Loading...
HomeMy WebLinkAbout20110923 Ver 1_DCM Permit_20111221Rr=!l kor ow[g Do DE' 2 i! 2012 DENR - WA R QuALiTY In11....J_ n ... X L,(cav, t.cn a f I.li_ii r ta..,./'_t`:t t. ' ,C' ' S 113 -- io sued to Maritime Place POA, Inc., 2904 Maggie Ct.,1- gh ?E oin_t, N C 2720 -- 1 Authorizing development in Brunswick County adi to shaflote sound aiidththe Atww at the old Mauna and Baywatch Drive. in Ocean isle Beach _ , as requested in the permittee's letter dated 10/22/12, including the attached workplan drawings (3). all dated revised 10/18/12 'his permit, Issued on December 17. 2012 . is subject to comphance with the application (where consistent vrth the petmit), all applicable iegulations, special conditions and notes set forth below Any violation of these terms may be subject to fines, imprisonment or civil action, or may cause the permit to be null and void Y� 1) Unless specifically altered herein, this minor modification authorizes the extension and reconfigui ation ' of the pieviously authorized docking facility and the additional pilings No othei additional stiuctuies, whether floating or stationary, shall become a permanent part of this docking facility without permit modification No non -water dependent usrs of structines shall be coiiducted on, in or over public trust Wcltct' WIIJOut p('iii,il loodiiicallon permit authorizes two additional boat slips for a maximum of ten formalized boat slips 2) This pe p p (See attached sheet for Additional Conditions) Y I Ali d , f 1 d b 1 S ­ i b th^ autiioi it of the Secretar of DENR ind the 1 his pet mit ae tion may Le appea e y ilk pernli k' of ether qualified persons within twenty (20) days of the issuing cipte An appeal iequires resolution prior to work initiation or , ontmuanc,, as the case may be This permit must be accessible on -site to Department , ersonnel when the project is inspected for compliance Ally Nvoik or proj­ct niodification not co�ele iieieundei requues further Division appioval All work must cease when the permit expires on January 29, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Chan man of the Coastal Resouices Commission r Y 131 F��� 7 C. P, l'. is, r +ii"Ctnr :3I�ISI i1 of Coastal Mai,,ageisl�nt z This permit and its conditions aie hereby accepted Signature of Permittee _ �,.x::�1T41° r �u ^:- 1 _� ;, 3.3�� '�` >• - Y.i..I i t } cA °Lltj - ?3YV al4, ie,I Pti _ "'.lil a Y f Y f Y5 F � r t jLLA¢� q� 4 i 5 I Z a