HomeMy WebLinkAboutNCC200982_NOT Closeout Documents_20210427SEDIMENTATION INSPECTION REPORT (City of Winston-Salem/Forsyth County)
Winston-Salem Field Operations Department Permit #: EN2000017
Erosion Control Division
P.O. Box 2511 Date: 4/23/2021
Winston-Salem, NC 27102
Report by: Wesley Williams
Revised 1-1-20 Phone: 1 336-727-2487
Project: I Watson Wood Works Location: 780 Megahertz Dr
1. Pictures: ("x" One) Yes: x No:
2. Potential for NPDES Violation: ("x" One) Yes: No: x Describ
3. Weather and soil conditions: Cloudy/Dry Initial inspection: ("x" One) Yes: No: X
4. Is site currently under notice of violation? ("x" One) Yes: No: x
5. Is the site in compliance with S.P.C.A. and rules? ("x" One) Yes: No: x If no, check violations below:
6. Violations: ("X" all applicable sections)
( )--- No approved plan, [UDO Sec. 8.4.6 (G) ; & G.S. 113A-57 (4) and 15A N.C.A.C4B.0107(e)]
( )--- Failure to follow approved plan, [UDO See.8.4.19 (A); & G.S. 113A-61.1]
( )--- Failure to submit revised plan, [UDO See. 8.4.17 (B) (5); & G.S. 113A-54.1(b) and 15A N.C.A.C. 4B.0118(a)]
( )--- Failure to provide adequate groundcover, [UDO See. 8.4.6 (D) (1) (b); & G.S. 113A-57(3); & 15A N.C.A.C. 413.0007(b) or 15AN.C.A.C.
413.0124(e)]
( )--- Insufficient measures to retain Sediment on Site, [UDO Sec. 8.4.6 (D) (1) (a); & G.S. 113A-57(3)]
( )--- Failure to take all reasonable measures, [UDO Sec. 8.4.4 (B); & 15A N.C.A.C.4130105]
( )--- Inadequate buffer zone, [UDO See. 8.4.6 (A); & G.S. 113A-57(1)]
( )--- Graded slopes and fills too Steep, [UDO Sec. 8.4.6 (B) (1) (a, b, e); & G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(d)]
Unprotected exposed slopes, [ UDO See. 8.4.6 (B) (1) (t); & G.S. 113A-57(2)]
Failure to install and maintain erosion control measures, [UDO See. 8.4.12; & 15A N.C.A.C. 413.0113]
Failure to keep current self -inspection records, [G.S. 113A-54.1 & 15A NCAC 0413. 0131]
Other (describe):
7. Contact made with (name): Chad Hylland Title Sela Building Project Manager
8. Contact Method: phone # () email (x) fax # O letter O person (x )
9. Corrective actions needed:
No corrective actions needed at time of inspection.
10. Comments: O No devices in place ( ) Additional devices needed ( ) Devices need maintenance ( ) Devices in & functioning
( ) No seeding noted ( ) Partially seeded (X) Areas seeded ( ) Off -site sedimentation (Yes ) Project in compliance
All phases of grading and construction have been completed. The site is in stable condition per the approved erosion
control plan.
11. Others present:
Office use only: Cityworks ( ) Final ( ) [white notebook] Excel ( ) Financially responsible contact ( ) ARCGIS ()