Loading...
HomeMy WebLinkAboutWQ0042038_Regional Office Historical File Pre 2018DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Itesourees 15 N('' AC 021.0300 1 51 TRACK" SEWER SYSTEM EX IT \ PFIPI„IC ,k 110,N ETA 04-lb & SUPPORIT T.NIENTA DION NrcP 'q,ovvR Application Number:Arno hi:completed I rWR) ,111 items tBu r the. application will be returned I. A PH:ICA:VI INEORALVFION: 1. Applicant's name.: Town of Harrisburg tcornpany;, municipality, 1,10A, utility,. etc.) 2: Applicant type: El Corporation LI General Partnership Ehued Public Federal LIJ tate ( ount N f . pai Er] ()Fier 3. Signature authority's..namer Rub Doitham,,P,F, per 15A NCAC 021 ,O106( hi Title: Engineering and Public Works Director 4 Applicant's .mailing addri....ss: 4100 !Alain Strce) Suile 102 City: l larrisburg State: N(ST 5.. Applicant's ccritaet information: Phone Mini her: (704i 45.5-0728 F" Zip: 28075- ddress: rdonhanniiharrisbutsine 11, PRO,IECT INFORMATION: 1, Project name: ComingusatTarimutort 2„ Application/Project status: Z Proposed (New Permit) LI Existing l'errnit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part or a master plan, provide the existing perniii number: 1.VQ(10 Cciunty Where project is located: Caliatr its 4„ Approximate Coordinates (Decimal Degrees): Latitude: 350202;17' Longitude: -80„6715:' 5, Parcel ID (if applicable): 5506073152 (or Parcel to closest dowmstreain sewer) 111. CONSCIA'ANT INFORMATION: Professional Engineer: Stuart \\Similar& PE, firm: lAte.Adains, „Mailing address: 3430 Toringdon Way, Suite 1.10 City: Charlotte State. NC /M. 281 7- Phne number: (p41, 52.0500, 1,icense Number: 01-6788 1 nail „Address: woodaritiiiancadamsco.com R. NVASTEWATER -FREATNIENVI FACILFIN (NNIVTF) INEORMATMN: Name: Pennit 'Number: Owner Name: V. RECEIVING DOWNSTREAM SEWER INFORMekTION (if different than WWIT): I Permit: Number( s): WQ Downstream (Receiving) Sewer Size, 8 inch System Wide Collection System Permit Number-Lj (if :applicable): WQ.CS Owner Name( s): Hie Water & Sewer Authority at Caix.irrus County wOROS MOO A ES V" L LE REGIONAL 0 Fne E FOR:NT:, I'lL/1 04-16 Page 1 01'5 VI. GENER.,11; REQ flIZEIVNTS lithe .Applicant is a Privately -Owned Public. Utility, lertificate of Public Convenience and Necessity been attached? El Yes ElNo MN/A 2. If the Applicant is a Developer of lots to be sold, has a Developefs Operational ,Aueement (FORM: DEVI been ,attached? El Ye ilNo ZNIA Tillie Applicant is a Home/Property OwnersAssociation, has an Operational .Agreement LFORM; 00A) been attached? Yes [INN/A. 4. Origin of wastewater: (check all that apply); Residential Owned Lil Residential Leased [1 School preschool day care E Food mid drink facilities El Businesses offices / factories Li Retail (stores, centers, malls) E Retail with food preparatioulservice El Medical / dental veterinary facilities lurch Nursing llome [1 Car Wash E Hotel aridlor Motels E swimming Pool /Clubhouse E SWI.•111111ing Pool/Filter Backwash. Li Other (1lx.plain in Attachment) 5, Nature of Wastewater : 100 % DoinestielConunercial % Commercial °At 'Industrial (See 15A NC.AC 02T .010:1(_11) s e a Pretreatment Program in effect? 6. Has a flow —reduction been approved under 15,A NCAC 02T .0114(-1)? Eel Yes if ves, provide a copy of flow reduction approval letter 7, Summarize ‘vastewater generated by project: Establishment -1.`ype (sce 02T.0 I I 4(f)) . Daily Design Flow "'h 1 NO. of Units Residential, Single-Famil) Detached 1.120 gal/daylbedroom * 5 bedrooms. — 600 36 Residential, Townhorucs 1 120 oalldavdiedroom *3 bedrooms — 360 1 '''' . ' - — 1-- .112 i gall galgal How 21,600 GPI) 40,320 GPD GPD GPD (PI) pr) Tool 61,920 GPD a See 15,A NCAC 02T „0114(ja„ at] 1 • d teii.21 for caveats to wastewater design. flow rates (i„e., minimum flow per clwellin2-, proposed unknown non-residential. development uses; public. access facilities located near high public use areas; and residential property, located south or east of the 2\ dantic Intracoastal Waterway to he used as vacation rentals as defined in G.S. 42A-41. ,Per 15.A NCAC 02'17 .0114(c), design flow rates for establishments not identified [in table :15.A. NCAC 02T,01141 shall be determined usino available flow data, water using fixtures, .oceupa•ncy or operation pattern.s, and other measured data. 8. Wastewater generatedby proje,et: (.3PD (per I5A NCAC 02T ,0114) Do not include future flows or previously permitted allocations If permitted •flow is zero, indicate why: E Pump Station or Gravity Sewer Where flow iI 11• •ed in subsequent permits that connect to thishuie n Flow has already been allocated in Permi•t 'Nutuber: Ej Rehabilitation ot replacement of exiting sewer with no new flow expected Other ttlxplain): FORM: 1lTA 04-16 Page 2 of 5 \II. GCtA bie'1 02T .0305 & M_IK" (Gravity Sewers fthe)✓fI)C"fas Perini ttingofCira thins inform oalicara related to minimum :i meet niinirttum slope requireriierrt is no ria VIII. PUMP STATION DESIGN CRITERIA (If Applicable) —02T Ji305 &C. (Pump ;ttttions/Force Main COMPLETE E FOR FACII PUMP STATION INCIAJDEI) IN THIS PRC),IECT Punt station nit} Approximate (. oordin ()esi to foe••ctf die pump pumE3(ti in to bility i• <accorda neitude: - allc ras Per dad (frm capacity) feet total dyi anric (read (11)I I) per n L,en th (feet) l 5 A NCAC 027I ,02105(1) f l l parole \vttfla start trnatic act. vat ion and telemetry - 15;\ NC(NCAC 02T Required for al 'l pump stations v•vitlt an average daily flow greater than or equal to 15,000 ,gallons per day Must be pernatacttt to facilit t Car if"tlte pump station bass ate atw ra{ daail) lc?sa (,] Portable power source with manual a :tivati of' [ j Portable ptrnaping It shall be demonstrated to the y")i< and is compatible, vvith th.e station, ftlte pc'rr-table power source. or pomp is dedc;$ata and the rotation schedule of the_ pott. a multiple station powet` t tstca4 a, ceptacle a telerrtctr- i tr 1. (dr trt `raltratitatr o'all the pump stations" storar� c ttding time, fraaoncs, ,,ball be provided FORM: F"1 }\ 0•l-1(i aue 3 of I X. SETBACKS & SEPARATIONS -- (02B .020( & 15A NCA.0 0219 .0305(0): 1./ocs the project comply with all separations found in 15A NCA( ". I 5A NCA(' 02:1,0'305W contains minimum selLarations chat shall bc_prov ided for sewer systems, Setback Pal ameter* Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water over sewer including, in benched trenches) ..— \filter mains (hmazontal) 9 Reclaimed ater fines (vertical - reclaimed over sewer) Reclaimed water lines (horizontal - recianned over seWer) Any private or public water supply source, including any welts, VviS-1 iivaters of Class I or Class 11 mpounded reservoirs used as a source of drinking water 1 **Waters classified WS (except WS-1 or WS-V), B, SA, OR W, HOW, or SB trorn normal high water (or tide cilevation) and wetlands (see item 1.X.,2) I **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundatioti 1 Any basement es ri No ' Separation Reipiired 24 inches I 8 inches 10 feet I 8 inches 2 feet Llop slope of embankmentor cuts cif 2 feet or more sertoal height Drainage systems cind interceptor drains nys \vimminLpools Final earth grade (Vertical) 50 !eel I 0 feet feet feet 10 feet 5 feet 90 feet 36 inches. 15A NCAC 02T.0305(g) contains alternatives where separations in 021305(1") cannot he achieved. **Stream classifications can he identified using the Division's NC Surface Water Classifications welipacte • Er noncompliance with 0291.0305(fi or t,e), see Section .X of this application 2. Does the project comply with S.L'paration requireimmis fin- wetlands? (50 reel of L(.I 0lrli NYti's El N9) • Sec the Division's draft separation requirements for situations \vhere separation cannot he meet ✓ No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3. Does thc project comply with setbacks found in the river basin rules per 15A NC,AC 02B .0200? No [1.N/A .9.- This would include Trout Buf feted Streams per 15 A NC,A( 2B4O202 4. i)oes the project require coveragettinthorization under a 404 Nationwide or individual permits or 409 Water Quality- Certitieations? Information can be obtained from. the 401 & Buffer PermiitinoUranch Yes No 5, Does project comply with 15 A .NCAC 02T.0 105( cl(6) (additional permits/certi)ications)? M Yes Per 15A NCAC 02T,0105iic)(6), directly related environmental permits or certification applications are being, prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosi)n and sedimentation control plans, stormwater management plans, ete.). 6. 'Does this project include any sewer collection lines that arc deemed -high-priority?" Per 1.5ANCAC 021.0402, "high -priority sewer- means -any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to stream banks that is subject to erosion that undermines or deteriorates the sewer. E yes z No FA VA If yes, include an attachment \vith details for each line., including type (aerialline, size, material, and location 9. High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A 1\1CAC 02TA0403(a)(5) or the perm itee's individual System -Wide Collection permit. FORM: (1 \ 04-16 Page 4 ol5 X. CERTIFICATIONS: I Does the submitted system comply with the MinimorpDssjgri„,Criteriii rizr the Permitting of Pump Stsiijous and Force Mains (Wiest vers„iou), and the Gravity Sewer Minimum Design Criteriailatest version as applicable? E Yes DNO If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required priqr to submittal of the_Fast Track Application anti supPortine ocuments, 2 Professional Engineer's Certification: attest that this application for En from Application Ite has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering Ca I cu la tions, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and I43-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: SEAL 41r 0 8 3, Applicant's Certification per ISA NCAC 02T .0106(b): \v" (Signature Authority's na4le & title from Application Item 1,3.) that this application for has been reviewed by me and is accurate and complete to the best ofmy knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this perrnit be violated 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes I43-215.6A and 143-215 OIL any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed 510,000 as well as civil penalties up to $25,000 per violation, Signature: FORM: FTA 04-16 Date, Page Page 5 of 5 WELLINGTON LN ROCK RIVER RD PLAZA EXTENSION RD VICINITY N.T.S. 1,000 2,000 1 inch — 2:000 feet COMMONS AT FARMINGTON USGS TOPO MAP 4,000 PROJECT #: TPH-19000 Feet HARRISBURG, NORTH CAROLINA McADA Division of Wat Stale of North Caro Department of Env irim mental Quality Division of 'Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSTE —(11 /14) (JURISDICTION USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: ICity of Concord ECity of KannTown of Harrisburg :ztarlotte Mecklenburg Utilities Project Title„ Description, and Nuinber of Lots/Unit: Project Title: Description: \lt. Pleasant What is the quantity of flow that will be discharged? GPD Flow type: Domestic % (,:ommereial 0 Industrial Section the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. l'omp tint) N,runc) Niiirribiiit D1 )) ( B r inn Capaciry` * ! fansiain ,aserayie Niu Ho, iJs A pprox Cuninnt Obligated, Ncia. Ynt Totat Curvera Finn' M(I) , ia"iiimpia ...asiiiiagn Dady Flow 'tributary Dady Hasa Pi 11.5 0 b I 'pled F ion A1(.: El . NUJ} MGT> AMU) . : si--- i . . ,• i ,••• . , i . *The Finn Capacity of any pump station iS defined as the maximum pumped flow that Can be anineyed 'with the largest pump taken out of service. i'iv•Design Average Daily Flow is the firm capacity of the pump station clivided by a "making factor not kss than 2,5, ""A Phuming Assessment .ikddendunt shall he al:hacked for each pump station located between the project connection point anti the 1 11T1) where Available a:opacity Section 11 .turisd let ion 's Certification Statement: 1,11_31 ". certi ly that, to the best of my .knowiedg, the addition of the volume of wastewater to he permitted in this project has been evaluated along the route to the receiving WSACC interceptor: and the flow —front this project not anticipated to cause an capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WS.ACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable, "Fhis analysis has been performed in accordance \vial. local established policies procedures using the best available data, This certification appliesto those items listed above in Section I plus all attached planning assessment addendums for which, to the best of my knowledge., will not adversely affect the downstream sewer capacity, Signature of this form. indicates acceptance of this Wastev,'ater flow, 111?-1..cafierkm's Signing („ eta! „S'igmlture Dote ReDsKIrt Date: (kS.D9/1 3 WSACC September 14, 2020 Mr. Haynes Brigman Town Manager Town of Harrisburg P.O. Box 100 Harrisburg, NC 28075 Subject: Flow Acceptance Request - Town of Harrisburg Commons at Farmington Dear Mr. Brigman: WATER & SEWER AUTHORITY' OF CABARRtb'S COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.1783 • 704.795.1564 Fax www.wsacc.©rg This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the Town of Harrisburg on August 12, 2020, WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed project entitled Commons at Farmington, located off Farmington Ridge Parkway. The referenced project will serve a residential development with 36 five -bedroom homes and 112 three -bedroom homes, with a projected wastewater flow of 61,920 gallons per day (gpd). The wastewater generated by this project will be conveyed through a proposed gravity system and then enter WSACC's system at the existing 18-inch Fuda Creek Interceptor. WSACC acknowledges it has or will have capacity for wastewater from the proposed development based on information provided by The John R, McAdams Company, Inc. using North Carolina Department of Environrnental Quality (NCDEQ) wastewater flow guidelines. if construction of this project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated, This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and. Commitment Policy. Please note that the final commitment to service to provide wastewater treatment services shall occur upon application for a building permit for the protect and when system development fees are paid pursuant to tV C,G.S. §lb2A, Article 8. If you have any questions, please call me at (704) 786-1783, extension 224. Chad VonCannon, PE Engineering Director cc: Rob Donham, PE/Harrisburg Stuart A. Woodard, PE/The John R. McAdams Company, Inc. Michael Wilson/WSACC Thomas Hahn, PE/WSACC Mark Lomax/WSACC Trent Gobble/WSACC Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE —10/18) (WSACC USE ONLY) Commons at Farmington Section I. Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 0 Muddy Creek Wastewater Treatment Facility — Permit 010081621 WWTP facility's actual avg. daily flow, MGD Total flow for this specific request, MGD Total actual and obligated flows to the facility, MGD Percent ofpermitted flow used 0,062 24.261 91.55% Section 11. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Pump Station (Name or Number) Lower Ro River PS Pump Station Permit No. NC0036269 Firm paeity MGD (A Design Average Daily Flow " (Finnipf) MOD 14.800 Approx. Current Average Daily Flow MGD 12.346 (C) Obligated, Not Yet utary Daily Flow MGD 1751 (Mr' (3+C) Total Current Flow Plus Obligated Flow MGD 16.097 Available MGD -1.297 The Firm Capacity (design now) of any pump station is defined as the maximum pumped flow that can be achieved wlth th largest pump takenIce. **De.sign Average Daily Flow is the firm capacity or the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4Xe) of the Minimum Design Criteria, ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and he WWTP where Available Capacity is < O. Section III, WSACC Certification Statement: 1, Chad VonCannon, PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section 1 and Section 11 plus all attached planning assessment addendums for which 1 arn the responsible party. Signature of this form indicates WSACC's guarantee of capacity for this wastewater flow, Notwithstanding the guarantee of capacity, WSACC does not make a commitment to service this wastewater flow until a building permit is requested through the Cabarrus County Building Inspections Department and WSA e1vesjyrnent of the System Development Fee. acv WSACC 's Signing Official Signature Date CaWASTEWATER FLOW ACCEPTANCE FORM FOR THE. WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date:. ❑City of Concord QCity of Kennapolis ®Town of Harrisburg []Town of Mt. Pleasant ©Charlotte Mecklenburg Utilities Project Title, Description, and Number of LotsltJnit: Commons at Farmington, Mixed -Use u'bdivisfost, 112 Townhornes & 36 Single -Family Project Title: Commons at Farmington Description: The proposed development is located off of Qt«oc' y lover Road within the proposed . Farnt.ingtyit I?cvetooment in the 'Taw t of liatTisburg, The site will be locate d at the north-east corner of the proposed intersection of n o e r r r 1. v t t 1 of e construction of 112 icaurnhontes and 36 sigtglt: J oily+ resldetilial lots acid the associated public greets and utilities, Number of Leta: 148 OR *Number of Units: *Must be included in request. Where will the new line be connected: © Directly into a WSACC Interceptor Into the Jurisdiction's existing collection system 0 Into a private line Describe the location of the thin line to which the new sewer line will connectautfSU is proposed to eonncct to an existing; sewer trunk kilted adiacentto Fuda Creek on the proposed development's property. Which WSACC Interceptor will the flow ultimately be discharged into: Fuda Creek What is the WSACC manhole number that the flow will be discharged into? 012771 (From Farmington) What is the quantity of flow that will be discharged? 61.920 GPD Flaw type:. Domestic 100 % © Commerclal % © Industrial y _err Name of wastewater treatment facility (WWTF) receiving wastewater: Q Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility— Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance, Drawings oan be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing int''astructure. lithe new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided. Mark Lomax at 704-786-1783, ext. 231, ►nust be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after completion, If construction is :not started within two (2) year from the dare of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. WSACC USE ONLY: DATE: Current sewer model shows an Interceptor as being surcharged south of the manhole in question. Approved © Not Approved Current Sewer Model shows: r. C-*Yic, tit' Fs JC yS 41(1P { ti (,1 41. + .0 AT Agrkt,or . hioY QJ 1 I t f$1 C qFp c- t-TY PLANNING AST ADDENDUM (PAA) Submit a planning assessment addendum for each pump statirn listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Lower Rocky River Pump Station Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for 23.3% and 3,751 MOD of the committed flow in the Lower Rocky River Pump Station; and that b. The rate of activation of this obligated, not yet tributary capacity is currentlyapproxiinately 1,806 MGD per year (please see second paragraph below); and that c. A funded Capital Project that will provide the required planned capacity, namely Lower Rocky River Pump Station Expansion is in design or under construction with planned completion in December 2021; and/or d. The following applies: Per guidance from Town of Harrisburg and the developer, it is expected that the Commons at Farmington project will be constructed and certified by October 2025, and a phased build -out is proposed for this project. I WSACC has been ►working with Brown and Caldwell since February 2020 to study an expansion of the Rocky River Regional W'WTP, which includes study of expanslo9 for the Lower Rocky River Pump Station. The Lower Rocky River Pump Station currently includes four pumps, with space available for two additional pumps and associated piping. WSACC plans to initiate formal design in S ptember 2020 for implementation of additional pumping capacity at the Lower Rocky River Pump Station. iven that space is already available for two additional pumps, and that some associated piping is already in place, SACC currently anticipates that design and construction for implementing additional capacity at the Lower Rocky River Pump Station can be completed by the end of 2021. Based on recent analyses by Brown and Caldwell, WSACC expect that the firm capacity of the upgraded Lower Rocky River Pump Station will be around 53.3 MGD, meaning that WSACC expects the "design average daily flow" of the upgraded Lower Rocky River Pump Station wail be around 21.3 MGD. Based on flow trends so far in 2020, WSACC expects the overall 2020 annual average rate of activatiou for obligated, not yet tributary capacity to be lower than the tsoq MGD per year indicated above (from calendar year 2019). The increase in flow at the Lower Rocky River Pump Station in calendar year 2019 was heavily influenced by significant and persistent rainfall events. The year-to-date average flow for 2020 is approximately 11.2 MGD, much lower than the 12.346 MGD annual average from 2019, which was heavily influenced by the referenced rainfall events. With the combination of lower actual flows so far In 2020 and an expected lower rate of activation for obligated, not yet tributary flows relative to the values experienced in 019, WSACC does not currently anticipate issues with design capacity at the Lower Rocky River Pump Station p for to completion of the planned capacity upgrades at the Lower Rocky River Pump Station. Finally, WSACC is also working with a consulting engineer on design and related work for the Back Creek Interceptor Improvements protect. Completion of construction for the Back Creek Interceptor Improvements protect is expected in early 2022 (after the expansion of the Lower Rocky River Pump Station is complete), and will result in an additional 1.1 MGD of wastewater flow from Charlotte Water conveyed to the WSACC system, which will lead to additional flow at the Lower Rocky River Pump Station. NC DEQ has issued a permit for the Back Creek Interceptor Improvements Project, and tutu ed on that permit a stipulation that, prior to any flow being tributary from the Back Creek Interceptor Improv4ments Project, the planned capacity upgrades at the Lower Rocky River Pump Station must be completed and ertified. Therefore: Given reasonably expected conditions and planning inflarrnation, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over-allocatrng capacity in the system infrastructure.. I understand that this does not relieve the collection sysern owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signaitrt*e Fag; 3 of 6 Date FTSE 10-18 August 9, 220 NCHEQ 610 East Center Avenue Mooresville, North Carolina 28115 Commons at Farmington Location: Farmington, Rocky Ricer Road, Harrisburg, NC 2821 Vater Resources Departs in addition to this ever utter, please find enclosed the frllcrvrinR: 1, Application Form (FTA) Signed o gin 2. Application Fee D 3, FTSF Form - .Signed„ Original lurisdictic rr 4. street Level Map 5, DS S reap select i c' ct i on The proposed development is located cuff of Rocky River Road within the proposed sed Farmington Development ent in the MAT) of Harrisburg, The site will be located at the port h-east corner of the proposed intersection of Farmington Ridge Parkway and Clear Creek Lane:. The prolapsed development will include the construction of 112 tow homes and 36 single-family residential "lots and the associated public streets and utilities: eting experiences through experaenc 34tt Tnringtron Chad.nttes NC 28277 / 70.4. 577. t7 Previous Per in The pr ject's erasion and sedimentation control plan was approved with perfc rmance reservations by I C EQ on February 24, 202a The project Harrisburg. currently under review for peri fitting through the Town of .Sanitary Bearer System and °Water .Supply system The water supply system and sanitary sewer system wl'll sears . t4 wnhtrne units and 36 single-family lots. The site will receive water by tapping the g" watermain (to be installed as part of the Farmington infrastructure) along dear Creek Cane. The proposed d water supply system is comprised of 1, linear feet f proposed water line and will service 11 , GPI). The proposed sanitary sewer system is completely gravity fed with 3,896 linear feet of g" sanitary sewer line proposed and will service 61,920 GPD. Sincerely MCADAMS Stuart Woodard,. PE Project Engineer h experience rtgr9a n Way, suite 1 „ Chariette, NC 2827i J 704, 7 800