Loading...
HomeMy WebLinkAbout20191242 Ver 2_Pre-Filing Meeting Request_20210331DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20191242 Version* 2 Raleigh Regional Office - (919) 791-4200 Stephanie Goss Pre -Filing Meeting Request submitted 3/31/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Krissina Newcomb krissina@halowensoil.com Summerdale II Prime 1 Builders Wake Street Address 2209 Hamrick Drive Address Line 2 City State / Province / Region Raleigh NC Fbstal / Zip Code Country 27616 US Is this a transportation project?* r Yes F No Type(s) of approval sought from the DWR: i7 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit fJ Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* NCDWR 20191242 Vert Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information. * Summerdale II is a proposed residential subdivision. The previous permit authorized 0.23 acre of impact and 140 linear feet of stream channel. A modification to that permit will being requested due to modifications in the plan directed by the Town of Fuquay which will impact an additional 1/10 acre of wetland. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Summerdale.pdf pdf only 638.18KB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature IMsag, farood Submittal Date 3/31/2021 ADDITIONAL MITIGATION I —I ww 0 0 O O U) U) (.1) v) 11 11 11 O N 0 Do w 0 u) N co LL 0 0 =1 .e�ya �743..„ • 7d3S rs3 f •w':rloom,. e"°baO2r •' woa'Iiowb@o baa6.gpb :Ii141-0 0020-609-6 L 6 :90140 9ZSLZ .3•N 'ouIaon lonbnj pooel langsa)1o0 909 JGGUIbu] `XGIbog laobaa0 NO11V9111W GNV713M 7VN011laab' "0 "N Xluno0 a)aM 077 `V 13071118 i 31NIdd dOd 30V771A 3S11OHNMO1 b 0d /��� �°,0 �lj �����i 9 `+ / A�a '92 .Z£,S es N22 \\ z \ io., A D� Dc Dc Dc > Dc D� Dc Dc Dc > > > Dc D� D z Q 0 COLEY FARM ROAD N) I