Loading...
HomeMy WebLinkAbout20120914 Ver 1_DCM Permit_20121207t �.3 i '711, i T l ' � i„ '_0t 5o -94 DEC 7 2012 r r anrw " ;� cauAi,TY D` ,I�,Y'''�;C�Jf '�l i `� i', L t.' /i °�1�._ .. :t,'! � �t�;r'i777, watBP�anch X Exca%a',ion and/ci i 11 ng ourstrant NC GS 113, -229 Issued to Harbour Village :Marina, PO Box 9993, Hampstead, iy C 28443 Authorizing development in Pender County at adl to AIWW, marina basin off of SR 1566 at v Harbour Village as requested in the permittee's letter dated 9/10/12 7 This permit, issued on December 3. 2012 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below Any violation of these teams may f be subject to fines, imprisonment or civil action, or may cause the permit to be null and void h 1) This renewal shall be tittached to the original of t'ermit No 56 -94 which was issued on 4/13/94, as well i as all subsequent renewals and minor modifications, and copies of all documents shall be readily available can site when Division personnel inspect the project foi compliance YI f Y 2) All i onddior, ,tid stipuloticiii� o" ilia, Live pF�uuit I(II)an) iit 1oi(c under this Icnewal Maintesiance Clause 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit and that notification include A The numbet of the original permit B A statement that no dimensional changes are proposed C A copy of the original permit plan(s) with cross - hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed D The date of plan revision and the permittee's signature shown anew on the original plan This permit action may be appealed by the pernuttce of other quahf,ad perFons within twcnty (20) days of the issuing date An appeal teclunes resolution piior to wor'., initiation or continuance as the case may be This permit shall be accessible on -site tn Department personnel when the project is inspected for complimce a Any maintenance work or project modification not covered hereunder requires further Division approval All work shall cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program Signed by the authority of the Secietary of DENR and the Chairman cf tl -c Coastal Resouices Commission Braxton C Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted Signature of Permittee i Y Y