HomeMy WebLinkAboutNCC204619_NOT Closeout Documents_20210429 Sedimentation/Constructionp" Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Currituck Project: Line 2064/2073 X-Brace River basin: Pasquotank
Person financially responsible:VEPCOdba Dominion Energy NC-Mark Allen, Project#: CURRI-2021-005
Director ET Project Development&Erecti
Address: 10900 Nuckols Road,4th Floor,Glen Allen,VA 23060
1. Project Location: South of Currituck H.S.Road,Barco to
Pictures: No Harbinger
2. Weather and soil conditions: 70 degrees,sunny,dry Initial inspection: Yes
3. Is site currently undernotice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with(name): Chelsea Sachs Title:
Inspection report: Sent Report Date given/sent: April 19,2021
9. Corrective action needed:None.
Permanent ground cover sufficient to restrain erosion has been established. No additional self-
monitoring or self-inspections are required. The project is in compliance and released under the
10. Comments: SPCA.The permittee must request termination of coverage under the NPDES General Stormwater
Permit for Construction Activities (NCGO 1)via a Notice of Termination (NOT).The NOT is available
at https://edoes.deq.ne.gov/Forms/NCGO1-Termination. Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: April 19,2021 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM
cc: