Loading...
HomeMy WebLinkAbout20110601 Ver 1_Certification of Completion_20130111' 44 � HCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, PE Dee Freeman Governor Director Secretary DWQ Project No ` ill, -- 0-(o C) � County \Ij Applicant. e_ q�O t` k is Project Name- 5 e— C,_J Ve (, ,r- Date of Issuance of 401 Water Quality Certification 3 a ►"\ e,t a ,r `� _ 9 D 2 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffet Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40 UWetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 'Phis form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer it is not necessary to send certificates from all of these Applicant's Certification 1, _ hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Agent's Certification Date. 11 _ , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was obsei ved to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the apps oved plans and specifications, and other supporting materials Signature Date If thus project was designed by a Certified Professional 1, S--L—c, Y\ rz e-- V\ as a duly registered Professional (i e , Engineei, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorised to observe �periodicailYr weekly, full time) the construction of the project, for the l ermitee hereby state that, to the best of my abilities, due caie and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature A L0,-,ti2,_. / ,.a,�,�,•�� Date t g L2 01 3 1650 Mail Service Center, Raleigh, North Carolina 276991650 Location 512 N Salisbury St Floor 9 Raleigh North Carolina 27604 -1170 Phone 919 -807 63011 FAX 919 807 -6494 Internet wwwncwatorquaittyorg An Equal Opporturdi I AUurnahea Action Employer Registration No 0 2- (b °V H 2 @��0� �D JAN 1 1 2013 No thCaxolina ilhi4 Dennison, Laurie From: Stanley, Chris [Chris Stanley @raleighnc gov] Sent: Friday, January 11, 2013 4 01 PM To- Higgins, Karen, Dennison, Laurie Cc Lance Strawn (strawnl @usi -eng com) Subject North Hills Drive Culvert Repair - DWQ Project # 11 -0601, Certificate of Completion (Mine Creek 030402, 22- 33 -14, C, NSW) Attachments: CertificateOfCompletion pdf Please find attached the signed Certificate of Completion for the above referenced culvert replacement project for the City of Raleigh Stormwater Utility Let me know of any questions, concerns or needs for additional information Regards, Chris Stanley, PE Project Engineer II City of Raleigh Stormwater Utility 919- 996 -4003 From: Lance Strawn [mailto strawnl @usi- eng.com] Sent: Tuesday, January 08, 2013 2.31 PM To: Stanley, Chris Subject: RE- North Hills punch list Chris- Here is the Certificate of completion Let me know if you need anything else Thanks, Lance "E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized City or Law Enforcement official " JA IV r� 2013 1