HomeMy WebLinkAboutNCC201215_Notice of Termination_20210428Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 4/28/2021 2:56:27 PM (NOT Submittal)
Approve by Morman, Alaina 4/29/2021 9:22:12 AM (NOT Request Review- NCC201215)
• The task was assigned to Morman, Alaina. The due date is: May 3, 2021 5:00 PM 4/28/2021 2:56 PM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC201215
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
2020 Annual Fee Status
2021 Annual Fee Status PAST DUE
Nby be blank (iF not yet billed).
This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request
until payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must
be completed first (at the NOD or NOV Review step) to ensure records are routed to the correct folder in the
repository.
However, you can reject the NOT now if it is not acceptable.
Information associated with this permit:
Project Name
Weavers Pond Phase 3B
Address
1521 Sage Tree Drive, Zebulon, NC
County
Wake
Latitude
35.8606
Longitude
-78.3336
Permittee Listed
Dan Ryan Builders
Legally Responsible
Randy Talton
Individual
NC Reference No.
NCG01-2020-1215
E&SC Plan ID
SEC-034048-2020
Original NOI
23463
Tracking No.
Date COC Issued
3/27/2020
Prior Rescission
Cate populates only ff OOCwas already rescinded at tirre of subrrittal.
Date
Reason for Rescission/Termination Request:
Reason for r Project Closed -Out
Termination of r Sale (Another Owner/Operator obtained a newCOC)
Coverage * r Mistake or Invalid Coverage
f Other
Add ional We information about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Ibcurrentation if applicable.
Documentation Mist beFCFformat
Project Close-out Information:
Final Close-out 3/27/2020
Inspection Approval
Project Close-out Certificate of Completion_WP Ph3B Lots.pdf 156.07KB
Approval Mist be FDFformat
Documentation
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
C' cf 0614-lezr
Type Name* Jay Lewis
Title * Division President
Organization* Dan Ryan Builders
Date * 04/28/2021
Email for rtalton@drbgroup.com
Confirmation *
Contact Telephone* 919-478-8149
NOT Certification NOT - Signed.pdf 287.03KB
Form Mist be FDF Format
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Additional Email 0Cd on Notification Errails
(Optional) aagee@thenauco.com
Original Permittee 0Cd onNiotificationBmils
Email rtalton@drbgroup.com
Original Site Contact 0Cd on Notificaiton Errails
Email rtalton@drbgroup.com