Loading...
HomeMy WebLinkAbout20201511 Ver 1_final signed B 5642 RGP 50_20210430 Electronically Transmitted U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2016-02146 County:Brunswick U.S.G.S. Quad:NC-ACME GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: NCDOT Phil Harris,P.E. Address: 1000 Birch Ridge Drive Raleigh,NC 27610 E-mail: pharris@ncdot.gov Size(miles) 0.161 Nearest Town Leland Nearest Waterway Batarora Creek River Basin Cape Fear USGS HUC 03030005 Coordinates Latitude:34.248203 Longitude:777.144823 Location description: The project(B-5642)area is located along Hwy 87 between Hwv 74/76 and Hwv 17 at Bridge#65 crossing Baratora Creek,Brunswick County. Description of projects area and activity: The existing 6lfoot long,29foot wide,3-span structure will be replaced on the existing alignment.The new bridge will be 70 feet long and a minimum 42-foot 10-inch clear roadway width. Standard road building equipment will be used and off-site detour utilized during construction.Aerial power lines and an underground fiber optic cable need to be adjusted along the project to facilitate construction.The bridge replacement will require the following impacts: 0.07 of an acre of mechanized land clearing,0.04 of an acre of roadway fill,and 0.31 of an acre of hand clearing in wetlands for utilities. Applicable Law(s): N Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: North Carolina Department of Transportation SAW-2019-02350(RGP 50) Nationwide Permit 57 Electric Utility Line and Telecommunications Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions,your application signed and dated 4/21/2021,and the enclosed plans Permit Drawing 1-6 of 6 dated 1/14/2021 and Utility Drawing 1-5 of 5 dated 3/24/2021.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified,suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended,revoked,or is modified,such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory program, please contact Brad Shaver at 910-251-4611or brad.e.shavernu,usace.armv.mil. Digitally signed by Brad Shaver Date:2021.04.30 09:01:33 Corps Regulatory Official: -04'00' Date:4/30/2021 Expiration Date of Verification: 12/31/2021 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Copy furnished(electronic): NCDOT-Div 3 attn: Mason Herndon NCDOT attn: Chris Rivenbark NCDOT attn: Gordon Cashin NCDWR attn:Joanne Steenhuis NCDMS attn: Beth Harmon SAW-2016-02146 SPECIAL CONDITIONS 1. All work must be performed in strict compliance with the plans attached to the application received 4/21/2021, Permit Drawings 1-6 of 6 dated 1/14/2021, and Utility Drawings 1-5 of 5 dated 3/24/2021 which are authorized by this permit. Any modification to the authorized permit plans must be approved by the USACE prior to implementation. COMPLIANCE WITH SPECIAL CONDITIONS 2. Failure to institute and carry out the details of the following special conditions, below, will result in a directive to cease all ongoing and permitted work within waters and/or wetlands associated with the permitted project, or such other remedies and/or fines as the District Engineer or his authorized representatives may seek. CONSTRUCTION PLANS 3. The permittee will ensure that the construction design plans for this project do not deviate from the authorized permit plans. Any deviation in the construction design plans will be brought to the attention of the Corps of Engineers, Wilmington Regulatory Field Office prior to any active construction in waters or wetlands. CONTRACTOR COMPLIANCE 4. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit, and any authorized modifications. A copy of this permit including the authorized plans referenced in Special Condition (1) and authorized modifications, including all conditions, shall be available at the project site during construction and maintenance of this project. ACTIVITIES NOT AUTHORIZED 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill, or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands, or shall any activities take place that cause the degradation of waters or wetlands. In addition, except as specified in the plans attached to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within, into, or out of waters or wetlands or to reduce the reach of waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material or construction equipment within waters or wetlands outside the permitted area. BORROW AND WASTE 6. To ensure that all borrow and waste activities occur on high ground and do not result in the degradation of adjacent wetlands and streams, except as authorized by this permit, the permittee shall require its contractors and/or agents to identify all areas to be used to borrow material, or to dispose of dredged, fill, or waste material. The permittee shall provide the USACE with appropriate maps indicating the locations of proposed borrow or waste sites as soon as the permittee has that information. The permittee will coordinate with the USACE before approving any borrow or waste sites that are within 400 feet of any streams or wetlands. All jurisdictional wetland lines on borrow and waste sites shall be verified by the Corps of Engineers and shown on the approved reclamation plans. The permittee shall ensure that all such areas comply with the preceding condition of this permit, and shall require and maintain documentation of the location and characteristics of all borrow and disposal sites associated with this project. This information will include data regarding soils, vegetation and hydrology sufficient to clearly demonstrate compliance with the preceding condition. All information will be available to the USACE upon request. NCDOT shall require its contractors to complete and execute reclamation plans for each waste and borrow site and provide written documentation that the reclamation plans SAW-2016-02146 have been implemented and all work is completed. This documentation will be provided to the Corps of Engineers within 30 days of the completion of the reclamation work. REPORTING OF VIOLATIONS 7. The permittee will report any violation of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act in writing to the Wilmington District, U. S Army Corps of Engineers, within 24 hours of the permittee's discovery of the violation. SEDIMENTATION AND EROSION CONTROL MEASURES 8. All fill material must be adequately stabilized at the earliest practicable date to prevent sediment from entering into adjacent waters or wetlands. The permittee shall remove all sediment and erosion control measures placed in wetlands or waters, and shall restore natural grades in those areas,prior to project completion. ENDANGERED SPECIES 9. This USACE permit does not authorize you to take a threatened or endangered species, in particular, the Northern Long-eared Bat (NLEB) (Myotis septentrionalis). In order to legally take a listed species,you must have separate authorization under the Endangered Species Act (ESA) (e.g., a Biological Opinion(BO) under the ESA, Section 7, with"incidental take"provisions with which you must comply). The U.S. Fish and Wildlife Service's (USFWS's)Programmatic BO titled "Northern Long-eared Bat(NLEB) Programmatic Biological Opinion for North Carolina Department of Transportation(NCDOT) Activities in Eastern North Carolina(Divisions 1-8)," dated March 25, 2015, and adopted on April 10, 2015, contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take"that are specified in the BO. Your authorization under this USACE permit is conditioned upon your compliance with all the mandatory terms and conditions (incorporated by reference into this permit) associated with incidental take of the BO. Failure to comply with the terms and conditions associated with incidental take of the BO, where a take of the listed species occurs, would constitute an unauthorized take, and would also constitute non-compliance with your USACE permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its BO and with the ESA. MITIGATION 10. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Digitally signed by Brad Shaver i ,...( Date:2021.04.30 09:04:27 -04'00' Action ID Number: SAW-2016-02146 County: Brunswick Permittee: NCDOT, Phil Harris, P.E. Project Name: B 5642 Date Verification Issued: 4/30/2021 Project Manager: Brad Shaver Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Brad Shaver Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 or brad.e.shaver@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Compensatory Mitigation Responsibility Transfer Form Permittee: NCDOT, Phil Harris, P.E. Action ID: SAW-2016-02146 Project Name: B 5642 County: Brunswick Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S.Army Corps of Engineers(USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit,or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsor Instructions to Sponsor:The Sponsor must verify that the mitigation requirements(credits)shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed,the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee,the USACE Project Manager,and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin:03030005,Cape Fear River Basin Stream Impacts(linear feet) Wetland Impacts(acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.11 *If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030005, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.22 Mitigation Site Debited: NC DMS (List the name of the bank to be debited. For umbrella banks,also list the specific site. For NCDMS,list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form,confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor,and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager(address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied,as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions:A letter from NC DMS,confirming they are willing and able to accept the applicant's compensatory mitigation responsibility,dated 3/29/2021 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed,the Sponsor should provide copies of this form along with an updated bank ledger to:1)the Permittee,2)the USACE Project Manager at the address below, and 3)the Wilmington District Mitigation Office,Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest,NC27587(email:todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: Brad Shaver USACE Field Office: Wilmington Regulatory Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 Email: brad.e.shaver@usace.army.mil Digitally signed by Brad C eer Dat C� Date:2021.04.30 09:07:17 -04'00' 4/30/2021 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios,functional assessments, and mitigation bank location and availability, and credit classifications(including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil