HomeMy WebLinkAbout20121049 Ver 1_Grading and Drainage Plans_20130114lizz-061pWarem
REVISIONS
DATE I BY I DESCRIPTION
LOCATI 0 N MAP
. . . . . . . . . .
§
RE L I A K T
1�4"' J
I N
fvi
'" +�r. lfl
10+9
R
JAI� .1
�AAAPTI
PIEDMONT TRIAD AIRPORT AU-HORITY
PIEDMONT TRIAD
AIRPORT AUTHORITY
1000A Ted Johnson Parkway
Greensboro, NC 27409
OFC: (336) 665-5600
FAX: (336) 665-5694
www.flyfrompti.com
DCT DCT
DESIGNED DRAWN
I IA
CHECKED S.O.
DATE: JANUARY 2013
SCALE: AS SHOWN
SHEET
rii Wl
OF G3
77
77� 7777
ONUMENTS AND BENCHMARKS
N
POND, WAI-ER
V
MONUMENT I.D.
NORTHING
FASTING
ELEVATION
DESCRIPTION
GPS-4-
856861.15
1728400.644
835.458
1/2" solid iron rod set 7' off south edge of Ballinger Rd.
SBM-11,
857403.61
1728039.205
859.66
Magnetic nail set in existing concrete 2utter an
REVISIONS
I m Iron, m- ".1,
I.D.
STATION
NORTHING
EASTING
ARC
R =150'
PC 12+46.52
1728291.796
857451.7432
D = 32000'59.296'
Cl
PT 13+30.34
1728374.502
857453.8580
L 83.82'
T 43.04'
R =150'
PC 16+96.15
1728728,595
857361.9961
D = 35*08*42.426"
C2
PT 17+88.16
1728819-042
857366.7821
L = 92.01'
T = 47.50'
yr
v-
t A& SHEET
TA
8381— 1 L
IrT
L
SCALE IN FEET !J\tv 6c" cmp (W) 72
INV 66" CMP (c
OF EASTERN: 66" CMP 803.33
HORIZONTAL &- VERTICAL DATUM
I �01�
TOP OF METAL PLAI.�
PARTIAUY OVER END
OF GL-1
r
WORK AREA I
50 25 0 50
SCALE IN FEET
Q�
S Olt AENT ASIN/DRY DETENTION BASIN C
E
0 YR . Q ='3.87 cfs
_1114- D.A. 1117
D. 1"5 Ac B 1
SEDIMENT TRAPJ DISTUfRbEb AREA=0.9 Ac.
=3.04 cfs REQ'D STORAGE VOLUM,E=3,240 CF
DES
D A.=1,45 Ac., IQ YR Q
DISTURBED ARE
SEDIMENT V�
36" Rcp
I/C /846 84 -A=0.4 Ac�'
ti REQ'D STO E VOLUME =1,440 CF N STORAGE VOLUME=24,610.9 CF,
SURFACE Af
$41,41 - bRA RECD �EA=l 683.45 SF
_$EQUENT"',
2 14
841.35 It �,
STOF3A'G VOLU 7E
btSION E: .ME=2,89242 CF _.io DESIGN 7,701 SF
rRAP8\
"q. -2
D
REQ'D TRAP DIMENSIONS=1;50� L k,,35 W x 4'
SURMCE AREA 1,713.9 SF�
DESI A--1,944 S-F
PN--S-UkFACF,/APE WEIR LENGTHS
X I 0'..W x 2' D
S
BOTTOM ELEVATION=809.0'
TRAP DIMENSIONS=1001 L 13'kWEE
�_V,
WEIR LENGTH=V
v,
`ORIFICE
(WP) SKIMMER SIZE, 2.'� WITH 1.8
TRAH RACK 831AD,5 UAFFLE
BOTTOM ELEVATION=827.0
HO
< •
-
SKIMMER 1.5u WITH 1 ORIFIC c cmp IN 824.64
ER SIZE
T
:16' R(P O,Jt 624, 0
�2
SKIMMER
EC-2 JOUTLET PIPE
O
I Ik YN
7
A7TACHED 1.
R� 6"
ti
END GO
F NSTkUC
-2 55 2 f
t.
1
i.
00, _7�
I '. K�
4'SPILLWAY
i 11
24' ��QP !P
1::CON� MAOW k.�
TYPE 11 EROSION
it's
rONTROI MATTIN(-, T AL 8574 4�(_
VIk
N 6
\
NOTE:
1. INSTALL EROSION CONTROL PERIMETER MEASURES AND SILT FENCE PER PLAN. SHEET
b, I
2. MODIFY EXISTING SEDIMENT TRAP TO DIMENSIONS AND DEPTH SHOWN ON PLAN.
EXISTING RIP-RAP SPILLWAY SHALL REMAIN FUNCTIONAL UNTIL ALL EMBANKMENT AND NEW
OUTLET STRUCTURE HAS BEEN COMPLETED. REMOVE AND/OR RETAIN EXISTING EROSION
CONTROL MEASURES (I.E. BAFFLES, SEDIMENT FENCE) ADJACENT TO EXISTING TRAP AS REFERENCES:
DIRECTED BY THE ENGINEER. CnD r2C:nfiAC:-rD1r' CONTROL, CICC Quar--r GL -1 OF
3. PERFORM CONSTRUCTION IN WORK AREA1. SEE SHEET GD-2 FOR DETAILS. FOR BASELINE PROFILE, SEE SHEET PR -1 BY DESCRIPTION
NO. DATE
* OR SUITABLE EQUIVALENT APPROVED BY THE ENGINEER
CENTERLINE ENDWALI
N 857402.6519
E 1728808.9584
PHASE 1 GRADING
SEE NOTE I -
FLOW--W.-
DIKE
LAYOUT PLAN NOTES:
1. AREA PREPARATION:
a) DRY WORK AREA USING SANDBAG DIKES WITH 'PLASTIC BARRIER LINERS AT UPSTREAM
AND DOWNSTREAM LIMITS OF STREAM IMPACTS-
b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION.
c).WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE
EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
2. INSTALL DRAINAGE STRUCTURE #26 AT LOCATION AND ELEVATIONS SHOWN.
3. INSTALL EMBANKMENT ACROSS STREAM.
4. SEED AND MAT EMBANKMENT; STABILIZE AREA.
5. REMOVE TEMPORARY DIVERSION ONCE AREA IS STABILIZED.
I'd U%ll '..-rlo.www I
E 1728,850.1662
IV x 10' SEDIMENT TRAP (2:1 SIDE SLOPES)
OR APPROVED EROSION CONTROL MEASURE
)BAG
- PROPOSED, LIMIT
OF GRADING
PROPOSED FINISHED GRADE
EXIST. GROUND
BASELINE "C"
STA 18+00.65
ELEV 817.29
31
-------------------------------
-------------------------------
DBL 60" RCP
FLOWLINE @ -1.49%
-------------------------------
-----------
SLOPE 1 Y2:1 MAX.----'
(TYP)
FILTER FABRIC
SECTION A-A,
N-TS.
CLASS 1
RIP RAP
1110100MIL
CLASS 1 RIP RAP
EXIST. GROUND
T
T = 20" MIN.
H = 4.5' MAX.
2
SECTION B-B
NOTE: N.T,S.
1. COMPACT ANY FILL USED IN CONSTRUCTION OF RIP RAP LINED CHANNEL.
2. RIP RAP LINING SHALL BE LEVEL WITH (OR SLIGHTLY BELOW) EXISTING STREAM
BED AND/OR PIPE INVERTS.
CENTERLINE CONTROL
ID
DESCRIPTION
TOP EL.
INV. IN
INV. OUT
0+25
'ENDWALL "AI' (NCDOT STD 838.28)
813.70
--
0+48.79
PIPE 26A
73 L.F. 60" RCP CLASS 111
PT
807.41
806.33
PIPE 26B
73 L.F. 60" RCP CLASS 111
1+32,28
807.38
806.30
g
'ENDWALL "B" (NCDOT STD 838.28)
814.20
1728729.071
POE
* OR SUITABLE EQUIVALENT APPROVED BY THE ENGINEER
CENTERLINE ENDWALI
N 857402.6519
E 1728808.9584
PHASE 1 GRADING
SEE NOTE I -
FLOW--W.-
DIKE
LAYOUT PLAN NOTES:
1. AREA PREPARATION:
a) DRY WORK AREA USING SANDBAG DIKES WITH 'PLASTIC BARRIER LINERS AT UPSTREAM
AND DOWNSTREAM LIMITS OF STREAM IMPACTS-
b) PUMP WATER AROUND WORK AREA UNTIL AREA IS DRY ENOUGH FOR CONSTRUCTION.
c).WATER FROM DISTURBED AREA SHALL BE PUMPED THROUGH AN ACCEPTABLE
EROSION CONTROL DEVICE (SILT BAGS, SEDIMENT TRAP, ETC.)
2. INSTALL DRAINAGE STRUCTURE #26 AT LOCATION AND ELEVATIONS SHOWN.
3. INSTALL EMBANKMENT ACROSS STREAM.
4. SEED AND MAT EMBANKMENT; STABILIZE AREA.
5. REMOVE TEMPORARY DIVERSION ONCE AREA IS STABILIZED.
I'd U%ll '..-rlo.www I
E 1728,850.1662
IV x 10' SEDIMENT TRAP (2:1 SIDE SLOPES)
OR APPROVED EROSION CONTROL MEASURE
)BAG
- PROPOSED, LIMIT
OF GRADING
PROPOSED FINISHED GRADE
EXIST. GROUND
BASELINE "C"
STA 18+00.65
ELEV 817.29
31
-------------------------------
-------------------------------
DBL 60" RCP
FLOWLINE @ -1.49%
-------------------------------
-----------
SLOPE 1 Y2:1 MAX.----'
(TYP)
FILTER FABRIC
SECTION A-A,
N-TS.
CLASS 1
RIP RAP
1110100MIL
CLASS 1 RIP RAP
EXIST. GROUND
T
T = 20" MIN.
H = 4.5' MAX.
2
SECTION B-B
NOTE: N.T,S.
1. COMPACT ANY FILL USED IN CONSTRUCTION OF RIP RAP LINED CHANNEL.
2. RIP RAP LINING SHALL BE LEVEL WITH (OR SLIGHTLY BELOW) EXISTING STREAM
BED AND/OR PIPE INVERTS.
CENTERLINE CONTROL
ID
STA.
NORTHING
EASTING
POB
0+25
PC
0+48.79
857320.0952
1728623.205
PT
0+87.91
857328.8503
1728659.748
PC
1+32,28
857317-7091
1728702.697
PT
1+67.90
857295.5345
1728729.071
POE
2+36
857233.5351
i 1728757.2357
W
r
TRAPEZOIDAL DITCH,, cl� 2:1 MAX.
CLASS 1 RIP RAP LINED
(TYP)
MAX, SLOPE=5.0%
MIN. SLOPE=0.5%
d =-I 5- MIN
1+00
W= 15' (0��5 to 6+88)
EL. 820.3 +25
+75..; /5� 101 0 +3210 112+36)
EL. 820.2
EL.821-2
+50
EL. 820.1
X
6� g
EL. 822.4
0,01
00
0 +75
0
0 0 k \/-ffL. 819.9
+
CA
0
00 +
SEE EROSION
00
�EL 819.8
�-J J, �o TRANSIT 'MOITH
TION CONTROL PLANS
0
STA- 0+25, f ' ° ''9-t° `, x` ;; !
0
MAT... -..._ CH EXIST. RCP a _ ,. \ �r \ 1 _I
(INV 823.66-)� C-9
REMOVE
v
DO NOT DISTU]
+36
EXIST. ENDWALL.. EL. 819.6
N
-PROPOSED LIMITS \
OF CONSTRUCT ION"
\Q) (TYP)
8, 3
0,
wall
0
DCT DCT
DESIGNED DRAWN
PERENIAL STREAM SURVEY
50FT JORDAN BUFFER
I OOFT AIRPORT BUFFER
STREAM BUFFER DELINEATION
FENCE (ORANGE SAFETY FENCE)
8-T-5 EXISTING CONTOUR
835 PROPOSED CONTOUR
GRAVEL CONSTR. ENTRANCE
om (Detail 3, Sheet EC-1)
RIP RAP CHANNEL LINING
PROPOSED DRAINAGE
50 25 0 50
SCALE IN FEET
REVISIONS
�i
ti
\, \\ %
DCT DCT
DESIGNED DRAWN
I.D,
NORTHING
EASTING
DESCRIPTION
TOP EL.
INV. IN
INV. OUT
57 L.F. 15" RCP CLASS Ill W/ENDWALL
809,34
809.06
857398.4364
1728984.79
DROP INLET (NCDOT STD 840,35)
812.10
809,044
809.34
60 L.F. 15" RCP CLASS Ill
809-73
809.44
857380.509
1728925.187
.-JUNCTION BOX (NCDOT STD 840.31)
814.00
809-83
809.73
174 L.F. 12" RCP CLASS Ill
817-18
809.83
857327.5462
1728775.768
*JUNCTION BOX (NCDOT STD 840.31)
819.50
81728
817.18
113 L.F. 12" RCP CLASS Ill
822-04
817.28
857353.7419
1 7286=74-794DROP
INLET (NCDOT STD 840.14)
823.70
822.04
DESCRIPTION WITH FRAME AND COVER (NCDOT STD 840.54)
6f5'-
Wt )F MrTAL PLATE
PA'R
NOTE:
1. INSTALL PROPOSED DRAINAGE TO SEDIMENT/ DRY DETENTION BASIN C.
2. CONSTRUCT ROADWAY FROM STATION 16+00 TO STA 20+25.27 (+/-).
DATE: JANUARY 2013
IV
REFERENCES:
FOR GEOMETRIC CONTROL, SEE SHEET GL-1
FOR BASELINE PROFILE, SEE SHEET PR-1
ROPOSED DRAINAGE
50 25 0 50
SCALE IN FEET
REVISIONS
F&TIA9 I
50FT JORDAN BUFFER
I OOFT AIRPORT BUFFER
STREAM BUFFER DELINEATION
FENCE (ORANGE SAFETY FENCE)
EXISTING CONTOUR
835
PROPOSED CONTOUR
om
GRAVEL CONSTR. ENTRANCE
(Detail 3, Sheet EC-1)
INLET PROTECTION
(Detail 1, Sheet EC-3)
ROCK PIPE INLET PROTECTION
(Detail 1, Sheet EC-4)
DRAINAGE DIVIDE
SEDIMENT FENCE
(Detail 2, Sheet EC-1)
DIVERSION CHANNEL
> > >
N
(Detail 4, Sheet EC-2)
DIRECTION
OF FLOW
T SD
TEMPORARY SLOPE DRAIN
(Detail 2, Sheet EC-4)
-.sgf DIRECTtON
GRADE TO SLOPE DRAIN
OF FLOW
�sm
TYPE I MATTING
(Detail 1, Sheet EC-1)
D.A.=0.20 Ac., 10 YR Q=0.69 cfs
RN moo.
RIP RAP CHANNEL LINING
PROPOSED DRAINAGE
50 25 0 50
SCALE IN FEET
REVISIONS
F&TIA9 I
I z
TWIN BARREL f 1
•STREAM CROSSING GD-2
TRAP H
A T TPAP inw n
lTr-t-4 \I& '4.1 f%AAY
N;Z
x
5OFT
IAN BUFFER
,jTYP)
om
, jvwl�
TE
(D
C)
N
STORAGE EXCAV "A"
D.A.=0.20 Ac., 10 YR Q=0.69 cfs
pIsT
DISTURBED AREA=O. 10 Ac.
-RE '
Qq
REQ'D STORAGE VOLUME=360 CF
btsii
DESIGN STORAGE VOLUME=578.2 CF
c-
'Ed
REqD SURFACE AREA=300.15 SF
DESIGN SURFACE AREA--450 SF
MAIn
T
TRAP DIMENSIONS=22'L x 7'W x 2'D
WE IR
Y. v
v. _v
B OT1
0%,
oft! "I
SKIMI!
I z
TWIN BARREL f 1
•STREAM CROSSING GD-2
TRAP H
A T TPAP inw n
lTr-t-4 \I& '4.1 f%AAY
N;Z
x
5OFT
IAN BUFFER
,jTYP)
om
, jvwl�
TE
(D
C)
������� ��� SEQUENCE AND ^
�-...~`�"~�"~ CONTROL "~^�"- ~�~~".~,"^.~=.°. "~~.. ~.~_,=~~�~~~~~-. �~.~ ..� `""",~-,"° �`~�~��""~~ NOTES:
1. ALL TEMPORARY DIVERSION BERMS' &QLT FENCE. 8c EROSION 8c SEDIMENT CONTROL MEASURES REQUIRED
FOR LAND DISTURBANCE WITHIN A WCRK AREA SHALL BE INSTALLED PRIOR TO BEGINNING WORK WITHIN
THAT WORK AREA,
2. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND OWNER A DETAILED CONSTRUCTION PROGRESS
SCHEDULE. THESE PLANS AND SPEQi |CAT|0NS PROVIDE GENERAL CONSTRUCTION SEQUENCE AND SAFETY
PARAMETERS WHICH MUST BE INCORPORATED INTO THE APPRCVED 3CHEDULE, THE CONTRACTOR'S
EROSION CONTROL PLAN SHALL BE INCORPORATED IN THE CONSTRUCTION SEQUENCE PLAN.
3. THE CONTRACTOR SHALL |k�PLEkXENT �EST MANAGEMENT PRACTICES IN ALL MATTERS OF CONTROLLING - ER03|DH, AND COLLECTION OF SE0K4BWT YNTM|N THE PROJECT SITE.
4. ANY FINES, PENALTIES, OR OTHER COSTS ASSESSED BY STATE, LOCAL OR THE GOVERNMENTAL AGENCIES
FOR NON-PERFORMANCE OF THE EROSION CONTROL REQUIREMENTS OF THIS PROJECT AGAINST THE
AIRPORT AUTHORITY SHALL BECOME TH[ RESPONSIBILITY OF THE CONTRACTOR, AND ANY SUCH
ASSESSMENTS, IF NOTP/\iD BY THE DONTRACT()R, VN:_L BE DEDUCTED FROM MONIES DUE AT THE
COMPLETION OF THIS PROJECT.
5. THE ENGINEER MAY DIRECT THAT ADC�TON/\L EROSION CONTROL MEASURES BE INSTALLED AT ANY TIME
AND IN ANY LOCATION AS DEEMED NECESSARY.
6. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED F0� STABILITY AND CPERAT|(}N
FOLLOWING EVERY RUNOFF - PR0DU[%NG RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK.
ANY NEEDED REPAIRS WILL BE MADE TO MAINTAIN AL_ PRACTICES AS DESIGNED.
7. SEDIMENT VYLL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT REACHES 0.5 FEET DEEP. THE
EROSION CONTROL BARRIER WILL BE IFF"EPA|RED AS NECESSARY TO MAINTAIN A B/\RR|ER,
8. THE DE-WATERING OF EROSION CONTFOL MEASURES WITH SEO/MENT-LADEN WATER DIRECTLY TO
STREAMS IS PROHIBITED.
9. TEMPORARY SEDIMENT TRAPS REQUIRED FOR THE EXCAVATION OF AN UPSTREAM DITCH Sf_-ALL BE
INSTALLED AT THE ELEVATION RE(}UiPED FOR IT T0 BE OPERATIONAL AFTER THE EXCAVATION OF THE
DITCH.
1& ALL TEMPORARY SEDIMENT TRAPS SHALL PREVENT SEDIMENT FROM ENTERING ANY WETLANDS DURING
CLEARING & GRUBBING OPERATIONS ,/ EXCAVATION OPERATIONS.
11. ALL TEMPORARY DIVERSIONS SHALL HAVE POSITIVE DRAINAGE T0 RESPECTIVE EROSION AND SEDIMENT
CONTROL MEASURE /TYP.\.
12. ALL TEMPORARY SED|K4EN7 TRAPS SHALL PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION SITE AND
ENTERING JURISDICTIONAL WAT_RS DURA|NG CLEARING AND CRU3B|NG OPERATIONS AND DURING
EXCAVATIONS OPERATIONS. CONTRACTOR SHALL MAINTAIN ALL EXISTING AND PROPOSED EROSION
CONTROL MEASURES WITHIN A|RPORT1PRDPERTY LIMITS FOR T�-E DURATION OF PROJECT AND UNTIL THE
REMOVAL OF EROSION CONTROL MEA5@RE3 |3 APPROVED BY THE NORTH CAROLINA DEPARTMENT OF
H
ENVIRONMENT AND NATURAL RESOURCES, DIVISION OF LAND RESOURCES, LAND QUALITY SECTION.
THE CONSTRUCTION OF THE PROJECT MUST BE COMPLETED IN SEQUENTIAL ORDER AS LISTED BELOW:
1. CONTACT LAND QUALITY PRIOR TO START OF CONSTRUCTION.
2' INSTALL CONSTRUCTION ENTRANCE ?ADS.
3. INSTALL SILT FENCE AROUND PERIMETER OF THE SITE AS SHOWN ON THE PLANS.
4. INSTALL SEDIMENT BAS|N3, 3ED}K4E�T TRAPS, AND DIVE-RS|OH DITCHES BEFORE BEG|MN1NG, AS SHOWN ON
PLANS.
5. BEGIN CLEARING AND GRUBBING OF-RATIONS ON THE PROJECT SITE.
6. AS CONSTRUCTION OPERATIONS ALI- OVY. STRIP TOPSOIL AND STOCKPILE.
7' INSTALL DIVERSION D|TCHES, AS NE�ESSARY, T0 CONVEY RUNOFF TO EROSION CONTROL MEASURES.
8. BEGIN GRAD1N3 OPERATl0N& INSTALL EROSION CONTROL MEASURES, AS SHOWN ON THE PLANS, AS
CONSTRUCTION PROCEEDS.
S� SLOPE DRAINS WIT-i BERMS SHALL 3E INSTALLED CONCURRENTLY WITH GRADING OPERATIONS. SILT FENCE
SHALL BE INSTALLED AROUND SLOPE AREAS PRIOR TO START OF GRADING OP.RAT|ON3.
10. PLACE TDPSOI:L FROM DNS|TE STOCKPILE ON COMPLETED AREAS OF GRADING AS CONSTRUCTION
PROCEEDS.
11. COVER ALL SLOPES 3:1 OR LESS V8TH TYPE l TEMPORARY EROSION CONTROL MATTING (EXCELSIOR
` CURLEX CL 1' OR APPROVED EQUAL), COVER ALL SLOPES GREATER THAN 3:1 WITH TYPE 2 TEMPORARY
EROSION CONTROL MATTING TRM-V` 1 OR APPROVED EQUAL).
12. GROUNDCDVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES WITHIN 7 CALENDAR DAYS FOLLOWING
COMPLETION OF ANY PHASE OF GRADING.
lJ. PERMANENT CROUNDCOVER SHALL BE E�TABL|5HED ON ALL DISTURBED AREAS WITHIN 14 CALENDAR
DAYS FOLLOWING COMPLETION OF CONSTRUCTION,
14. ONCE PERMANENT VEGETATION HAS BEEN ESTABLISHED ANC ACCEPTED BY THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (NCDENR) THE CONTRACTOR SHALL REMOVE
THE TEMPORARY EROSION CONTROL DEVICES, RE-CRADE, AND RESEED AS NECESSARY. ALL ST4C|N{;
AREAS AND HAUL ROUTES SHALL BE RESEEDED.
15. CONTRACTOR SHALL RESTORE ALL TEMPORARY IMPACT AREAS VWTH|N THE BUFFER AREAS AND STREAM
� T0 PRE- CONSTRUCTION CONDITIONS OR|OR TO THE COWPLEl0N OF THE PROJECT.
CONSTRUCTION SEQUENCE FOR SEDIMENT TRAPS
1. INSTALL SEDIMENT TRAPS AND ERCSION CONTROL MEASURES PER SHEET G8-1.
CONSTRUCT EARTHWORK TO LINES AND GRADES AS SHOWN ON SHEETS GD-2 THRU GD-4.
2� ARE/\S DRAINING T0 SEDIMENT TRAPS SHALL BE STAB|L|ZED, AND HAVE AN APPROVED
STAND OF GROUND COYER PRIOR TO CONSTRUCTING PERMANENT ROADWAY EMBANKMENT.
3^ IMMEDIATELY SEED` MULCH, AND INSTALL MATTING AT THE CONCLUSION OF GRADING OPERATION ON
SPECIFIC AREA.
4. DO NOT REMOVE DIVERSIONS OR TFAP3 UNTIL THE SITE HAS ESTABL!SHED GROUND COVER AND _1A3
BEEN APPROVED BY NCDENR.
.i DATE |BYK DESCRIPTION
� ALL SOIL STABILIZATION MEASURES SHALL MEET THE REQUIREMENTS OF ITEMS T-901, T-905` AND T-808
OF THE SPECIFICATIONS. GROUNDCOVER SHALL BE ESTABLISHED ON ALL EXPOSED SLOPES WI-H|N 7
CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GR0UNDCOVER SHALL
BE ESTABLISHED ON ALL DISTURBED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF
CONSTRUCTION.
2-
PRIOR TO SOIL STAB|L|Z/`T0N, AREAS SHALL BE CLEARED OF STONES OR DEBRIS LARGER THAN 2 INCHES !N
D.AwETER'
J. AREA TO BE SEEDED SHALL BE THOROUGHLY LOOSENED T0 A DEPTH OF 5 INCHES. THE TOP J INCHES
SHALL BE WORKED INTO A SATISFACTORY SEEDBED BY DI3C|NG, OR BY USE OF CULTiPACKERS` ROLLERS,
EIRAGS` OR OTHER APPROPRIATE MEANS.
4. T',HE K'NDS OF SEED AND THE RATES OF APPLICATION OF SEED SMALL BE AS STATED BELOW. ALL RATES
ARE IN POUNDS PER ACRE.
All L AREAS EXCEPT 5TORMWATER MANAGEMENT PONDS-
PIERMANENT SEEDING
1QO#TALL FESCUE
1Q# KOBE LESPEDEZA
25# BAH(A GR/\33
4,0# RYE GRAIN /JANUARY T0 FEBRUARY APPL|CAT|ON\
TEMPORARY SEEDING
TEMPORARY SEEDING FOR THE PROJECT SHALL MEET ALL REQUIREMENTS PUBLISHED WITHIN THE CURRENT
BB|Tl0N OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOCRCES, DIVISION
CrF LAND RESOURCES, LAND QUALITY SECTION'S EROSION AND SEDIMENT CCNTROL PLANNING AND DESIGN
1QANUAL, TABLE 0.10A' TABLE 6.10B AND TABLE 6,10C FOUND ON PACE 5.10.4. PAGE 6.10.5 AND PAGE
6_18.5.
NOTE: WHERE NOTED ON PLANS, -SER|CEA LE5PEDEZA SEED SHALL BE ADDED TO THE SPECIFIED SEED
kdXTURE AT A �ATE OF TH|RTY P0UND3 �ER AC�E. NO ADDITIONAL PAYMENT SHALL BE WACE FOR
THE A]O|7lON OF SER)CEA L[5PEOEZA SEED.
STORMWATER MANAGEMENT PONDS PERMANENT SEEDING:
/AY TO SEPTEMBER APPLICATION:) /OCTOBER T0 APRIL 4PpUCAllON:\
`- '
# TALL FESCUE / `2O# TALL FESCUE
/
25' � BERMUDA GRASS 15# BERMUDA GRASS
25# BAHIA GRASS 10# BLUE GRASS
10# HARD FESCUE
�HE K|NDS OF GRA5S, LEGUME, AND COVER-CROP SEED FURNISHED SHALL BE THOSE STPULAT[D ABOVE.
S-E-ED SHALL CONFORM TO THE REQUIREMENTS OF FEDERAL SPECIFICATION JJJ-S-181.
SEED SHALL BE FURNISHED SEPARATELY OR IN MIXTURES IN STANDARD CONTAINERS WITH THE SEED
NAK4E, LDT NUVIBER. NET WE(SHT' PERCENTAGES OF PURITY AND OF GERKJ|N/\llCN AND HARD SEED, AND
FERCENTAGE0F MAXIMUM WEED SEED CONTENT CLEARLY MARKED FOR EACH KIND OF SEED. THE
C-ONTRACTOR SHALL FURNISH THE ENGINEER DUPLICATE SIGNED COPIES OF A STATEMENT BY THE VENDOR
CERTIFYING TESTING WITHIN 3|X /6\ MONTHS OF DATE OF DEL/VERY. THIS STATEMENT SHALL INCLUDE:
NAME AND ADDRESS OF LABORATORY, DATE OF TEST, L()T NUMBER FOR EACH KIND OF 3EED, AND THE
RESULTS OF TEST /\3 TO NAME, PERCENTAGES OF PURITY AND OF GERk4|N/\T0N, AND PERCENTAGE OF
��ED CONTENT FOR EACH KIND OF SEED.
5, G-ROUND LIMESTONE SHALL BE APPLIED PRIOR TO APPLICATION OF FERTILIZER OR SEED AND SHALL BE
VV!ORKED INTO TOP 3 INCHES OF SOIL,
8. FIERTlUZER SHALL B_ SPREAD UNIFORMLY OVER ALL AREAS TO BE SEEDED AFTER LIMING IS COk4PLET_.
7 GRASS SEED SHALL BE APPL|EO AT THE RATE ND|CATED ABOVE AND |N THE SPEC|F|CATIONS, PROPERLY
COVERED' AND COMPACTED WITH AN APPROVED LAWN ROLLER.
8. fvULCI-. SHALL BE APPLIED IMMEDIATELY AFTER SEEC|NG, MULCH MUST MEET THE REQUIREMENTS OF ITEM
T-9O8.
Q. STRAW MULCH SHALL BE SPREAD TO A UNIFORM THICKNESS AT THE RATE OF 2 - J TONS PER ACRE TO
PROVIDE A LOOSE DEPTH OF NOT LESS THAN 1-112 INCHES NOR MORE THAN 5 INCHES.
1& yitULCH. SHALL BE HELD IN PLACE BY LIGHT O|S]NC' P|N5, STAKES, WIRE MESH, OR ASPHALT BINDER.
<l. |F ASPHALT SPRAY METHOD |3 USED, MULCHED SURFACES SHALL BE SPRAYED UNIFORMLY AT A RATE OF
APPROXIMATELY 8.0 GALLONS PER 1.000 SQUARE FEET.
12� IF ASPHALT MIX METHOD IS USED, THE MULCH SHALL BE APPLIED BY BLOWING AND THE ASPHALT BINDER
k6ATERIAL SHALL BE SPRAYED INTO THE MULCH AS IT LEAVES THE BLOWER. BINDER. SHALL BE UNIFORMLY
APPLIED TO THE MULCH AT THE RATE OF APPROXIMATELY 8.0 GALLONS PER 1.000 SC)U/\R[ FEET.
13. CONTRACTOR SHALL PROTECT SEEDED AND MULCHED AREAS AGAINST TRAF-|C, SURFACES GULL|ED DR
DAMACEDSHAL_ BE REPAIRED, RESEEDED, AND REMULCHED, CONTRACTOR SMALL MOW, WATER ' AND
OTHERWISE MAINTAIN SEEDED AREAS IN A SATISFACTORY CDND|llCN UNTIL FINAL INSPECTION AND
TO BE INSTALLED IN ACCORDANCE wl MANUFACTURERS SPECIFICATIG,�'IS
8'-0° MAX- POST SPACING
ELEVATION VIEW
STEEL POST—\ /--WOVE\,I WIRE FENCE
SYNT�ETlC FILTER FABRIC
118"
- 24 ^
EXIST. GROUND LINE
�
_
�
" | | �`
`rl | .-- C0WFACT[D SOIL OR GRAVEL
1. N00]E\J POSTS SHALL NOT BE USED FOR SILT FENCE INSTALLATION,
PCSTS SHALL BE 1.33 LB/L|N. FT. STEEL WITH A M|N|kWUM LENGTH
OF 5 FEET.
2 INSTALL SILT FENCE WHERE SHOWN ON THE PLANS AND
MAINTAIN UNTIL DISTURBED AREA |3 COMPLETELY STABILIZED.
TEMPORARY SILT E
1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE THE CONSTRUCTION ENTRANCE IS USED.
2.|F CONSTRUCTION ON THE SITE ARE SUC� THAT THE kJUO IS NOT REMOVED BY THE V[H|CL_-_' TRAVELING
OVER THE STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD.
3. IF A PROJECT CONTINUES T0 PULL MUD AND DEBRIS ON TO THE PUBLIC ROAD, THE CONTRACTOR SHALL
CLEAN THE AREA.
25' OR WIDTH OF
PROPOSED STREET,
WHICHEVER IS
|
J_
5'MH
EXISTING
ROADWAY
35' MIN.
,
15 W|k
CROSS SECTION
7 Poo
N.l[S.
E S
S3 Ee-
DCT DCT
DESIGNED DRAWN
I JA
mvw.mbakercorp.com
MICHAEL BAKER
ENGINEERING, INC
7800 Airport Center Drive
Suite 100
�
�� Greensboro, ''__' '--
OFC: (336)931-1500
FAX� /336\931-1501
DATE: JANUARY 2013
SCALE: AS SHOWN
SHEET
cami
OF EC-4
|
OP OF DAM
EMERGENCY SPILLWAY
RISER R|KJ
10' SPILLWAY
-
2 A zu" 3
RISER CLAY CORE (CH, MATERIAL)
TO CRIFICE AT
BOTTOM OF RISER BARREL ANTI—SEEP
COLLARS
t p \ I � 86C8
FOOTING \_K�Y IN CUT—OFF
TRENCH
* CUT TRENCH TO STABLE SOIL MATERIAL, BUT IN
� NO CASE MAKE IT LESS THAN 2` DEEP
�8" CLASS B
1�\IP RAP
CONCRETE ANB—SEEP /—CONCRETE ANTI—SEEP
COLLAR COLLAR
¥
NOTE:
EXACT ELEVATIONS TO BE FIE-D VERIFIED AND ADJUSTED PRIOR
TO ACTUAL CONSTRUCTION OF SEDIMENT BASIN.
POROUS BAFFLES
3 EACH
'
NOTE: INSTALL BAFFLES |N SAME MANNER
AS SILT FENCE. REPLACE SiLr FENCE
FABRIC WITH 7CO g/' oq nn CD[R
EROSION BLANKET. BAFFLES SHALL
EXTEND UP THE ENTIRE SIDES OF
THE BASIN.
I.D.
STORAGE
SURFACEAREA
WIDTH
I BARREL
BARREL
11:
ORIFICE.
TOP, OF
IFEIITTERUER
RISER
RISER
SEDIMENT
oil
,goal's
DAM
SPILLWAY
RIM
CLEANOUT
ELEV.
ELEV.
ELEV.
ELEV.
¥
NOTE:
EXACT ELEVATIONS TO BE FIE-D VERIFIED AND ADJUSTED PRIOR
TO ACTUAL CONSTRUCTION OF SEDIMENT BASIN.
POROUS BAFFLES
3 EACH
'
NOTE: INSTALL BAFFLES |N SAME MANNER
AS SILT FENCE. REPLACE SiLr FENCE
FABRIC WITH 7CO g/' oq nn CD[R
EROSION BLANKET. BAFFLES SHALL
EXTEND UP THE ENTIRE SIDES OF
THE BASIN.
I.D.
STORAGE
SURFACEAREA
WIDTH
LENGTH
DEPTH
LENGTH
Deim
"C" ENCLOSURE
WATER ENTRY UNIT
PERSPECTIVE VIEW OF SKIMMER
5' M|N
FLCVy |— —|
COMPACTED SOIL
BAFFLES
2' N|N.
�
����~�.����°
m���n�����
1. TEMPORARY SILT DIVERSION DITCH VY|LL NDT BE MEASURED.
COST VY1L BE INCIDENTAL TO OTHER ITEMS.
2. TEMPORARY GROUND COVER MUST BE ESTABLISHED IN ALL
DIVERSION DITCHES.
l. MAINTAIN EXISTING TEMPORAR"T' SEDIMENT TRAPS.
2. STORAGE CAPACITY SHALL BE 3'600 FT'/ ACRE OF DISTURBED AREA.
1 STONE SIZE SHALL BE CLASS 'B^ WITH A ONE FOOT (1 FT.) LAYER OF NCD0T # 57
4. PLACE FILTER FABRIC BELOW RIP PAP.
5. REMOVE SEDIMENT TRAPS AS DIRECTED BY THE ENGINEER.
6. REMOVE SEDIMENT WHEN VOLdkjE IS ONE—HALF OF REQUIRED STORAGE VOLUME
7. REQUIRED STORAGE CAPACITY AND SURFACE AREA ARE MEASURED
FROM THE WEIR ELEVATION.
DATE BY DESCRIPTION
SIDE NEW
�
N.l�5. ��-7
` ~�
ir
PVC END CAP
PVC ELBOW
D CAP
PVC TE[—� |
�—PVC PIPE
1/2''H0LES IN
| |
UNDERSIDE
END \4EVY OF SKIMMER
OUTLET
REVISIONS
DATE I BY
DEWATER|NG
CONCRETE BLOCK
-0.. AQ..
k.
_
T— ---=
�- �.1 SLOP[ WASHED STONE FILTER
TEMPORARY WIRE
SEDdMENT POOL SCR�EN --PROVIDE ONE 0EVYATERiNC
BLOCK PER SIDE
\—DROP INLET
SEDIMENT W/ GRATE
COST OF INLET PROTECTION SHALL BE
INCLUDED IN THE COST OF STRUCTURE.
N,l[S.
/
1_D�
3LC;IPE 1-1/2:1 OR FLATTER
! D /
SECTION A-A
^
FILTER FABRIC
H= RIP RAP TO TOP OF PIPE (MAX. H = D i Tl
T= 20' CLASS | RIP RAP` UNLESS OTHERWISE SHOWN ON PLANS
T= 12" CLASS `B' RIP RAP, UNLESS 01-HERVN3E SHOWN ON PLANS
OUTLET WITH DITCH
D
CLASS I RIP-RAP
S. Y
TONS
FILTER FABRIC
36"
29
15
30
42"
22
13
30
48"1
49
26
50
541
60
33
62
gym
A �
12" No. 57
WASHED STONE
N.'[�,:l
Ld
r/x `^coT
�vL_,'
RIP RAP
r/L I ER r*um.
/
k
�
01
L-f
CL|
C�_|
SECTION ������mm��m`m A~A
T= 20" CLASS | RIP RAP, UNLESS OTHERYV|3E SHOWN ON PLAN�
T= 12" CLASS 'B' RIP RAP, UNLESS 0TH[RVVSE SHOWN ON PLANS
1. SEE GRADING PLANS FOR RIP RAP APRON
DIMENSIONS.
2. COMPACT ANY FILL J3EC IN CONSTRUCTION
OF APRON.
3. RIP RAP APRON SHALL BE LEVEL WITH RECEIVING
S;'REAM OR SLIGHTLY BELOW.
OUTLET WITHOUT DITCH
36"
16
10
23
42"
22
13
30
54"
36
21
47
PIPE OUTLET PROTE%C�"TION WITHOUT DITC.'o"H
4�0�������� \
������n���m� ���� \— FILTER FABRIC
L = THE DISTANCE SUCH THAT POINTS
A AND 8 ARE OF EQUAL ELEVATION
ir In
CLASS 'B' EROSION
CONTROL STONE
DCT DCT
DESIGNED DRAWN
' '^
CHECKED S.O.
www.mbakereorp.com
MICHAEL BAKER
ENGINEERING, INC
7800 Airport Center Drive
Suite 100
Greensboro, NC
OFC: 1-1508
FAX: (3361931_1501
DATE: JANUARY 2013
- --i _ .___._ i