
a CWA section 401 water quality certification for the proposed discharge must be
obtained or waived (see 33 CFR 330.4(c)). If the permittee cannot comply with all of the
conditions of a water quality certification previously issued by certifying authority for the
issuance of the NWP, then the permittee must obtain a water quality certification or
waiver for the proposed discharge in order for the activity to be authorized by an NWP.
(b) If the NWP activity requires pre -construction notification and the certifying authority
has not previously certified compliance of an NWP with CWA section 401, the proposed
discharge is not authorized by an NWP until water quality certification is obtained or
waived. If the certifying authority issues a water quality certification for the proposed
discharge, the permittee must submit a copy of the certification to the district engineer.
The discharge is not authorized by an NWP until the district engineer has notified the
permittee that the water quality certification requirement has been satisfied by the
issuance of a water quality certification or a waiver.
(c) The district engineer or certifying authority may require additional water quality
management measures to ensure that the authorized activity does not result in more
than minimal degradation of water quality.
26. Coastal Zone Management. In coastal states where an NWP has not previously
received a state coastal zone management consistency concurrence, an individual state
coastal zone management consistency concurrence must be obtained, or a
11
presumption of concurrence must occur (see 33 CFR 330.4(d)). If the permittee cannot
comply with all of the conditions of a coastal zone management consistency
concurrence previously issued by the state, then the permittee must obtain an individual
coastal zone management consistency concurrence or presumption of concurrence in
order for the activity to be authorized by an NWP. The district engineer or a state may
require additional measures to ensure that the authorized activity is consistent with state
coastal zone management requirements.
27. Regional and Case -By -Case Conditions. The activity must comply with any
regional conditions that may have been added by the Division Engineer (see 33 CFR
330.4(e)) and with any case specific conditions added by the Corps or by the state,
Indian Tribe, or U.S. EPA in its CWA section 401 Water Quality Certification, or by the
state in its Coastal Zone Management Act consistency determination.
28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single
and complete project is authorized, subject to the following restrictions:
(a) If only one of the NWPs used to authorize the single and complete project has a
specified acreage limit, the acreage loss of waters of the United States cannot exceed
the acreage limit of the NWP with the highest specified acreage limit. For example, if a
road crossing over tidal waters is constructed under NWP 14, with associated bank
stabilization authorized by NWP 13, the maximum acreage loss of waters of the United
States for the total project cannot exceed 1/3-acre.
(b) If one or more of the NWPs used to authorize the single and complete project has
specified acreage limits, the acreage loss of waters of the United States authorized by
those NWPs cannot exceed their respective specified acreage limits. For example, if a
commercial development is constructed under NWP 39, and the single and complete
project includes the filling of an upland ditch authorized by NWP 46, the maximum
acreage loss of waters of the United States for the commercial development under
NWP 39 cannot exceed 1/2-acre, and the total acreage loss of waters of United States
due to the NWP 39 and 46 activities cannot exceed 1 acre.
29. Transfer of Nationwide Permit Verifications. If the permittee sells the property
associated with a nationwide permit verification, the permittee may transfer the
nationwide permit verification to the new owner by submitting a letter to the appropriate
Corps district office to validate the transfer. A copy of the nationwide permit verification
must be attached to the letter, and the letter must contain the following statement and
signature:
"When the structures or work authorized by this nationwide permit are still in existence
at the time the property is transferred, the terms and conditions of this nationwide
permit, including any special conditions, will continue to be binding on the new owner(s)
of the property. To validate the transfer of this nationwide permit and the associated
liabilities associated with compliance with its terms and conditions, have the transferee
sign and date below."
12
(Transferee)
(Date)
30. Compliance Certification. Each permittee who receives an NWP verification letter
from the Corps must provide a signed certification documenting completion of the
authorized activity and implementation of any required compensatory mitigation. The
success of any required permittee-responsible mitigation, including the achievement of
ecological performance standards, will be addressed separately by the district engineer.
The Corps will provide the permittee the certification document with the NWP
verification letter. The certification document will include:
(a) A statement that the authorized activity was done in accordance with the NWP
authorization, including any general, regional, or activity -specific conditions;
(b) A statement that the implementation of any required compensatory mitigation was
completed in accordance with the permit conditions. If credits from a mitigation bank or
in -lieu fee program are used to satisfy the compensatory mitigation requirements, the
certification must include the documentation required by 33 CFR 332.3(I)(3) to confirm
that the permittee secured the appropriate number and resource type of credits; and
(c) The signature of the permittee certifying the completion of the activity and mitigation.
The completed certification document must be submitted to the district engineer within
30 days of completion of the authorized activity or the implementation of any required
compensatory mitigation, whichever occurs later.
31. Activities Affecting Structures or Works Built by the United States. If an NWP
activity also requires review by, or permission from, the Corps pursuant to 33 U.S.C.
408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps
of Engineers (USACE) federally authorized Civil Works project (a "USACE project"), the
prospective permittee must submit a pre -construction notification. See paragraph
(b)(10) of general condition 32. An activity that requires section 408 permission and/or
review is not authorized by an NWP until the appropriate Corps office issues the section
408 permission or completes its review to alter, occupy, or use the USACE project, and
the district engineer issues a written NWP verification.
32. Pre -Construction Notification. (a) Timing. Where required by the terms of the
NWP, the prospective permittee must notify the district engineer by submitting a pre -
construction notification (PCN) as early as possible. The district engineer must
determine if the PCN is complete within 30 calendar days of the date of receipt and, if
13
the PCN is determined to be incomplete, notify the prospective permittee within that 30
day period to request the additional information necessary to make the PCN complete.
The request must specify the information needed to make the PCN complete. As a
general rule, district engineers will request additional information necessary to make the
PCN complete only once. However, if the prospective permittee does not provide all of
the requested information, then the district engineer will notify the prospective permittee
that the PCN is still incomplete and the PCN review process will not commence until all
of the requested information has been received by the district engineer. The prospective
permittee shall not begin the activity until either:
(1) He or she is notified in writing by the district engineer that the activity may proceed
under the NWP with any special conditions imposed by the district or division engineer;
or
(2) 45 calendar days have passed from the district engineer's receipt of the complete
PCN and the prospective permittee has not received written notice from the district or
division engineer. However, if the permittee was required to notify the Corps pursuant to
general condition 18 that listed species or critical habitat might be affected or are in the
vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the
activity might have the potential to cause effects to historic properties, the permittee
cannot begin the activity until receiving written notification from the Corps that there is
"no effect" on listed species or "no potential to cause effects" on historic properties, or
that any consultation required under Section 7 of the Endangered Species Act (see 33
CFR 330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR
330.4(g)) has been completed. If the proposed activity requires a written waiver to
exceed specified limits of an NWP, the permittee may not begin the activity until the
district engineer issues the waiver. If the district or division engineer notifies the
permittee in writing that an individual permit is required within 45 calendar days of
receipt of a complete PCN, the permittee cannot begin the activity until an individual
permit has been obtained. Subsequently, the permittee's right to proceed under the
NWP may be modified, suspended, or revoked only in accordance with the procedure
set forth in 33 CFR 330.5(d)(2).
(b) Contents of Pre -Construction Notification: The PCN must be in writing and include
the following information:
(1) Name, address and telephone numbers of the prospective permittee;
(2) Location of the proposed activity;
(3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to
authorize the proposed activity;
(4) (i) A description of the proposed activity; the activity's purpose; direct and indirect
adverse environmental effects the activity would cause, including the anticipated
amount of loss of wetlands, other special aquatic sites, and other waters expected to
14
result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a
description of any proposed mitigation measures intended to reduce the adverse
environmental effects caused by the proposed activity; and any other NWP(s), regional
general permit(s), or individual permit(s) used or intended to be used to authorize any
part of the proposed project or any related activity, including other separate and distant
crossings for linear projects that require Department of the Army authorization but do
not require pre -construction notification. The description of the proposed activity and
any proposed mitigation measures should be sufficiently detailed to allow the district
engineer to determine that the adverse environmental effects of the activity will be no
more than minimal and to determine the need for compensatory mitigation or other
mitigation measures.
(ii) For linear projects where one or more single and complete crossings require pre -
construction notification, the PCN must include the quantity of anticipated losses of
wetlands, other special aquatic sites, and other waters for each single and complete
crossing of those wetlands, other special aquatic sites, and other waters (including
those single and complete crossings authorized by an NWP but do not require PCNs).
This information will be used by the district engineer to evaluate the cumulative adverse
environmental effects of the proposed linear project, and does not change those non-
PCN NWP activities into NWP PCNs.
(iii) Sketches should be provided when necessary to show that the activity complies
with the terms of the NWP. (Sketches usually clarify the activity and when provided
results in a quicker decision. Sketches should contain sufficient detail to provide an
illustrative description of the proposed activity (e.g., a conceptual plan), but do not need
to be detailed engineering plans);
(5) The PCN must include a delineation of wetlands, other special aquatic sites, and
other waters, such as lakes and ponds, and perennial and intermittent streams, on the
project site. Wetland delineations must be prepared in accordance with the current
method required by the Corps. The permittee may ask the Corps to delineate the
special aquatic sites and other waters on the project site, but there may be a delay if the
Corps does the delineation, especially if the project site is large or contains many
wetlands, other special aquatic sites, and other waters. Furthermore, the 45-day period
will not start until the delineation has been submitted to or completed by the Corps, as
appropriate;
(6) If the proposed activity will result in the loss of greater than 1 /10-acre of wetlands or
3/100-acre of stream bed and a PCN is required, the prospective permittee must submit
a statement describing how the mitigation requirement will be satisfied, or explaining
why the adverse environmental effects are no more than minimal and why
compensatory mitigation should not be required. As an alternative, the prospective
permittee may submit a conceptual or detailed mitigation plan.
(7) For non-federal permittees, if any listed species (or species proposed for listing) or
designated critical habitat (or critical habitat proposed for such designation) might be
15
affected or is in the vicinity of the activity, or if the activity is located in designated critical
habitat (or critical habitat proposed for such designation), the PCN must include the
name(s) of those endangered or threatened species (or species proposed for listing)
that might be affected by the proposed activity or utilize the designated critical habitat
(or critical habitat proposed for such designation) that might be affected by the proposed
activity. For NWP activities that require pre -construction notification, Federal permittees
must provide documentation demonstrating compliance with the Endangered Species
Act;
(8) For non-federal permittees, if the NWP activity might have the potential to cause
effects to a historic property listed on, determined to be eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must
state which historic property might have the potential to be affected by the proposed
activity or include a vicinity map indicating the location of the historic property. For NWP
activities that require pre -construction notification, Federal permittees must provide
documentation demonstrating compliance with section 106 of the National Historic
Preservation Act;
(9) For an activity that will occur in a component of the National Wild and Scenic River
System, or in a river officially designated by Congress as a "study river" for possible
inclusion in the system while the river is in an official study status, the PCN must identify
the Wild and Scenic River or the "study river" (see general condition 16); and
(10) For an NWP activity that requires permission from, or review by, the Corps
pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or
use a U.S. Army Corps of Engineers federally authorized civil works project, the pre -
construction notification must include a statement confirming that the project proponent
has submitted a written request for section 408 permission from, or review by, the Corps
office having jurisdiction over that USACE project.
(c) Form of Pre -Construction Notification: The nationwide permit pre -construction
notification form (Form ENG 6082) should be used for NWP PCNs. A letter containing
the required information may also be used. Applicants may provide electronic files of
PCNs and supporting materials if the district engineer has established tools and
procedures for electronic submittals.
(d) Agency Coordination: (1) The district engineer will consider any comments from
Federal and state agencies concerning the proposed activity's compliance with the
terms and conditions of the NWPs and the need for mitigation to reduce the activity's
adverse environmental effects so that they are no more than minimal.
(2) Agency coordination is required for: (i) all NWP activities that require pre -
construction notification and result in the loss of greater than 1/2-acre of waters of the
United States; (ii) NWP 13 activities in excess of 500 linear feet, fills greater than one
cubic yard per running foot, or involve discharges of dredged or fill material into special
aquatic sites; and (iii) NWP 54 activities in excess of 500 linear feet, or that extend into
16
the waterbody more than 30 feet from the mean low water line in tidal waters or the
ordinary high water mark in the Great Lakes.
(3) When agency coordination is required, the district engineer will immediately provide
(e.g., via e-mail, facsimile transmission, overnight mail, or other expeditious manner) a
copy of the complete PCN to the appropriate Federal or state offices (FWS, state
natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the
exception of NWP 37, these agencies will have 10 calendar days from the date the
material is transmitted to notify the district engineer via telephone, facsimile
transmission, or e-mail that they intend to provide substantive, site -specific comments.
The comments must explain why the agency believes the adverse environmental effects
will be more than minimal. If so contacted by an agency, the district engineer will wait an
additional 15 calendar days before making a decision on the pre -construction
notification. The district engineer will fully consider agency comments received within
the specified time frame concerning the proposed activity's compliance with the terms
and conditions of the NWPs, including the need for mitigation to ensure that the net
adverse environmental effects of the proposed activity are no more than minimal. The
district engineer will provide no response to the resource agency, except as provided
below. The district engineer will indicate in the administrative record associated with
each pre -construction notification that the resource agencies' concerns were
considered. For NWP 37, the emergency watershed protection and rehabilitation activity
may proceed immediately in cases where there is an unacceptable hazard to life or a
significant loss of property or economic hardship will occur. The district engineer will
consider any comments received to decide whether the NWP 37 authorization should
be modified, suspended, or revoked in accordance with the procedures at 33 CFR
330.5.
(4) In cases of where the prospective permittee is not a Federal agency, the district
engineer will provide a response to NMFS within 30 calendar days of receipt of any
Essential Fish Habitat conservation recommendations, as required by section
305(b)(4)(B) of the Magnuson -Stevens Fishery Conservation and Management Act.
(5) Applicants are encouraged to provide the Corps with either electronic files or
multiple copies of pre -construction notifications to expedite agency coordination.
District Engineer's Decision
1. In reviewing the PCN for the proposed activity, the district engineer will determine
whether the activity authorized by the NWP will result in more than minimal individual or
cumulative adverse environmental effects or may be contrary to the public interest. If a
project proponent requests authorization by a specific NWP, the district engineer should
issue the NWP verification for that activity if it meets the terms and conditions of that
NWP, unless he or she determines, after considering mitigation, that the proposed
activity will result in more than minimal individual and cumulative adverse effects on the
aquatic environment and other aspects of the public interest and exercises discretionary
authority to require an individual permit for the proposed activity. For a linear project,
17
this determination will include an evaluation of the single and complete crossings of
waters of the United States that require PCNs to determine whether they individually
satisfy the terms and conditions of the NWP(s), as well as the cumulative effects caused
by all of the crossings of waters of the United States authorized by an NWP. If an
applicant requests a waiver of an applicable limit, as provided for in NWPs 13, 36, or 54,
the district engineer will only grant the waiver upon a written determination that the
NWP activity will result in only minimal individual and cumulative adverse environmental
effects.
2. When making minimal adverse environmental effects determinations the district
engineer will consider the direct and indirect effects caused by the NWP activity. He or
she will also consider the cumulative adverse environmental effects caused by activities
authorized by an NWP and whether those cumulative adverse environmental effects are
no more than minimal. The district engineer will also consider site specific factors, such
as the environmental setting in the vicinity of the NWP activity, the type of resource that
will be affected by the NWP activity, the functions provided by the aquatic resources
that will be affected by the NWP activity, the degree or magnitude to which the aquatic
resources perform those functions, the extent that aquatic resource functions will be lost
as a result of the NWP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource
functions to the region (e.g., watershed or ecoregion), and mitigation required by the
district engineer. If an appropriate functional or condition assessment method is
available and practicable to use, that assessment method may be used by the district
engineer to assist in the minimal adverse environmental effects determination. The
district engineer may add case -specific special conditions to the NWP authorization to
address site -specific environmental concerns.
3. If the proposed activity requires a PCN and will result in a loss of greater than 1 /10-
acre of wetlands or 3/100-acre of stream bed, the prospective permittee should submit a
mitigation proposal with the PCN. Applicants may also propose compensatory mitigation
for NWP activities with smaller impacts, or for impacts to other types of waters. The
district engineer will consider any proposed compensatory mitigation or other mitigation
measures the applicant has included in the proposal in determining whether the net
adverse environmental effects of the proposed activity are no more than minimal. The
compensatory mitigation proposal may be either conceptual or detailed. If the district
engineer determines that the activity complies with the terms and conditions of the NWP
and that the adverse environmental effects are no more than minimal, after considering
mitigation, the district engineer will notify the permittee and include any activity -specific
conditions in the NWP verification the district engineer deems necessary. Conditions for
compensatory mitigation requirements must comply with the appropriate provisions at
33 CFR 332.3(k). The district engineer must approve the final mitigation plan before the
permittee commences work in waters of the United States, unless the district engineer
determines that prior approval of the final mitigation plan is not practicable or not
necessary to ensure timely completion of the required compensatory mitigation. If the
prospective permittee elects to submit a compensatory mitigation plan with the PCN, the
district engineer will expeditiously review the proposed compensatory mitigation plan.
18
The district engineer must review the proposed compensatory mitigation plan within 45
calendar days of receiving a complete PCN and determine whether the proposed
mitigation would ensure that the NWP activity results in no more than minimal adverse
environmental effects. If the net adverse environmental effects of the NWP activity (after
consideration of the mitigation proposal) are determined by the district engineer to be no
more than minimal, the district engineer will provide a timely written response to the
applicant. The response will state that the NWP activity can proceed under the terms
and conditions of the NWP, including any activity -specific conditions added to the NWP
authorization by the district engineer.
4. If the district engineer determines that the adverse environmental effects of the
proposed activity are more than minimal, then the district engineer will notify the
applicant either: (a) that the activity does not qualify for authorization under the NWP
and instruct the applicant on the procedures to seek authorization under an individual
permit; (b) that the activity is authorized under the NWP subject to the applicant's
submission of a mitigation plan that would reduce the adverse environmental effects so
that they are no more than minimal; or (c) that the activity is authorized under the NWP
with specific modifications or conditions. Where the district engineer determines that
mitigation is required to ensure no more than minimal adverse environmental effects,
the activity will be authorized within the 45-day PCN period (unless additional time is
required to comply with general conditions 18, 20, and/or 31), with activity -specific
conditions that state the mitigation requirements. The authorization will include the
necessary conceptual or detailed mitigation plan or a requirement that the applicant
submit a mitigation plan that would reduce the adverse environmental effects so that
they are no more than minimal. When compensatory mitigation is required, no work in
waters of the United States may occur until the district engineer has approved a specific
mitigation plan or has determined that prior approval of a final mitigation plan is not
practicable or not necessary to ensure timely completion of the required compensatory
mitigation.
Further Information
1. District engineers have authority to determine if an activity complies with the terms
and conditions of an NWP.
2. NWPs do not obviate the need to obtain other federal, state, or local permits,
approvals, or authorizations required by law.
3. NWPs do not grant any property rights or exclusive privileges.
4. NWPs do not authorize any injury to the property or rights of others.
5. NWPs do not authorize interference with any existing or proposed Federal project
(see general condition 31).
19
Definitions
Best management practices (BMPs): Policies, practices, procedures, or structures
implemented to mitigate the adverse environmental effects on surface water quality
resulting from development. BMPs are categorized as structural or non-structural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation),
establishment (creation), enhancement, and/or in certain circumstances preservation of
aquatic resources for the purposes of offsetting unavoidable adverse impacts which
remain after all appropriate and practicable avoidance and minimization has been
achieved.
Currently serviceable: Useable as is or with some maintenance, but not so degraded as
to essentially require reconstruction.
Direct effects: Effects that are caused by the activity and occur at the same time and
place.
Discharge: The term "discharge" means any discharge of dredged or fill material into
waters of the United States.
Ecological reference: A model used to plan and design an aquatic habitat and riparian
area restoration, enhancement, or establishment activity under NWP 27. An ecological
reference may be based on the structure, functions, and dynamics of an aquatic habitat
type or a riparian area type that currently exists in the region where the proposed NWP
27 activity is located. Alternatively, an ecological reference may be based on a
conceptual model for the aquatic habitat type or riparian area type to be restored,
enhanced, or established as a result of the proposed NWP 27 activity. An ecological
reference takes into account the range of variation of the aquatic habitat type or riparian
area type in the region.
Enhancement: The manipulation of the physical, chemical, or biological characteristics
of an aquatic resource to heighten, intensify, or improve a specific aquatic resource
function(s). Enhancement results in the gain of selected aquatic resource function(s),
but may also lead to a decline in other aquatic resource function(s). Enhancement does
not result in a gain in aquatic resource area.
Establishment (creation): The manipulation of the physical, chemical, or biological
characteristics present to develop an aquatic resource that did not previously exist at an
upland site. Establishment results in a gain in aquatic resource area.
High Tide Line: The line of intersection of the land with the water's surface at the
maximum height reached by a rising tide. The high tide line may be determined, in the
absence of actual data, by a line of oil or scum along shore objects, a more or less
continuous deposit of fine shell or debris on the foreshore or berm, other physical
markings or characteristics, vegetation lines, tidal gages, or other suitable means that
20
delineate the general height reached by a rising tide. The line encompasses spring high
tides and other high tides that occur with periodic frequency but does not include storm
surges in which there is a departure from the normal or predicted reach of the tide due
to the piling up of water against a coast by strong winds such as those accompanying a
hurricane or other intense storm.
Historic Property: Any prehistoric or historic district, site (including archaeological site),
building, structure, or other object included in, or eligible for inclusion in, the National
Register of Historic Places maintained by the Secretary of the Interior. This term
includes artifacts, records, and remains that are related to and located within such
properties. The term includes properties of traditional religious and cultural importance
to an Indian tribe or Native Hawaiian organization and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-
linear project in the Corps Regulatory Program. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in
the project area. Portions of a multi -phase project that depend upon other phases of the
project do not have independent utility. Phases of a project that would be constructed
even if the other phases were not built can be considered as separate single and
complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther
removed in distance, but are still reasonably foreseeable.
Loss of waters of the United States: Waters of the United States that are permanently
adversely affected by filling, flooding, excavation, or drainage because of the regulated
activity. The loss of stream bed includes the acres of stream bed that are permanently
adversely affected by filling or excavation because of the regulated activity. Permanent
adverse effects include permanent discharges of dredged or fill material that change an
aquatic area to dry land, increase the bottom elevation of a waterbody, or change the
use of a waterbody. The acreage of loss of waters of the United States is a threshold
measurement of the impact to jurisdictional waters or wetlands for determining whether
a project may qualify for an NWP; it is not a net threshold that is calculated after
considering compensatory mitigation that may be used to offset losses of aquatic
functions and services. Waters of the United States temporarily filled, flooded,
excavated, or drained, but restored to pre -construction contours and elevations after
construction, are not included in the measurement of loss of waters of the United
States. Impacts resulting from activities that do not require Department of the Army
authorization, such as activities eligible for exemptions under section 404(f) of the Clean
Water Act, are not considered when calculating the loss of waters of the United States.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899.
These waters are defined at 33 CFR part 329.
21
Non -tidal wetland: A non -tidal wetland is a wetland that is not subject to the ebb and
flow of tidal waters. Non -tidal wetlands contiguous to tidal waters are located landward
of the high tide line (i.e., spring high tide line).
Open water: For purposes of the NWPs, an open water is any area that in a year with
normal patterns of precipitation has water flowing or standing above ground to the
extent that an ordinary high water mark can be determined. Aquatic vegetation within
the area of flowing or standing water is either non -emergent, sparse, or absent.
Vegetated shallows are considered to be open waters. Examples of "open waters"
include rivers, streams, lakes, and ponds.
Ordinary High Water Mark: The term ordinary high water mark means that line on the
shore established by the fluctuations of water and indicated by physical characteristics
such as a clear, natural line impressed on the bank, shelving, changes in the character
of soil, destruction of terrestrial vegetation, the presence of litter and debris, or other
appropriate means that consider the characteristics of the surrounding areas.
Perennial stream: A perennial stream has surface water flowing continuously year-
round during a typical year.
Practicable: Available and capable of being done after taking into consideration cost,
existing technology, and logistics in light of overall project purposes.
Pre -construction notification: A request submitted by the project proponent to the Corps
for confirmation that a particular activity is authorized by nationwide permit. The request
may be a permit application, letter, or similar document that includes information about
the proposed work and its anticipated environmental effects. Pre -construction
notification may be required by the terms and conditions of a nationwide permit, or by
regional conditions. A pre -construction notification may be voluntarily submitted in cases
where pre -construction notification is not required and the project proponent wants
confirmation that the activity is authorized by nationwide permit.
Preservation: The removal of a threat to, or preventing the decline of, aquatic resources
by an action in or near those aquatic resources. This term includes activities commonly
associated with the protection and maintenance of aquatic resources through the
implementation of appropriate legal and physical mechanisms. Preservation does not
result in a gain of aquatic resource area or functions.
Re-establishment: The manipulation of the physical, chemical, or biological
characteristics of a site with the goal of returning natural/historic functions to a former
aquatic resource. Re-establishment results in rebuilding a former aquatic resource and
results in a gain in aquatic resource area and functions.
Rehabilitation: The manipulation of the physical, chemical, or biological characteristics
of a site with the goal of repairing natural/historic functions to a degraded aquatic
22
resource. Rehabilitation results in a gain in aquatic resource function, but does not
result in a gain in aquatic resource area.
Restoration: The manipulation of the physical, chemical, or biological characteristics of
a site with the goal of returning natural/historic functions to a former or degraded aquatic
resource. For the purpose of tracking net gains in aquatic resource area, restoration is
divided into two categories: re-establishment and rehabilitation.
Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the
404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient
sections of streams. Such stream sections are recognizable by their hydraulic
characteristics. The rapid movement of water over a course substrate in riffles results in
a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools
are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a
smooth surface, and a finer substrate characterize pools.
Riparian areas: Riparian areas are lands next to streams, lakes, and estuarine -marine
shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems,
through which surface and subsurface hydrology connects riverine, lacustrine,
estuarine, and marine waters with their adjacent wetlands, non -wetland waters, or
uplands. Riparian areas provide a variety of ecological functions and services and help
improve or maintain local water quality. (See general condition 23.)
Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase
shellfish production. Shellfish seed consists of immature individual shellfish or individual
shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate
may consist of shellfish shells, shell fragments, or other appropriate materials placed
into waters for shellfish habitat.
Single and complete linear project: A linear project is a project constructed for the
purpose of getting people, goods, or services from a point of origin to a terminal point,
which often involves multiple crossings of one or more waterbodies at separate and
distant locations. The term "single and complete project" is defined as that portion of the
total linear project proposed or accomplished by one owner/developer or partnership or
other association of owners/developers that includes all crossings of a single water of
the United States (i.e., a single waterbody) at a specific location. For linear projects
crossing a single or multiple waterbodies several times at separate and distant
locations, each crossing is considered a single and complete project for purposes of
NWP authorization. However, individual channels in a braided stream or river, or
individual arms of a large, irregularly shaped wetland or lake, etc., are not separate
waterbodies, and crossings of such features cannot be considered separately.
Single and complete non -linear project: For non -linear projects, the term "single and
complete project" is defined at 33 CFR 330.2(i) as the total project proposed or
accomplished by one owner/developer or partnership or other association of
owners/developers. A single and complete non -linear project must have independent
23
utility (see definition of "independent utility"). Single and complete non -linear projects
may not be "piecemealed" to avoid the limits in an NWP authorization.
Stormwater management: Stormwater management is the mechanism for controlling
stormwater runoff for the purposes of reducing downstream erosion, water quality
degradation, and flooding and mitigating the adverse effects of changes in land use on
the aquatic environment.
Stormwater management facilities: Stormwater management facilities are those
facilities, including but not limited to, stormwater retention and detention ponds and best
management practices, which retain water for a period of time to control runoff and/or
improve the quality (i.e., by reducing the concentration of nutrients, sediments,
hazardous substances and other pollutants) of stormwater runoff.
Stream bed: The substrate of the stream channel between the ordinary high water
marks. The substrate may be bedrock or inorganic particles that range in size from clay
to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high
water marks, are not considered part of the stream bed.
Stream channelization: The manipulation of a stream's course, condition, capacity, or
location that causes more than minimal interruption of normal stream processes. A
channelized jurisdictional stream remains a water of the United States.
Structure: An object that is arranged in a definite pattern of organization. Examples of
structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin,
weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef,
permanent mooring structure, power transmission line, permanently moored floating
vessel, piling, aid to navigation, or any other manmade obstacle or obstruction.
Tidal wetland: A tidal wetland is a jurisdictional wetland that is inundated by tidal waters.
Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the
gravitational pulls of the moon and sun. Tidal waters end where the rise and fall of the
water surface can no longer be practically measured in a predictable rhythm due to
masking by other waters, wind, or other effects. Tidal wetlands are located channelward
of the high tide line.
Tribal lands: Any lands title to which is either: 1) held in trust by the United States for
the benefit of any Indian tribe or individual; or 2) held by any Indian tribe or individual
subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent
sovereign authority, unextinguished aboriginal title, treaty, statute, judicial decisions,
executive order or agreement, and that give rise to legally enforceable remedies.
Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1)
Guidelines. They are areas that are permanently inundated and under normal
24
circumstances have rooted aquatic vegetation, such as seagrasses in marine and
estuarine systems and a variety of vascular rooted plants in freshwater systems.
Waterbody: For purposes of the NWPs, a waterbody is a "water of the United States." If
a wetland is adjacent to a waterbody determined to be a water of the United States, that
waterbody and any adjacent wetlands are considered together as a single aquatic unit
(see 33 CFR 328.4(c)(2)).
REGIONAL CONDITIONS:
The following Regional Conditions have been approved by the Wilmington District for
the Nationwide Permits (NWPs) published in the January 13, 2021, Federal Register
(86 FR 2744) announcing the reissuance of 12 existing (NWPs) and four new NWPs, as
well as the reissuance of NWP general conditions and definitions with some
modifications.
A. EXCLUDED WATERS AND/OR AREAS
The Corps has identified waters that will be excluded from the use of all NWP's during
certain timeframes. These waters are:
1. Anadromous Fish Spawning Areas. Work in waters of the U.S. designated by
either the North Carolina Division of Marine Fisheries (NCDMF) or the North Carolina
Wildlife Resources Commission (NCWRC) as anadromous fish spawning areas are
prohibited from February 15th through June 30th, without prior written approval from the
Corps and the appropriate wildlife agencies (NCDMF, NCWRC and/or the National
Marine Fisheries Service (NMFS)). Work in waters of the U.S. designated by NCWRC
as primary nursery areas in inland waters are prohibited from February 15th through
September 30th, without prior written approval from the Corps and the appropriate
wildlife agencies. Work in waters of the U.S. designated by NCDMF as primary nursery
areas shall be coordinated with NCDMF prior to being authorized by this NWP.
Coordination with NCDMF may result in a required construction moratorium during
periods of significant biological productivity or critical life stages.
2. Trout Waters Moratorium. Work in waters of the U.S. in the designated trout
watersheds of North Carolina are prohibited from October 15th through April 15th
without prior written approval from the NCWRC, or from the Eastern Band of Cherokee
Indians (EBCI) Fisheries and Wildlife Management (FWM) office if the project is located
on EBCI trust land. (See Section C.3. above for information on the designated trout
watersheds).
3. Sturgeon Spawning Areas. No in -water work shall be conducted in waters of the
U.S. designated by the National Marine Fisheries Service as Atlantic sturgeon critical
habitat from February 1st through June 30th. No in -water work shall be conducted in
waters of the U.S. in the Roanoke River designated as Atlantic sturgeon critical habitat
25
from February 1st through June 30th, and August 1st through October 31 st, without
prior written approval from NMFS.
4. Submerged Aquatic Vegetation. Impacts to Submerged Aquatic Vegetation (SAV)
are not authorized by any NWP, except NWP 48, NWP 55 and NWP 56, unless
Essential Fish Habitat (EFH) consultation has been completed pursuant to the
Magnuson -Stevens Fisheries Conservation and Management Act (Magnuson -Stevens
Act). Permittees shall submit a PCN (See NWP General Condition 32) to the District
Engineer prior to commencing the activity if the project would affect SAV. The permittee
may not begin work until notified by the Corps that the requirements of the Magnuson -
Stevens Act have been satisfied and that the activity is verified.
B. REGIONAL CONDITIONS APPLICABLE TO ALL NWP's
1. Critical Habitat in Western NC. For proposed activities within waters of the U.S. that
require a Pre -Construction Notification (PCN) and are located in the thirteen counties
listed below, permittees must provide a copy of the PCN to the U.S. Fish and Wildlife
Service (USFWS), 160 Zillicoa Street, Asheville, North Carolina 28801 and the Corps
Asheville Regulatory Field Office. Please see General Condition 18 for specific PCN
requirements related to the Endangered Species Act and the below website for
information on the location of designated critical habitat.
Counties with tributaries that drain to designated critical habitat that require notification
to the Asheville U.S. Fish and Wildlife Service: Avery, Cherokee, Graham, Haywood,
Henderson, Jackson, Macon, Mecklenburg, Mitchell, Swain, Transylvania, Union and
Yancey.
Website and office addresses for Endangered Species Act Information:
The Wilmington District has developed the following website for permittees which
provides guidelines on how to review linked websites and maps in order to fulfill NWP
General Condition 18 (Endangered Species) requirements:
http://www.saw.usace.army.mil/Missions/RequlatoryPermitPropram/ApencyCoordinatio
n/ESA.aspx.
Permittees who do not have internet access may contact the appropriate U.S. Fish and
Wildlife Service offices listed below or Corps at (910) 251-4850.
26
Below is a map of the USFWS Field Office Boundaries:
Asheville U.S. Fish and Wildlife Service Office counties: All counties west of and
including Anson, Stanly, Davidson, Forsythe and Stokes Counties.
U.S. Fish and Wildlife Service
Asheville Field Office
160 Zillicoa Street
Asheville, NC 28801
Telephone: (828) 258-3939
Raleigh U.S. Fish and Wildlife Service Office counties: All counties east of and
including Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties.
U.S. Fish and Wildlife Service
Raleigh Field Office
Post Office Box 33726
Raleigh, NC 27636-3726
Telephone: (919) 856-4520
2. Special Designation Waters. Prior to the use of any NWP that involves a discharge
of dredged or fill material in any of the following identified waters and/or adjacent
wetlands in North Carolina, permittees shall submit a PCN to the District Engineer prior
to commencing the activity (see General Condition 32). The North Carolina waters and
wetlands that require additional PCN requirements are:
"Primary Nursery Areas" (PNA), including inland PNA, as designated by the North
Carolina Marine Fisheries Commission and/or the North Carolina Wildlife Resources
Commission. The definition of and designated PNA waters can be found in the North
Carolina State Administrative Code at Title 15A, Subchapters 3R and 10C (15A NCAC
03R .0103; 15A NCAC 10C .0502; and 15A NCAC 10C .0503) and at the following web
pages:
27
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2003%20-
%20marine%20fisheries/subchapter%20r/15a%20ncac%2003r%20.0103.pdf
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2010%20-
20wildlife%20resources%20and%20water%20safety/subchapter%20c/15a%20
ncac%2010c%20.0502. pdf
• http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20quality/chapter%2010%20-
20wildlife%20resources%20and%20water%20safety/subchapter%20c/15a%20
ncac%2010c%20.0503. pdf
3. Trout Waters. Prior to any discharge of dredge or fill material into streams,
waterbodies or wetlands within the 294 designated trout watersheds of North Carolina,
the permittee shall submit a PCN (see General Condition 32) to the District Engineer
prior to commencing the activity. The permittee shall also provide a copy of the PCN to
the appropriate NCWRC office, or to the EBCI FWM Office (if the project is located on
EBCI trust land), to facilitate the determination of any potential impacts to designated
Trout Waters.
NCWRC and NC Trout Watersheds:
NCWRC
Contact**
Counties that are entirely
within Trout Watersheds*
Counties that are
partially within Trout
Watersheds*
Mountain
Allegheny
Jackson
Burke
McDowell
Coordinator
Ashe
Macon
Buncombe
Mitchell
645 Fish
Avery
Swain
Caldwell
Polk
Hatchery
Graham
Transylvania
Cherokee
Rutherford
Rd., Building
Haywood
Watauga
Clay
Surry
B
Henderson
Wilkes
Marion, NC
Madison
Yancey
28752
828-803-
6054
For NCDOT
Projects:
NCDOT
Coordinator
12275 Swift
Rd.
28
Oakboro,
NC 28129
704-984-
1070
EBCI
Contact**
Counties that are within
Trout Watersheds*
Office of
Natural
Resources
P.O. Box 1747,
Cherokee, NC
28719
(828) 359-6113
Qualla Boundary and non -
contiguous tracts of trust
land located in portions of
Swain, Jackson, Haywood,
Graham and Cherokee
Counties.
*NOTE: To determine PCN requirements, contact the Corps Asheville Regulatory
Field Office at (828) 271-7980 or view maps showing trout watersheds in each
County at the following webpage:
http://www.saw.usace.army.m i l/M issions/Req u latory-Perm it-Program/Agency-
Coordination/Trout/.
**If a project is located on EBCI trust land, submit the PCN in accordance with
Regional Condition C.16. Contact the Corps Asheville Regulatory Field Office at
(828) 271-7980 with questions.
4. Western NC Waters and Corridors. The permittee shall submit a PCN (see General
Condition 32) to the District Engineer prior to commencing the activity in waters of the
U.S. if the activity will occur within any of the following identified waters in western North
Carolina, within 0.5 mile on either side of these waters, or within 0.75 mile of the Little
Tennessee River, as measured from the top of the bank of the respective water (i.e.,
river, stream, or creek):
Brasstown Creek
Burningtown Creek
Cane River
Caney Fork
Cartoogechaye Creek
Chattooga River
Cheoah River
Cowee Creek
Cullasaja River
Deep Creek
Ellijay Creek
French Broad River
29
Garden Creek
Hiwassee River
Hominy Creek
lotla Creek
Little Tennessee River (within the river or within 0.75 mile on either side of this river)
Nantahala River
Nolichucky River
North Fork French Broad River
North Toe River
Nottley River
Oconaluftee River (portion not located on trust/EBCI land)
Peachtree Creek
Shooting Creek
Snowbird Creek
South Toe River
Stecoah Creek
Swannanoa River
Sweetwater Creek
Tuckasegee River (also spelled Tuckaseegee or Tuckaseigee)
Valley River
Watauga Creek
Watauga River
Wayah Creek
West Fork French Broad River
To determine PCN requirements, contact the Corps Asheville Regulatory Field Office at
(828) 271-7980 or view maps for all corridors at the following webpage:
http://www.saw.usace.army.mil/Missions/Requlatory-Permit-Program/Agency-
Coordination/Designated-Special-Waters.aspx
5. Limitation of Loss of Stream Bed. NWPs may not be used for activities that may
result in the loss of more than 0.05 acres of stream bed, except for NWP 32.
6. Pre -Construction Notification for Loss of Stream Bed Exceeding 0.02 acres.
The permittee shall submit a PCN to the District Engineer prior to commencing the
activity (see General Condition 32) prior to the use of any NWP for any activity that
results in the loss of more than 0.02 acres of stream bed. This applies to NWPs that do
not have PCN requirements as well as those NWPs that require a PCN.
7. Mitigation for Loss of Stream Bed. For any NWP that results in a loss of more than
0.02 acres of stream bed, the permittee shall provide a mitigation proposal to
compensate for more than minimal individual and cumulative adverse impacts to the
aquatic environment, unless the District Engineer determines in writing that either some
other form of mitigation would be more environmentally appropriate or the adverse
effects of the proposed activity are minimal. For stream bed losses of 0.02 acres or less
that require a PCN, the District Engineer may determine, on a case -by -case basis, that
30
compensatory mitigation is required to ensure that the activity results in minimal
adverse effect on the aquatic environment.
8. Riprap. For all NWPs that allow for the use of riprap material for bank stabilization,
the following conditions shall be applied:
a. Filter cloth must be placed underneath the riprap as an additional requirement of its
use in North Carolina waters. The placement of filter fabric is not required if the riprap
will be pushed or "keyed" into the bank of the waterbody. A waiver from the
specifications in this Regional Condition must be requested in writing.
b. Riprap shall be placed only on the stream banks, or, if it is necessary to be placed in
the stream bed, the finished top elevation of the riprap should not exceed that of the
original stream bed.
9. Culvert Placement. For all NWPs that allow for culvert placement, the following
conditions shall be applied:
a. For all NWPs that involve the construction/installation of culverts, measures shall be
included in the construction/installation that will promote the safe passage of fish and
other aquatic organisms
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20%
of the culvert diameter for culverts having a diameter less than or equal to 48 inches. If
the culvert outlet is submerged within a pool or scour hole and designed to provide for
aquatic passage, then culvert burial into the streambed is not required.
Culvert burial is not required for structures less than 72 inch diameter/width, where the
slope of the culvert will be greater than 2.5%, provided that all alternative options for
flattening the slope have been investigated and aquatic life movement/connectivity has
been provided when possible (e.g., rock ladders, cross vanes, sills, baffles etc.). Culvert
burial is not required when bedrock is present in culvert locations.
Installation of culverts in wetlands shall ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. When roadways,
causeways, or other fill projects are constructed across FEMA-designated floodways or
wetlands, openings such as culverts or bridges shall be provided to maintain the natural
hydrology of the system as well as prevent constriction of the floodway that may result
in destabilization of streams or wetlands.
31
Circular
Culvert
Streambed
Material
12 Inches
Invert
Rise
(Diameter)
A waiver from the depth specifications in this condition may be requested, in writing, by
the permittee and issued by the Corp. This waiver request must be specific as to the
reasons(s) for the request. The waiver will be issued if it can be demonstrated that the
proposed design would result in less impacts to the aquatic environment. Culverts
placed across wetland fills purely for the purposes of equalizing surface water do not
have to be buried, but the culverts must be of adequate size and/or number to ensure
unrestricted transmission of water.
b. Bank -full flows (or less) shall be accommodated through maintenance of the existing
bank -full channel cross sectional area. Additional culverts or culvert barrels at such
crossings shall be allowed only to receive bank -full flows.
Approach Fill
Roadway
Bankfu 1
--
Baffle/ Stream
Blockage Bottom
Culvert buried
below streambed
to appropriate
depth (if required) .
c. Culverts shall be designed and installed in such a manner that the original stream
profiles are not altered and allow for aquatic life movement during low flows. The
dimension, pattern, and profile of the stream above and below a pipe or culvert shall not
be modified by widening the stream channel or by reducing the depth of the stream in
connection with the construction activity. The width, height, and gradient of a proposed
culvert shall be such as to pass the average historical low flow and spring flow without
adversely altering flow velocity. If the width of the culvert is wider than the stream
channel, the culvert shall include multiple boxes/pipes, baffles, benches and/or sills to
maintain the natural width of the stream channel. If multiple culverts/pipes/barrels are
used, low flows shall be accommodated in one culvert/pipe and additional culverts/pipes
shall be installed such that they receive only flows above bankfull.
32
10. Utility Lines. For all NWPs that allow for the construction and installation of utility
lines, the following conditions shall be applied:
a. Utility lines consisting of aerial electric power transmission lines crossing navigable
waters of the U.S. (which are defined at 33 CFR part 329) must comply with the
applicable minimum clearances specified in 33 CFR 322.5(i).
b. The work area authorized by this permit, including temporary and/or permanent fills,
will be minimized to the greatest extent practicable. Justification for work corridors
exceeding forty (40) feet in width is required and will be based on pipeline diameter and
length, size of equipment required to construct the utility line, and other construction
information deemed necessary to support the request. The permittee is required to
provide this information to the Corps with the initial PCN package.
c. A plan to restore and re -vegetate wetland areas cleared for construction must be
submitted with the required PCN. Cleared wetland areas shall be re -vegetated, as
appropriate, with species of canopy, shrub, and herbaceous species. The permittee
shall not use fescue grass or any other species identified as invasive or exotic species
by the NC Native Plant Society (NCNPS): https://ncwildflower.org/invasive-exotic-
species-list/.
d. Any permanently maintained corridor along the utility right of way within forested
wetlands shall be considered a loss of aquatic function. A compensatory mitigation plan
will be required for all such impacts associated with the requested activity if the activity
requires a PCN and the cumulative total of permanent conversion of forested wetlands
exceeds 0.1 acres, unless the District Engineer determines in writing that either some
other form of mitigation would be more environmentally appropriate or the adverse
effects of the proposed activity are minimal.
Where permanently maintained corridor within forested wetlands is 0.1 acres or less,
the District Engineer may determine, on a case -by -case basis, that compensatory
mitigation is required to ensure that the activity results in minimal adverse effects on the
aquatic environment.
e. When directional boring or horizontal directional drilling (HDD) under waters of the
U.S., including wetlands, permittees shall closely monitor the project for hydraulic
fracturing or "fracking." Any discharge from hydraulic fracturing or "fracking" into waters
of the U.S., including wetlands, shall be reported to the appropriate Corps Regulatory
Field Office within 48 hours. Restoration and/or compensatory mitigation may be
required as a result of any unintended discharges.
11. Temporary Access Fills. The permittee shall submit a PCN to the District Engineer
prior to commencing the activity if the activity will involve the discharge of dredged or fill
material into more than 0.1 acres of wetlands or 0.02 acres of stream channel for the
construction of temporary access fills and/or temporary road crossings. The PCN must
33
include a restoration plan that thoroughly describes how all temporary fills will be
removed, how pre -project conditions will be restored, and include a timetable for all
restoration activities.
12. Federal Navigation Channel Setbacks. Authorized structures and fills located in or
adjacent to Federally authorized waterways must be constructed in accordance with the
latest setback criteria established by the Wilmington District Engineer. You may review
the setback policy at
http://www.saw.usace.army.mil/Missions/Navigation/Setbacks.aspx. This general permit
does not authorize the construction of hardened or permanently fixed structures within
the Federally Authorized Channel Setback, unless the activity is approved by the Corps.
The permittee shall submit a PCN (see General Condition 32) to the District Engineer to
obtain a written verification prior to the construction of any structures or fills within the
Federally Authorized Channel Setback.
13. Northern Long-eared Bat — Endangered Species Act Compliance
The Wilmington District, U.S. Army Corps of Engineers has consulted with the United
States Fish and Wildlife Service (USFWS) in regard to the threatened Northern long-
eared bat (NLEB) (Myotis septentrionalis) and Standard Local Operating Procedures for
Endangered Species (SLOPES) have been approved by the Corps and the USFWS.
This condition concerns effects to the NLEB only and does not address effects to other
federally listed species and/or federally designated critical habitat.
A. Procedures when the Corps is the lead federal* agency for a project:
The permittee must comply with (1) and (2) below when:
• the project is located in the western 41 counties of North Carolina, to include non-
federal aid North Carolina Department of Transportation (NCDOT) projects, OR;
• the project is located in the 59 eastern counties of North Carolina and is a non-
NCDOT project.
*Generally, if a project is located on private property or on non-federal land, and the
project is not being funded by a federal entity, the Corps will be the lead federal agency
due to the requirement to obtain Department of the Army authorization to impact waters
of the U.S. If the project is located on federal land, contact the Corps to determine the
lead federal agency.
(1) A permittee using an NWP must check to see if their project is located in the range
of the NLEB by using the following website:
http://www.fws.gov/midwest/endangered/mammals/nleb/pdf/WNSZone.pdf. If the project
is within the range of the NLEB, or if the project includes percussive activities (e.g.,
blasting, pile driving, etc.), the permittee is then required to check the appropriate
website in the paragraph below to discover if their project:
34
• is located in a 12-digit Hydrologic Unit Code area ("red HUC" - shown as red areas on
the map), AND/OR;
• involves percussive activities within 0.25 mile of a red HUC.
Red HUC maps - for the western 41 counties in NC (covered by the Asheville Ecological
Services Field Office), check the project location against the electronic maps found at:
http://www.fws.qov/asheville/htmls/proiect review/NLEB in WNC.html. For the eastern
59 counties in NC (covered by the Raleigh Ecological Services Field Office), check the
project location against the electronic maps found at:
https://www.fws.gov/raleigh/NLEB RFO.html.
(2) A permittee must submit a PCN to the District Engineer, and receive written
verification from the District Engineer, prior to commencing the activity, if the activity will
involve any of the following:
• tree clearing/removal and/or, construction/installation of wind turbines in a red HUC,
AND/OR;
. bridge removal or maintenance, unless the bridge has been inspected and there is no
evidence of bat use, (applies anywhere in the range of the NLEB), AND/OR:
. percussive activities in a red HUC, or within 0.25 mile of a red HUC.
The permittee may proceed with the activity without submitting a PCN to either the
Corps or the USFWS, provided the activity complies with all applicable NWP terms and
general and regional conditions, if the permittee's review under A.(1) and A.(2) above
shows that the project is:
. located outside of a red HUC (and there are no percussive activities), and the activity
will NOT include bridge removal or maintenance, unless the bridge has been inspected
and there is no evidence of bat use, OR;
. located outside of a red HUC and there are percussive activities, but the percussive
activities will not occur within 0.25-mile of a red HUC boundary, and the activity will NOT
include bridge removal or maintenance, unless the bridge has been inspected and there
is no evidence of bat use, OR;
. located in a red HUC, but the activity will NOT include tree clearing/removal;
construction/installation of wind turbines; bridge removal or maintenance, unless the
bridge has been inspected and there is no evidence of bat use, and/or; any percussive
activities.
B. Procedures when the USACE is not the lead federal agency:
For projects where another federal agency is the lead federal agency - if that other
federal agency has completed project -specific ESA Section 7(a)(2) consultation for the
NLEB, and has (1) determined that the project would not cause prohibited incidental
take of the NLEB, and (2) completed coordination/consultation that is required by the
USFWS (per the directions on the respective USFWS office's website), that project may
35
proceed without PCN to either the USACE or the USFWS, provided all General and
Regional Permit Conditions are met.
The NLEB SLOPES can be viewed on the USACE website at:
http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-
Coordination/ESA/. Permittees who do not have internet access may contact the
USACE at (910) 251- 4633.
14. West Indian Manatee Protection. In order to protect the endangered West Indian
manatee (Trichechus manatus) the Permittee shall implement the USFWS' Manatee
Guidelines, and strictly adhere to all requirements therein. The guidelines can be found
at https://www.fws.qov/raleigh/pdfs/ManateeGuidelines2017.pdf.
15. ESA Programmatic Biological Opinions. The Wilmington District, USFWS,
NCDOT, and the FHWA have conducted programmatic Section 7(a)(2) consultation for
a number of federally listed species and designated critical habitat (DCH), and
programmatic consultation concerning other federally listed species and/or DCH may
occur in the future. The result of completed programmatic consultation is a
Programmatic Biological Opinion (PBO) issued by the USFWS. These PBOs contain
mandatory terms and conditions to implement the reasonable and prudent measures
that are associated with "incidental take" of whichever species or critical habitat is
covered by a specific PBO. Authorization under NWPs is conditional upon the
permittee's compliance with all the mandatory terms and conditions associated with
incidental take of the applicable PBO (or PBOs), which are incorporated by reference in
the NWPs. Failure to comply with the terms and conditions associated with incidental
take of an applicable PBO, where a take of the federally listed species occurs, would
constitute an unauthorized take by the permittee, and would also constitute permittee
non-compliance with the authorization under the NWPs. If the terms and conditions of a
specific PBO (or PBOs) apply to a project, the Corps will include this/these
requirements in any NWP verification that may be issued for a project. For an
activity/project that does not require a PCN, the terms and conditions of the applicable
PBO(s) also apply to that non -notifying activity/project. The USFWS is the appropriate
authority to determine compliance with the terms and conditions of its PBO and the
ESA. All PBOs can be found on our website at:
https://www. saw. usace.arm y. m i l/Missions/Req u latory-Perm it-Proq ram/Agency-
Coordination/ESA/.
16. Work on Eastern Band of Cherokee Land.
Notifying NWPs - All PCNs submitted for activities in waters of the U.S. on Eastern
Band of Cherokee Indians (EBCI) trust land (i.e., Qualla Boundary and non-
contiguous tracts of trust land located in portions of Swain, Jackson, Haywood,
Graham and Cherokee Counties), must comply with the requirements of the latest
MOU between the Wilmington District and the EBCI.
36
Non -notifying NWPs - Prior to the use of any non -notifying NWP for activities in
waters of the U.S. on EBCI trust land (i.e., Qualla Boundary and non-contiguous
tracts of trust land located in portions of Swain, Jackson, Haywood, Graham and
Cherokee Counties), all prospective permittees must comply with the requirements of
the latest MOU between the Wilmington District and the EBCI; this includes
coordinating the proposed project with the EBCI Natural Resources Program and
obtaining a Tribal Approval Letter from the Tribe.
The EBCI MOU can be found at the following URL: http://saw-
reg.usace.army.mil/FO/Final-MOU-EBCI-USACE.pdf
17. Sedimentation and Erosion Control Structures and Measures
All PCNs will identify and describe sedimentation and erosion control structures and
measures proposed for placement in waters of the U.S. The structures and
measures should be depicted on maps, surveys or drawings showing location and
impacts to jurisdictional wetlands and streams.
C. REGIONAL CONDITIONS APPLICABLE TO NWP 51
a. Discharges in streams and wetlands for stormwater management facilities are
prohibited under this NWP.
b. Discharges of dredged or fill material into waters of the U.S., including wetlands,
within the floodway* or mapped FEMA 100-year floodplain resulting in permanent
above -grade fills are not authorized by this NWP.
* NOTE: Floodway means the area designated and/or regulated by Federal, State, or
local requirements to provide for the discharge of the base flood so the cumulative
increase in water surface elevation is no more than a designated height identified by the
regulating entity within the 100-year floodplain.
D. SECTION 401 WATER QUALITY CERTIFICATION (WQC) AND/OR COASTAL
ZONE MANAGEMENT ACT (CZMA) CONSISTENCY DETERMINATION SUMMARY
AND APPLICABLE CONDITIONS
The CZMA Consistency Determination and all Water Quality Certifications for the NWPs
can be found at: https://www.saw.usace.army.mil/Missions/Regulatory-Permit-
Prog ram/Perm its/201 7-Nationwide-Perm its/
37