HomeMy WebLinkAbout20210869 Ver 1_17BP.1.R.91_Permit Drawings_Final_20210426WA11
WA10 WA9
WA8 WA7 WA6 WA5
WA4
WA3
WA14
WA15 WA16 WA17
WA18
WA20
WA21
WA19
WA2
WETLAND WA
WETLAND WA
WETLAND WA
WETLAND WA
3.57
5.18
7.33
0.57
T
T
THE HISTORIC HIGH WATER MARK=1.42’
POLLOCK SWAMP
POLLOCK SWAMP
SHEET 1 OF 5
PERMIT DRAWING
WETLAND AND SURFACE WATER IMPACTS PERMIT
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
4/1/2021R:\Hydraulics\Permit Drawings\17BP.1.R.91_prm_tsh.dgnKAlfordCONTRACT:=
2550 50 100
50 25 50 100
10 5 10 20
PE
NCDOT CONTACT:
BOB A. MAY, PE
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
ENGINEER
ROADWAY DESIGN
HYDRAULICS ENGINEER
Prepared for:Prepared in the Office of:
Bus: 919.851.8077 Fax: 919.851.8107
License No. F-0377
1223 Jones Franklin Rd. Raleigh, N.C. 27606
RIGHT OF WAY DATE:
LETTING DATE:
PROJECT LENGTH
=ADT
ADT
DESIGN DATA
K =
=D
T =
V MPH=
GRAPHIC SCALES
ENGINEERING
ETHERILL
4
CHOWAN COUNTY
17BP.1.PE.91
GRADING, DRAINAGE, PAVING & STRUCTURE.
2015
50
FUNC. CLASS = LOCAL
DIVISION 1
DIVISION OF HIGHWAYS
Edenton NC, 27935
113 Airport Drive
BEGIN BRIDGE
-L- STA. 13+61.06
END BRIDGE
-L- STA. 15+13.94
(Subregional Tier)ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NA-L-
See Sheet 1-B for Conventional Symbols
See Sheet 1-A For Index of Sheets
TO EDENTON
590
= 0.161 MILES
= 0.029 MILES
= 0.132 MILES
17BP.1.R.91
17BP.1.R.91-L- STA. 10+00.00
BEGIN PROJECT 17BP.1.R.91
-L- STA. 18+50.00
END PROJECT 17BP.1.R.91
DIVISION PROJECT ENGINEERPROJECT:ROW / UTIL.
2018 STANDARD SPECIFICATIONS NAD
8
3/ NA
2
0
1
1
YAM .A
BOBFINAL PLANS17BP.1.R.91 CONST.
MARCH 22, 2019
* TTST = 2%DUAL = 4%
6% *
2035 720
12%
60%
-L-
SR 1200 (MEXICO RD.)
SR 1200 (MACEDONIA RD.)
(HICKORY FORK RD.)
TO SR 1202
TOTAL LENGTH TIP PROJECT 17BP.1.R.91
LENGTH STRUCTURE TIP PROJECT 17BP.1.R.91
LENGTH ROADWAY TIP PROJECT 17BP.1.R.91
EDWARD G. WETHERILL, PE
RYAN L. SHOOK DROFLA .B N
IV
EK
JUNE 23, 2021
17BP.1.ROW.91
NO DECK DRAINS ON BRIDGE
ON SR 1200
BRIDGE No. 3 OVER POLLOCK SWAMP
SWAMP
POLLOCK
SWAMP
POLLOCK
Pembroke
Creek
Virginia RdVirginia RdVirginia Rd
1204 120912081242
1
20
41200
12041202 1321
1208
1332
1331
12341200
1204
1202
1239
1265
1202
1204
1288 12041137
1139
1136
1201
1138 11301136
1150
Hancock
CAROLINA
Edenton
Bay
Edenton
1206 120012055
32
32
VICINITY MAP
OFF-SITE DETOUR
17
17
SITE
PROJECTPollock CreekCreek
Pe
mbroke
Pembroke
Creek
Virginia RdVirginia RdVirginia Rd
1204 120912081242
1
20
41200
12041202 1321
1208
1332
1331
12341200
1204
1202
1239
1265
1202
1204
1288 12041137
1139
1136
1201
1138 11301136
1150
Hancock
CAROLINA
Edenton
Bay
Edenton
1206 120012055
32
32
VICINITY MAP
OFF-SITE DETOUR
17
17
SITE
PROJECTPollock CreekCreek
Pe
mbroke
POLLOCK SWAMP
783
23.08
1
2
3
4
5
6
7 9
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W60.00’60.00’TO EDENTON
MEXICO ROAD SR 1200 20’ PAVED ROADWAY
8
WOODS
WOODS
WOODS
WOODS
1SFD
CONC
1SBKD
CONC
CONC
48" CHL
48" CHL
72" WD FENCE
DECKWD
PATIO
STONE
CONC
CONC
CONC
CONC
TOWN OF EDENTON
TOWN OF EDENTON
LELA COPELAND TWINE
EIP
EIP
CHL48"
CHL48"
CHL48"
1SBKD
1SBKD
48" CHL
EXISTING R/W
EIP
10
11
12
13
14
15
16
17
EIP
THOMAS A. BATEMAN
KATHLEEN ANSINK DON
TYLER LEE SPRUCE
TURNER, JR. ET UX
ROBERT F.
HICKORY FORK ROAD
TO SR 1202
20’ PAVED ROADWAY
MACEDONIA SR 1200
POTTS
JASON RANDOLPH
BENJAMIN D TWINE
KATHRYN GOODWIN WARD
T
T
759
4.04760
4.04761
4.06762
4.05
763
5.34764
5.32765
5.34766
5.34
767
5.70768
5.58769
5.65770
5.79
15" RCP
INV=1.38’
INV OUT=1.81’
TOP=4.04’
INV IN=1.82’
TOP=5.56’
INV OUT=3.12’
INV OUT=2.88’
TOP=5.32’
DI
DI
DI
15" RCP
15" RCPINV IN=3.01’
WITH WOOD WINGWALLS
8 SPAN CONCRETE AND WOOD
BRIDGE #3
TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=1.29
LOW WOOD BEAM=1.85’
15" RCP 15" HDPE
HDPE
15"
THE HISTORIC HIGH WATER MARK=1.42’
POLLOCK SWAMP
POLLOCK SWAMP
10’10’.025OUT OT OUT33’10’10’-L- STA. 13+61.06
BEG. BRIDGE
-L- STA. 15+13.94
END BRIDGE
-L- STA. 13+50.36
BEG. APP. SLAB
-L- STA. 15+24.64
END APP. SLAB
SKETCH SHOWING PAVEMENT / STRUCTURE RELATIONSHIP
.03.04.01.025.025.02SEE SHEET S-1 THRU S-27 FOR STRUCTURE PLANS
5.25’5.255’EL = 1.52
-L- STA. 10+00.00
BEGIN GRADE
EL = 5.06
-L- STA. 18+50.00
END GRADE
-L- STA. 13+61.06BEGIN BRIDGE-L- STA. 15+13.94END BRIDGEMILLING
100’ VAR.
MILLING
90’ VAR.
ELEV = 0.44’
WS ON 1/8/19
ELEV. =-1.0’
EXCAVATE TO
ELEV. =-1.0’
EXCAVATE TO
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
$FILEL$$(USERNAME)$$DATE$SHEET 2 OF 5
PERMIT DRAWING
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
BORE PIT
BORE PIT
REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
13101112 14 15 16 17 18 19 20
Fax: 919 851 8107
Bus: 919 851 8077
License No. F-0377
Raleigh, N.C. 27606
1223 Jones Franklin Rd.
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN
ENGINEERING
ETHERILL
TYPE-III
TYPE-III
GREU TL-3
F
-L-
-L- PC Sta. 15+24.18
-20
-10
0
10
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.1.R.91
R/W SHEET NO.8/17/994/1/2021R:\Hydraulics\Permit Drawings\B-5501_Hyd_prm_wet.dgnKAlfordAT-1
10
0
-10
-20
GREU TL-3
GREU TL-3 TYPE-III
TYPE-III
18" UNKNOWN
18" UNKNOWN
NAD 83/ NA 2011101520-L-
POLLOCK SWAMP
DS = 50MPH DS = 50MPH DS = 50MPH
PI = 17+28.77
EL = 4.53’
VC = 150’
K = 203
PI = 10+50.00
EL = 1.53’
(+)0.0300%(+)1.1788%
VC = 100’
K = 87
PI = 13+90.00
EL = 5.54’
(+)1.1788%(-)0.3000%
VC = 300’
K = 203
(-)0.3000%(+)0.4400%
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2000
= 25
= 1.4
= 3000
= 100
= 2.3
= 2100
= 25 +/-
= 1.4
= Jan. 8, 2019
= 0.44’
ELEV. =-1.0’
EXCAVATE TO
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
PL
EX. R/W
40.00
1
1
2
3
4
6
5
2:
1 D
B
( Not to Scale)
Flatter4:1 or
SPECIAL LATERAL BASE DITCH
FROM STA. 16+50 TO STA.17+50 -L- Rt.
DETAIL B
B= 2.0 Ft.
See Profile
Min. D= Var. Ft.
Ground
Natural
Slope
Fill
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:1D
FROM STA. 17+60 TO STA. 18+50 -L- Lt.
SEE PROFILE
Min. D= Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
RETAIN
RETAIN
RETAIN
RETAIN
EX 15"
REMOVE
DI
REMOVE
RETAIN
15"
15"18"
SEE DETAIL A
SEE DETAIL B
STA. 13+18 -L- LT.
BEGIN SBG
STA. 15+57 -L- LT
END SBG
SHEET PILING
PROPOSED
GEOTEXTILE = 5 SY
CL B RIP RAP= 1 TON
GEOTEXTILE = 5 SY
CL B RIP RAP = 1 TON
GEOTEXTILE = 10 SY
CL B RIP RAP = 3 TONS
TO SHOULDER POINT
GF = 6 SY
CLASS I RIP RAP = 5 TONS
TO SHOULDER POINT
GF = 4 SY
CLASS I RIP RAP = 3 TONS
TO SHOULDER POINT
GF = 8 SY
CLASS I RIP RAP = 6 TONS
TO SHOULDER POINT
GF = 17 SY
CLASS I RIP RAP = 12 TONS
TB 2GI
2GI-D
TB
2GI-D
DITCH STA 17+00.00 (RT)DITCH STA 16+50.00 (RT)DITCH STA 17+50.00 (RT)DITCH STA 18+00.00 (LT)DITCH STA 17+50.00 (LT)DITCH STA 18+50.00 (LT)(+)0.82%(+)0.46%(+)0.20%(+)0.30%ELEV=1.25 FTELEV=1.40 FTELEV=1.50 FTELEV=1.46 FTELEV=1.69 FTELEV=2.10 FTDITCH LEGEND
RIGHT DITCH
LEFT DITCH
SKEW=120
PROP. GRADE=5.14’
SHEET PILE RETAINING WALL
(2’-6" DEEP CAPS) W/
21" CORED SLAB,
PROP. 3@50’
L -L- STA. 14+37.5
ELEV. =-1.0’
EXCAVATE TO
SHEET PILING
PROPOSED
SHEET PILING
PROPOSED
ELEV. =-1.0’
EXCAVATE TO
C
783
23.08
1
2
3
4
5
6
7 9
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W60.00’60.00’TO EDENTON
MEXICO ROAD SR 1200 20’ PAVED ROADWAY
8
WOODS
WOODS
WOODS
WOODS
1SFD
CONC
1SBKD
CONC
CONC
48" CHL
48" CHL
72" WD FENCE
DECKWD
PATIO
STONE
CONC
CONC
CONC
CONC
TOWN OF EDENTON
TOWN OF EDENTON
LELA COPELAND TWINE
EIP
EIP
CHL48"
CHL48"
CHL48"
1SBKD
1SBKD
48" CHL
EXISTING R/W
EIP
10
11
12
13
14
15
16
17
EIP
THOMAS A. BATEMAN
KATHLEEN ANSINK DON
TYLER LEE SPRUCE
TURNER, JR. ET UX
ROBERT F.
HICKORY FORK ROAD
TO SR 1202
20’ PAVED ROADWAY
MACEDONIA SR 1200
POTTS
JASON RANDOLPH
BENJAMIN D TWINE
KATHRYN GOODWIN WARD
T
T
759
4.04760
4.04761
4.06762
4.05
763
5.34764
5.32765
5.34766
5.34
767
5.70768
5.58769
5.65770
5.79
15" RCP
INV=1.38’
INV OUT=1.81’
TOP=4.04’
INV IN=1.82’
TOP=5.56’
INV OUT=3.12’
INV OUT=2.88’
TOP=5.32’
DI
DI
DI
15" RCP
15" RCPINV IN=3.01’
WITH WOOD WINGWALLS
8 SPAN CONCRETE AND WOOD
BRIDGE #3
TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=1.29
LOW WOOD BEAM=1.85’
15" RCP 15" HDPE
HDPE
15"
THE HISTORIC HIGH WATER MARK=1.42’
POLLOCK SWAMP
POLLOCK SWAMP
10’10’.025OUT OT OUT33’10’10’-L- STA. 13+61.06
BEG. BRIDGE
-L- STA. 15+13.94
END BRIDGE
-L- STA. 13+50.36
BEG. APP. SLAB
-L- STA. 15+24.64
END APP. SLAB
SKETCH SHOWING PAVEMENT / STRUCTURE RELATIONSHIP
.03.04.01.025.025.02SEE SHEET S-1 THRU S-27 FOR STRUCTURE PLANS
5.25’5.255’WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
$FILEL$$(USERNAME)$$DATE$SHEET 3 OF 5
PERMIT DRAWING
HC HC
CLEARING
DENOTES HAND
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
BORE PIT
BORE PIT
REVISIONS DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
13101112 14 15 16 17 18 19 20
Fax: 919 851 8107
Bus: 919 851 8077
License No. F-0377
Raleigh, N.C. 27606
1223 Jones Franklin Rd.
CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN
ENGINEERING
ETHERILL
TYPE-III
TYPE-III
GREU TL-3
F
-L-
-L- PC Sta. 15+24.18
-20
-10
0
10
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.1.R.91
R/W SHEET NO.8/17/994/1/2021R:\Hydraulics\Permit Drawings\B-5501_Hyd_prm_wet_con.dgnKAlfordAT-1
10
0
-10
-20
GREU TL-3
GREU TL-3 TYPE-III
TYPE-III
18" UNKNOWN
18" UNKNOWN
NAD 83/ NA 2011101520-L-2:
1 D
B
( Not to Scale)
Flatter4:1 or
SPECIAL LATERAL BASE DITCH
FROM STA. 16+50 TO STA.17+50 -L- Rt.
DETAIL B
B= 2.0 Ft.
See Profile
Min. D= Var. Ft.
Ground
Natural
Slope
Fill
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:1D
FROM STA. 17+60 TO STA. 18+50 -L- Lt.
SEE PROFILE
Min. D= Ft.
DETAIL A
Ground
Natural
Flatter3:1 or
Slope
Fill
-10
-10-10-10-10
-10-10-10-10-100
0000
0000000000
000
0
00
00000000 0000000 00000000001010101010101010EL = 1.52
-L- STA. 10+00.00
BEGIN GRADE
EL = 5.06
-L- STA. 18+50.00
END GRADE
-L- STA. 13+61.06BEGIN BRIDGE-L- STA. 15+13.94END BRIDGEMILLING
100’ VAR.
MILLING
90’ VAR.
ELEV = 0.44’
WS ON 1/8/19
ELEV. =-1.0’
EXCAVATE TO
ELEV. =-1.0’
EXCAVATE TO
POLLOCK SWAMP
DS = 50MPH DS = 50MPH DS = 50MPH
PI = 17+28.77
EL = 4.53’
VC = 150’
K = 203
PI = 10+50.00
EL = 1.53’
(+)0.0300%(+)1.1788%
VC = 100’
K = 87
PI = 13+90.00
EL = 5.54’
(+)1.1788%(-)0.3000%
VC = 300’
K = 203
(-)0.3000%(+)0.4400%
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2000
= 25
= 1.4
= 3000
= 100
= 2.3
= 2100
= 25 +/-
= 1.4
= Jan. 8, 2019
= 0.44’
ELEV. =-1.0’
EXCAVATE TO
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
PL
EX. R/W
40.00
1
1
2
3
4
6
5
RETAIN
RETAIN
RETAIN
RETAIN
EX 15"
REMOVE
DI
REMOVE
RETAIN
15"
15"18"
SEE DETAIL A
SEE DETAIL B
STA. 13+18 -L- LT.
BEGIN SBG
STA. 15+57 -L- LT
END SBG
SHEET PILING
PROPOSED
GEOTEXTILE = 5 SY
CL B RIP RAP= 1 TON
GEOTEXTILE = 5 SY
CL B RIP RAP = 1 TON
GEOTEXTILE = 10 SY
CL B RIP RAP = 3 TONS
TO SHOULDER POINT
GF = 6 SY
CLASS I RIP RAP = 5 TONS
TO SHOULDER POINT
GF = 4 SY
CLASS I RIP RAP = 3 TONS
TO SHOULDER POINT
GF = 8 SY
CLASS I RIP RAP = 6 TONS
TO SHOULDER POINT
GF = 17 SY
CLASS I RIP RAP = 12 TONS
TB 2GI
2GI-D
TB
2GI-D
DITCH STA 17+00.00 (RT)DITCH STA 16+50.00 (RT)DITCH STA 17+50.00 (RT)DITCH STA 18+00.00 (LT)DITCH STA 17+50.00 (LT)DITCH STA 18+50.00 (LT)(+)0.82%(+)0.46%(+)0.20%(+)0.30%ELEV=1.25 FTELEV=1.40 FTELEV=1.50 FTELEV=1.46 FTELEV=1.69 FTELEV=2.10 FTDITCH LEGEND
RIGHT DITCH
LEFT DITCH
SKEW=120
PROP. GRADE=5.14’
SHEET PILE RETAINING WALL
(2’-6" DEEP CAPS) W/
21" CORED SLAB,
PROP. 3@50’
L -L- STA. 14+37.5
ELEV. =-1.0’
EXCAVATE TO
SHEET PILING
PROPOSED
SHEET PILING
PROPOSED
ELEV. =-1.0’
EXCAVATE TO
C
WETLANDS WETLANDS
WETLANDS
WETLANDS
2.46
0.0100.025
3:1 2.2:13.17
0.0250.025
3:1 2.3:1-6.64
0.025 0.025
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
0
4/8/2019P:\2018\18162.01_Chowan03\Hydraulics\Permit Drawings\17BP.1.R.91_prm_xpl_L.dgnUSER: FBrooks8/23/99PROJ. REFERENCE NO.SHEET NO.
-5 -5
0 0
5 5
10 10
13+00.00
-5 -5
0 0
5 5
10 10
13+50.00
-5 -5
0 0
5 5
14+00.00
X-317BP.1.R.91
-L-
5 10
SHEET 4 OF 5
PERMIT DRAWING
DocuSign Envelope ID: 0BE52D32-6C0D-4122-845E-17F86ACB0DA8Cofferdam/Dewatering Plan forDemolition and CapConstruction3-15-21CofferdamPhase A4074 sq.ft.CofferdamPhase B3050 sq.ft.Temporary Surface Water Impacts7124 sq. ft.PERMIT DRAWINGSHEET 4A OF 5
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) -L- 10+00 to 17+45 150' Bridge 0.10 0.03 0.24 0.16 TOTALS*: 0.10 0.03 0.24 0.16 0 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET 5OF 5Permanent fill in Wetlands impacts = 4,369 square feet.Mechanized Clearing in Wetlands impacts = 1,320 square feet.Hand Clearing in Wetlands impacts = 10,468 square feet.Temporary Surface Water Impacts due to Cofferdam Installation is 7,124 square feet. WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSCHOWAN CO. NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS4/1/2021