Loading...
HomeMy WebLinkAboutNCC190256_Notice of Termination_20210430Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 4/30/2021 2:12:33 PM (NOT Submittal) Approve by Morman, Alaina 4/30/2021 3:08:09 PM (NOT Request Review- NCC190256) • The task was assigned to Morman, Alaina. The due date is: May 5, 2021 5:00 PM 4/30/2021 2:12 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190256 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status OPEN K/hy be blank (if not yet billed). Information associated with this permit: Project Name Mt. Holly Steam Station Decommissioning Address 599 American Street, Mt Holly, NC County Gaston Latitude 35.1720 Longitude -81.0032 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible Ronnie Goodman Individual NC Reference No. NCG01-2019-0256 E&SC Plan ID GASTO-2019-019 Original NOI 10927 Tracking No. Date COC Issued 5/13/2019 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 4/13/2021 Inspection Approval Project Close-out GASTO-2019-019 Close out.pdf 125.29KB Approval Mast be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Amide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Ronnie Goodman Title * Manager Reg Plant Demo and Retirement Organization* Plant Demolition and Retirement Date * 04/30/2021 Email for ronnie.goodman@duke-energy.com Confirmation * Contact Telephone* 7042633216 NOT Certification NCG01 - NOT.pdf Form Mast be FDF Forrrst Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Erails (Optional) Original Permittee CCdonNotification Errails Email ronnie.goodman@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email richard.massey@duke-energy.com 360.69KB