HomeMy WebLinkAbout20120914 Ver 1_DCM Permit_20121207t
�.3
i '711, i T l ' � i„ '_0t
5o -94
DEC 7 2012
r
r anrw " ;� cauAi,TY
D` ,I�,Y'''�;C�Jf '�l i `� i', L t.' /i °�1�._ .. :t,'! � �t�;r'i777, watBP�anch
X Exca%a',ion and/ci i 11 ng ourstrant NC GS 113, -229
Issued to Harbour Village :Marina, PO Box 9993, Hampstead, iy C 28443
Authorizing development in Pender County at adl to AIWW, marina basin off of SR 1566 at
v
Harbour Village as requested in the permittee's letter dated 9/10/12
7
This permit, issued on December 3. 2012 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below Any violation of these teams may
f be subject to fines, imprisonment or civil action, or may cause the permit to be null and void
h
1) This renewal shall be tittached to the original of t'ermit No 56 -94 which was issued on 4/13/94, as well
i as all subsequent renewals and minor modifications, and copies of all documents shall be readily
available can site when Division personnel inspect the project foi compliance
YI
f
Y
2) All i onddior, ,tid stipuloticiii� o" ilia, Live pF�uuit I(II)an) iit 1oi(c under this Icnewal
Maintesiance Clause
3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of
any maintenance work authorized by this permit and that notification include
A The numbet of the original permit
B A statement that no dimensional changes are proposed
C A copy of the original permit plan(s) with cross - hatching indicating the area to be maintained
and the area to be used for dredge spoil, and the estimated amount of material to be removed
D The date of plan revision and the permittee's signature shown anew on the original plan
This permit action may be appealed by the pernuttce of
other quahf,ad perFons within twcnty (20) days of the issuing
date An appeal teclunes resolution piior to wor'., initiation or
continuance as the case may be
This permit shall be accessible on -site tn Department
personnel when the project is inspected for complimce
a
Any maintenance work or project modification not covered
hereunder requires further Division approval
All work shall cease when the permit expires on
December 31, 2021
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program
Signed by the authority of the Secietary of DENR and the
Chairman cf tl -c Coastal Resouices Commission
Braxton C Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted
Signature of Permittee
i
Y
Y