Loading...
HomeMy WebLinkAboutNCG060295_DMR June-Sept_20200915 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 09/15/2020 CERTIFICATE OF COVERAGE NO. NCG06 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD ❑Jan-June ❑July-Dec PERSON COLLECTING SAMPLES Robert Jackson or *Monthly_August (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 r`M1 Au TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RF F: �r LS) ['Zero-flow ❑Water Supply ❑SA S E P 21 2020 ❑■Other c;sw FACILITY ACTIVITIES INCLUDE (check all that apply): 4},v 1 , 1G^! ❑l use/process meats ❑ use animal fats/byproducts PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall 2 or ❑ No discharge this period' OutfaII No. Date Sample TSS, pH, COD, Oil and Grease, Fecal Coliform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 unable to obtain a representative sample 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. °See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month? ❑yes ❑ no (if yes, complete Part B) Permit Date: 11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>S5 gal of new motor oil/month. Date Sample Collected 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended Solids Outfall No. Inchesx Hydraulic Oil Usage Petroleum Hydrocarbons (mo/dd/yr) Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 45529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Ei NO 0 IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES NO Q REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4:`_..46,411/t) Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 2 of 2 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 09/15/2020 CERTIFICATE OF COVERAGE NO. NCGO6 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD ❑Jan-June ❑July-Dec PERSON COLLECTING SAMPLES Robert Jackson or ❑■Monthly_August (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 DISCHARGING TO CLASS ❑ORW ❑HQW ['Trout ❑PNA ❑Zero-flow ❑Water Supply ESA ■❑Other C;Sw FACILITY ACTIVITIES INCLUDE(check all that apply): ❑■ use/process meats ❑ use animal fats/byproducts PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall 2 or ❑ No discharge this period' OutfaII No. Date Sample TSS, pH, COD, Oil and Grease, Fecal Coliform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 unable to obtain a representative sample I Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. 'See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month? ❑yes ❑ no (if yes,complete Part B) Permit Date: 11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Date Sample Collected 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total Total Suspended Solids Outfall No. Inchesz Hydraulic Oil Usage Petroleum Hydrocarbons (mo/dd/yr) Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO 0 IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO 0 REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports) to; Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." .4)‘d Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 2 of 2 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 08/14/2020 CERTIFICATE OF COVERAGE NO.NCGO6 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD ID Jan-June ❑July-Dec PERSON COLLECTING SAMPLES Robert Jackson or ❑Q Monthlys_July (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 DISCHARGING TO CLASS ❑ORW ❑HQW ['Trout ❑PNA ❑Zero-flow ❑Water Supply ❑SA •Other C;Sw RE�'`FIVLITY ACTIVITIES INCLUDE(check all that apply): Muse/process meats ❑use animal fats/byproducts AUG 2 5 2020 CC rcf"L i=1 SE REMEMBER TO SIGN ON THE REVERSE-4 UUJ� �z. 11ff�F► Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall 2 wA or ❑No discharge this period3 Outfall No. Date Sample TSS, pH, COD, 011 and Grease, Fecal Coliform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 unable to obtain a representative sample — 1 Only applies to facilities that use/process meats. 'The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at Kly outfalls.You must still submit this discharge monitoring report with a checkmark here. 'See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. SMonthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month?•yes 0 no (if yes,complete Part B) Permit Date:11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Outfall No. Date Sample Collected 24-hour rainfall amount, New Motor OH or Non-Polar O&G/Total (mo/dd/yr) Inchesz Hydraulic Oil Usage Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 unable to obtain a representative sample Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES 0 NO r REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR, including all"No Discharge"reports,_within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ccejZti Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 2 of 2 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 08/14/2020 CERTIFICATE OF COVERAGE NO.NCGO6 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD ❑Jan-June ❑July-Dec PERSON COLLECTING SAMPLES Robert Jackson or QMonthlys_July (month) LABORATORY Cameron Testing Services,inc. Lab Cert.# 645 DISCHARGING TO CLASS ❑ORW DHQW ❑Trout ❑PNA ❑Zero-flow ['Water Supply ❑SA ['Other c;sw FACILITY ACTIVITIES INCLUDE(check all that apply): ❑� use/process meats ❑use animal fats/byproducts PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall'Nth or ❑No discharge this period' Outfall No. Date Sample TSS, pH, COD, Oil and Grease, Fecal Conform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 unable to obtain a representative sample 1 'Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. °See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month?Q yes ❑no (if yes,complete Part B) Permit Date: 11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Outfall No. Date Sample Collected 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total (mo/dd/yr) Inches2 Hydraulic Oil Usage Petroleum Hydrocarbons Total Suspended Solids Benchmarks Parameter Code - - 15 mg/L 100 mg/L or 50 mg/L" - 46529 NCOIL 00552 C0530 unable to obtain a representative sample Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES n NO 0 REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR,including all"No Discharge"reports,_within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." F -lc Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU 249,Last Revised 11/5/2018 Page 2 of 2 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 RECEI\/pu Date submitted 07/06/2020 JUL 13 2020 CERTIFICATE OF COVERAGE NO. NCGO6 0 2 9 5 SAMPLE COLLECTION YEAR 2020 CENTRAL FILE• FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant DWR SECTION COUNTY Robeson SAMPLE PERIOD ❑Jan-June ❑July-Dec PERSON COLLECTING SAMPLES Robert Jackson or 0Monthlys_June (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 DISCHARGING TO CLASS ❑ORW ❑HQW ['Trout ❑PNA ❑Zero-flow ❑Water Supply ❑SA *Other c;sw FACILITY ACTIVITIES INCLUDE(check all that apply): ❑■ use/process meats ❑ use animal fats/byproducts PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall�1.95" or ❑ No discharge this period' OutfaII No. Date Sample TSS, pH, COD, Oil and Grease, Fecal Conform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 01 06/15/20 17.6 5.98 <10.0 <5.00 340 02 no discharge 03 06/15/20 163 5.96 143 <6.00 2600 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. 4See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month? ❑� yes ❑ no (if yes, complete Part B) Permit Date: 11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Outfall No. Date Sample Collected 24-hour rainfall amount, New Motor Oil or Non-Polar O&G/Total (mo/dd/yr) Inches2 Hydraulic Oil Usage Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - 15 mg/L 100 mg/L or 50 mg/L4 Parameter Code - 46529 NCOIL 00552 C0530 02 no discharge Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO El IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES El NO 0 REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR,Including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and impriso ent for know' g violation ." Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 I SWU-249,Last Revised 11/5/2018 Page 2 of 2 STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG060000 Date submitted 06/22/2020 CERTIFICATE OF COVERAGE NO. NCG06 0 2 9 5 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Mountaire Farms Inc.-Lumber Bridge Processing Plant COUNTY Robeson SAMPLE PERIOD ❑Jan-June n July-Dec PERSON COLLECTING SAMPLES Robert Jackson or *Monthly' May (month) LABORATORY Cameron Testing Services,Inc. Lab Cert.# 645 DISCHARGING TO CLASS fORW ❑HQW ❑Trout ❑PNA ❑Zero-flow ❑Water Supply nSA n fOther C;Sw FACILITY ACTIVITIES INCLUDE (check all that apply): 3UN 9, 9 Zd2� n use/process meats ❑ use animal fats/byproducts lLY a ail L1\'J'� J`��i PLEASE REMEMBER TO SIGN ON THE REVERSE- Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall�4.8" or ❑No discharge this period' Outfall No. Date Sample TSS, pH, COD, Oil and Grease, Fecal Coliform, Enterococci, Collected,mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 ml Colonies per 100 ml Benchmark - 100 or 504 Within 6.0—9.0 120 30 10001 5001 Parameter Code - C0530 00400 00340 00556 31616 61211 01 05/19/20 53.1 7.59 35.4 <6.00 5800 02 no discharge 03 05/19/20 52.0 6.22 56.4 <6.00 8200 'Only applies to facilities that use/process meats. 'The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. 4See General Permit text,Table 1,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new oil per month? ❑■ yes ❑ no (if yes, complete Part B) • Permit Date: 11/1/2018-05/31/2021 SWU-249, Last Revised 11/5/2018 Page 1 of 2 Part B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Outfall No. Date Sample Collected 24-hour rainfall amount, New Motor O[I or Non-Polar O&G/Total Total Suspended Solids (mo/dd/yr) Inchesa Hydraulic Oil Usage Petroleum Hydrocarbons Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/14 Parameter Code - 46529 NCOIL 00552 C0530 02 no discharge Footnotes from Part A also apply to Part B *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES El NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES El NO Q REGIONAL OFFICE CONTACT NAME: Bradley Bennet Mail an original copy of this DMR,including a!!"No Discharge"reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of"No Discharge"reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the Information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." auf0(j— ,Z2 -p? Signature of Permittee Date Permit Date:11/1/2018-05/31/2021 SWU-249,Last Revised 11/5/2018 Page 2 of 2