HomeMy WebLinkAbout20210871 Ver 1_Riparian Buffer Authorization Request_20210429Buffer Authorization Application Form
15ANCPC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form -
Update 10/23/2018
Water Resources
ENVIRONMENTAL QUALITY
Original Submittal 4/29/2021
A. Owner/Applicant Information
General Information
Primary Contact Email:*
Who is submitting the application?*
becauseofhim2@yahoo.com
Reese list the contact person's enail for questions or payment on this project if needed.
▪ Owner
❑ Applicant other than Owner
El Agent
Is there an agent working on this application C Yes
but not submitting it? O No
1. Property Owner Information:
.....................................................................................................
la. Name on Recorded Deed:*
1b. Responsible Party:
lc. Mailing Address:*
Id. Telephone:*
2525313070
Edgar A. & Melanie H. White
(for Corporations)
Street Address
2358 Portertown Road
Address Line 2
City State / Rovince / Region
Greenville NC
Fbstal / Zip Code Country
27858 United States
B. Project Information and Prior Project History
.............................................................................................
1. Project Information
.............................................................................................
1a. Name of Project:*
1e. Email Address:* becauseofhim2@yahoo.com
305 Forte Shores Drive
(Subdivision, facility, or establishrrent nacre)
1b. Is this a publicly -funded transportation project?*
r Yes
F No
Id. Subdivision Name:
le. Nearest
Municipality:
If. Property Size: acres
1g. County (or Counties) where the project is located:*
Beaufort
lh. PropertylD#
Tax RN or Parcel id
1 i. Deed Information
Date of Purchase
1j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach docurrent
FDF only
1k. How would you like to provide the Latitude and Longitude information?*
G' Address Lookup
f Manually
Address Lookup
Latitude *
Street Address
305 Forte Shores Drive
Address Line 2
City State / Bovine / Region
Chocowinity NC
Ratal / Zip Code Country
27817-8919 US
Longitude *
35.5169919 77.03492469999999
11. Is the project located in any of North Carolina's twenty coastal counties?*
C' Yes
r No
1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)?
C' Yes
f No
2. Surface Waters
2a. Name of the nearest body of water to proposed project:*
Pamlico River
2b. Water Quality Classification of nearest receiving water:*
SC; NSW
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:*
605
(linear feet only)
3. Project Description:
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
3b. Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Oick the upload button or drag and drop files here to attach docunent
FDF only
3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the
project site.
Click the upload button or drag and drop files here to attach docunent
FCF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:*
Building stone retaining wall (6 blocks high) around perimeter of existing home.
Equipment used is tractor and escavator
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach docurrent
305 FOTRE SHORES BUFFER APPLICATION PLOT
PLAN.pdf
FDF only
5. Jurisdictional Determinations
37.35KB
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this
property/project (including all prior phases) in the past?*
r Yes
0•' No
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
0•' Yes
r No
6b. List any permits/approvals that have been requested or obtained for this project in the past.
A
Application Date
4/23/2021
Date Issued
Permit Type
CAMA minor
6c. Please explain and detail according to "help file" instructions.*
Applied for and pending this approval
7. Future Project Plans
7a. Is this project a phased project?*
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
C Yes
C' No
✓ Neuse River Basin (15A NCAC 02B.0233)
✓ Catawba River Basin (15A NCAC 02B.0243)
C Randleman Lake Watershed (15A NCAC 02B.0250)
F Tar -Pamlico River Basin (15A NCAC 02B.0259)
✓ Jordan Lake Watershed (15A NCAC 02B.0267)
f Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# - Reason
Stream Name
Buffer Impact*
Impact Type*
Zone 1
Zone 2
B1 Retaining wall
and fill
Map label (e.g. Fbad
Pamlico
River
Permanent
(P)
Fbrmor Terrp
Allowable
0.00
Square
Feet
1,059.
00
Square
Feet
Crossing 1)
Total Zone 1 Impacts: 0.00
Total Zone 2 Impacts: 1,059.00
Total Buffer Impacts: 1,059.00
Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.*
Steps were inset in the proposed retaining wall in order to reduce the impact of the
wall in the Zone 2 area. All ground filled behind new wall will remain planting beds
planted with vegetation (bushes / trees) that will have better impact on the buffer
area than the original grasses existing. Also all filled areas will remain porous. There
will be no impervious area added by this project other than the wall thickness itself.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.*
The only equipment used will be a mini excavator and it remain in Zone 2
throughout the project. There is no need to disturb Zone 1. If the any erosion
potential occurs throughout the project, a continuous silt fence will be established
on the Zone 1 to Zone 2 line to stop all materials from entering the river waterway.
Based on the level and flatness of the lot as well as the existing soil conditions which
are sandy, this is expected to not be an issue at all.
E. Diffuse Flow Plan
la. What type of SCM are you providing?*
r- Level Spreader
r- Vegetated Conveyance (lower SHWT)
✓ Wetland Swale (higher SHWT)
r% Proposed project will not create concentrated stormwater flow through the
buffer
✓ Other SCM that removed minimum of 30% nitrogen
lc. Diffuse Flow Documentation*
F. Supplementary Information
Click the upload button or drag and drop files here to attach docunent
diffuse flow plan.pdf
FtF only
183.56KB
A
A
Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
✓ Yes
r No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR
Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
✓ Yes
r No
2b. Is this an after -the -fact buffer authorization application?
r Yes
✓ No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments:
Additional Comments:
H. Sign and Submit
aick the upload button or drag and drop files here to attach docun ent
FEF only
By digitally signing below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
o I intend to electronically sign and submit the application form."
Print Name:* Edgar A. White
Signature
EP6Alt At.vx,4NiPayz KOltr
Submission Date: (Auto populated field)
Initial Review
Is this accepted into the review process?* O Yes in No
Is this project a public transportation
project? *
O Yes
C' No
ID#* 20210871
Version:* 1
Select Reviewer: Robert Tankard:eads\rbtankard
Select Reviewing Office * Washington Regional Office - (252) 946-6481
Has payment been received?* ( No Payment Needed
✓ Fee Received
✓ Need Fee - send electronic notification
PAMLICO RIVER
M
HATCH INDICATES WALL AND PERVIOUS FILL AREAS
J
N
ZONE 1
etaining Wall
EXISTING DECK
EXISTING HOUSE
PLOT PLAN
305 FORTE SHORES
DRIVE
EDDIE WHITE
0
ZONE 2
CO
'COCTi
0
0)
01
N
0
z
m
RONT IMPACT 790.72 Feet
ZONE 2 SIDE IMPACT 267.9 Feet
1VNVO 2ONVH±N2
ENTRANCE CANAL
No stormwater will be created