Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0038753_Regional Office Historical File Pre 2018
Water Resources CNVIRONMENT AL QUALITY October 3, 2016 Mr, Wilmer Melton, III, Director of Public Works City of Kannapolis 401 Laureate Way. Kannapolis, North Carolina 28081 Subject: Dear Mr. Melton: P-7,71,0 trmn P417 MCCROtestr77771 ovvoitor DONALD R. VAN DER VA.ART Secrofury S. JAY ZI.M.MERMAN Permit No. No. WQ0038753 City of Kannapolis PEGH Investments LLC Mass Grading Wastewater Collection System Extension Pe Cabarrus County In accordance with your application received September 22, 2016, we are forwarding herewith Permit No. WQ0038753 dated October 3, 2016 to the City of Kannapolis (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition IL 1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office I 610 East Center Avenue, Suite 301 I Mocausville, North Carolina 2S115 704 663 1699 If you need additionalinformation concerning this matter, please con et Ori Tuvia at (704) 235-2190 r via e-mail at ori.tuvi cde i v Sincerely, fea, by W. Corey Basinger, Regional SuperviSupervisor Water Quality Regional Operations Section Division ision of Water Resources, NCDEQ cc Greg Welsh P.E (E-copy) Mooresville Regional Office Files Water Resources Central Files PER E-copy) Page of STATE OF NORTH CAROLINA. ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER ATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapolis Cabarrus County for the construction and operation of approximately 370 linear feet of 8-inch PVC gravity sewer and 359 linear feet of 8-inch DIP gravity sewer; to serve PEGH Investments LLC Mass Grading, and the discharge of 26,400 gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received September 22, 2016, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum. Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000,, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. y W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0038753 Permit Issued: October 3, 2016 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET City of Kannapolis is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDMONS 1) No flow in excess of the quantity permitted herein, 26,400 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division, [15A NCAC 02T.0304 (b)] H. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 1.5.A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000,.as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01 1. 0] This permit shall be effective only with respect to the nature and volume ofwastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Perrnittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2'T .0403. If an individuai permit is not required, the following performance criteria shall be met: [15.A NCAC 02T .0108(b)]: Page 4 of 8 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shaft be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. g. A general observation of the entire sewer system shall be conducted at least once per year. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C, h. A Grease Control Program is in place as follows: For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained, in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volurne, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(aI)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification foul' attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10°A or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Desit Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10, Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T ,0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Pennittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15.A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all. statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF PERMIT #: WQ0038753 PROJECT: PEGH INVESTMENTS LLC MASS GRADING ISSUE DATE: OCTOBER 3, 2016 APLIS This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Titte Signature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional En the State of North Carolina, having been authorized to observe (0 periodically, E weekly, LI fUll tirne) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February l2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: LI Final Ell Partial (include description) Certification Comments/Qualifiers (attach if necesa NC DWR —Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 •61,44sion of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Application Number: / (to be comp! clted by DWR) All items must be cotipIeted or the application will be returned APPLICANT INFORMATION: 1 Applicant's name: Citv of KnLapc 2, Applicant type: 0 Individual El Federal any, municipality,110A„ uU 1 it etc.) 0 Corporation 0 State/County [1] General. Partnership Z Nlunicipal Signature authority's name: Wilmer Melton per l5A NCAC 02T ,01061b) Title: Director of Public Works 4, :,kpplicant's mailing address: 401 Laureate Wav City: Kannapolis State: NC Zip: 28081-0005 5, Applicant's contact information: Phone number: (704)920-4200 Email Address: wmeltota?(:),kannapolisne,goy 11. PROJECT INFORMATION: 1, Project name: PEGH investments LLC Mass Grading 2, Application/Project status: Z Proposed (New Permit) if a inodification, provide the existing permit number: WOO° El Privately -Owned Public Utility 0 Other ID Existing Permit/Project and issued date: Inew construction but part of a master plan, provide the existing permit .number. WQ00 3, County where project is located: C:iabariais 4, Approximate Coordinates (Decimal Degrees): Latitude: 35,4438' Longitude: -8' ,6758' 5, Parcel ID Of applicable): 5602009407 (or Parcel 1.D to closest downstream sewer) 1111. CONSULTANT INFORMATION: Professional Engineer: Greg Welsh License Number: 33996 Firm: Burton Engineering Associates Mailing address: 5950 Fairview Road, Suite 100 City: Charlotte State: NC Zip: 28210- Phone number: (704) 553-8881 Email Address,: gregfiiiburtonengineering„com IV. WASTEWATER 'TREATMENT FACILITY (AVWTF) INFORMATION': I, Facility Name: Rocky Rier Regional ‘,Vastexvater 'Ureatment Plant Permit Number: NC0036269 Owner Name: Water& Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ___ System Wide Collection System Permit Number(s) V' Owner Name(s): 4 9 WORY)S OF"FICE 1'0 M: 1l'-1/A 04-16 Page 1 (.)1 GENERAL REQUIREMENTS 1. If the ,Applicant is a Privately -Owned Public Utility, has it Certificate of Public Convenience and Necessity been attached? El Yes ElNo NIA 2„ If the Applicant is a .Developer of lots to be sold, has a Developers Operational \reemen jj RjJEV) been attached? 3„ If the Applicant is a Horne/property 0 NVner 4, Origin of iivastewater (cheek all that apply): El Residential Owned El Residential Leased [1] School / preschool / day care Food and drink facilities Z Businesses / offices / factories []Yes L10 NIA ssociation. has an Operational Agreement (FORM: IlOAl been attached? Ej Yes EN° IN/A Retail (stores, centers, malls) Lil Retail with food preparationlservice Ej Medical / dental / veterinary facilities Church Lil Nursing Ilonle Nature of wastewater : % Domestic/Commercial % Industrial (See I 5A NCAC 0.21 00_(1,:i Commercial 103 2 )1- Is there a Pretreatment Program in effect? 6„ Has a flow reduction been approved under I 5A NCAC 02T :0114(1)? ves - vide a eop offlow reduction apDroval letter Summarize wastewater generated by project: pe (see 02T.0114(n) unknown Yes Daily Design HOW ''b Er] Car Wash El Hotel and/or Motels El Swimming Pool /Clubhouse Ej Swimming Pool/Filter Backwash. [1 Other (Explain in Attachment) CS N4 No No. of Units Flow 880 galhicre 30 26,400 GPD gal/ GPD al GPD gal gal/ GPD GPD GPD Totaf 26,400 GPD a Sec 15A NCAC 024° :0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (4,e,, minimum flow per dwelling, proposed unknown non-residential development uses; public access facilIties located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. Per 15A NCAC 0.271 .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T,011:41 shall he determined .using available flow data, water using fixtures, occupancy (r operation patterns, and other measured data, 8, Wastewater generated by project: 26,400 GPD (per 15A NCAC 02T .0114) Do not include future flows or previously pertained allocations lf permitted flow is zero, indicate why: Li Pump Station or Gravity Sewer Where :flow Will be permitted in subsequent permits thatconnect to this line Ej Flow has already been allocated in Permit 'Number: El Rehabilitation or replacement ofexisting sewer with no mew flow expected. E Other (Explaini: FORM: FTA 0116 Page 2 01'5 VII. GRAVITY SEWER DESIGN CRITERIA Of Applicable) - 02T .0305 & 1. Summ.arize gravity sewer to he permitted: C (Gravity Sew Material Ductile Iron PVC Section 11 & 111 oldie MLX. for Permitting of Ciravity Sewers contains information rclated to design criteria Section 111 contains information related to minimum slopes for gTavity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the INDIC VIII, PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & NI Dc(puttin Stations/Force .(V. COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT .Pump station number or name: 2. .Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3, Design flow of the pump station: millions gallons per day (firm capacity) t. Operational point(s) of the pump(): gallons per minute at Summarize the force main to be permitted (for this Pump Station): feet total dynamic head (TM) :hes) Length (feet) Material 6. Povver reliability' in accordance with 15A NCAC arr ,0305th( t): Standby power source or pump with automatic activation and telemetry - I.5A NC AC 02-1 .03 05 .- Required tor all pump stations with an average daily flow greater than or equal to 15,000. gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: LIJ Portable power source with -manual activation, quick -connection receptacle and telemetry - ISA. 02-1 .0305(1)( 1)(C) or El Portable pumping unit with plugged ernergency pump connection and telemetry - 15A N(. AC 02'1 .0305(h)(1)(( ): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draf) a.greement) and is compatible with the station, -lithe portable power source or pinup is dedicated to 'multiple pump stations., an evaluation °fall the pump stations* storage capacities and the rotation schedule of the portable power source or -pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORA1 FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (0211 .0200 & 15A NCAC 02T .0305(1)): 1 Does the project comply with ail separations found in I5A NCAC 02T .0305(1& t9-) I 5A NCAC 021.0305(4) contains minimum separations that shall he rovide Setback Parameter* Storm sewers and other utilities not listed below 'ertica ) Water mains (vertical -water over sewer including it VetterVater mains (horizontal) Reclaimed ' ater hnes jertict. - reclaime 'cr sewer) died trenches Reclaimed Water lines (horizontal - reclaimed over sewer **Any private or public water supply source, including any wells. VS-1 waters of Class I or .lassit impounded reservoirs used as a source of drinking water **Waters classified \VS (except WS-I or WS-V), B, SA, ORW, F1QW, or S13 from normal high water (or tide elevation) and wetlands (see item. IX..2) Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches nv building foundation Any basement joimslope of C[flbH1kfl1Cflt or cuts of 2 feet Drainagesystems and interceptor drains Any twimming pools Mal earth grade ore vertical eight NI ' No Separation Required 24 inches I 8 inches_ 10 feet 18 inches 2 feet 10 feet 5 feet 10 feet 36 inches 1.5A NCAC 021 .0305t contains alternatives 'where separations in 021.0305„jf) cannot be achieved. • **Stream classifications .an be identified using the Division's NC Surface Water Classifications webpage • If noncompliance with 02-1.0305(1) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) j';See the .Division's draft separation requirements for situations where separation cannot be meet • No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents shouldreference the location of areas effected. El Yes 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 025 0200'.! Z Yes El No • This would include Trout Buffered Streams per 45A NCAC213„0,202 4, Does the project comply with an individual ,404 Permit or any 401 Certificathms? Z Ye E No Wetland -related permits shall he requested, obtained, and adhered to for projects t. Information can be obtained from the 401 & Buffer Permitting Branch pact ;etlands or surface waters Does project comply with 15A NCAC 021.01 05(c)(6) {additional permits/certifications)? Z Yes LI No Per 15A. NCAC 02T,0105(c)(6), directly related environmental perrnits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, storrnwater management- plans, etc,)„ 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means. "arr!..,' aerial sewer, sewer contacting surfa.ce N.vaters„ siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. 0 Yes No Byes., include an attachment with details. for each line, including type (aeria) Inc. size, !material, and Ioeaton) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. 01-16 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with I 5A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Ciravitv Sewer Niinimum Design Criteria (latestversion). as, applicable? [A Yes El No If No, complete and submit h Variance/Altentative Design Request application (V.AD( 10-14) arid supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting, documents. 2. Professional Engineer's Certification: Greg Welsh. Pt. attest that this application liar (Professional Engineer's name Ii:om .Application Item. 111.1.) Invesimenis Mass. Grading has been reviewed by inc and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my: knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force. Mains (latest version). Although other professionals may have developedcertain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design„ NOTE --- In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall he guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10,000, as well as civil penalties up to S25,000 per violation, • • North Carolina Professional Engineer's seal, signature, and date: • 3. Applicant's Certification per 15A NCAC 021 .0106(b): Wilmer Melton, 111 Direotor of Public Works (Signature Authority's name & title from Application Item 13.) FECAL [rives -talents 1,i ,C Mass Grading has been reviewed by me and is accurate and complete to the hest of my knowledge, I understand that if all required pars of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, 1 understand that any discharge of wastewater from this 11011- discharge si.,stem to surface waters or the land will result in an immediate enforcement action that may include. civil penalties, injunctive relief,. and or criminal prosecution. 1 will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting, information and attachments are not included, this application package will be returned to me as incomplete, attest that this application for NOTE — In accordance with Genet -at Statutes 14.3-2 I5.6A and I43-215.613, any person 'who knowingly. makes any .false statement, representation. or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to S25,000 per violation. Signature: Date: 17 FORM: ['FA 04-16 Page 5 of 5 NOTES. Data av �6a (ln,an 'in Th. IUn1e.rn=a1 1%4,+ u ►tie ►VdUUfIdl ►v►ap NationaV Geospateaf Program. 1 r)9I1C G•i . hr 1 miles km 2 PPrSr' ACC `SO 1. t,t ,2O04 • NC Star Pubic Sect©r Mr. Michael C...egg City Manager" City of Kannapolis P.O.. Box 1 199 Kaa.nnapol is, NC. 28082-1199 September 15, 2016 Flow Acceptance Request — City of Kannapolis PEGH Investments LL( Mass Grading WATER & SEWER AUTHORITY OF CABARRUS COUNTY Office: 232 Qao'a °._ Concord, NC 2802 Mait to: PC), Box 428 Concord, NO 25026-0428 704,7 6,178J # t04,795,'1564 F. WVl W:M3C. ol`q 'this is an approval of the flow acceptance request that was received by Vater° and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on September 14, 201.6. ` r t'C has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled PEGII Investments. 1 1 (' Mass Grading, located off Kannapolis Parkway. The referenced project rsill serve a 29.82 acre non-residential development, �v°ith a projected wastewater flow nt 26.400 gallons per day (gpd), The'wastewater generated by this project will be conveyed through the proposed 8-inch line, through an existing gta ityr ;y°stettt, and the-tr toes° WSACC''s system at the existing 15-inch Afton Run Outfall Interceptor. \ '°SACC. aaK roes to accept v a.stew°liter from the proposed development based on infcasAtasation provided br<- (`ity nl Kannapolis tr in„' t'rrth ("oar°calitta Department of Environrnent.aal Quality (NCDI Q) svrastewater flow guidelines, ltowever., please contact 4'SACC once the character of the wastewater is I.nown to determine whether any pretreatment reclui-en aet 1- WSACC Capital hnprcavernent Program (CIP) has been on lrayr as }crtr go .since Fiscal Year 2005 - 2006„ funding Capital Projects entirely front Capital Reserves, and W'SACC" expects to continue: this policy into the future. Projects on the CUP are subject to approval by \VSA((C's Board of Director's, support from local a bodies. reftrlatory approval, and funding mailability. At this time there are no scheduled upgrades in 'i 'SACC I aeilitii located cf:)avatstxMcrirtt of this proposed project. It should be noted of CIP projects oat°e ten'tat:i°e nand are revised periodically to reflect changing conditions and needs, it c asastrrra tiosa of''this project is not started within rescinded and a second request and approval will be req construct" e any cues is initiated. a ears of the daate of this approve. tired. Please no'ACC, 704) 786-1783. cXtenSion Divis ater Rft, our State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Seller Extension Permit Applications (yrsE-01/14) (WSACC USE ONLY) PEGH Investments LLC Mass Grading Section I. Name of wastewater treatment facility (WWII) receiving waste uter: Rocky River Wastewater Treatment Facility Permit #NC00362,69 Muddy Creek Wastewater Treatment Fa.cility — Perrnit gNC0081621 WWTP facility's permitted flow, MGD 26,500 Estimated obligated flow not yet .tributary to the WWI', MGD 2.1.90 WWTP 'facility'sactual avg, daily flow. MGD 16.88 (63.70% of permit) Total flow for this specific request, MG[) 0.026 Total actual and obligated flows to the facility, MG[) Percent of permitted flow used 19.096 72.0.6% Section 11. Pump stations along the route from the Jurisdiction's connection point to the WWTP Pump Station fNatrie or Number) Lower Rocky River PS Firm Capaelly MGD 37.000 (A (B) (0 tt)) u, i fi-r-Ch Dcsro Average: Daily Flow ''* Approx. Currenr I kr i gra c.a., No Yet Totai Clar,aa Flow I Firm,pri Average Daily. Flow 'Unitary Daily Flow Hes Gbligarcil How MGD MGD M(E) MGD 14.80(1 ,710 1.973 11.683 Available Capacity*** MGD 7 flie Firm Capacity of any pump station is defined As the maximum pumped flow that can be achieved with the largest pomp taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. Planning Assessmerri Addendum shall be attached for each pump station located between the project connection point and the WWII' where Available Capacity is < 11 Section 111. WSACC Certification Statement: J. Thomas Hahn, PE, certify that, to the best of my knowledge, the addition of the volume of waste -water to he permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving Wastewater treatment facility; and the flow -from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circuinstances, given the implementation of the planned improvements identified in the planning assessment where applicable, 'This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items, listed above in Section I and Section II plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity, Signature of this !brill indicates acceptance of this wastewater flow. .4CC 's Signing Official S Revision Date] 08/09113 Septei„.1,er 90, 2016 1 6501 -06 North Carolina Department of Environmental Quality Mooresville Regional Office - Water Quality Section 610 I4tst Center Avenue, Suite 301 :Mooresville, 'North (.7:arolina 281 15 Re: PEGH Investments L-LC -Mass Grading Sewer Extension City. of Kz.i.anapolis — Cabarrus County .Dear Sir or -Niladam: Please find attached for your review and appro-val the original and one copy of the permit application. along with the $480 processing fee for the above referenced project. Also enclosed, is the flow acceptance letter from the "Water Sr Sewer Authority of Cabarrus County stating they viii accept and treat the additional wastewater at the Rocky River Regional Wastewater Treatment Plant. The proposed extension Vitconnect to the existing .K.annapolis sewer system which extends to the WSACC. Afton Run Outfall Interceptor. This wastewater collection system will serve the proposed PUGH Investments Ll.„C Mass Grading site. The proposed sewer flow to be discharged is approximately 26,400 gpd to serve a proposed non-residential development. The Water and Sewer Authority of Cabarrus County Standard Specifications for Wastewater Collections Systems were approved by your office and are being maintained by the Division of 1.n.virontnental Management. This project twill be installed in accordance with these Standard Specifications. Please call. me at .704-938-1519 if you have any questions. Sincerely, A.. Mark„McGregor G:\wordltrs\16501\16501-06 PEGH Investments Sewer PerrotPermt Letterdocx fir\KANkliu NG 120 S. MAJN STREET PO Box 1248 K.ANNArous, N.C. 28082 704_9,38, 15.19 w\A"\,,,,,,,..KANNAN"N rsNc.,Gov Cover Attention; From: Project Name. er LIRTON ENGINEERING ASSOCIATES CIVIL ENGINEERS LAND PLANNERS Fahaew Rd. m Snits 10.Charlotte, NC 28210 7 4) 553-8881 Fax (Th4) 553-8880 NCDENR — Division of Water Resources Mooresville Regional Office Water Quality Section 610 E. Center Avenue Mooresville, NC 28115 70-.a-1 gg Greg Welsh, PE Burton Engineering Associates PEGH Investments LLC ass Grading Project lumber; 603-001 Date; May 20, 2016 Re, DWR-East-Track Application t'TA 04 PEGH Investments, LLC is proposing the mass grading of a 29,82 acre site off l annapolis Parkway in Kannapolis, North Carolina, The site is proposed to be served by 729 feet of new public " gravity sewer with jack and bore stream crossing. If you have any questions concerning this inform ion please -contact e at (704) -3881 or by email at Gre bort nengjneering.corn Sincerely, Greg "elsh, PE Program Category Non -discharge Permit Tyree; Gravity Sewer Extension. Pump Stations, & Pre Pririaary Reviewer tuvia ule Permitted Flow 26,400 Facility ensions Central Files: AS 10/12016 Per Tracking hp Status Active Version Project Type New Project Pei ma Classification individual Perrmt Contact Affiliation Facility Name PEGH investment Location Address Cwne LC Mass Grading Minor Pacitity Cortta At'filiati ai Regione Mooresville County Oedema Owner Name City of Kannapolis fe'te`v E Owner Type Government Municipal Owner Affsiiatian Wilmer Melton ICI DIR PUBLIC WORKS PO Box 1199 Kannapolts NC 28t381119 Sche±iuled Ong issue 10/3/2016 Apo Received Draft hi t at 9122)2616 Regulated Achy indutrialiCormeroial wash ke Office Wastewater collection Publl Notice soe Plfective 1013/2016 10/3/2016 Requested sted eceived Events Expiration Additional information requested 9/25116 Additional information received 3t30/ t 6 Waterbody Name Strearretndex Ntanber Current Class Subbasin ME KEY TO DO UMENT SECURITY • NEAT ACTIVATEDTHUMB PRINT . ADDITIONAL SECURITY F ATOR INCLU t; • BACK I OR D TAILS TY SANK 11 �€x Do i RTMNT C I Water Resources ENVIRONMENTAL QUALETY November 21, 2fl17 Mr. Wilmer Melton, III, Director of Public Works City of Kannapolis 401 Laureate Way. Kannapolis, North Carolina 28081 SUBJECT: Final Engineering Certification Acknowledgement PEGH Investments LLC Mass Grading Permit No, WQ0038753 Permitee: City of Kannapolis County: Cabarrus Dear Mr. Melton: ROY COOPER Governor MIC.HAEL S. REGAN Secretary LINDA CULPEPPER Interim Director The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on 1.1/16/2017, Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Perrnittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal.ncdenr.org/web/wq/swp/ps/cs/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia�a'�;ncdenr. gov. Sincerely, Ori Tuvia, Environmental Engineer Mooresville Regional Office Division of Water Resources, DEQ cc: Mr. Carlton Burton (P.E.) (E-copy) Central Files MRO State of North Carolina 610 E. Center Avenue., Suite 301, l raro;tivi e, NC 28115 P"nnec.• 7{14-663-1699 [ Internet: wknv.ncd itr,c ov Prir-- PERMITTEE: CITY OF KANNAPLIS PERMIT #: WQ0038753 PROJECT: PEGFI INVESTMENTS LLC MASS GRADING ISSUE DATE: OCTOBER 3, 2016 FAST TRACK SEWER ENGINEERING CERTIFICATION This project shall not he considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. it should be submitted in a manner that documents the Division's. receipt, Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at. the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings .and design calculations regardless of whether partials have been submitted, PERNIITTEE'S CERTIFICATION I, the undersigned agent for the Perrnittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permit -tee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. I/J.40,T Printed Name, Title Date ENGINEER'S CERTIFICATION 1,WCZ-4-4 , as a duly registered Professional Eiueer in the State of North Carolina, having been authorized to observe (in periodically, 7Li weekly, Li full ime) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials, North Carolina Professional Engineer's Seal iv/signature & date; Final L Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quaiity Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 14Tater Resources EN Vf ROWetNIAL„ As built check list (reference 2T .0300) Reviewed By: Ori Tuvia Review Date: 11/21/2017 Project Name: PEGH Investments LLC Mass Grading WQ#: WQ0038753 1) As -built has been signed, sealed, and dated by an N.C. PE Z Yes No ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interm 1)/rect('r 2) Adequate information related to sewer lines : Note that per the 2T and MDC, there is a minimum 8" for public gravity or minimum 6" for private gravity, Three (3) feet IllitliMUM cover shall be provided for all sewers unless ferrous material pipe is specified. Manholes shall be installed: at the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet, minimum diameter of manholes shall be 4 feet (48 inches), Yes E No E N/A 3) Adequate information related to pump stations: Ensure power reliability option is selected (15A. NCAC 02T.0305(h)). ri Yes 7 No N/A 4) Is Project design is in accordance with (see section B.13 of FTA 1.2-12) I5A NCAC 02T Gravity Sewer Minimum Design Criteria (latest version) MinimurnDesign Criteria for Permitting of Pump Stations and Force Mains (latest version). fJ Yes No N/A If no, a variance approval is required per the requirements of 15A NCAC 02T,0105(b) Applicant must submit TWO copies of the plans, specifications, and calculations Contact the Central Office to discuss the variance request to determine a course of action. The central office will review the variance request, and if approvable, specific language regarding the variance will be forwarded to the Regional Office reviewer to incorporate into the permit. A copy of the variance letter (or email corre ndence) should be kept with the application file. 5) Project contains high priority lines (15A NCAC 02T .0402(2)) E Yes No If Yes, insure that the permit contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5) 6) Is the Sewer As -built length within 10% of the fast track applied Length? ( I Original 'length of pipe --- As built length / Original length) < 1.0%. Yes El No If no application need to be modified State of North Carolina Environmental Quality Water' ReSOlifeeS 1 Water Quality Regional OperationEr Mooresville Regional Office ; 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28.115 70,1 663 1699