HomeMy WebLinkAbout20110923 Ver 1_DCM Permit_20111221Rr=!l kor ow[g Do
DE' 2 i! 2012
DENR - WA R QuALiTY
In11....J_ n ...
X L,(cav, t.cn a f I.li_ii r ta..,./'_t`:t t. ' ,C' ' S 113 --
io sued to Maritime Place POA, Inc., 2904 Maggie Ct.,1- gh ?E oin_t, N C 2720 --
1
Authorizing development in Brunswick County adi to shaflote sound aiidththe Atww at the old Mauna
and Baywatch Drive. in Ocean isle Beach _ , as requested in the permittee's letter dated 10/22/12, including the
attached workplan drawings (3). all dated revised 10/18/12
'his permit, Issued on December 17. 2012 . is subject to comphance with the application (where consistent
vrth the petmit), all applicable iegulations, special conditions and notes set forth below Any violation of these terms may
be subject to fines, imprisonment or civil action, or may cause the permit to be null and void
Y� 1) Unless specifically altered herein, this minor modification authorizes the extension and reconfigui ation
' of the pieviously authorized docking facility and the additional pilings No othei additional stiuctuies,
whether floating or stationary, shall become a permanent part of this docking facility without permit
modification No non -water dependent usrs of structines shall be coiiducted on, in or over public trust
Wcltct' WIIJOut p('iii,il loodiiicallon
permit authorizes two additional boat slips for a maximum of ten formalized boat slips
2) This pe p p
(See attached sheet for Additional Conditions)
Y I
Ali
d ,
f
1 d b 1 S i b th^ autiioi it of the Secretar of DENR ind the
1 his pet mit ae tion may Le appea e y ilk pernli k' of
ether qualified persons within twenty (20) days of the issuing
cipte An appeal iequires resolution prior to work initiation or
, ontmuanc,, as the case may be
This permit must be accessible on -site to Department
, ersonnel when the project is inspected for compliance
Ally Nvoik or projct niodification not co�ele
iieieundei requues further Division appioval
All work must cease when the permit expires on
January 29, 2015
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program
Chan man of the Coastal Resouices Commission
r
Y
131 F��� 7 C. P, l'. is, r +ii"Ctnr
:3I�ISI i1 of Coastal Mai,,ageisl�nt z
This permit and its conditions aie hereby accepted
Signature of Permittee
_ �,.x::�1T41° r �u ^:- 1 _� ;, 3.3��
'�` >• - Y.i..I i
t
}
cA °Lltj - ?3YV al4, ie,I Pti _ "'.lil
a
Y
f
Y
f
Y5
F
�
r
t
jLLA¢�
q�
4
i
5
I
Z
a