Loading...
HomeMy WebLinkAbout20121049 Ver 1_More Info Received_20130114Michael Baker Engineering, Inc. 7800 Airport Center Drive, Suite 100 Greensboro, NC 27409 336- 931 -1500 FAX 336 - 931 -1501 To: NCDWQ - WSRO S.O. No. 585 Waughtown Street Project: Winston - Salem, NC 27107 Attn: Ms. Sue Homewood We are forwarding the following: ® Attached � gs— 10 +9 Letter of Transmittal 129093 Honda Connector Road Date: January 11, 2013 ❑ Under Separate Cover ❑ Other DWG. NO. NO. COME TITLE OR DESCRIPTION COMMENTS 2 Full Size Plans for Honda Connector Road Per comments in letter dated 1 Revised PCN Forms December 14, 2012 1 Supporting Information for Dry Detention Basin: - Calculations - Executed O &M Agreement 1 Geotechnical Report for Honda East Site THESE ARE TRANSMITTED as checked below: ® As requested ❑ For review and comment ❑ For your information GENERAL COMMENTS: CC. Richard Darling — Baker Ian McMillan — NCDWQ (Raliegh) Alex Rosser - PTAA ❑ No exception taken ❑ Rejected - See remarks ❑ Proceed subject to corrections noted r=n@ V I L9 Do ►AN 1 4 2013 D_ NR WAT�It aUMAY I ❑ Revise and resubmit ❑ Submit specified items ❑ Other Michael Baker Engineering, Inc. By. Larry J. Allen, P.E. Title: Sr. Project Manager Page 1 of 1 1. . ... : I a- i o4 of wArF9 0`' 0� Office Use Only: I Corps action ID no. B Y DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version re- Construction Notification PC Form[rbdl] A. licant Information[rbd2j 1. [Process d[rbd3] 0_ ] rbaaj Type(s) of approval sought from the ®Section 404 Permit ❑Section 10 Permit Corps: Cbj[rbd5] Specify Nationwide Permit (NWP) number: NWP 18 or General Permit (GP) number: 116Jrbd6J Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 11dj[r�a7j Types) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization (1etrbd8j Is this notification solely for the record For the record only for DWQ 401 , For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes ® No ❑ Yes ® No 11f irbd9j Is payment into a mitigation bank or in -lieu fee program proposed for ❑ Yes ® No mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. (1gkr 461 Is the project located in any of NC's twenty coastal counties. If ❑ Yes ® No yes, answer 1 h below. [1hJ[64_l`11 Is the project located within a NC DCM Area of Environmental Concern ❑ Yes ® No (AEC)? 2. Froject Informationkr_ dui [2a�[rbd13] Name of project: HONDA Connector [2b�[�baiaj County: Guilford PtIrko151 Nearest municipality / town: Greensboro j2d.�b k Subdivision name: N/A ( ej[rbdiij NCDOT only, N/A T.I.P. or state project no: 3. Owner Informati*�[rbd18j I a.�[rbd19] Name(s) on Recorded Deed: Piedmont Triad Airport Authority P tY TOEM-WATIE-14011A11TV �3b.][rbd2oj Deed Book and Page No �c�[�bailj Responsible Party (for LLC if applicable): Kevin J. Baker, Executive Director 3d. Street address: 1000 A Ted Johnson Pkwy. 3e. City, state, zip: Greensboro, NC 27409 3f. Telephone no.: (336) 665 -5600 3g. Fax no.: (336) 665 -5694 3h. Email address: bakerk @gsoair.org Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version im 4. �pplicant Information (if different from owner) I[rbd22I 10.jrbd231 Applicant is: ❑ Agent ❑ Other, specify: �b.krbd241 Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. ( gent/Consultant Information (if applicable j; 2sl 5a. Name: Richard Darling 5b. Business name (if applicable): Michael Baker Engineering, Inc. g' 5c. Street address: 7800 Airport Center Dr., Suite 100 5d. City, state, zip: Greensboro, NC 27409 5e. Telephone no.: (919) 481 -5740 5f. Fax no.: (919) 463 -5490 5g. Email address: rdarling @mbakercorp.com Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 11a.krbd26] Property identification no. (tax PIN or parcel ID): 1b. rbd27 Site coordinates in decimal degrees): C_ _ � j c g ): Latitude: 36.102255 Longitude: - 79.917830 (DD.DDDDDD) ( -DD DDDDDD) [1c.krb4281 Property size: 159 acres 2. Surface Waters VA 029] Name of nearest body of water (stream, river, Horsepen Creek etc.) to proposed project: �bjrbd3o] Water Quality Classification of nearest receiving WS -III, NSW water: PcIrbd3ij River basin: Cape Fear 3. Project Description [3a jrbd32j Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area includes maintained lawn and forested stream corridor within the Honda Development Site. kb j[6031 List the total estimated acreage of all existing wetlands on the property: 0.05 kicl[rbd34] List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3,219 kid j W351 Explain the purpose of the proposed project: To connect the existing Honda Campus to the Honda Expansion area (under construction) to allow safe pedestrian and vehicular access to all facilities without having to exit the site. kieirbd361 Describe the overall project in detail, including the type of equipment to be used: Construction of two - lane roadway using excavators and other large construction equipment including installation (in the dry) of two 60 -inch reinforced concrete pipes buried approximately one foot into the stream bottom, necessitating 18 cubic yards clean fill below OHWM. 4. Jurisdictional Determinations ( a j,w7j Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) ® Yes ❑ No ❑ Unknown in the past? Comments: SAW- 2011 -01169 �b.jrbdmj If the Corps made the jurisdictional determination, what ® preliminary ❑ Final type of determination was made? (4cJrbm] If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Michael Baker Eng. Name (if known): Andy Williams Other: 41! 4oj If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Action ID SAW- 2011 -01169 dated 06/27/2011 expires 06/27/2016 5. Project History (58�[rbd411 Have permits or certifications been requested or obtained for this project (including all prior phases) in the ❑ Yes ® No ❑ Unknown past? �b][ &21 If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans J a.JMUI Is this a phased project? ❑ Yes ® No IE— plrbd44j If yes, explain. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 11 a.krbd45] Which sections were completed below for your project (check all that apply): El Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland ImpactSJrbd46j If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. a. rbd47j Ob.krbd481 C. rbd49] d. rbd50j e. rbd51] f.[rbd521 Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) (if known) DWQ — non -404, other) (acres) or Temporary W1 ❑ P ❑ T Choose an item. Choose an item. ❑ Yes ❑ No ❑ Corps ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ Og4rbd53j Total wetland impacts 0.00 �11.1[rbd54] Comments: 3. (Stream ImpactS'kM55j If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. Oa][rbd561 Ob.krbd57j Oc][rbd581 Od.irbd59j oe][rbd601 OfJrbd611 rbd62]. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) intermittent DWQ — non -404, width (linear or Temporary (INT)? other) (feet) feet) (T) S1 ®P ❑ T Road Crossing g D2 (UT to Horsepen Cr.) ® PER ❑ INT ® Corps ® DWQ 10 101 S2 ❑ P ®T Erosion Control CD2 (UT to ® PER ® Corps 10 47 and Grading Horsepen Cr.) ❑ INT ® DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ kih�[rbd63] Total stream and tributary impacts 148 l3i.�[rbd64j Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. (Open Water Impact4r4oj If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. _ rbd_66]. Open water impact number — Permanent (P) or Temporary rbd67]. Name of waterbody (if applicable) _ rbd681. Type of impact _d.[rbd691 Waterbody type _ �ekkd7qj. Area of impact (acres) 01 ❑P ❑T 02 ❑P 03 ❑P 04 ❑P ❑T �4f�(rbinj Total open water impacts k49.][rbd72] Comments: 5. 1 in—dl—or Lake Constructio rbd73 If pond or lake construction proposed, then com lete the chart below. _ 06k!k 474j. Pond ID number 04rkd751. Proposed use or purpose of pond 0C,[rbd76j. Wetland Impacts (acres) 0_ [rbd77 . Stream Impacts (feet) 0e1[rbd78]. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 rb . Total [rbdBU]. Comments: o rbg-J. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: No d Expected pond surface area (acres): �5j: rbabi Size of pond watershed (acres): [5k][rbd 4J Method of construction: Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Puffer Impacts([rbd8s] (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. rbd86]. - [I Neuse ❑Tar- Pamlico ®Other: Jordan Project is in which protected basin? ❑ Catawba ❑ Randleman 014rW87]. rbd88]. _ _ rbd89j. 0ekrbd90J. rbd91]. 0gkrbd92J. Buffer impact number — Reason for Buffer Zone 1 impact Zone 2 impact Permanent (P) impact Stream name mitigation (square feet) (square feet) or Temporary required? 61 ®P ❑ T Road CD2 (UT to Horsepen ❑ Yes 1,493 1,028 Creek ) No B2 ❑ P ®T Embankment CD2 (UT to Horsepen ❑ Yes 9,147 5662 Creek )) No B3 ❑P ❑T ❑Yes [I No 0h.krbd93] Total buffer impacts 10,640 6,690 �J[M94]. Comments: Less than 150 l.f. / 1/3 ac. road crossing of stream impact "allowable" without mitigation D. Impact Justification and Mitlgatloip rb095j 1. Avoidance and Minimization 11ak6d96j. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Project location, alignment, and footprint have been configured to avoid and minimize impacts to the maximum extent practicable see enclosed cover letter). [11 �[rbd971. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Application of appropriate BMPs and adherence to approved sediment and erosion control procedures will avoid and minimize construction impacts see enclosed cover letter). 2. (Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the Stat4rbd981 [2aj[!b4991. Does the project require Compensatory ❑ Yes ® No Mitigation for impacts to Waters of the U.S. or Waters of the State? ftrbd1001. If yes, mitigation is required by (check all that ❑ DWQ ❑ Corps apply): ❑ Mitigation bank ( _4rbg101J. If yes, which mitigation option will be used for ❑ Payment to in -lieu fee program this project? ❑ Permittee Responsible Mitigation 3. �omplete if Using a Mitigation Ban_krbd102j 4[Mlo3j. Name of Mitigation Bank: Obl[rW04J. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version c. rbdlo5j Comments: 4. Complete it Makin 9-_a Payment to In -lieu Fee Programirb006 4A—DI dolj Approval letter from in -lieu fee program is attached. ❑ Yes (40 10 1081 Stream mitigation requested: linear feet KcJrbdto9j If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold �4d rbdq 6 Buffer mitigation requested (DWQ only): square feet (4e.�rbd� 11j Riparian wetland mitigation requested: acres ba�_ 2j Non - riparian wetland mitigation requested: acres R4dEbd113i Coastal (tidal) wetland mitigation requested: acres h.[rbd114j Comments: 5. (Complete if Using a Permittee Responsible Mitigation Plard[rbal t1 [5atrbdi 161 If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated_ Riparian Buffer Rules) - required by i;W I' bd11A 0 j trbdt i 8 Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No Pbjrbdi 19j if yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone _ rbdi2oj. Reason for impact _ rbdl2lj. Total impact (square feet) Multiplier _ rbd122j. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 01[kd!231 Total buffer mitigation required: 06Jrbd124j If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). h.[rbd125j Comments: Page 8 of 11 PCN Form —Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan (1a.baiz6j Does the project include or is it adjacent to protected riparian buffers ® Yes ❑ No identified within one of the NC Riparian Buffer Protection Rules? 11 b.km_i27_j If yes, then is a diffuse flow plan included? If no, explain why. ® Yes ❑ No Comments: 2. Stormwater Management Plan �2a d1281 What is the overall percent imperviousness of this project? 12% �bVbd129j. Does this project require a Stormwater Management Plan? ® Yes ❑ No �Lc.&rbdl3 J If this project DOES NOT require a Stormwater Management Plan, explain why: klrbal311 If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government [2 .krb4i3_271 Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ® DWQ 401 Unit 3. ertifled Local Government Stormwater 0400 4M-1-3-31' (3a. rbatA In which local government's jurisdiction is this project? ❑ Phase II b. k13s Which of the following locally-implemented stormwater management _ �[__ _ _ _l 9 9 ❑ NSW ❑ USMP programs apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 0c.Lg36j Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. WQ Stormwater Pro ram Revie rbd137 ❑ Coastal counties a. at38 (4 6b_ _ j Which of the following state - implemented stormwater management programs [I HQW ❑ ORW apply (check all that apply): ❑ Session Law 2006 -246 ❑ Other: [4ti. rba1391 Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. WQ 401 Unit Stormwater Revie rbaiao 05a.krbd141j Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ❑ No ab. rbii 2j Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version • Y F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) J1a.Jrbd143j Does the project involve an expenditure of public (federal /state /local) ❑ Yes ® No funds or the use of public (federal /state) land? [I b fj dI44j If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the ❑ Yes ❑ No National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 11c.Vrba1451 If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA ❑ Yes ❑ No final approval letter.) Comments: 2. Violations (DWQ Requirement) Pair6a1461 Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland ❑ Yes ® No Standards, or Riparian Buffer Rules (15A NCAC 26 .0200)? (2krbCM4 j Is this an after - the -fact permit application? ❑ Yes ® No rbd1481 If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) (Sa.krbai49j Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream ❑ Yes ® No water quality? (3bl!bdl5oj If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Project connects existing development to development already under construction only. 4. Sewage Disposal (DWQ Requirement) Kp.Jq!d_is j Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered species and Designated Critical Habitat (Corps Requirement&652j N- irkinj Will this project occur in or near an area with federally protected ❑ Yes ® No species or habitat? JWLrbd1saj Have you checked with the USFWS concerning Endangered ❑ Yes ® No Species Act impacts? _ �5c.�rba155j If yes, indicate the USFWS Field Office you have contacted. Raleigh ❑ ❑ Asheville �Qrwm_6_ 1 What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? hffp://www.saw.usace.army.mil/WETLANDS/esa 6. Pssential Fish- Habitat (Corps Requirement)Jrbd157] 0a.krbdis8j Will this project occur in or near an area designated as essential fish ❑ Yes ® No habitat? 0 .k!r d_ s9j What data sources did you use to determine whether your site would impact Essential Fish Habitat? hffp://ocean.floridamarine.org/effi coral/ims /viewer.htm - - - — -- - -- - - -- - - 7. istoric or Prehistoric Cultural Resources (Corps Requirement) r�dt6o 7[a.�[rbat6tj Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural ❑ Yes ® No preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? V1b.Crba162j What data sources did you use to determine whether your site would impact historic or archeological resources? hftp://www.hpo.dcr.state.nc.us 8. JIFlood Zone-Desigoation (Corps Requirement)([rbdt63j oa.Lrbat6aj Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No I8birbdt6sj If yes, explain how project meets FEMA requirements: (8c.,[rbd166j What source(s) did you use to make the floodplain determination? http: / /www.ncfloodmaps.com Kevin J. Baker, P.E. Executive Director Piedmont Triad Airport Authority 1/11/2013 ApplicanttAgets Printed Name Date ican 's S natur rbd167 (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form —Version 1.3 December 10, 2008 Version TA MEW Permit No. I ;;�" 1 D A 01 (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Honda Connector Contact person Larry J. Allen, PE (Michael Baker Engineering, Inc.) Phone number 336.931 -1500 Date Drainage area number 10- Jan -11 O��p W AIFAOG y O < II. DESIGN INFORMATION 2.79 Site Characteristics Drainage area 89,298.00 fe Impervious area 34,848.00 fe % Impervious 0.39 Design rainfall depth 1.00 in Peak Flow Calculations 1 -yr, 24 -hr rainfall depth 2.79 in Rational C, pre - development 0.30 (unitless) Rational C, post - development 0.49 (unitless) Rainfall intensity. l -yr, 24 -hr storm 0.12 inthr Pre - development 1 -yr, 24 -hr peak flow 1.72 ft3 /sec Post - development 1 -yr, 24 -hr peak flow 2.82 ft3 /sec Pre/Post 1 -yr, 24 -hr peak control 1.10 ft3 /sec Storage Volume: Non-SA Waters Minimum required volume 2,977.00 ft3 Provided volume 20,907.00 ft3 OK Sediment storage volume provided 6,205.00 ft3 OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff volume ft3 Post - development 1 -yr, 24 -hr runoff volume ft3 Minimum required volume ft3 Provided volume ft3 Sediment storage volume provided ft3 Basin Design Parameters Drawdown time 3.00 days OK SHWT elevation 807.00 fmsl Basin bottom elevation 809.00 fmsl OK Storage elevation 812.00 fmsl Basin side slopes 3.0 :1 OK Top elevation 814.50 fmsl OK Freeboard provided 1.00 ft OK Basin Bottom Dimensions Basin length 70.00 ft Basin width 35.00 ft Length to width ratio 2.00 :1 OK Form SW401 -Dry Extended Detention Basin -Rev 3 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Total runoff volume captured by basin 0.82 ac -in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? Y (Y or N) OK Does basin capture all runoff at ultimate build -out? Y (Y or N) OK Is a sediment depth indicator included? Y (Y or N) OK Does the basin include a drain? Y (Y or N) OK Form SW401 -Dry Extended Detention Basin -Rev 3 Parts I & 11 Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan i ' I Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW),, - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. / ' �� ^ 3. Section view of the basin 0" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. (BASin i9 evia'skvNqSQd►."%&JC 7. The supporting calculations. bas Mt 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. 9. A copy of the deed restrictions (if required). r l/✓ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Dry Extended Detention Basin -Rev.3 Part III. Required Items Checklist, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Dry Extended Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - The drainage area will be managed to reduce the sediment load to the dry extended detention basin. - Immediately after the dry extended detention basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the dry extended detention pond will be fertilized after the first initial fertilization that is required to establish the vegetation. - I will maintain the vegetation in and around the basin at a height of approximately six inches. - Once a year, a dam safety expert will inspect the embankment. After the dry extended detention basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash debris is present. Remove the trash/ debris. The perimeter of the dry Areas of bare soil and /or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then plant a basin ground cover and water until it is established. Provide lime and a one -time fertilizer application. Form SW401 -Dry Detention O &M -Rev.3 Page 1 of 4 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. ' The main treatment area Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and (see diagram below). dispose of it in a location where it will not cause impacts to streams or the BMP. Revegetate disturbed areas immediately with sod (preferred) or seed protected with securely staked erosion mat. Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an ' appropriate rofessional. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). Form SW401 -Dry Detention O &M -Rev.3 Page 2 of 4 BMP element: Potential problem: How I will remediate the roblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. Grass cover is unhealthy or Restore the health of the grass cover eroding. - consult a professional if necessary. Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. 733 -1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 809.8 feet in the main pond, the sediment shall be removed. When the basin depth reads Sediment Removal Bottom FOREBAY feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Temporary Pool Elevation 812.0 tpora Pool Temporar3 olume - - - - -- Sediment Removal Elevation 809.8----- - - - - -- Volume Sediment Storage Bottom Elevation MAIN POND Form SW401 -Dry Detention O &M -Rev.3 Page 3 of 4 25% Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Honda Connector Road BMP drainage area number: Print name:Kevin J. Baker, PE Title:Executive Director Address: l000A Ted Johnson Parkway, Greensboro, NC 27409 Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of N L , County of ( L � , do hereby certify that kZ°I Iih personally appeared before me this 6 day of ,ZO i3 , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, STEPHANIE H. FREEMAN NOTARY PUBLIC GUILFORD COUNTY, NC Commission Expires: 10 -23 -2014 SEAL My commission expires to Lzg I -10m Form SW401 -Dry Detention O &M -Rev.3 Page 4 of 4 THE LPA GROUP OF NORTH CAROLINA, P.A. JOBN� %il 7031 Albert Pick Road SHEET NO. / OF Suite 302 GREENSBORO, NC 27409 CALCULATED BY LJ 61 DATE (336) 393 -0441 FAX (336) 393 -0616 CHECKED BY DATE y+ .� a . „� kV 3- - - - Arr_rC6 -is, ii Fq- fzu�14::) o UO' , a y /1'z � • �� � `` . . a t +sv�,`� �� �. r �„ ,L j.Y�c r •en, io• IZJ .•4 THE LPA GROUP OF NORTH CAROLINA, P.A. 7031 Albert Pick Road Suite 302 GREENSBORO, NC 27409 (336) 393 -0441 FAX (336) 393 -0616 JOB SHEET NO OF_ CALCULATED BY DATE CHECKED BY DATE SCALE F �Y. �I Q - " S ZQ GIG Pn > �s�•. '� (� rr _i; r r f= �,' • : aJ �� 1(►'r it �� , '�. F• � -e ♦ � , ; > �., r ,a .,,�� � > .,�+ � a• f�.,! I - � ;.,r - _ . �- ��L: l'�r? ;�''rt�i:� �'°� ~.t•�.-��� n� °�� � �lZ t7 \� �%t' I:��t��i�St�t�' -� -� . , +rvl �`p' , ,.Vkr � r�Z +� � E . v _ K. da� ��• a , > e _ a s s. a > � �ll�+��E Y fir. � � � !.. L'!t'� �� I`a� . � ♦ ✓ � '-� a C�= Z I. J � —�` • _ .e a' / > , . - � I Imo' 1 a •-29 - j rn j w w t o%iAi. 0W • .f, i .d as , � f5 — - + ' Ys �a��Y �' ►7 $ rte ..• P'��i:' � a CIC MOD X �„� �?• iwa.ra -^`I!• a w �MF a e � 1' \�a� _e� I� Ri.� a _ > ♦ - , ♦ _ a g� Page 1 BASIN C SURFACE AREA.tXt Honda connector Road Basin C Storage volume Elevation Incremental volume cumulative volume Acre -Feet Surface Area cu ft. cu ft sq ft 810.00 6205.670 6205.670 0.142 6579.246 811.00 6961.073 13166.743 0.302 7347.028: 812.00 7741.232 20907.975 0.480 8139.5671 813.00 8546.150 29454.125 0.676 8956.860; g� Page 1 LAllen HondaConnector Basin C Guilford County, North Carolina Hydrograph Peak /Peak Time Table (Trial #1) Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach ANALYSIS: 5 -Yr 10 -Yr 25 -Yr 100 -Yr 1 -Yr Identifier (hr) (hr) (hr) (hr) (hr) (hr) ---------------------------------------------------------------------------------- SUBAREAS ConnRoad 3.40 5.44 7.40 8.67 13.44 2.37 11 -.94 -- - - 11.94 - - - 11:94- - - 11. -94 - 11.93 - - -11.95 -- - - - - REACHES basinc 3.40 5.44 7.40 8.67 13.44 2.37 11.94 11.94 11.94 11.94 11.93 11.95 Down 0.98 1.09 1.18 1.24 1.41 0.85 12.13 12.17 12.25 12.30 12.46 12.11 OUTLET 0.98 1.09 1.18 1.24 1.41 0.85 WinTR -55, Version 1.00.09 Page 1 1/11/2013 3:23:39 PM LAllen HondaConnector Basin C Guilford County, North Carolina Hydrograph Peak /Peak Time Table (Trial #2) Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 2 -Yr 5 -Yr 10 -Yr 25 -Yr 100 -Yr 1 -Yr Identifier (hr) (hr) (hr) (hr) (hr) (hr) ---------------------------------------------------------------------------------- SUBAREAS ConnRoad 3.40 5.44 7.40 8.67 13.44 2.37 - 11 -.94- - 11.94 -- - - -11:94 11.94- - 11:93- - - 11.95 - - - - - - - - - - REACHES basinc 3.40 5.44 7.40 8.67 13.44 2.37 11.94 11.94 11.94 11.94 11.93 11.95 Down 1.63 1.81 1.96 2.05 2.35 1.20 12.08 12.11 12.12 12.14 12.18 12.08 OUTLET 1.63 1.81 1.96 2.05 2.35 1.20 WinTR -55, Version 1.00.09 Page 1 1/11/2013 3:23:39 PM LAllen HondaConnector Basin C Guilford County, North Carolina Hydrograph Peak /Peak Time Table (Trial #3) Sub -Area Peak Flow and Peak Time (hr) by Rainfall Return Period or Reach 2 -Yr 5 -Yr 10 -Yr 25 -Yr 100 -Yr 1 -Yr Identifier (hr) (hr) (hr) (hr) (hr) (hr) ---------------------------------------------------------------------------------- SUBAREAS ConnRoad 3.40 5.44 7.40 8.67 13.44 2.37 - 11 -: 94 - - - - 11.-94 11:94 - - -11.94 - - - 11.93 -- - - 11.95 REACHES basinc 3.40 5.44 7.40 8.67 13.44 2.37 11.94 11.94 11.94 11.94 11.93 11.95 Down 2.46 3.41 3.77 3.95 4.66 1.71 12.06 12.06 12.07 12.08 12.10 12.06 OUTLET 2.46 3.41 3.77 3.95 4.66 1.71 WinTR -55, Version 1.00.09 Page 1 1/11/2013 3:23:39 PM i fflnTR -S Output H Upstream, Downstt 8 - 5- F 1 4 0 w 3 2 ydro0i am M Project: HondaConnector 11110013 Rewlw (basilic) Storrm 10-Yr 6new Be), Upstram basin — t>mrshvam basin - --- --- --- t0- Yr.Dmnstmm 0 2. 4. 8. 87 10. 12. 14. i8. 18. 20. 22. 24. T I M E (his) WinTR -M Output Hydrograph Project: HondaConnector Upstream, Omnstream Reach; (basinc) Storm: l- -Yr <new file> 2.0 1.5 F I o 1.0 .5 .o 2. 4. 6. 8. 10. T I M E (hrs) 111112013 Upstmm basin — — b mnshx= basin -- -- ------ 10- Yr,Dmunshvma 14. 18. 18. O REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS PTIA - EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA ECS CAROLINAS, LLP PROJECT NUMBER 09.19988 PREPARED FOR PIEDMONT TRIAD AIRPORT AUTHORITY GREENSBORO, NORTH CAROLINA JULY 229 2011 REVISED: AUGUST 17, 2011 l JAN 1 4 2013 D NR - �v 4 ®UALIIY _.— —� E&� CAROLINAS, LLP "Setting the Standard for Service" LLP ECS C _ Geotechnical • Construction Materials • Environmental • Facilities NC Registered Engineering Firm F -1078 Mr. Kevin Baker Piedmont Triad Airport Authority PO Box 35445 Greensboro, North Carolina 27425 July 22, 2011 Revised August 17, 2011 ECS Project No. 09.19988 Reference: Report of Preliminary Subsurface Exploration and Geotechnical Engineering Analysis PTIA — East Site Development Greensboro, North Carolina Dear Mr. Baker ECS Carolinas, LLP (ECS) has completed a preliminary subsurface exploration for the subject site as authorized by acceptance of our Proposal No. 09.17937, dated July 13, 2011. The purposes of this exploration were to explore the subsurface conditions at the site and to develop geotechnical recommendations to guide design and construction of the project. This report presents our evaluations and recommendations, the results of our exploration, our scope of work, and our understanding of the project information. The report was revised to add 3 borings In an additional borrow area adjacent the site. This report is provided for the use of Piedmont Triad Airport Authority. This report is not intended to be used or relied upon in connection with other projects or by other unidentified third parties without the written permission of ECS. The unauthorized use of this report by any undesignated third party or parties will be at such party's sole risk and ECS disclaims liability for any such unauthorized third party use or reliance. ECS appreciates the opportunity to provide our professional services during this chase of your project. Please contact us if you have questions concerning the folic Respectfully, ECS CAROLINAS, LLP Lorin E. Akins Project Manager Attachments A.. G Reviewed by: usseil A. Bend( Principal Engineer Licensed NC 024430 cc: Mr. Alex Rosser w/ Michael Baker Engineering 4811 Koger Boulevard • Greensboro, NC 27407 • T: 336 - 856 -7150 • F: 336- 856 -7160 www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Mid - Atlantic, LLC • ECS Southeast, LLC ECS Texas, LLP PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July22, 2011 Revised August 17, 2011 REPORT SUMMARY We request you read the entire contents of this report. Recommendations and clarifications are contained in the body that are not in the report summary. Prolect Information The project consists of development of the site northeast of the existing Honda Aircraft Facility on Ballinger Road. While plans for the proposed facility are in the preliminary phase, we understand that the project will consist of construction of two facilities, a concrete apron and asphalt driveways and parking lots. The northern facility has a proposed finished floor elevation of 882 feet and the southern facility has a proposed finished floor elevation of 825 feet. We anticipate maximum cuts of 30 feet and maximum fills of 50 feet. The site was used as a borrow site for the Honda Aircraft Facility. ECS performed 10 borings on this site previously (ECS project No.: 09.13835 -C dated March 7, 2007). The project also includes evaluating the site adjacent the Leonard Center for use as a borrow source. Subsurface Conditions The borings typically encountered undisturbed residual soils and partially weathered rock derived from the in -place weathering of parent rock. Hard, unweathered rock was also encountered by the borings. Fill was encountered in one boring location. The encountered conditions are summarized on the Generalized Subsurface Profile in Appendix E. Additional information is provided on the soil boring logs in Appendix E. Fill soils consisting of medium stiff to stiff fine to medium sandy slit and clayey silt were encountered in boring B -210 to depths of 5.5 feet below existing grades. Standard Penetration Test values within the fill ranged from 5 to 9 blows per foot. We consider the encountered fill to be variably compacted based on these SPT values. We did not find evidence of debris, trash, or excessive fibrous organic materials within the fill. The undisturbed residual soils generally consisted of soft to hard clayey silts, fine to medium sandy silt, fine to medium sandy clay, clayey fine to coarse sand, and loose to very dense silty fine to coarse sand. The residual soils had SPT resistance values ranging from 4 to 50 blows per foot. Partially weathered rock and auger refusal materials were encountered by borings B -204, B -206, B -207, B -208, B -214 and B -215. Recommendation Summant • Based on proposed finished grades, we do anticipate partially weathered rock and rock would be encountered during footing and utility excavations, in areas of borings B -204, 8-206, B -207, B -208, B -214 and B -215 at depths of 15.5 to 26.0 feet below existing grades. • Based on planned finished grades, groundwater should be expected at or above the planned grades for the southern portion of the site. It is our opinion that PTM — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July22, 2011 Revised August 17, 2011 groundwater ranges in elevation between 830 and 820 feet. Capillary rise in fine grained soils may be 10 feet above top of groundwater. Permanent groundwater control would be necessary if facilities are constructed at the planned grades in this portion of the site. Non - plastic site soils are suitable for use as controlled fill, though some higher plasticity soils, such as the MH and CH soils which were encountered throughout the site within 3.5 to 12.0 feet below existing grades, may be used in fill areas outside building and pavement areas, and 4 feet below bottom of footing elevation. Lime stabilization would be appropriate for treatment of these higher plasticity soils if placed within the upper 5 to 6 feet of final grades. This will provide stabilization for building pads, aprons, and pavements that may be graded but not constructed immediately. The majority of the on -site soils planned to be cut and used as fill are wet and will require drying prior to achieving compaction. Additional time should be allowed in the contract for drying of wet soils. Site grading should also be planned for the summer months, if possible, to take advantage of the best weather for drying soils. If site grading will occur during the fall, winter or spring, we recommend that contingencies be placed in the budget for lime to help drying. For drying purposes, approximately 3% lime (by weight) should be budgeted for at least half of the proposed cut volume of soil. Soils within 10 feet of stabilized groundwater may be wetter than expected due to capillary action within the fine grained soils. a Soils from utility excavations may be too wet to achieve compaction during backfill operations of utility excavations in the south and east portions of the site due to groundwater. Temporary groundwater control may also be necessary during utility excavations. We recommend a contingency be put in place for installation of a french drain at the toe of the slope adjacent borings B -204, B -205, B -206, and B -207. a The soils in planned borrow area adjacent The Leonard Center (B -216, B -217, 6- 218) and adjacent the site (B -219, B -220, B -221) are suitable to use as controlled fill; however, some of the soils are wet and will require drying. We recommend a preliminary Seismic Site Classification C in accordance with the North Carolina Building Code based on the encountered conditions. The existing soil conditions are suitable for the proposed building to be supported on shallow foundations bearing on undisturbed residual soils and new compacted controlled fill. Preliminary recommendations for shallow foundations should indicate an allowable net bearing pressure of up to 3,000 pounds per square foot. IV PTIA - East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July22, 2011 Revised August 17, 2011 SITE CONSTRUCTION AND EARTHWORK Excavation Conditions Partially weathered rock and auger refusal materials were encountered in the borings B -204, B -206, B -207, B -208, B -214 and B -215 at depths of 15.5 to 26.0 feet below existing grades. It should be possible to excavate soils above partially weathered rock using conventional equipment (scrapers, loaders and bulldozers). Partially weathered rock with SPT values of 50/6' to 50/37 can often be excavated from open - cut excavations by ripping with a Caterpillar D -8 bulldozer equipped with a single tooth ripper. Although it may be possible to rip the top few feet of PWR with SPT values stronger than 50/3 ", or even auger refusal materials, we recommend the contractor should be prepared to use pneumatic hammers or blasting to excavate these materials. We recommend using pneumatic hammers or blasting to make confined excavations (footings or utility trenches) in any PWR. The site soils are OSHA Type B and C soils for the purpose of excavation support. Excavations should be constructed in compliance with current OSHA standards for excavation and trenching safety. Excavations should be observed by a "competent person", as defined by OSHA, who should evaluate the specific soil type and other conditions, which may control the excavation side slopes or the need for shoring or bracing. Groundwater Control Based on planned finished grades, groundwater control is expected to be necessary for this project in the southern and eastern portion of the site. Groundwater control is the purposeful drawdown of groundwater below subgrades, foundations, slabs, or pavements to facilitate construction and to mitigate long term problems associated with groundwater. Whatever method used, the groundwater control should be in place and operating continuously (around the clock) to achieve and maintain the desired drawdown in advance of excavation, proofrolling, compaction or other construction. Temporary groundwater control measures typically consist of gravity ditches, well points, SUMP pumps, pumping from gravel lined and cased sumps, or other suitable methods. It is the contractor's responsibility to plan for and budget for temporary groundwater control. The means and methods of lowering the groundwater are at the contractor's discretion. Permanent groundwater control measures typically consist of French drain systems and/or permanent sumps. Subgrade Preparation Site preparation should begin with stripping all vegetation, root -zone, and all other soft or unsuitable material from the proposed building and pavement areas. We expect a stripping depth of at least 3 inches based on the borings, however, deeper stripping depths are should be anticipated. Stripping depths will vary depending on the time of the year. During the wet seasons stripping may be deeper due to saturated soils on the surface. PTIA — East Site Development Greensbow, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 Following stripping and rough excavation, but prior to placing controlled fill, the exposed subgrades should be proofrolled. Unstable areas identified by proofrolling should be undercut to firm materials. If firm soils are not encountered within 3 feet below subgrade elevation in grade slab and pavement areas, the deeper unstable materials should be evaluated by the project geotechnical engineer to determine if these materials may remain in place. Any undercut areas should be backfilled with controlled fill. Appropriate proofrolling equipment typically consists of a dump truck having a single rear axle with axle weight of at least 10 tons, or a dump truck having a tandem rear axle with axle weight of at least 20 tons. Alternate equipment, such as a fully loaded pan scraper, may be utilized with approval of the geotechnical engineer responsible for evaluating the subgrade during construction. Proofrolling consists of driving the appropriate equipment over the subgrade at a walking pace. The proofrolling equipment should make overlapping passes across the subgrade in the same direction, with the overlap not exceeding h the width of the equipment. A second set of overlapping passes should then be made in a direction perpendicular to the first set of passes. Earthwork The majority of the on -site soils planned to be cut and used as fill are wet and will require drying prior to achieving compaction. Additional time should be allowed in the contract for drying of wet soils. Site grading should also be planned for the summer months, if possible, to take advantage of the best weather for drying soils. If site grading will occur during the fall, winter or spring, we recommend that contingencies be placed in the budget for lime to help drying. For drying purposes, approximately 3% lime (by weight) should be budgeted for at least half of the proposed cut volume of soil. Additionally, soils removed during utility installations may be too wet to reuse as backfill in order to achieve compaction due to existing groundwater elevations. When dry, the majority of the site soils should provide adequate subgrade support for fill placement and construction operations. When wet, the soil may degrade quickly with disturbance from construction traffic. Good site drainage should be maintained during earthwork operations to prevent ponding water on exposed subgrades. Soil subgrades should be protected from rain by "sealing" the subgrades prior to forecast precipitation. Sealing subgrades can be performed by rolling with rubber -tired equipment, but ruts should not be created, or by rolling with a smooth steel -drum roller without vibration. Subgrades that have been sealed should be scarified prior to receiving additional fill. If site soils are initially placed at planned subgrade elevations and are left exposed over a period of time, the exposed soils may become soft and wet and may become holding areas for trapped water. Even compacted fill soils left exposed for long periods of time will degrade due to exposure. The lack of confinement at the surface and cycles of wetting and drying through the seasons will soften and loosen the compacted fill, or in the case of cut subgrades the removal of overburden pressure promotes rebound and can allow the surficial soils to relax over time. The disturbance can extend as deep as 1 foot, or possibly more depending on soil types and exposure conditions. Leaving site grades high allows for a sacrificial layer of soil that can then be removed from the final subgrade at the time of 2 PTIA - East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 future construction to reduce the need for undercutting and replacement below planned grades. Controlled Fill Site soils are suitable for use as controlled fill. The higher plasticity soils, such as the MH and CH soils may be used in fill areas outside of the building and pavement areas, and 4 feet below bottom of footing or pavement subgrades. Lime stabilization would be appropriate for treatment of these soils if placed within the upper 5 to 6 feet of final grades. We recommend a shrinkage factor of 10 to 15 percent when calculating earthwork quantities using on -site soils for fill. Controlled fill should be compacted to at least 95 percent of the maximum dry density obtained in accordance with ASTM Specification D -1557, Modified Proctor Method. Aggregate base course (ABC) stone should be compacted to 95 percent of Modified Proctor maximum dry density under building slabs and to at least 100 percent density under pavements. The maximum loose lift thickness depends upon the type of compaction equipment used: The moisture content at the time of compaction should be within 3 percent of the optimum moisture content determined by ASTM D1557. Some soils will require a moisture content closer to optimum to facilitate compaction, while other soils can be adequately compacted at moisture contents even more than 3 percent away from optimum. For this reason, the moisture content of the fill should not be the sole reason for failing a field density test. If the density test indicates the fill is adequately compacted but the moisture content is more than 5 percent away from the optimum moisture content, the density results should be reviewed by the geotechnical engineer who should then recommend whether the fill should be accepted or rejected. Controlled fill should be soil that has less than 5 percent fibrous organic content and a liquid limit and plasticity index less than 50 and 20, respectively. Soils with Unified Soil Classification System group symbols of SP, SW, SM, SC, and ML are suitable for use as controlled fill. Soils with USCS group symbol of CL which meet the restrictions for liquid limit and plasticity index are also suitable for use as controlled fill. Soils with a liquid limit less than 70 and a plasticity index less than 35 can be used as fill deeper than 4 feet below final grade, but only if the soil can be adequately compacted. Controlled fill should be benched into the sides of slopes steeper than 4:1 (H:V) to improve the bond between the fill and the undisturbed soils. Each bench cut into a slope should be 3 PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 at least 12 inches but not more than 60 Inches high. The benches should be wide enough to allow operation of the compaction equipment within the benched area so that fill can be placed on the bench and over the rest of the fill in continuous layers. We recommend that all fill operations be observed and tested by an engineering technician to determine if compaction requirements are being met. The testing agency should perform a sufficient number of tests to confirm that compaction is being achieved. For mass grading operations we recommend a minimum of one density per 500 cubic yards of fill placed or per 1 foot of fill thickness, whichever results in more tests. We recommend at least one test per 1 foot thickness of fill for every 100 linear feet of utility trench backfill. Density tests in the field should be performed using the Drive Tube Method (ASTM D2937), the Sand Cone Method (ASTM D1556), or the Nuclear Method (ASTM D2922). If the Nuclear Method is used, the moisture content determined by the nuclear density equipment should be verified by performing one moisture content test per ASTM D2216 for every five nuclear density tests. 4 PTIA — East Site Development Greensboro, North Carolina ECS Projeot No.: 09.19988 Jury 22, 2011 Revised August 17, 2011 PRELIMINARY BUILDING CON9MUCTION PmUrninary Sef$r nic Cond[tlo We recommend a preliminary Seismic Site Classification C In accordance with the North Carolina Building Code based on the encountered conditions. Pr+ellminam Ruildina Foundations We recommend the proposed building be supported on shallow foundations bearing on undisturbed residual soils and new compacted controlled fill. Preliminary shallow foundations should be designed for an allowable net bearing pressure of up to 3,000 pounds per square foot. The allowable net soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the surrounding overburden pressure. Based on borings higher plasticity soils, such as the MH and CH soils that were encountered throughout the site, lime stabilization would be appropriate for treatment of these higher plasticity soils if placed within the upper 5 to 6 feet of final gradds. This will provide stabilization for building pads, aprons, and pavements that may be graded but not constructed immediately. 6 PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 ReWsed August 17, 2011 Appendix A — Explora Results Appendix B — Exploration Proc= Appendix C — Prolect Qescriotlon Appendix D — Flenort Quallficetlons Appendix E — Illustratio_ns, Site Location Map Boring Location Plan ' Generalized Subsurface Profile Legend Sheet and Unified Soil Classification System Soil Test Boring Logs Appendix F — Lebora= Test Results Moisture Density Relationship Curve Afterberg Limits &Vndix G — Previous Subsurface Exploration Boring Location Diagram Soil Test Boring Logs i a PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 0919988 July22, 2011 Revised August 17, 2011 APPENDIX A - EXPLORATION RESULTS SRe Conditions The site is currently an undeveloped site that was previously an old golf course /driving range. This area was used as a borrow pit area for the Honda Aircraft project. Site grades generally slope from north to south. The site is open and partially wooded. We did not observe indications of former groundwater springs or rock outcrops during our site visit. Re lonal Qeoloulf The site Is located in the Piedmont Physiographfc province of North Carolina. The Piedmont extends generally from Alabama to southern Pennsylvanfa and extends from the Valley and Ridge province in the west to the Coastal Plain province to the east. The soils in the Piedmont were formed by In -place weathering of parent rock and are termed residual soils (or saprolite), The typical residual profile consists of a clayey near surface horizon, where weathering is most severe, transhloning to sifts and sands with Increasing depth. The materials transition to partially weathered rock (PWR), which Is designated for geotechnical engineering purposes as residual material with a Standard Penetration Test resistance In excess of 100 blows per foot. The degree of weathering typically decreases with depth until solid bedrock is encountered. Due to differential weathering along seams and less resistant materials, it is not uncommon to encounter seams and layers of harder materials within partially weathered rock. A review of the Geologic Map of North Carolina (1985) indicates the site is underlain by Metamorphosed Granitic Rock of the Carolina Slate Belt. It is important to note that the natural geology within portions of the site may have been modified in the past by the placement of fill materials. The qualify of man -made fills can vary significantly, and it is often difficult to assess the engineering properties of existing fills. Furthermore, there is no specific correlation between N- values from the standard penetration test and the degree of compaction of existing fill soils; however, a qualitative assessment of existing fills can sometimes be made based on the N- values obtained and observations of the materials sampled in the test borings. Soil Conditions The borings typically encountered undisturbed residual soils and partially weathered rock derived from the In -place weathering of parent rock. Hard, unweathered rock was also encountered by the borings. Fill was encountered in one boring location. The encountered conditions are summarized on the Generalized Subsurface Profile In Appendix E. Additional information is provided on the soil boring logs in Appendix E. Fill soils consisting of medium stiff to stiff fine to medium sandy silt and clayey silt were encountered in boring B -210 to depths of 5.5 feet below existing grades. Standard Penetration Test values within the fill ranged from 5 to 9 blows per foot. We consider the encountered fill to be variably compacted based on these SPT values. We did not find evidence of debris, trash, or excessive fibrous organic materials within the fill. F PT1A — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 The undisturbed residual soils generally consisted of soft to hard clayey silts, fine to medium sandy silt, fine to medium sandy clay, clayey fine to coarse sand, and loose to very dense silty fine to coarse sand. The residual soils had SPT resistance values ranging from 4 to 50 blows per foot. Partially weathered rock and auger refusal materials were encountered by borings B -204, B -206, B -207, B -208, B -214 and B -215. Groundwater Conditions Groundwater was encountered between elevations 814 feet and 828 feet at the time of the exploration. The borings caved -in at depths of 11 to 33 feet below existing grades. In this geology, the cave -in depth of a boring is often an indication of the stabilized water level although the water level may be a few feet below the cave -in depth and therefore cannot be directly observed. It is our opinion that groundwater ranges in elevations between 830 and 820 feet. In general, shallow unconfined groundwater movement within the soils overlying bedrock is controlled largely by topographic gradients. Movement in this water table is generally from higher to lower elevations. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation, surface water runoff, and other factors. Normally, the highest groundwater levels occur in the late winter and spring and the lowest groundwater levels occur in the late summer and fall. 8 PTIA — East site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2d 11 APPENDIX B - EXPLORATION PROCEDURES Soil Test 8orinos Eighteen soil test borings, denoted B-201 through B -218, were performed on July 13 -15, 2011 and three additional borings, denoted B -219 through 8-221, were performed on August 4, 2011 at the approximate locations shown on the Boring Location Plan In Appendix E. The boring locations were selected by ECS and Michael Baker Engineering and were staked In the field utilizing our GIPS. Boring elevations were interpolated from topographic contours shown on the drawing provided by Mr. Alex Rosser, P.E: of Michael Baker Engineering. Drilling was performed by a Deidrich D -50, truck - mounted drill rig using continuous - flight hollow stem augers. Soil samples were obtained by means of the split - barrel sampling procedures in accordance with ASTM Specification D -1586. In the split - barrel sampling procedure, a 2 -inch O.D., split - barrel sampler is driven into the soil a distance of 18 inches by means of a 140 -pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12 -inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs. This value can be used to provide a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can significantly affect the SPT value and prevent a direct correlation between drill crews, drill rigs, drilling procedures, and hammer - rod - sampler assemblies. Representative portions of each SPT sample were sealed in airtight containers and returned to our laboratory for classification, testing, and storage. The soil samples were visually classified in general accordance with the Unified Soil Classification System (USCS). The basic elements of the USCS are described on a legend sheet attached in Appendix E and in ASTM 132487. Additional information from each soil boring is provided on the individual soil test boring logs in Appendix E. Laboratory TestIna Prouram Selected SPT samples from borings B -201 through 205 and 8-208 through B -218 were tested for natural moisture content in accordance with ASTM D2216. Results are indicated on the individual boring logs in Appendix E. Selected SPT samples from borings B -204, B -212 and 8 -216 were tested for Atterberg Limits in accordance with ASTM D4318. Results are indicated on the individual boring logs and in Appendix F. Bulk samples from borings B -204, B -212, and B-216 were tested for Modified Proctor compaction in accordance with ASTM D -1557. Results are presented on the Moisture Density Relationship Curve in Appendix F. 9 PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 APPENDIX C - PROJECT DESCRIPTION The project consists of development of the site northeast of the existing Honda Aircraft Facility on Ballinger Road. While plans for the proposed facility are in the preliminary phase, we understand that the project will consist of construction of two facilities, a concrete apron and asphalt driveways and parking lots. The northern facility has a proposed finished floor elevation of 882 feet and the southern facility has a proposed finished floor elevation of 825 feet. We anticipate maximum cuts of 30 feet and maximum fills of 50 feet. The site was used as a borrow site for the Honda Aircraft Facility. ECS performed 10 borings on this site previously (ECS project No.: 09.13835 -C dated March 7, 2007. The project also includes evaluating the site adjacent the Leonard Center for use as a borrow source. Project information was provided from Mr. Alex Rosser, P.E. with Mibhael Baker Engineering. We have received a site sketch indicating the site boundaries, building footprint, existing and future contours and parking lot areas. 10 PTIA — East site Development Greensbo% North Carollna ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 APPIENDU(D — REPORT OUALIFfCAl IONS This report has been prepared in order to aid in the evaluation of this site and to assist the Owner and Engineer in the feasibility study of the project. The report scope is limited to the specific project and location described, and the project description represents our understanding of the significant aspects relevant to soil and foundation characteristics. The recommendations in this report have been developed using generalized subsurface conditions based on the soil test borings performed. Subsurface conditions can vary laterally and with depth, and significantly different conditions may exist at locations between the borings. Conditions different from those encountered by the borings and described in this report may require modifications to the geotechnical recommendations for the project. The recommendations In this report were developed based on assumptions made by ECS regarding the likely site earthwork. While we believe our assumptions to be reasonable based on our experience with similar projects, it is possible that specific project information may lead us to alter or modify our recommendations. We strongly recommend that we be given an opportunity to review design and construction information related to the project as soon as it becomes available so we can assess whether additional exploration or analyses maybe warranted. We recommend that the construction activities be monitored by a qualified geotechnical engineering firm to provide the necessary overview and to check the suitability of the subgrade soils for support of slabs, pavements, and footings. We would be pleased to provide these services. 11 PT1A - East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July22, 2011 Revised August 17, 2011 APPENDIX E - ILLUSTRATIONS 12 SCALE (1" °3,000) 1b00 3000 3000 0 REFERENCE: USGS TOPOGRAPFQC MAP GUILFORD, NC QUADRANGLE DATED 1951, REVISED 1994 m7p CAROLINAS F FIGURE I E LOCATION MAP AST SITE DEVELOPMENT GREENSBORO, NC S PROJECT 09.19988 1 tip.^'. %r.� .^��'••����n.r� -� . �Tti!ti o�+a+�r' �. -� _ _�"'���'i � •, ! J ',.. � X716111 B1rp1 -a - � jCl I ._ `� -' -�' , J _i N �y a * SCALE (IN FEET) 200 400 60 0 REFERENCE: SITE PLAN PROVIDED BY BAKER CORPORATION r == r Eft L CAROLINAS r 1,• t, FIGURE 2 -A BORING LOCATION PLAN PTIA EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA 1CS PROJECT 09.19988 890 880 860 880 Z Q 840 W w 830 820 810 .FF Elsft 8 -202 800---, 8-201 b 1 t9 1 B -203 3. VERTICAL DISTANCES ARE NOT TO SCALE. 4. GROUND SURFACE ELEVATIONS AT BORINGS WERE WEVOLAMM ®w -�wm sw ®n,_m, nummr aT 9 FROM CONTOURS SHOWN ON FIGURE 2. 14 14 9 L11 >a _ sm p % i I SA s. '; E08 @25.0' t- ,' EOB @ 15.0' EL 862.00 (DRV) EL 857.00 (DRY) E08 OB @ 15.0' 85500 n (DRY) 8-204 14 I SA 8-208 1 8-206 :K I 8-209 n I 6 207 9 MR 10 24 a 9 14 65L 13 Cti 20 � u 9 26 9M 14 A0. 24 i 39 ! ML 10 m" p >b se 14 O , au .736 ' i AL �rROX Ft£. az9 SA a gab O 1'8 1 j( . I 4 14L AW j 3µ 19 m 9a9 WR wa f 1 6w � 9a4 a 9oi3 eaa a R 90/6 � t0. 90.6 EOB @40.0' EOB @ 29.0' EO @ 2 gas E08 @ 34.0' EL 812.00 EL 812.OD EL 813.75 E08 @ 30.0' EL 809.00 EOB @ 35.0' EL 810.00 (DRY) EL 808.00 (DRY) (DRY) 800---, b • - "" "0` '"- "°'"®°°'°° i°�- NOTES: 1. NUMBERS NEXT TO BORINGS REPRESENT STANDARD PENETRATION TEST' RESISTANCE IN BLOWS PER FOOT (ASTM D1586). 2. HORIZONTAL DISTANCES NOT TO S 1 3. VERTICAL DISTANCES ARE NOT TO SCALE. 4. GROUND SURFACE ELEVATIONS AT BORINGS WERE WEVOLAMM ®w -�wm sw ®n,_m, nummr aT m� -rovnee FROM CONTOURS SHOWN ON FIGURE 2. C® 890 [:II•' 870 860 850 rm- m 840 > O Z 830 820 810 800 FIGURE 3 —A GENERALIZED SUBSURFACE PROFILE PTIA EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA 800---, mum ®W n Pot"" ®°_an1p� ®w -�v10m °i°a ° -=ow eo - asa rao • - "" "0` '"- "°'"®°°'°° i°�- NOTES: 1. NUMBERS NEXT TO BORINGS REPRESENT STANDARD PENETRATION TEST' RESISTANCE IN BLOWS PER FOOT (ASTM D1586). 2. HORIZONTAL DISTANCES NOT TO S 3. VERTICAL DISTANCES ARE NOT TO SCALE. 4. GROUND SURFACE ELEVATIONS AT BORINGS WERE WEVOLAMM ®w -�wm sw ®n,_m, nummr aT m� -rovnee FROM CONTOURS SHOWN ON FIGURE 2. C® 890 [:II•' 870 860 850 rm- m 840 > O Z 830 820 810 800 FIGURE 3 —A GENERALIZED SUBSURFACE PROFILE PTIA EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA 850 - -- - - -- -- - — - - -- - - -- — _ - 850 B -219 8-220 B -210 B -212 B -214 B -215 it u 8-221 840 - B -21i q -- - I - B zls u a + I 840 9 8-216 5 CH 2O 9 lz ° F711 >E 13 32 SAI ti MN ° i SN a u Z 830 1' ° a a -- B -213 7° - — " °L - B-217 u - —a 830 m — v ro at p T u� x� � u ° u rn P— NN At 11 - _ AFFROX FFEs 623 _'7 ML 26 ° JKH t !1L ° � Via{ Q SA— is � 4 �, �I u 7 k 13 i M w820 — -u - — - 4 mt u 9 is RL a ' ''" -- 820' Z u is Ze n ; m 7 °oiu aa6 ° EOB @ 15.0' �p7 IAL Y WA EL 817.00 3 33 11 611 EOB @ 250 EOB @ 20.0' ro 6v (DRY) u EL 814.00 - E08 @ 20.0' 13 EL 815.00 _- —5W6 _ 7 EOB @ 30 0._ EOB @�0 0_ 810 -_ - - -_ EOB @z50— 810 (DRY) EL 81300 EOB @ 15.0' (Dm EOB @ 25.0' EOB @ 20.0' EL 812.00 EL 812.00 (ORy) 17 EL 810.00 EL 810.00 EL at 6 (DRy) EL 811-00 (DRY) (DRY) (DRY) (DRY) EOB @ 35.0' E08 @ 20.0' 800 _ EL 805.00 _ - -- EL 805.T - Boo (DRY) (DRY) - - - - — a- AYmllat NOTES: REP ®'LL' °°LTMO 1. NUMBERS NEXT TO BORINGS RESENT STANDARD PENETRATION FIGURE 3 —B TEST RESISTANCE IN BLOWS PER FOOT (AMU D1588). GENERALIZED 2. HORIZONTAL DISTANCES NOT TO SCALE. 3. VERTICAL DISTANCES ARE NOT To SCALE. SUBSURFACE PROFILE o -1mo a.m aea a -an m a- aimtu>om ®m 4. GROUND SURFACE ELEVATIONS AT BORINGS WERE WTERPOLATED N&P PTjA EAST SITE DEVELOPMENT eaeraan n- ie.luaenaAr .,� FROM CONTOURS SHOWN ox FIGURE z. GREENSBORO, NORTH CAROLINA .- �uaass® ®a -aa wow+m a = 7 % J� 6_o z 6_ a T a CAROLINAS - „~„ mium REFERENCE NOTES FOR BORING LOGS Drilling Sampling Symbols SS Split Spoon Sampler ST Shelby Tube Sampler RC Rock Core, NX, BX, AX PM Pressuremeter DC Dutch Cone Penetrometer RD Rock Bit Drilling BS Bulk Sample of Cuttings PA Power Auger (no sample) HSA Hollow Stem Auger WS Wash sample REC Rock Sample Recovery % RQD Rock Quality Designation % II. Correlation of Penetration Resistances to Soil Properties Standard Penetration (blows/ft) refers to the blows per foot of a 140 lb. hammer falling 30 Inches on a 2 -inch OD split -spoon sampler, as specified in ASTM D 1586. The blow count is commonly referred to as the N- value. A. Non - Cohesive Soils (Silt, Sand, Gravel and Combinations) Density Relative Properties Under 4 blows/ft Very Loose Adjective Form 12% to 49% 5 to 10 blows /ft Loose With 5% to 12% 11 to 30 blows /ft Medium Dense 31 to 50 blows /ft Dense Over 51 blows/ft Very Dense B. Cohesive Soils (Clay, Silt, and Combinations) Particle Size Identification Boulders 8 inches or larger Cobbles Comp. Strength 3 to 8 inches Gravel Coarse 1 to 3 inches OP (ISO Medium 1/2 to 1 inch Under 2 Fine 1/a to 31 inch Sand Coarse 2.00 mm to V inch (dia. of lead pencil) Soft Medium 0.42 to 2.00 mm (dia. of broom straw) 5-7 Fine 0.074 to 0.42 mm (dia. of human hair) Silt and Clay Medium 0.0 to 0.074 mm articles cannot be seen B. Cohesive Soils (Clay, Silt, and Combinations) Water Level Measurement Symbols WL Water Level BCR Before Casing Removal DCI Dry Cave -In WS While Sampling ACR After Casing Removal WCI Wet Cave -In WD While Drilling V Est. Groundwater Level e Est. Seasonal High GWT The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when sugaring, without adding fluids, In a granular soil. In clay and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. Unconfined B101#01 Consistency Comp. Strength Degree of g Plasticity Y OP (ISO Plasticity Index Under 2 Very Soft Under 0.25 None to slight 0-4 3 to 4 Soft 0.25 -0.49 Slight 5-7 5 to 8 Medium Stiff 0.50 -0.99 Medium 8-22 9 to 15 Stiff 1.00 -1.99 High to Very High Over 22 16 to 30 Very Stiff 2.00 -3.00 31 to 50 Hard 4.00 -8.00 Over 51 Very Hard Over 8.00 Water Level Measurement Symbols WL Water Level BCR Before Casing Removal DCI Dry Cave -In WS While Sampling ACR After Casing Removal WCI Wet Cave -In WD While Drilling V Est. Groundwater Level e Est. Seasonal High GWT The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when sugaring, without adding fluids, In a granular soil. In clay and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. qt r JOB # BORING # SHEET ` °- "'- - "i Piedmont Triad Airport Authority 19988 B -201 1 or 1 PROJECT NAME ARCHITECT— ENGINEER East Site SITE LOCATION -O- CAIMMTO P — -. eO 4 4 6+ Ballinger Road, Greensboro, NC B PL AKIC VATBR LIQUID LIlOP x CONTENT x umm x ROCK QUALITY DESIGNATION & RECOVERY DESCRIPTION OF MATERIAL Exom1l 0NF19 v BOTTOM OF CASING I,03S OF CIRCULATION 1 � �-- -20X-40X-60%-80%-100)9 SURFACE EMATION 872.0 (0 SPAN %; TION 10 20 so 40 60f d Topsoil Depth 3" 570 9 (3 -4-5)� 1 SS 18 18 RESIDUAL: Clayey SILT, Trace Fine Sand and Mica, Reddish Tan, Moist, Stiff, 27.1 (MH) I 14 (5 -e-e1 2 SS 18 16 Micaceous Silty Fine SAND, Reddish Brown 8 to Yellowish Tan, Moist, Medium Dense to Loose, (SM) 3 SS 1Q 15 865 10 (4=s-5) 17.9 15 (s -7 -s) 4 SS 18 16 1 860 14 (e -") 5 SS 18 116 1 SO 0 END OF BORING ® 15.0' 14'3 855 Z. 20 850 g 25 Z. 845 6 30 d' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Yn DRY ® OR WD BORLNG STARTM 07/14/11 DRILLER: Wingo pwat) jwl(ACR) DRY BORLNG COMPLIED 07 14 1 1 CAVE IN DI�Tx ®t2.o' RIG �j� FoREMAN John Wingo DRUMG DIBTIIOD NSA CUNT Piedmont Triad Airport Authority PROJECT NAME East Site SITE LOCATION Ballinger Road, Greensboro. NC JOB # BORING # 19988 B -202 ARCHITECT— ENGINEER BHBB"1' 1 or 1 Topsoil Depth 3" 1 SS 18 17 RESIDUAL: Clayey SILT, Trace Fine to $�Jr 19 (5 -8-11) Medium Sand, Dark Red to Orangish Red, Moist, Very Stiff, (MH) 2 SS 18 18 21 Is 28.7 3 SS 18 17 870 23.(to- ii-12) Fine Sandy SILT, Trace Clay, Orangtsh 4 SS 18 16 Yellow, Molst, Stiff, (ML) 14 (5 -e-e) r f Selo 5 SS 1$ 18 611 (4 -5-6) END OF BORING ® 15.0' Ll 4 I q THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Yn DRY ® OR WD BORING STARTED 07/14/11 DRILLER: wingo �) TWL(ACH) DRY BORING COMPLETED 07/14/11 CAve IN DrO-M e t 1.0' �' R'4 adiih D•�D (fi� FOREW John Wingo DRILLQLG METHOD HsA ' PLAMIC WAbR LIQUID LI64T X CONTENT X UNIT X 9 DESCRIPTION OF MATERIAL ENGLISH UNITS -k 0 —A ROCK DESIGNATION z° BOTTOM OF CASING ®— LOSS OF CIRCULATION 100 o QUALITY & RECOVERY RQDX— — — REC.% --,- -- 9 20% -40X- 60%-- 80 %100X— 10.2 1 SURFACE ELEVATION 877.0 ® STANDARD PENETRATION i= BLOWS/FT. 10 8o so in Rns Topsoil Depth 3" 1 SS 18 17 RESIDUAL: Clayey SILT, Trace Fine to $�Jr 19 (5 -8-11) Medium Sand, Dark Red to Orangish Red, Moist, Very Stiff, (MH) 2 SS 18 18 21 Is 28.7 3 SS 18 17 870 23.(to- ii-12) Fine Sandy SILT, Trace Clay, Orangtsh 4 SS 18 16 Yellow, Molst, Stiff, (ML) 14 (5 -e-e) r f Selo 5 SS 1$ 18 611 (4 -5-6) END OF BORING ® 15.0' Ll 4 I q THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Yn DRY ® OR WD BORING STARTED 07/14/11 DRILLER: wingo �) TWL(ACH) DRY BORING COMPLETED 07/14/11 CAve IN DrO-M e t 1.0' �' R'4 adiih D•�D (fi� FOREW John Wingo DRILLQLG METHOD HsA oLt» Joa 0 aoRn1G # sHEL"r Piedmont Triad Airport Authori 19988 B -203 1 Ere PROJECT NAME ARCHITECT— ENGINEER East Site `'• SITB LOCATION -- ^C)- CALIBRATED PM. 0METER 6+ Ballinger Road, Greensboro, NC 1 a 4 PLASTIC WATER LIQUID Lwr X CONTENT % IJlDT x X --- --♦ ROCK QUALITY DESIGNATION & RECOVERY DESCRIPTION OF MATERIAL ENGLISH UNITS z BOTTOM OF CASING.— LOSS OF CIRCULATION 10 RQD%— — — REC.% 20%40 %60% - SOXx-100% _+ AND ® STS PENETRATION Dloxs/rr. to 6b so dA 50+ SURFACE ELEVATION 8700 Q Topsoil Depth 2" 1 SS 18 17 RESIDUAL: Fine to Medium Sandy CLAY, 08 (3--3-5) 0 Trace Fine Roots, Tannish Red, Dry, Medlum Stiff, (CH) 23.2 2 SS 18 lb Silty Fine to Medium SAND, Trace Mica and 15 (6-7 -e) 0 j Clay, Reddish Orange to Whitish Tan, ; 865 Moist, Medium Dense to Loose, (SM) ? = 22,9 3 SS 18 15 7 (3-�� 17.0 SS 16 13 ` 7 (,1 1 860 6 (4"3"3j 5 SS IB 18 855 20 850 Z. i 25 845 i y L 30 END OF BORING ® 15.0' i THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 5 PL DRY ® OR WD BORING STARTED 07/14/11 DRILLER: Wingo �1 :Zwocw DRY BORING COUPLE'ISD 07/14Z1 1 CAVE IN DEPTH a 11.0 - V, m, RIG ( Mj) FoREUm John Wingo DRILLING IIETSOD NSA , i CLIENT JOB # BORING # Slim Piedmont Triad Airport Authori 19988 1 B -204 1 0» 2 - PROJECT NAME ARCHITECT— ENGINEER ' East Site SITE LOCATION -O- CAU UTl��ENET G ESTER Ballinger Road, Greensboro, NC p 2 —:1 3 1SS1181171 Silty Fine SAND, Black Inclusions, Trace 4 SS 18 16 Mica Oranglsh Brown, Wet, Medium Dense, Clayey Fine to Medium SAND, With Rock Fragments, Trace Mica, Tannish Brown, 5 ISS118 16 Wet, Medium Dense, (SC) PARTIALLY WEATHERED ROCK: Fine to Coarse SAND, With Rock Fragments, Trace Mica. Tannish Brown, Moist to Dry, (WR) 20.2 W24 (7- 11 -13) )& -.A 19 33 26 (e -io-ls) 6 (10-12 -14) (50/6) 0 (50/3) 6.0 (50/4) Tj CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL, s Yn DRY IS OR WD BORING STARTED 07/14/11 DRILLER: Wingo I TWL(BCB) TWIACR) DRY BORING COMPLETED 07/14/11 CAVE IN DEM 6 23.0' I Z�' �G VA Da A) FOREMAN John Wingo DRi=G METROD HSA PLASTIC HATER LIQUID Lwr % CONTENT % LnfiT X A ROCK QUALM DESIGNATION & RECOVERY RQDX— — -- REC.X 20X=-4OX-6OX---8OX-1009L- ® STANDARD PE MMUTION BLOWS/HT. 10 EO 30 40 60+ A x DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W- LOSS OF CIRCULATION fo0 o SURFACE ELEVATION 843.0 0 5 Topsoil Depth 3" 84() (1 -2 -3) 0 6 21.6 (3 -3-j) 1 SS 18 17 RESIDUAL: Clayey SILT, Trace Fine Roots, Tannish Orange, Moist, Medium Stiff, (MH) 2 SS 18 16 Fine to Medium Sandy CLAY, Oronglsh Tannish Brown Moist, Medium Stiff to Very Stiff, (CO —:1 3 1SS1181171 Silty Fine SAND, Black Inclusions, Trace 4 SS 18 16 Mica Oranglsh Brown, Wet, Medium Dense, Clayey Fine to Medium SAND, With Rock Fragments, Trace Mica, Tannish Brown, 5 ISS118 16 Wet, Medium Dense, (SC) PARTIALLY WEATHERED ROCK: Fine to Coarse SAND, With Rock Fragments, Trace Mica. Tannish Brown, Moist to Dry, (WR) 20.2 W24 (7- 11 -13) )& -.A 19 33 26 (e -io-ls) 6 (10-12 -14) (50/6) 0 (50/3) 6.0 (50/4) Tj CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL, s Yn DRY IS OR WD BORING STARTED 07/14/11 DRILLER: Wingo I TWL(BCB) TWIACR) DRY BORING COMPLETED 07/14/11 CAVE IN DEM 6 23.0' I Z�' �G VA Da A) FOREMAN John Wingo DRi=G METROD HSA ELI T JOB # BORING # MEET Piedmont Triad Airport_ Authorit y 19988 B -204 2 or 2 PROJECT NAME ARCHITECT- ENGINEER East Site SITE LOCATION -0- CALIDRATITONS OMETER Ballinger Road, Greensboro, NC '4' 3. s+ PLASTIC OATBR LIQUID LIMIT R CONTENT R um x ROCK QUALITY DESIGNATION & RECOVERY DESCRIPTION OF MATERIAL ENGLISH STS a 9 � � BOTTOM OF CASNG W— LOSS OF CIRCULATION f00 Fi� 20 % x 40X-60X —SOXr- -100 '5 SURFACE ELEVATION 843.0 ® STANDARD PENETRATION BLOso/PT. 40 60t 10 2O 90 3Q PARTIALLY WEATHERED ROCK: Fine to Coarse SAND, With Rock Fragments, Trace Mica, Tannish Brown, Moist to Dry, (WR) 810 5 END OF BORING ® 34.0' 7.4 805 4 Sao 4 795 50 790 55 i 785 60 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BDUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL :7n DRY ® OR WD BORING STARTED 07/14 11 DRILLER: Wingo TwL(BCR) TWtdAM) DRY BORING COMPLETED 07/14/11 CAVE IN DEPTH 6 23.0' RIG FOREMAN John Wingo DRDIONG METHOD HSA k CLIENT Piedmont Triad Airport Authority PROJECT NAME East Site SZE LOCATION Ballinger Road, Greensboro, NC JOB # I BORING # 19988 B -205 ARCHITECT- ENGINEER SHEET 1 or 2 rem 5 1 PIASRC RATER LIQUID LDiiT X CONTENT X LIMIT X ROCK 9 Topsoil Depth 2" DESCRIPTION OF MATERIAL ENGLISH UNITS 11 (3 -5-6) 14 (8-6 -B) 0 25.5 29(5-8-21) 11 Q -S-sj 1 SS 18 18 QUALITY DESIGNATION & RECOVERY RQD�— 2 1 F BOTTOM OF CASING W- LOSS OF CIRCULATION 100 — — REC.7S 18 16 Silty Fine SAND, Orangish Tan, Wet, Medium Dense, (SM) 20X-40X-60%—BOX-1 Oog-- A 3 SS 18 .4 SURFACE ELEVATION 852.0 ® STANDARD PENETRATION Fine Sandy SILT, Trace Clay, Oran ish Tan to Orangish Brown, Wet, Stiff, (ML) 0 SS 18 16 10 .RO s0 AD a" 5 1 Topsoil Depth 2" 850 845 11 (3 -5-6) 14 (8-6 -B) 0 25.5 29(5-8-21) 11 Q -S-sj 1 SS 18 18 RESIDUAL: Clayey SILT, Trace Fine Sand and Fine Roots, Brownish Tan, Moist, Stiff, (MH) 2 SS 18 16 Silty Fine SAND, Orangish Tan, Wet, Medium Dense, (SM) 3 SS 18 15 Clayey Fine to Coarse SAND, Trace Mica, Whitish Orange, Moist, Medium Dense, (Sc) Fine Sandy SILT, Trace Clay, Oran ish Tan to Orangish Brown, Wet, Stiff, (ML) 4 SS 18 16 " H5lIN N - IIIMt� 6 SS 18 14 14 (4.6-5) i 25.2 7C; IE 18 15 IT I 114 (4 -5-e) 4 � Clayey SILT, Trace Fine Sand, Gray, Wet, 8 SS 181171 Stiff, (MH) 'k (5 -6-7), : 53.8, 0 F3 ------ - - - - -- --- - -y- -� CONTINUED ON NEXT PAGE. A THE STRATIFICATION LINES REPRESENT THE APPRDXINATE BOUNDARY LINES BETNEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL VwL 35.00 4b OR WD BORING STARTED 07/14/11 DRILLER: Wingo IL"CR � 1es) BORING COMPLETED 07/14/11 CAVE IN DEM 0 33.0' 25.00 RIG FOREMAN John Wingo DRUM METHOD HSA CIMT JOB BORING # SHEET _ -- Piedmont Triad Airport Authorf 19988 1 B -205 2 OF 2 PROJECT NAME ARCHITECT - ENGINEER -- — East Site -�-- CALIBRATED PENETROMETER SITE LOCATION 2 TONS'm. 4 6+ Ballincier Road, Greensboro, NC 4 3■ in bU 11 101SS118117 d' THE STRATIFICATBIN LINE s PL 35.00 TWL(BCR) zrgkCR) In 25.00 END OF BORING @ 40.0' t E 27 (9- 12 -15) i • 45.1 REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY HE GRADUAL OR WD BORING STARTED 07/14/11 DRILLER: Wingo BORING COMPLETED 07/14/11 CAVE IN DEPTK ® 33.0' RIG W H M FOREWN John Wingo DR111MG MMOD HSA J1 PIASTIC WATER ISR� LIMIT R CONTENT X LWr R ROCK QUALITY DESIGNATION & RECOVERY DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W— LASS OF CIRCULATION LOO RQD%— — -- REC.96 20%-40%-60%-80% -100%- G+ � ® STANDA��jffRATION io ao so ao so+ SURFACE ELEVATION 852.0 3 Clayey SILT, Trace Fine Sand, Gray, Wet, Stiff, (MH) 820 Fine Sandy Clayey SILT, Black Inclusions, Orangish Tan to Yellowish Tan, Wet, Very Stiff, (MH) 20 (e -7 -I3) 9 SS 16 16 3 4 3■ in bU 11 101SS118117 d' THE STRATIFICATBIN LINE s PL 35.00 TWL(BCR) zrgkCR) In 25.00 END OF BORING @ 40.0' t E 27 (9- 12 -15) i • 45.1 REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY HE GRADUAL OR WD BORING STARTED 07/14/11 DRILLER: Wingo BORING COMPLETED 07/14/11 CAVE IN DEPTK ® 33.0' RIG W H M FOREWN John Wingo DR111MG MMOD HSA J1 C(nN`P JOB N BORING # 1§1= Piedmont Triad .Airport Authority 19988 B -206 1 aF 1 EU-j-, PROJECT NAME ARCHITECT- ENGINEER East Site SITE LOCATION Ballinger Road, Greensboro, NC PEMmoMETER i e TONS/ff. g+ PJAMC WATER LIQUID L IT X CONTENT X UM3T X ROCK QUALITY DESIONATI� ON & RECOVERY RQDX— 0X-4 — 6 RE B 20X - -40X -601'6 809 -100 ® STANDMW PEMMTION n DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LASS OF CIRCULATION 1 ooX � o F_: SURFACE ELEVATION 841 .0 vJ to 90 so 40 6O+ O Topsoil Depth 2" 84 1 SS 18 17 RESIDUAL, Fine Sandy SILT, Trace Clay, Black Inclusions, Tannish Orange, Moist, Stiff, (ML) 10 (3 -9-e) 2 SS 19 16 14 (6 -6-e) 5 835 Fine to Coarse SAND, Trace Slit, With 3• SS 18 15 Mica and Rock Fragments, Reddish Brown, Wet, Medium Dense, (SM) i 24 (8- 14-10) 21 (24- 11 -10} 4 SS 1B 6 1 830 11 (5--") 5 SS 18 8 15 825 28 (10- 16 -12) 6 SS 18 14 20 PARTIALLY WEATHERED ROCK: Fine to Coarse SAND, With Mica, Trace Slit and Rock 820 Fragments, Tannish Gray, Wet, (WR) (50/5) -5r,0- 25 815 (50j8) VC PARTIALLY WEATHERED ROCK: Silty Fine to Medium SAND, Trace Mica, Orangish Tan, Moist, (WR) END OF BORING ® 29,0' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SDIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL PL 13.00 ® OR WD BORING STARTED 07/13/11 DRILLER: Wingo :gWL(BCR) TWUACR) BORING COMPLETED 07 13/11 CAVE IN DEPTH ® 13.0' In. RIG UH D300) FOREMAN John Wingo DRU=G HMOD NSA CLR*T Piedmont Triad Airport Authori JOB 19988 BORING # 1 B -207 SHEET 1 -I' 1 - - - PROJECT NAME East Site ARCHITECT-ENGINEER SITE LOCATION Ballinger Road, Greensboro, NO -a- CAUBRATED PENETROMETER >< P, TDNS r a B+ F! Uft WATER LIQUID LUiIT % CONTENT % LRI1T % ROCK QUALITY DESIGNATION & RECOVERY RQD%— -- - REC.% 20 %40 %- 60X -80% --100 ® STANDA W PENETRATION SO go 30 dG gO# °z DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W- LOSS OF CIRCULATION i Go SURFACE ELEVATION 837.5 .r Z. e - � 0 fs 1 20 25 Topsoil Depth 2" 835 830 825 820 815 810 20 (84-11) (tt- t8-2t) 39 (9- 15-28) 43 (ii-n-21) -36 (13- 27 -31) 58 (50/3) 5Q (`0/3) :i 1 SS 18 16 RESIDUAL: Fine Sandy SILT, Trace Mica, Black Inclusions, Orangish Brown, Moist, Very Stiff, (ML) 2 SS 18 15 Fine to Coarse SAND, Trace Mica, Silt and Rock Fragments, Whitish Orange, Moist, Dense, (SM) : `• 3 SS 18 16 Fine to Medium SAND, Trace Mica and Slit, (SM)gish Brown, Wet, Dense to Very Dense, 4 SS 18 16 5 SS 18 1S PARTIALLY WEATHERED ROCK: Fine to Medium SAND, With Silt, Black Inclusions. Trace Mica and Fine Rock Fragments, Reddish Brown, Moist to Wet, (WR) END OF BORING ® 23.8' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL VL 10.00 (D OR WD BORING STARTED 07/13/11 DRILLER: Wingo PUBCit) TWL(ACR) BORING COMPIt M 07/13/11 CAVE IN DEPT$ 6 17.0' 'T"L RIG 10 Di(r4 >rOREvAN John Wingo DRUMG KMOD HSA cum Piedmont Triad Airport Authorit y JOB # 19988 BORING # 1 B -208 SHEET 1 of 2 Ax PROJECT NAME East Site ARCHITECT - ENGINEER SITE LOCATION Ballinger Road, Greensboro, NC -0- CAMPAT� ENET�OMETER 1 8 2 4 s+ PLASTIC WATER UQUID Lnu S CONTENT % uwr x ROCK QUALITY DESIGNATION & RECOVERY R — — RECX 20%7fr-4 4076 -60%- 3 096 ---100 0 STANDARD PENETRATION RIAWS/FT. to ao ao io Ba+ Z 1 DESCWTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING &— LOSS OF CIRCULATION 10 � SURFACE ELEVATION 843.0 p 1 15 20 2i 30 Topsoil Depth 2" 840 835 830 _ 82, 820 Bj3 010 (4 -5-5)0 27.6 12 (3-5 -7) 11 (4 -5-6) 10 (3 -4-6) 46.9 11 (4 -5-6) 27 (5 -g-16) 23 (9- 1i -12) 13,s (sa -5d/6} 1 SS 18 16 RESIDUAL: Silty CLAY, Trace Fine Roots. Orangish Red, Dry, Stiff, (CH) 2 SS 18 17 Clayey SILT, Trace Fine Sand, Reddish Gray, Moist, Stiff, (MH) 3 SS 18 15 4 SS 18 16 Fine Sandy SILT, Trace Clay, Orangish Tan, Wet, Stiff, (ML) 5 SS 18 16 Fine to Coarse SAND, Orangish Tan to Orangish Red, Wet, Medium Dense, (SM) 6 SS 18117 7 SS 18 16 PARTIALLY WEATHERED ROCK: Fife to Coarse SAND, Trace Fine Rock ragments and Mica, Reddish Tan, Moist, (WR ------- - - - - -- 8 SS 12 it —1 — ---- - - - - -- — CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL PL DRY 0 O WD BORING STARTED 07/14/11 DRILLER: Wingo s TW1(ACR) DRY BORING COMPLETED 07/14/11 CAVE IN DEFM ® 25.0' �,pWL(BM) BIG lieu FOREMAN John Wingo - DRUMG METHOD HSA �i CLIENT JOB # BORING # SHEBT '• �'' ""' Piedmont Triad Airport AuthodfK 19988 B -208 2 OF 2 PROJECT NAME ARCHITECT— ENGINEER East Site MEL. SrrE LOCATION Ballinger Road, Greensboro, NC -a' CALMRAT FaNSTI °1�Tta I a 4 e+ FLAmc 11'AM LIQUID IWT X CONTENT R LOOT X ROCK gvALITY DF.SITtON & RECOVERY RQDX— REC.X 0%40 %60X -90%- -100 9TANDA��PI�. TION 1_0 _ 8.0 30 40 60�F a x DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING Loss OF CIRCULATION too C o SURFACE ELEVATION 843.0 PARTIALLY WEATHERED ROCK: Fine to Coarse 30 SAND, Trace Fine Rock Fra ments and Mica, Reddish Tan, Moist, (9WR) 010 50 (50/11) T 3 END OF BORING 0 35.0' $05 4 800 45 50 790 55 [785 60 THE STRATIFICATION LINES REPRESENT THE APPRDXI14ATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL gn DRY ® OR WD HOMO, STARTBD 07/14/11 DRILLER: Wingo 7"CR) TvAAcR) DRY BORING COMPLETED 07/14/11 CAVE IN DRFTa ® 25.0' �,TL RIG IilbifiMM FOMrSMAN John Wingo DRUM MMOD HSA c 4 f"JAZRr JOB # BORING # Piedmont Triad Airport Authoffly 19988 B -209 1 or 1 PROJECT NAME ARCHITECT— ENGINEER East Site Li. SITE LOCATION -L)._ CAIZRATED BOMEM Ballinger Road, Greensboro, NC NSP 1. s 4 6+ PLASTIC WAM LIq= um R CONTENT X U= x DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUA1dTY DESIGNATION & RECOVERY BOTTOM OF CASING .— LOSS OF CIRCULATION t0 20% -40X -60X— 09x -100%- ° SURFACE ELEVATION 840.0 ® STANDARD PENETRATION « BLOWSAT. {) 10 80 SO 40 50+ Topsoil Depfh 2" I SS 18 18 RESIDUAL: Silty CLAY, Trace Fine to 13 (2 -5—s) Medium Sand, Black Inclusions, Blackish Tan, Dry, Stiff, (CH) T8351 2 SS 18 16 Fine to Medium Sandy SILT, Trace Clay, 8 (3-4-4) [� ar] Black Inclusions, Reddish Brown to 38:9 Orangish Brown, Moist to Wet, Medium Stiff to Very Stiff, (ML) 3 SS 18 17 12 (3 --5 -7) ,moo ®1212 III = 5 SS 18 16 ?18 (erg -to) 825 � 33.7 6 1 SS 1181151 111r8201 t-7-8' 7 SS I 16 25 24 (9-10-10 815 8 SS 18 16 618 END OF BORING ® 30.0' ^------ - - -- - THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES iN —SITU THE TRANSITION MAY BE GRADUAL -7n DRY ®OR WD BORING STARTED 07 14 1 1 DRILLER: Wingo TWL(B (M) TWL(AM) DRY BORING COMPLETED 07/14/11 GAVE IN DMH ® 16.0' TwI' BIG t D�0 (fib) FOREMAN John Wingo DRiLi. NG METHOD HSA c CLiENT JOB # BORING # SIFT _ Piedmont Triad Airport Authority 19988 B -210 1 Dp 1 u-C. PROJECT NAME ARCHITECT- ENGINEER East Site SITE LOCATION -0- CALIBRATED PBNI;10METER TONS/IR Ballinger Road, Greensboro, NC I R 4 6+ "AM R LIQUID UWT X CONTENT % LURT R R ����� ROCK QUALITY DESIGNATION &RECOVERY DESCRIPTION OF MATERIAL ENGLLS3 UNITS °z BOTTOM OF CASING W-- LASS OF CIRCULATION 100 _ - 20% 96 40% -60X 0f(r100 P °° ® STANDARD PENETRATLON 10 ao B�30 40 eo+ SURFACE ELEVATION 839.0 Topsoll Depth 2" !' ley 1 SS 18 16 FILL: Fine to Medium Sandy SILT, Trace _ �= ' 9 (4 -4-5) Clay, Fine Roots and Rock Fragments, Reddish Brown, Moist, Stiff, (FILL) , ;f 17.7 .. 835 5 (2 -2 -3) 2 SS 18 15 FILL: Clayey SILT, Trace Fine Roots and Rock Fragments, Tannish Red, Moist, Medium Stiff, (FILL) 8 (3-4-4) 3 SS 18 16 RESIDUAL: Clayey SILT, With Fine Sand, Black Inclusions, Tannish Orange to Orangish Brown, Moist to Wet, Medium Stiff to Stiff, (MH) 830 it (3 -4-7) 2. 4 SS 18 16 1 32.4 825 11 (3 -5-s) 5 SS 18 15 ss 820 9 (4 -°r4) 6 SS 18 16 20 Sandy Fine Medium Sand SILT, Reddish Brown, Moist, Very Stiff, 7 SS 18 15 815 25 (12- 13-12) ,2$ END OF BORING ® 25.0' i 810 30 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL $� DRY ® OR wD BOrWG STARTED 07/ 13/11 DRILLER: Wingo :ZwL(BCR) TTrI.(ACR) DRY BDRDLG COMPLIM 07/13/11 CAVE IN DEPM ® 14.0' RIG FGRm" John Wingo DRUMG MMOD HSA CUENT JOB # BORING # SHEET Piedmont Triad Airport Authorify 19988 8-211 1 or _ PROJECT NAME ARCHITECT-ENGINEER r ' East Site SITE LOCATION -Q- CALiBRATED PENMOMETER Ballinger Road, Greensboro, NC , TONS/FT. A ei 3 ISSI18116 Silty Fine to Medium SAND, Trace Mica and 4 SS 18 16 Fine Rock Fragments, Orangish Brown, Wet, I %'j I Medium Dense, (SM) 1 4 A x Fine Sandy SILT, Black Inclusions, Tannish Brown, Wet, Stiff, (ML) 5 ISSI18115 Silty Fine to Medium SAND, Trace Mica, Black Inclusions, Reddish Orange, Wet, 6 SS 18 16 Medium Dense, (SM) A END OF BORING @ 20.0' 4 125 41a 15 (3 -a-s) 20 98.5 1S 10 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL, TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7wL DRY OR NO BORING STARTED 07 13 11 DRILLER: Wingo s -TWL(BCR) TWI4A=) DRY BORDIG CQea?LETEa 07 13 11 CAVE IN aEPTH ®11.0' �� RIO row John Wingo DRBJJNG METHOD HSA PLASTIC 1fATBR LIQUID LWT R CONTENT X LDJIT X DESCRiPT)ON OF MATERIAL ENGLISH UNITS X —p ROCK DESIONA77ON z x QUALTPY & RECOVERY BOTTOM OF CASING ®- Loss OF CIRCULATION 100 RQD%— — — REC.96 20X-40X—SOX—BOX-1 00% - a SURFACE ELEVATION 833.0 ® STANDARD PENKMTION BLOws/Fr. Q 10 Bo 30 40 SOt Topsoil Depth 2" 1 RESIDUAL: Silty CLAY, Grayish Red, Moist, 8 (3 -4-4) Medium Stiff, (CH) ASS 83 0 2 Fine Inclusions, dOrangTe, Brownish Moist, Stiff (M) 9 (5 =4-5) 5 3 ISSI18116 Silty Fine to Medium SAND, Trace Mica and 4 SS 18 16 Fine Rock Fragments, Orangish Brown, Wet, I %'j I Medium Dense, (SM) 1 4 A x Fine Sandy SILT, Black Inclusions, Tannish Brown, Wet, Stiff, (ML) 5 ISSI18115 Silty Fine to Medium SAND, Trace Mica, Black Inclusions, Reddish Orange, Wet, 6 SS 18 16 Medium Dense, (SM) A END OF BORING @ 20.0' 4 125 41a 15 (3 -a-s) 20 98.5 1S 10 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL, TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7wL DRY OR NO BORING STARTED 07 13 11 DRILLER: Wingo s -TWL(BCR) TWI4A=) DRY BORDIG CQea?LETEa 07 13 11 CAVE IN aEPTH ®11.0' �� RIO row John Wingo DRBJJNG METHOD HSA cam JOB # BORING # 1 _ Piedmont Triad Airport Authori 19988 B -212 ) of 2 - -- PROJECT NAME ARCHITECT - ENGINEER East Site - SITE LOCATION Ballinger Road, Greensboro, NC -O- CALIBRATED NS i rr •4 5+ >'tone TIATM LIQUID LDDT X CONTENT X LIIDT R ROCK QUALITY DESIGNATION &RECOVERY RQD %— — — REC.% 80100% 20%- 40 %- 60%% ® STANDA RD PENET BII.01/9/FP. RATION 10 EO 30 40 60+ z F DESCRIPTION OF MATERIAL ENGLISH UNITS BO'PfOM OF CASING L033 OF CIRCULATION 100 o SURFACE ELEVATION 840.0 Topsoil Depth 2" 9 (3 -4-5) 1 SS 18 17 RESIDUAL: Silty CLAY, Trace Fine Roots, Tannish Dark Red, Dry. Stiff, (CH) Fine to Medium Sandy CLAY, Trace Mica, Orangish Dark Red, Moist, Stiff, (CH) 5 - 835 13 (5 -s -7) s * - - ---A 20.7 30 60 12 (4 -5-7) 2 SS 18 18 Fine Sandy SILT, Black Inclusions, Trace Mica, Reddish Tan to Orangish Tan, Moist to Wet, Hard, (ML) 3 SS 18 17 f 830 11 (3 -5-s} 4 SS 18 16 15- 825 11 (3 -5-8) 5 SS 18 16 0 820 16 (6-7 -9) i 31.5 6 SS 18 16 I i 25 815 (9- 14-16) 30 7 SS 18 15 i I i E 20 (5 -e-u) 4043.5 8 SS 18 16 CONTINUED ON NEXT PAGE. ,�— l THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION NAY BE GRADUAL PI, DRY ® OR BD BORING STARTED 07/1 3 1 1 DRILLER: Wingo ywL(BCR >wl.(ACR) DRY BORING COMPLETED 07/13/11 CAVE IN DEPTH ® 20.0' Sn RIG W D�0 (Gldl) FoaEw John Wingo DRD METHOD LDNG MEOD HsA CitiaN'1' Piedmont Triad Airport Authority PROJECT NAME East Site SITE LOCATION Ballinger Road, Greensboro. NC n .0 JOB # BORING® 19988 1 B -212 ARCHITECT— ENGINEER a SHEET 2 OF 2 L20X-40X-60X—S0%—j00X- STANDARD ASTIC VAU R LIQUID ff S CONTENT R LiM1T R DESCRIPTION OF MATERIAL ENGLISH UNITS $ —--- -- CK QUAIM DESIGNATION & RECOVERY x BOTTOM OF CASINO !— LOSS OF CIRCULATION 100 RQDX— REC X 9URF'AC>� $LEVATION PENETRATION 840.0 P I ® BLOWS / t0 sa Bo So ao 60+ Fine Sandy SILT, Black Inclusions, , Ora gish Dark Brown, Wet, Very Stiff, IT I 50 01 11 II 9 I SS I IB 116 END OF BORING ® 35.0' 795 17 (7 -8-9) THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BDUNDARY LINES BETWEEN SOIL TYPES 1N -SITU THE TRANSIT= MAY BE VL DRY ® OR WD BORING STARTED 07/13/11 DRILLER: Wingo TWL(ACR) DRY BORING COMPLETED 07/13/11 11 CAVE IN DEPTII 0 20.0' i1 _ Ric FORMAN John Wingo DRDddNG►�rxoD HSA CLIENT JOB # BORING # SHEET " Piedmont Triad Air pod Authority 19988 B -213 1 0" PROJECT NAME ARCHITECT- ENGINEER East Site SITE LOCATION �cER - CALIBRA TON9P " OZU Ballinger Road, Greensboro, NC PId1MC WAM tdiQ= UWr % CONVW % U147 R ROB gUWff DESIGNATION & R31COVERY DESCRIPTION OF MATERIAL ENGLISH UNITS y� ° z F a BOTTOM OF CASING LOSS OF CIRCULATION 100 � U � 0%-4 — 6 REC.% 207040 %- 60Xr-809fr -100 � STANDARD PENNI'PRATION /Fr . 10 20 BO AO 60+ SURFACE ELEVATION 825.0 (} RESIDUAL: Silty CLAY, Trace Sand, Orangish Tan, Moist, Soft, (CH) 0 1 SS 18 18 4 (2 -2 -2) 45.2 8 (2-4-4) 2 SS 18 17 Clayey SILT, Trace Fine Sand, Grayish 6 Tan, Moist, Medium Stiff, (MH) $20 Clayey Fine SAND, Trace Silt and Mica, 3 SS 18 16 Tannish Brown, Wet, Medium Dense to 9 (4 -4-5) Loose, (SC) 7 (2 -374) 4 SS 18 15 1 815 13 (s-e -» 37. la 5 SS 18 15 15 810 END OF BORING ® 15.0' 20 805 s 25 800 i y , i 3 , i L THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7,10- DRY ® OR WD BORING STAR= 07/15/11 DRILLER: Wingo y"CR) TWIAACR) DRY BORING COMPLETED 07/15/11 CAvE IN DMS ® 12.0' yR, RIG FORM" John Wingo DRUMG MMOD HSA CLIENT Piedmont Triad Airport Authori JOB 19988 BORWO B -214 1 of 1 UPJ--- PROJECT NAME East Site ARCHITECT- iGINEER SITE LOCATION Ballinger Road, Greensboro, NC -0- CALIBRATlI PEOHOMUM .' s+ I PLABPIO WATER LIQUID LIltITT x CONTENT x Lmr X W A BOCK QUALITY DESIGNATION & RECOVERY ROD% -- — — RECX 2096 - 4056- 60*6 --8Ox -100 ® STMMMM P nMUTION 10 20 80 40 60+ 04 P DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W --LOSS OF CIRCULATION 100 SURFACE ELEVATION 835.0 � f 2O i i 25 3 Topsoil Depth 2" RESIDUAL: Fine Sandy SILT, Trace Mica, Black Inclusions, Orangish Tan, Moist to Wet, Stiff to Dense, (ML) 830 825 820 PARTIALLY WEATHERED ROCK: (in) Sandy SILT, Orangish Brown, Moist, WR $f5 END OF BORING ® 20.0' 81 U 3 (4 -e -I) (8 -14-24 38 0 4 (8- 10 -1:1) 15.9 (15 -22725 47 (0- 28-24) 50 12.6 (t8- 30- 5o /e)' 0 1 SS 18 17 2 SS 18 18 3 SS 18 16 4 SS 18 16 5 SS 18 17 6 SS 18 16 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 19NL DRY ® OR WD BQIWG STARTED 07/13/11 DRILLER: Wingo s 7,WL(BCR) Pl AcR) DRY BORING COMPLi= 07/13/11 CAVE IN DEM ® 13.0' �`�' RIG FOREIIAN John Wingo Dm=G MMOD HSA C11W - Piedmont Triad Airport Authodty JOB 19988 BORING # B -215 SHEET 1 CF 1 ' PROJECT NAME East Site ARCHITECT- ENGINEER SITE LOCATION Ballinger Road, Greensboro, NC CAIdBRATtTO�olllETER 48 a 4 s+ PLASTIC WA= LIQUID LIS(IT R CONTENT X LOUT R %_� —�� - -A ROCK QUAUTY DESIGNATION & RECOVERY RQD96— — — RE 8 2096x- 4096 - 609 -809(r -10096 ® STAND %�P TION io so so 40 z DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING L033 OF CIRCULATION o x ° SURFACE ELEVATION a35 0 �j 1 15 2D i 25 i i i 30 Topsoil Depth 2" i 830 825 820 815 810 (8- t3-i9) 32 19 (9 -9-10) 12A (to- ts-le) 33 26 (7- 10-18) 19 (5 -9-10) T_ 1 SS 18 17 RESIDUAL: Fine to Coarse SAND, Trace Mica and Slit, Black Inclusions. Brownish Orange, Moist, Dense, ISM) iii " 2 SS 18 17 Clayey Fine to Medium SAND, Trace Mica, Brownish Orange, Moist, Medium Dense, (SC) 3 SS 18 16 Fine to Coarse SAND, Trace Mica and Silt, Black Inclusions, Brownish Orange, Moist, Dense to Medium Dense, (SM) 4 SS 18 16 5 SS 18 16 PARTIALLY WEATHERED ROCK: Fine to Coarse SAND, Trace Silt and Mica, Orangish Tan, Moist, (WR) 6 SS 12 It END OF BORING 0 25.0' I THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOD. TYPES IN -SITU THE TRANSITION MAY BE GRADUAL VWL DRY ® OR WD BORWG STARTED 07/13/11 DRILLER: Wingo TW911CR) TW904) DRY BORING COMPLETED 07/13/11 CAVE IN DEPTH ® 15.0' RIG C p.;� (i FOREMAN John Wingo DRILLING IMTHOD NSA . CLIENT JOB # BORING # SHEET Piedmont Triad Airport Authoffly 19988 1 B -216 1-of 1 - PROJECT NAME ARCHITECT- ENGINEEII East Site SITE LOCATION -0- CALMUM PENETROMETER Ballinger Road, Greensboro, NC >< $ 4 a+ PLASTIC WATER UQvm LDDT R CONTENT R Lwr x DESCRIPTION OF MATERIAL ENGLISH UNITS X ��- _o 6 ROCK QUALITY DESIGNATION & RECOVERY x BOTTOM OF CASING ®- LOSS OF CIRCULATION 10 o RQDX- - -- REC.9d -- d 20%40X- 6OX -- SOX -- 100Xr- SURFACE ELEVATION 831 .0 ® STANDMW PENETRATION 2O �' Topsoil Depth 3" 10 9 40 50+ 830 1 SS 18 17 RESIDUAL: Clayey SILT, Trace Fine Sand, 15 (4 -9 -9) 0 • X-- -:-A Tannish Red to Yellowish Tan, Moist to 38,8 43 58 Wet, Medium Stiff and Stiff, (MH) C ©®MM II 10 *4 3 SS 18 1 15 I 111t:7-1 6 8 (4 -4-4) 1 a '4 I SS 18 8 II I � I t 9 (�¢2• 43 � SS 18 a I 111v 1 611(4-5-6) 6 SS 18 15 610 (4 -5-5) END OF BORING 0 20.0' T8101 s 2 T 113 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY SE GRADUAL .7wL DRY ® OR WD BORING STARTED 07/15/11 DRILLER: Wingo :ZWL(BCR) 3WL(AcR) DRY BOEING COMPLETED 07/15/11 cavE IN DEPTH 0 16.0' 'm' RIG p �p FOREMAN John Wsngo nRIUNG METHOD HSA cum JOE BORING # Air Piedmont Triad ort Authori 19988 B -217 1 or 1 _ _ PROJECT NAME ARCHITECT— ENGINEER East Site SITE LOCATION Ballinger Road, Greensboro, NC -0- oALIDRA �o� PLASTIC WATER LIQUID LOIT % CONTENT R Luar x x a ROCK QUALITY DESIGNATION & RECOVM 0%-4 — — REC.A x-100% 2056- 40% -609k- 8096 -100 ® STANDARD ENET �.P/�'• RATION 10 EO 30 40 60+ °z DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION too z � � SURFACE ELEVATION 825.0 Topsoil Depth 3" 12 (3-5 -7) 1 SS 18 17 RESIDUAL: Silty CLAY, Trace Fine Roots, Dark Red to Orangish Red, Moist, Stiff, (CH) 2 SS 18 17 5 824 13 (4 -6 -7) Fine Sandy SILT, Black Inclusions, Trace Mica, Reddish Oran gge to Yellowish Tan, Moist to Wet, Stiff to Medium Stiff, (ML) 11 (4 -5-s) 39,¢ 3 SS 18 16 10-- 815 5 (3 -2 -3) 4 SS 18 10 15 810 7 (4 -3-4) 40:8 5 SS 18 14 20--- END OF BORING 0 20.0' 845 6 (2 - -3 -3) 6 SS 18 15 S I y 25 800 3 , a Tw STtATIFTCAVIi7N LINES REPRESENT THE APPR13 iMATE BOMIARY LINES SETVEEN SOIL TYPES IN -SITH THE TRANSITION MAY BE GRADUAL PL DRY OR WD BORING STARTED 07/1 f) 1 1 DRILLER: W(ngo TTrL(BCR) TWL(ACR) DRY BORING COMPLETED 07/15/11 CAVE IN DEPTR 0 15.0' �, RIG NIN"M FOmmm John Wingo DRi.LING METHOD HSA N4' JOB # BORING # SHEET Piedmont Triad Airport Authority 19988 B -218 1 ce 1 u;-_j PROJECT NAME ARCHITECT- ENGINEER East Site . SITE LOCATION Ballinger Road, Greensboro, NC -0- CALIDRAT>PSNET�OMETER TONS 1 a a Ns+ PLASTIC VAfi LIQUID LWT x CONTENT R LIMIT 9I % _0 ~ - -,& ROCK QUALITY DESIGNATION & RECOVERY 2009 -4096 -6096 EC 0%100 DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING &— LOSS OF CIRCUTATION 100 1 c SURFACE ELEVATION 832.0 ® STANDARD PENETRATION a BLOWW". t e0 9D to aa+ O Topsoll Depth 3" 1 SS 18 16 830 11 (4-5-6) RESIDUAL: Silty CLAY, Orangish Red, Moist, Stiff. (CH) 11 (5 -5-6) 2 SS 18 17 Fine Sandy SILT, Black Inclusions, Orangish Red to Yellowish Tan, Moist to Wet, Stiff to Medium Stiff. (ML) 825 13.(4 -6 -7) 3 SS 18 17 1 7 (3-473) ss.s 4 SS 18 13 820 1 9 (3..4..g) 5 SS 18 14 END OF BORING ® 15.0' 815 20 810 25 845 3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BDUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL DRY ®OR" BORING STARTED 07/15/11 DRILLER: Wingo 6 ®PL , WL(BCR) TwL(ACR) DRY BORING COMPLETED 07 15/11 CAVE IN DEPTH 0 12.0' $WL FOREMAN John Wingo DRH=G METHOD HSA CLIENT Piedmont Triad Ai ort Authority JOB If 19988 BORING # B -219 1 or 1 9.5-. PROJECT NAME East Site ARCHITECT— ENGINEER SITE LOCATION Ballinger Road, Greensboro, NC -0- CAUBRAT D PSNU OME M >+ 4 6+ PLASTIC Wx= LIQUID 11M1T % CONTENT % MIT % W� R M�0 � ROCK QUAIWY DESIGNATION k RECOVERY 0X-4 _ 6 —8 209(x -40 %6090-- 80Xr-100 ® STANDNBLMPB�NETRATION ib 20 90 40 �56+ x DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTON OF CASING 0— LOSS OF CIRCULATION �' 0 i SURFACE ELEVATION 842.0 _ ,a 5 1 20 25 Topsoil Depth 4 840 835 830 $25 820 815 11 (4 -5-6) 15 (5 -7 -e) 20 (ms9-1i) 15 (5 -7 -8) 4 (7 -2 -2) 14 (5-") 18 (5 -8-10) (15- i6-17) 33 1 SS 18 16 RESIDUAL: Fine to Medium Sandy SILT, With Clay, Trace Mica, Orangish Brown to Tannish Orange, Moist, Stiff to Soft, (MH) 2 SS 18 17 3 SS 18 16 4 SS 18 17 5 SS 18 15 Fine to Medium Sandy SILT, Trace Mica, Orangish Tan, Moist to Wet, Stiff to Hard, (ML) 6 SS 18 16 7 SS 18 16 8 SS 18 18 END OF BORING ® 30.0' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL i Y.WL 28.00 ® OR WD BORING STARTED 08/04/11 E DRILLER: Wingo TWL(BCR) TWL(ACR) BORING COMPLETED 08/04/11 CAVE IN DEPTH ® 23.5' �*� RIG FA 11M FOM AN John Wingo DRILLING METHOD HSA � CLIENT Piedmont Triad Airport Authori JOB 19988 BORING 1 B -220 SHEET 1 of i PROJECT NAME ARCHITECT- ENGINEER East Site SITE LOCATION Ballinger Road, Greensboro, NO -0- CAMPATED MFT. DOER t e s a+ PLASTIC RATER UQ= LIMIT X CONTENT x EMIT S $--------- --- - -A ROC{ QUALITY DESIGNATION & RECOVERY RQD %- - - REC.% 20%40% -60% - 80Xr -10 $► sTANDARD PEA TION to • BO 30 40 604 ° z DESCRIPTION of MATERIAL ENGLISH UNITS BOTTOM OF CASING ®- IA93 OF CDiCUL4TI0N 100 SURFACE ELEVATION 8 42.0 Z0 �c' 'o Topsoil Depth 3" i SS 18 17 840 13 (4-6 -7) RESIDUAL: Fine to Medium Sandy SILT, With Clay, Trace Mica, Reddish Orange to Tannish Orange, Moist, Stiff, (MH) 2 SS 1B 16 5 11 (4 -5-6) ' ! 835 ii 9 (3-4-5) 3 SS 18 16 Silty Fine to Medium SAND, Trace Mica, Tan, Moist, Loose, (SM) 1 8 (2 -4-4) 4 SS 18116 830 Fine to Medium Sandy SILT, Trace Mica, Tannish Orange, Moist, Stiff, (ML) i 12 (3 -5-7) S SS 18 15 825 Silty Fine to Medium SAND, Trace Mica, Tan, Moist to Wet, Medium Dense, (SM) i e 20 I 13 (s -7-6) 6 SS i8 16 i 828 i 2 i i' 23 (6 -9-14) 7 SS IS 16 815 Sandy SILT, Orangish Brown, Wet, Stiff, (ML) 3 it (4 -5-6) e S5 18 IFIne END OF BORING ® 30.0' — �'---- - --"�' THE STRATIFICATION LINES REPRESENT THE APMXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL :9vL DRY 0011-IM BORING SIART>♦D 08/04/11 DRILLER; Wingo ITXKBCR) TIUACR) DRY BORING COMPLETED 08Z04/1 I CAVE IN DEPTH 6 24.0' TVL RIG M M FOREMAN John Wingo D=J NG METHOD NSA CUZNT Piedmont Triad Airport Authori ty JOB # 19988 BORING # B -221 SHEET 1 OF 1 r' ' l MONSEEMMd PROJECT NAME ARCHITECT- ENGINEER East Site rr�. SITE LOCATION Ballinger Road, Greensboro, NC -O- CALIBRATED PENETI�OME'1'ER I s T0N9 4 0+ PLASTIC WATER LigUID LIMIT % CONTENT 9 LiMIT X R � ____� ._ —___OV ROCK QUALiT1f DESIGNATION k RECOVERY RQD% — — REC.% -20%-40X-60X-80%-100%— ® STANDARD a DESCRIPTION OF MATEERIAL ENGLISH UNITS - LOSS OF CIRCULATION 10 BOTTOM OF CASING ® ® ' c SURFACE ELEVATION 836.0 O 30 EO 90 40 50+ Topsoil Depth 3 835 RESIDUAL: Fine to Medium Sandy SILT. With Clay, Trace Mica, Reddish Brown to Yellowish Tan, Moist, Stiff, (MH) 1 SS 18 17 12 (3-5-7) 2 SS 18 17 11 (-5-6) 5 830 3 SS 18 16 14 (5 -6-8) 8 (3 -4-4) 4 SS 18 15 1 825 9 (1 -4 -5) 5 SS 18 15 15 820 - 10 (3 -5-5) Fine to Medium Sandy SILT, Trace Mica, Tan, Moist to Wet, Stiff, (ML) 6 SS 18 16 2a 815 18 (2 -5-7) 7 SS 113116 25— - END OF BORING ® 25.0' 810 3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BEjVEEN SOIL TYPES IN -SITU THE TRANSTTIDN MAY BE GRADUAL :WwL DRY IS OR WD BORING STARTED 08/04/11 DRILLER: Wingo TWL(BCR) Tv(Aca) DRY BORING COMPLETED 08/04/11 CAVE IN DEPm ® 19.0' gym, RIG W pip M FOREMAN John Wingo DRILLING METHOD HSA PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 APPENDIX F — LABORATORY RESULTS Proctor (ASTM D 1557 )Test Summary 129 ' 128 127 ` 126 125 124 123 122 tl 121 120 .� 119 118 NL 117 a 116 115 114 113 112 , 111 110 109 = 108 107 $ 6 7 8 9 10 it 12 13 14 15 16 17 18 19 20 21 22 23 Moisture Content ( %) LI uid Limit LL 32 Natural Moisture Content 20 Plastic Limit PL 1J Percent Passing No. 200 Sieve Percent Retained on the — Plasticity Index (PI) P 13 No. 4 Sieve Liquidity Index (LI) — Maximum Dry Densl ty (PcfI 119.8 Tan Brown Fine to Medium Sandy optimum Moisture Content % 11.7 Corr. Maximum Dry Density cf 119.8 Description CLAY Corr. Optimum Moisture 11,7 Classification "° Content Test Method A Test Standard ASTM D 1557 Specific Gravity of Soil Determination Test Estimated Specific Gravity of Soil 2.70 Method _ Specific Gravity of Oversize 2.70 Specific Gravity of Oversize Fraction Test Method Estimated Fraction S-3 Borlon Nu ber 8 -204 Sample Number _ Preparation Method I Dry Ram er Type Manual ECS Carolinas, LLP Project No. 18988 Project Name: East Site PM: Lorin E. Awns PE: James D. Hoskins Greensboro, NC Printed on(date): July 22, 2011 1 f 1 1 1 1 1 L ii iL 11 `� 11 � c C c c c 5 9 8 8 r ummary • ���i���a��titalllllllllf ■Itftftff•������ �aaas .a.a�.aar�.�aaar.rr.rrr.�.. -------- - - - - -- -_ -------------- - - - - -- - AQ AV AV Gl 22 2.i 24 25 26 27 28 29 30 31 32 33 34 .35 Moisture Content ( %) Index (PI) 13 Percent Retained on the No. 4 Sieve ndex LI Maximum Dry Density cf g9.2 �n Red Clayey SiLT Trace Fine Sand 0 timum ofsture Content 76 22.0 Corr. Maximum Dry Density c 99.2 lion d, Corr. Optimum Moisture Content W 22.0 Specific Gravity of Soil 2.70 pecific Gravity of Soil Determination Test _ ethod Estimated Specific Gravity of Oversize Fraction 2.70 ;4M pecific Gravity of Oversize Fraction Test Method Estimated Borin Number &21B am le Number Preparation Method D arnmer Type Manual Project No. 19988 Project Name; East Site ; ECS Carolinas, LLP PM: Lorin E. Akins PE: James D. Hoskins Printed on(date): July 22, 2011 Greensboro, NC Proctor (ASTM D 1557 )Test Summary 110 109 108 107 106 105 104 103 102 101 A=! 100 99 98 ' 97 96 - 95 94 93 92 91 90 89 � 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Moisture Content (°/O) Liquid Limit (LI-1 53 Natural Moisture Content 27 Plastic Limit PL 43 Percent Passin No. 200 Sieve Percent Retained on the .. -, Plasticity Index (Pi) 8 No. 4 Sieve Liquidity Index LI Maximum Dry Dens it Cf 100.3 Yellowish Tan Fine Sandy SILT With optimum Moisture Content % 20.3 Corr. Maximum Dry Densily logo 100.3 Description Clay Corr. Optimum Moisture 20.3 Classification ,._ Content Test Method A Test Standard ASTM D 1557 Specific Gravity of Soil Determination Test Estimated Specific Gravity of Soil 2.70 Method Specific Gravity of Oversize 2.70 Specific Gravity of Oversize Fraction Test Method Estimated Fraction S -4 Borin Number B -216 Sample Number_ Pre t o Method Dry IgammerType Manual - ECS Carolinas, LLP Project No. 18986 Project Name: East Site PM: Lorin E. Akins PE: James D. Hoskins Greensboro, NC Printed on(date): July 22, 2011 1: 11 11 1( V V U 1( "F is CL is is i 9 C: 9 N 9 0 9 9. 9, 9; 9; 9: 9( 8! 8E 84 est Summary — ■iY� �aaa arrrr rr.. , Av 17 N Al ZZ G.i Z4 25 26 27 28 29 30 31 32 33 34 Moisture Content ( %) Plasticity Index (PI) 30 rcent Retained on the . 4 Sieve --�- Li uidi _Index LI .... ximum D Density c bN _ 100.2 23.0 Description CLA Brown Fine to Medium Sandy timum Mo isture Content o _ _ rr. Maximum Dry Density c 100.2 Classification ... Corr. Optimum Moisture Content % 23.0 Test Method A Test Standard Specific Gravity of Soil 2.70 Specific Gravity of Soil Determination Test _ ASTM D 15: Method Estimated Specific Gravity of Oversize Fraction 2.70 Specific Gravity of oversize Fraction Test Method Estimated Boring Number 8 -212 Sam le Number Pre a t o Method _ o Rammer Type S -2 Manual Project No. 19988 Project Name: East Site - - ' ECS Carolinas, LLP PM: Lorin E. Akins PE: James D. Hoskins Printed on(date): July 22, 2011 "`_ Greensboro, NC mits est Summary (Met S All samples are prepared using'DRr method unless otherwise noted %Semple Boring Number Depth Test Description MC LL PL PI % Passing Retained on Not" Sample Number (feet) Symbol (%) $200 Steve 940 Sieve B-216 / S-11 1.00 - 2.5D A Red Clayey SILT Trace Fine Sand 36.6 50 43 13 Project No. Project Name: PM: PE: Printed on(dat 19988 East Site Lorin E. Akins James D. Hoskins July 22, 2011 -- - I ECS Carolinas, LLP Greensboro, NC O OD - 70 60 - FT 50 X W 40 Co U 30 ltl t0 10 - ummary ........... .......... ____n n } ...n........... n.n.......... Ir .......,.n .... .......... n........... . '...� 6 E ..................... n n 10 20 30 40 30 00 70 80 90 E PE: James D. Hoskins Liquid Limit, LL Greensboro, NC Printed on(date): July 22, 2011 f All samples are prepared using 'DRY'method unless otherwise noted ....7:.w.o.. ` ... ..........................nn... ............... ............. «. «.......n„..... ....n........... ..y,.:��� ..... -..n.n ..I................. Description MC LL PL PI %Passing .n•....w..,.... }n nn.n.n...... u.n «......n..... .... «...n... ,..................... (feet) 9 .... ......... '., n'J" t «..... ,., nnn.....n......•,.uy . n 1r,/' i ................ ............wyn -.-. ) 3 • •tip I _ .............. ;ti .n...n......nWi« .......n.....,. ni............... n.n .............r�r�.. n..... .......... ..........�...... ............ ..... ...n.........na ......... .... «.« .. .n...n...........� ............n «.. y ................................ ... ........ «.....�..r......... ,•.1- ........ n.nn............�,..... n. n....... o......... ._.........o... «..n............ t • ........ ...n........ _ ........... I .. n.n ......... ........ ....nn «......... OL i � a a' - ECS Carolinas, LLP Project Name: East Site 0 10 20 30 40 30 00 70 80 90 PE: James D. Hoskins Liquid Limit, LL Greensboro, NC Printed on(date): July 22, 2011 _ All samples are prepared using 'DRY'method unless otherwise noted Boring Number Depth Test Description MC LL PL PI %Passing %Sample Retained on Sample Number (feet) Symbol 06) #200 sieve #40 Sieve B -2041 S-3 6.00-7.50 A Tan Brown Fine to Medium Sandy CLAY 20.2 32 19 13 100 1�0 Notes Project No. 19988 a' - ECS Carolinas, LLP Project Name: East Site PM: Lorin E. Akins PE: James D. Hoskins Greensboro, NC Printed on(date): July 22, 2011 _ sn 70 X 0) C 40 Q) 30 CL 20 10 D 4jia) i eat summary (Method A' ... ........n « .... ........ ... ».. «.�................... !! ».n.. «....,.....; ».... . ...... » .... ia 33 .. ........... » !t . ...r...... ..' ,r .......... ................ ��... `F............... F , 3 ...u.....uulWji[[FF'I .. .......... [.. u».. u.».... ' uEn nm.....r... .., .....w.u.... .. .. mn. »n.,nw.. .. m......w u .. .F.....m... I lilt � Iler � tpF �,1t'w i ' 1 f� ` ..t.. »...�. « ................ ..n..n...... .................. » .......... 9.. `.... -,. �., . ................ ................ E � .'♦r = ..� F i ».. »..................... c ............... ........... .......n...... ;........... «...e ,.. .n........m .........a.... ........n ( _ f ........... n .. .. i .•' �`y�� o.n f ) f . t ! E 6 i ' f .... »..« v-, a.'��r. », «..... F,......» . »a ................. m ». »...... ...... . ...... ».» ....n ..........w ....N. E .................. ..... ...... ».n lug t"' ML or!OL '� c t n 1A hn ear ... „' ou qu 7D 8D 9D 10D 110 I Liquid Limit, LL All samples are prepared using TRY' method unless otherwise noted Boring Number Depth Te61 MC % Passing % Sample Sample Number (feet) Sjrmhot Description LL PL PI Retained on Notes (°i�1 #200 Sieve #40 Steve B -218 / S-4 8.50- 000 Yellowish Tan Fine Sandy SILT with Clay 28.8 51 43 a Project No. 19988 Protect Name: East Site ECS Carolinas, LLP PM: Lorin E. Akins PE: James D. Hoskins Printed on(date): July 22, 2011 Greensboro, NC PTIA — East Site Development Greensboro, North Carolina ECS Project No.: 09.19988 July 22, 2011 Revised August 17, 2011 APPENDIX G - PAEVIOUS SUBSURFACE EXPLORATION _ l J * SCALE (IN FEET) 200 400 s 400 U REFERENCE: SITE PLAN PROVIDED BY BAKER CORPORATION LLP CAROLINAS Q., i µr r ' fI� f1 r� 1 r° •; �4 � y FIGURE 2 -B ECS PREVIOUS BORINGS PTIA EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA ECS PROJECT 09.19988 - -. rte- * SCALE (IN FEET) 200 400 s 400 U REFERENCE: SITE PLAN PROVIDED BY BAKER CORPORATION LLP CAROLINAS Q., i µr r ' fI� f1 r� 1 r° •; �4 � y FIGURE 2 -B ECS PREVIOUS BORINGS PTIA EAST SITE DEVELOPMENT GREENSBORO, NORTH CAROLINA ECS PROJECT 09.19988 CLIENT PIEDMONT TRIAD AIRPORT AUTHORITY JOB # BORING SHEET 09.13835C L B -100 1 of 2 E c PROJECT NAME ARCHITECT- ENGINEER gLLP BALLINGER ROAD BORROW SITE �AFZ4�T/+IAS SITE LOCATION GREENSBORO, NORTH CAROLINA ALIDRATED PEN] amETER 'C' a TOHB a+ RATER LIQUID CONTENT % UiAITT X -' ° -- W UALITY DESIGNATION dt RECOVERY FROCK -4 % — RE 8 - 409K- 60?6— SOXr --10O 0 STAND ��PENENETRATION DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING W- LOSS OF CIRCULATION t0 ,4 c SURFACE ELEVATION 851 .0 0 !0 20 SO 40 6D+ Topsoil Depth B" 850 RESIDUAL: Brownish Orange and 1 SS 1B 15 6 • Tan, Clayey SILT, Moist, Firm, (ML) 45.0 2 SS 18 15 7 47 Orangish and Yellowish Brown, SILT, Trace Fine Sand, Moist to Wet, Firm to Soft, (ML) 845 S SS 18 15 4 50.3 i 840 6 32.9 4 SS 18 1S Orangish Brown and Dark Yellowish Brown, Silty Fine SAND, Moist to Wet, Loose (SM) =' b 5 SS 18 15 i5 '• s35 10 6 SS 18 15 20 830 S 7 SS 18 15 25 825 8 SS 18 15 CONTINUED ON NEXT PAGE. THE srmnNEICATIDA LINES REPRESENT THE APPROMATE IMUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRMUTION MAY BE GRADUAL PL DRY WS OR Co BORING STMM 03 -02 -07 TWLIBCR) TWMACR) BORING COMPLETED 03 -02 -07 CAVE IN DEPTH a 26.0' :9n25.0' 0 24HRS. RIG CME 550 WINGO DEWO METHOD HSA CLIENT PIEDMONT TRIAD AIRPORT AUTHORITY JOB # 09.13835C BORING # I B -100 SHEET 2 OF 2 IEULLP CAROL1fVA9 PROJECT NAME BALLINGER ROAD BORROW' SITE ARC=CT- ENGRfl= SITE LOCATION GREENSBORO, NORTH CAROLINA -0- CAIMUT D P OMETER i s 4 5+ PLASTIC WA16 LIQUID LDHT X CONTENT ENT X LBII'r R R A ROCK QUALITY DESIGNATION k RECOVERY 0%-4 - 6 RE 8 20X- 40X- 60Xr- 809fr -100ZC 0 STANDARD PENETRATION BLOwslrr. 10 20 s0 40 a" A z° 9 DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING ®-- LOSS OF CIRCULATION 100 SURFACE ELEVATION 851.0 Orangish Brown and Dark Yellwh Brown, Silty Fine $20 tSAN_D,'_61S,t to Wet, Firm to f, (SM) 5 SUE 9 PARTIALLY WEATHERED ROCK: S Grayish Dark Brown, Silty Medium to Coarse SAND, With Rock Fragments, Wet, (WR) 815 END OF BORING 0 34.2' 4 810 45 805 I i 50 800 55 795 Z. Z. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL Yn DRY ws oR ® BORING STARTED 03 -02 -07 TwL(BCR) :gwL(ACR) BORING COMPLETED 03 -02 -07 CAVE IN DEPTH ® 26.0' PL 25.0' 0 24HRS. RIG CME 550XREW WINGO DRILLING METHOD HSA cima PIEDMONT TRIAD AIRPORT AUTHORITY JOB # 09.13835C BORING # I B -101 SHE r 1 OF 2 ��- Ecq LLP PROJECT NAME ARCHITECT- ENGINEER BALLINGER ROAD BORROW SITE CAROLINAS SITE LOCATION GREENSBORO, NORTH CAROLINA PSNMO'MER A a TOS.M. 4 4 e+ PLASTIC RATER LIQUID I]HC1' R CONTENT R LnUT 9 x (m-- -- —A ROCK QUALITY DESIGNATION & RECOVERY DESCRWMON OF MATERIAL ENGLISH UMS BOTTOM OF CASING W- LOSS OF CIRCULATION IGO SURFACE ELEVATION 875.0 RQDX— — — REC.96 --- 2096- 4OX -60Xr- 80%100 ® STANDARD PENETRATION 10 20 30 40 rA* O Topsoil Depth 3'° 1 SS 18 15 10 0 RESIDUAL: Reddish to Orangish Brown, SILT, Trace Fine Sand, 31.2 Moist, Stiff, (ML) 2 SS 1B 15 14 0 $ $70 33.8 9 • X_ —A 3 SS 18 15 30.7 41 51.4 i 865 7 i 11.7 4 SS 18 14 Yellowish to Pinkish Tan, Fine to Medium SAND, Trace Slit, Trace Mica, Moist, Loose, (SW) .Y.' 5 SS 1e 13 6 • 15 'k 860 i8.s Brown, Orangish Brown and Grayish Tan, Silty Fine SAND, With Mica, Wet, Loose to Medium 20 Dense, (SM) 6 27.4 6 SS 18 14 2 g5Q 6 57.8 7 SS 18 15 69.9 8 • B SS I8 15 30 ------- --- --- - -- - - ------- _...__ CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SGIL TYPES IN -SITU THE TRANSITION NAY BE GRADUAL VL DRY WS OR ® BORING STARTED 03 -02 -07 7TH om) TwL(AcR) 3 6.0 BORING COMPLETED 03-02-07 CAVE IN DEPTH TIL 32.0' 0 72HRS. RIG CME 550WMNWINGO DRIIIDIG METHOD HSA alENT JOB BORING SHEET PIEDMONT TRIAD AIRPORT AUTHORITY 09.13835C B -101 2 OF 2 PROJECT NAME ARCHITECT- ENGINEER BALLINGER ROAD BORROW SITE SITE LOCATION Tjl'lO%-4O%—lOX-8OX-1 TONS OI - GREENSBORO, NORTH CAROLINA z r' 4 6} C 1fAlER LIQUID R CONTENT % LUM R DESCRIPTION OF MATgRM ENGLISH UNVS _V UALITY DESIGNATION &RECOVERY BOTTOM OF CASING ®— LOSS OF CIRCULATION ao D %- -- — Rec.% 00 SURFACE ELEVATION 875 O STAND AIM PPENETRATION BWW 3 10 eD 30 40 so+ Br own, Orangish Brown and Grayish Tan, Silty Fine SAND, With Mica, Wet, Loose to Medium Dense, (SM) -:1 9 1 SS I le 115 1 3 plell®u® it IS$I15115 KIM 1'R SS 18 15 50 I� 13 SS 18 10 � 55 END OF BORING ® 55.0' 7 0 55.8 )IS 0 48.2 13 82.9 !15 41:.5 0 40.8 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL $n DRY 0 BoRwO 8TARTED 03 -02 -07 TWL(BCR) TmOcR) 36.0' BORING COMPLETED 03 -02 -07 CAVE IN DEPTR a pVC In 32,0' 0 72HRS. RIG CME 550 WINGO Dm=" ' MI) HSA CLIENT PIEDMONT TRIAD AIRPORT AUTHORITY JOB # BORING # 09.13835C B -102 Si ET 1 GF 1 ! "p CAROLINAS PROJECT NAME BALLINGER ROAD BORROW SITE ARCHITECT – ENGINEER SM: LOCATION GREENSBORO, NORTH CAROLINA -0- CMM1kT %� DMZ s x a 4 6+ PLASTIC WATER LIQUID LiM X CONTENT X LBIlT X 0 ROCK QUALITY DESIGNATION & RECOVERY RQDX— 0%-4 — 6 RE 8 2096 - 4016 -60%r- 80%10096 ® STAND PENETRATION ID Pb 8b 4O 64t q a DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION b � � SURFACE ELEVATION 8 41.0 0 b 1 1 20 25 3 Topsoil Depth 3° 840 838 830 825 820 815 9 12 13 20 13 13 20 1 SS 18 - 14 RESIDUAL: Orangish Brown, SILT, Trace Clay, Moist, Stiff, (ML) 2 SS IB 14 Orangish Tan, SILT, Moist, Stiff, (ML) Dark Purplish Brown and Dark Tannish Brown, Silty Fine SAND, Moist, Medium Dense, (SM) END OF BORING 0 25.0' 3 SS 18 15 4 SS 18 1S 5 SS IS 15 6 St 18 15 '7 SS 18 15 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOD_ TYPES IN -SITU THE TRANSITION MAY BE GRADUAL $TL DRY WS OR 0 BORING STARTED 03 -02 -07 7WL(BCR) TWL(AcR) DRY BORING COMPLETED 03 -02 -07 CAVE IN DEP711 ® 16,0' Tn 19.0' 0 72HRS. RIG CME 55 WINGO DRM NG MBTHOD HSA CLMNT PIEDMONT TRIAD AIRPORT AUTHORITY JOB # 09.13835C I BORING # B -103 MEET 1 OF 2 �'! WLLP CAf20L1p4^S PROJECT NAME BALLINGER ROAD BORROW SITE ARCHITECT- ENGINEER SITE LOCATION GREENSBORO, NORTH CAROLINA -0 CALIBRATED pg o�R x $ '0�a . 4 6+ PLASTIC WATER LIQUID LDRT X CONTENT X LIMIT X g-- .,...��__.__�0 ROCK QUALTPY DESIGNATION & RECOVERY ROD%— — — REC.M 2016- 40916- 6016 --8OXr -100 0 sTANDM PENETRATION 10 20 so 40 604 ° z DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING ®- LOSS OF cIRCULATION t0 z SURFACE ELEVATION 865.0 0 Topsoil Depth 2" 1 SS 113 15 7 RESIDUAL: Orangish Brown, SILT, Moist, Firm to Stiff, (ML) 5 2 SS 18 15 860 f3 3 SS 18 15 .7 Brownish Orange and Yellowish 1 4 SS 18 15 Tan, Silty Fine SAND, Trace Mica, Moist, Loose to Medium Dense, (SM) 855 g 15 850 6 5 SS 18 15 3 845 6 SS 18 15 r 25 840 7 9 SS] IS 15 8 SS 18 12 30 - - - - -.... - - - - - - - ------ -- - --- CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SIII. TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7n 26.0' WS OR 0 BORING STARTED 03 — 01 — 07 ® n(BCR) TWQACR) BORING COMPLETED 03-01-07 CAVE IN DEPTH a no' Zn 24.0' 0 72HRS, RIG CME 550 WINGO DRumr- Ml<l'HOD HSA cum JOB # BORING # SHEET No i PIEDMONT TRIAD AIRPORT AUTHORITY 09.13835C B -103 2 OF 2 EC&Lp PROJECT NAME ARCHITECT - ENGINEER BALLINGER ROAD BORROW SITE CAROLINAS SITE LOCATION - CAURRATED PENMOMETER T01�s GREENSBORO, NORTH CAROLINA x a 4 a+ ASTIC NAM LIQUID q1F, MIT % CONTENT N UMIT R X 0— DESCRIPTION OF MATERIAL ENGLM UNITS CK QUALITY D ESIGNATION &RECOVERY BOTTOM OF CASING LOSS OF CIRCULATION � o � C� ROD % — X 6 —S 2ox— ao %— soap —so %1 00 ® STANDARD PENETRATION BLOWS/Ff. SURFACE ELEVATION 865.0 to ea so 40 60+ 3 Brownish Orange and Yellowish Ton, Silty Fine SAND, Trace Mica, Moist Loose to Medium Dense, (SM5 PARTIALLY WEATHERED ROCK: Dark 35- Brown and Dark Gray, Fine to 830 Medium SAND, Trace Mica, Moist to Dry, (WR) 40-: 828 50 45 END OF BORING ® 44.0' 820 50 81 55- 810 60 — — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY HE GRADUAL PL 26.0' WS OR ® BORING STARTED 03-01-07 T"CR) YWUACR) BORING COMPLETED 03-01-07 cnvE Da DEPTH 6 31.0' TwL 24.0' 0 72HRS. RIG CME 55DXRMNWINGO DRIU NG METHOD HSA """r" • JOB # BORING # SMET PIEDMONT TRIAD AIRPORT AUTHORITY 09.13835C j B -104 1 Dzr 'f PROJECT NAME ARCHITECT— ENGINEER SLIP, BALLINGER ROAD BORROW SITE CAROLINAS SITE LOCATION —o- PEOMMETER - GREENSBORO, NORTH CAROLINA do . $ 5 15 PLASTIC WATER LIQUID Topsoil Depth 3" , `. �+ + �' .' LURT 9 CONTENT X MIT R X --�-- 1 23.9 50 14.3 5 37.3 4 • 60.7 13 1 SS 18 15 DESCRIPTION OF MATERIAL. ENGLISH UKrm x I 2 +SS18 x ROCK QUALITY DESIGNATION & RECOVERY ng 3 BOTTOM OF CASING ®— LOSS OF CIRCULATION 100 18 ROD%— — — REC,36 a g �j �, 4 2036 - 4036 -60%— BOX -100%- ® STANDARD x /FT. SURFACE ELEVATION 843.0 15 Brownish Orange, SILT, Wet, Soft, (ML) Orangish Brown, Silty Medium to Coarse SAND, Moist, Medium Dense, (SM) DW 0 SS 18 15 -- - 10 •16 so 40 eo+ 5 15 Topsoil Depth 3" , `. �+ + �' .' 840 035 830 1 23.9 50 14.3 5 37.3 4 • 60.7 13 1 SS 18 15 POSSIBLE ALLUVIAL: Purplish Dark Gray, Clayey SILT, Wet, Very Soft, (ALLUV) 2 +SS18 15 POSSIBLE ALLUVIAL: Gray, Clayey SAND, Wet, Loose, (ALLUV) 3 SS 18 15 RESIDUAL: Grayish Green, Clayey SILT, Wet, Firm, (ML) 4 SS 18 15 Brownish Orange, SILT, Wet, Soft, (ML) Orangish Brown, Silty Medium to Coarse SAND, Moist, Medium Dense, (SM) 5 SS 18 15 Grayish Green to Orangish 1g 825 Brown, Silty Fine SAND, Moist, 6 SS 18 15 Medium Dense, (SM) 7 ISS118115 � j -j I I I ! END OF BORING ® 25.0' 4 o.�1_I_LJ ker I THE SYRATIFICATMN LINES REM SENT THE APPROXIMATE MUNDARY LINES )M'rVEEN SAIL TYPES IN -SITU THE TRANSITIDN MAY X GRADUAL ; SwL DRY WS OR ® BORING STARTED 03 -02 -07 TWgBCR) TW4ACR) BORING COMPIRM 03-02-07—CAVE IN DEPTH 6 22.0' ,T� 20.0' ® 24HRS, RIG CME 550W"AN WINGO i DRIUNG METHOD NSA CLWff PIEDMONT TRIAD AIRPORT AUTHORITY JOB # 09.13835C BORING # 1 B -105 s1izo 1 9F 1 �,�, LLP PROJECT NAME ARCHITECT — ENGINEER BALLINGER ROAD BORROW SITE CAROLINAS SITE LOCATION GREENSBORO, NORTH CAROLINA -o- CAUBRATED PENETROMETER i # TONS P. 54r I�'I. me RAISER Liqum I= M CONTENT R LTSIiT R ROCK QUALITY DESIGNATi0 oN &RECOVERY RQD9L— — — REC.A6 ---- -- 20%- 40%— GOX—SOX —100 ® STANDAM PME nON 10 EO 90 40 60+ a z° FN DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING LOSS OF CIRCULATION 100 SURFACE ELEVA77ON 841 .0 o � � Topsoil Depth 2" 840 RESIDUAL: Reddish and Orangish 1 SS 18 15 7 0 Brown, SILT, Trace Fine Sand, Moist, Firm, (ML) 35.3 8 SS 18 15 9 ! 5 41.5 835 11 • « 34.8 3 SS 18 15 Orangish Brown to Brownish Dark Tan, Silty Fine SAND, Moist, Loose to Medium Dense, (SM) 4 SS 18 15 1 e -0 37.0 854 9 5 SS 18 15 1 LP 33.6 825 223 6 SS is 15 20 18. 820 16 • 7 SS 18 15 2� - 20.7 END OF BORING ® 25.0' 815 3 _- THE STRATIFICATION LINES REPRESERt THE APPROXINATE BOUNDARY LINES BETWEEN SML TYPES IN -$ITu THE TkmSITtrw MAY 8E GRAwAL Vn DRY WS OR a BORING STARTED 03 -03 -07 ,T"CR) TwgAcR) DRY BOMG COMPLETED 03 -03 -07 CAVE IN DEM ® 16.0' b°WL RIG CME 550WMN WINGO DR UMr. MMOD ' NSA CLIENT PIEDMONT TRIAD AIRPORT AUTHORITY PROJECT NAME BALLINGER ROAD BORROW SITE SITE LOCATION GREENSBORO, NORTH CAROLINA O• 5 JOB # BORING # 09.13835C B -106 ARCHITECT - ENGINEER SHEET i OF 2 -0- ca nwm 2 ISSIIBI15 Orange to Orangish Brown, SILT, 3 SS 18 15 Trace Mica, Wet, Firm to Soft, (ML) PLASTIC WATER LIQUID L MI'T X CONTENT X Luc X ROCK QUALITY DESIGNATION & RECOVERY RODX— -- — REC.% 20%-40%-60X—BOX-1 00%— ® STANDARD `MTION to Lb 30 40 6D+ x 18 1 15 DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CASING &- LOSS OF CIRCULATION 100 11 o P SURFACE ELEVATION 852.0 • Topsoil Depth 3" 1 SS 18 15 18 450 6 RESIDUAL: Orangish and Reddish Brown, SILT, Moist, Firm to Q Stiff, (ML) 2 ISSIIBI15 Orange to Orangish Brown, SILT, 3 SS 18 15 Trace Mica, Wet, Firm to Soft, (ML) Orangish Brown and Gray, Silty Fine to Medium SAND, Trace Mica, Wet, Loose to Medium 7 SS 18 10 Dense, (SM) 0 R 1 8 1 SS 1 18 15 CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL Yn DRY WS OR ® BORING STARTED 03 -01 -07 TaW913m) TW(AcR)18.0' BORING COMPL.EM 03-01-07 CAVE IN DEPTH ® PVC WL 16.0' ® 72HRS. RIO CME 55DX=m WINGO DRMING MMOD HSA 4 SS 18 1 15 1 5 SS 18 15 15 Q 6 SS 18 7 20 Orangish Brown and Gray, Silty Fine to Medium SAND, Trace Mica, Wet, Loose to Medium 7 SS 18 10 Dense, (SM) 0 R 1 8 1 SS 1 18 15 CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL Yn DRY WS OR ® BORING STARTED 03 -01 -07 TaW913m) TW(AcR)18.0' BORING COMPL.EM 03-01-07 CAVE IN DEPTH ® PVC WL 16.0' ® 72HRS. RIO CME 55DX=m WINGO DRMING MMOD HSA RI4m JOB # BORING # SHEET PIEDMONT TRIAD AIRPORT AUTHORITY 09.13835C I B -106 2 OF 2 c LLP PROJECT NAME ARCHITECT — ENGINEER BALLINGER ROAD BORROW SITE GAROL�NAS SITE LOCATION CALMRA48D PE'jIEl 007ER T°�/�',70 GREENSBORO, NORTH CAROLINA ;g 4 6+ IC TA'I�RR LIQUID X CONTENT x Lnar x QUALITY DESIGNATION RECOVERY Ti DESCRIPTION OF MATERIAL ENGLISH UNITS BOTTOM OF CA91riG ®-- Id[33 OF CIRCULATION 100 A SURFACE ELEVATION 852.0 X- 4096 -60%— OX-100 3TANDAENETRATION 10 20 s0 40 60+ Orangish Brown and Gray, Silty Fine to Medium SAND, Trace Mica, Wet, Loose to Medium 820 Dense, (SM) PARTIALLY WEATHERED ROCK: 9 SS 18 15 Orangish Dark Brown, Silty Fine SAND, Trace Mica, Dry, Very Dense, (WR) 815 END OF BORING ® 35.0' 4 810 4 4 $a5 50 $aa 55 60 f-7951 TW MATIFICAT113N LINES REPRESENT THE APPMXIMATE BOUNDAIIY LINES BETWEEN St1U. TYPES IN -SITU THE TRANSITION MAY BE GRADUAL YWL DRY WS OR ® BORING STARTED 03 -01 -07 .TWL(BCR) TWL(ACR) 18. 0' BORING COMPLETED 03-01-07 CAVE DI DEPTH :gWL RIG CME 550XRmaNWINGO DRRIMG METHOD HSA CLIENT PIEDMONT TRIAD AIRPORT AUTHORITY PROJECT NAME BALLINGER ROAD BORROW SITE SITE LOCATION GREENSBORO, NORTH CAROLINA 1 I R ®1 R1 01 0 �.1 JOB # BORING # 09.13835C I B -107 ARCHrrECT- ENGINEER SFJEET t � ) Topsoil Depth 3" 1 SS 18 15 POSSIBLE _FILL: Orangish Brown and Graylsh Tan, Silty Fine SAND, With Clay, Moist, Medium 2 SS 18 15 Dense, (Possible Fill) RESIDUAL: Brownish Tan and 81 Orangish Brown, Fine SAND, S SS 18 15 Ira a Silt. Moist to Dry, Medium Dense to Dense, (SM) 4 ISS118115 END OF BORING ® 10.0' 81 s THE .MATWICATION LINES REPW-SEWr THE APPAm11iW1rE BOUNDARY LINES 9T4 IMN 9131L TYPES IN -SITU THE TRAa1SIT10N NAY BE GRADUAL :9n DRY WS OR 4D BORING STARTED 03-01-07 illynmcR) TW14ACR) DRY BORING COMPLW= 03 -01 -07 CAVE IN DEPTS 0 6.5' !o' RIG CME 550XMM WINGO oR RIG IMOD HSA PL1 MC WATn LIQUID U= % CONTENT R LIMIT % K QUALITY DESIGNATION & RECOVERY bl DESCRIPTION OF MATERIAL ENGLISH UNITS z BOTTOM OF CASING ®— LOSS OF CIRCULATION 100 O00 r2j0X-40%-60%-8OX—j % sTANDAR�P�ENE nTIoN SURFACE ELEVATION 820.0 /F'• Topsoil Depth 3" 1 SS 18 15 POSSIBLE _FILL: Orangish Brown and Graylsh Tan, Silty Fine SAND, With Clay, Moist, Medium 2 SS 18 15 Dense, (Possible Fill) RESIDUAL: Brownish Tan and 81 Orangish Brown, Fine SAND, S SS 18 15 Ira a Silt. Moist to Dry, Medium Dense to Dense, (SM) 4 ISS118115 END OF BORING ® 10.0' 81 s THE .MATWICATION LINES REPW-SEWr THE APPAm11iW1rE BOUNDARY LINES 9T4 IMN 9131L TYPES IN -SITU THE TRAa1SIT10N NAY BE GRADUAL :9n DRY WS OR 4D BORING STARTED 03-01-07 illynmcR) TW14ACR) DRY BORING COMPLW= 03 -01 -07 CAVE IN DEPTS 0 6.5' !o' RIG CME 550XMM WINGO oR RIG IMOD HSA 0T PIEDMONT TRIAD AIRPORT AUTHORITY JOB # 09.13835C BORING # B -108 SHEET 1 or 1 RFLLP CAROL /IVAS PROJECT NAME BALLINGER ROAD BORROW SITE ARCHITECT — ENGINEER SITE LOCATION GREENSBORO, NORTH CAROLINA =(?- CA1I}LRA PBN OM MM TONS i >t 4 e+ PLASTIC InER LIQUID LIMIT R CONTENT X Luar R X �-- -�~��� ROCK QUALITY DESIGNATION k RECOVERY RQDX -- — -- REC.% 2096 --40%— SOX -80% -100 ® STANDARD PENF°1RATION BLOWS/f. ao 20 so 40 80+ Q IG .., p O z° � � DESCRIPTION OF MATERIAL ENGLISH ;Jq BOTTOM OF CASING ®— LOSS OF CIRCULATION � z SURFACE ELEVATION 830.0 6 1 15-: i 20 25 3 Topsoil Depth 3" 825 820 815 810 805 8 1a 4 1 SS 18 15 RESIDUAL: Orangish Tan and Brown, SILT, Moist, Firm to Stiff, (ML) 2 Ss 18 15 Orangish Tan and Orangish Brown, SILT, With Black Inclusions, Wet, Soft, (ML) 3 SS 18 15 4 SS 18 15 -- END OF BORING ® 10.0' THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BDUN'DARY LINES KTVEEN SOIL TYPES IN -SITU THE TRANSMaN MAY K GRADUAL VWL DRY WS OR (D BORING STARTED 03 -03 -07 CR) Twr( )DRY SoRicic COMPLETED 03-03-07 CAVE IN DEPTII 0 6.0' '� RIG CME 550WMM WINGO DRILLING METHOD HSA y � M D AIRPORT AUTHORITY ROAD BORROW SITEO, NORTH CAROLINA 9 5- JOB # BORING # 09.13835C 8 -109 ARCHITECT - ENGINEER SHEET or 1 PLAMC $ATIM i bESCXPnON OF MATERIAL ENGLISH LO[I'f CON %TIT x 1J147' !L �i UNITS `� '�—A q BOTTOM OF CASING RM RUAUN DESIGNATION Ac RBCOVny LO33 OF CIRCULATION 100 c RQD9K— -. REC.X SURFACE ELEVATION a 2OA'r- 4pN`60X --8oX --I OOX-- I� R 28 0 I ISS118115 2 1 SS I'a 115 Topsoil depth 7" I RESIDUAL: Dark Brown and Orange and Tan, SILT, Trace Roots, Moist to Wet, Firm, NO 3 SS 18 15 Orange and Orangish Brown, Fine to Medium SAND, Trace Slit, Moist, Medium Dense, (SM) 4 SS I8 15 I END OF BORING ® 10.0' ; 1 8 2( 7; 25' THE STRATIFICATION LINES RrP1IE'SEHT TAE APPROXIMATE BM WARY LUGS BETWEEN SDO DRY WS OR 0 RORWG SrAIMn ,Y'cR)wt(ACR) DRY eoxDaG 03 — 0 3 — 0 7 coalPtETSD 03 -03 -07 zoo CMI= 550'"ium WINGO ►a� 61 IH -situ THE CAVE IN DEPTH 6 6,0' DRMMO UIOD NSA HAY BE GRADUAL