Loading...
HomeMy WebLinkAboutNCC203721_NOT Closeout Documents_20210429North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Pender Project: Topsail 230kV Tap Line for NCDOT River basin: Cape Fear Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: PENDE-2021-001 Director of Transmission Permitting Address: 440 South Tryon St, Charlotte, NC 28202 1. Project Location: Saint Johns Church Road, Hampstead Pictures: No 2. Weather and soil conditions: sunny and dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): none Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Project appears complete and stabilized. Title: Date given/sent: April 15, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Trent James Others present: Date of inspection: April 14, 2021 Time arriving on site: 1:25 PM Time leaving site: 2:00 PM cc: