Loading...
HomeMy WebLinkAboutWQ0040425_Regional Office Historical File Pre 2018Y COOPER MICHAEL S. BEGAN UNDA CULPEPPER November 15, 2018 Mr. Scott Bosco, Vice President, Construction Management Riverbend Concord Properties 11,. LLC 204 West Newberry Rd. Bloomfield, CT 06002 Subject: Permit No. WQ0040425 Riverbend Concord Properties 11. LLC Griffin International Wastewater Collection System . tension Permit Cabarrus County Dear Mr. Bosco: In accordance with your application received November 13, 2018we are forwarding herewith Permit. No. WQ0040425 dated November 15, 2018 to the Riverbend Concord Properties II, L.LC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and. limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this p Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition -11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form.. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.01 161 70 It shall be the responsibility of the Ferrnittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute 143- 15.6A through 143 21 .6 , construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing; board. 11' any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a %Written petition, conforming to Chapter 150171 of North Carolina General tatutes, and filed with the Office of Mann e Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. if you need additional information cot g this matter; please eontact (1)ri Tuvia at (704) 73 -71 0 or via e-mail at oritarviartaincdenraa Sincere!), Duine y; Al4C6681AF27425, fa Culpepper Direcuor, Division of We .r e,sour• by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Div°ision of Water Resources, ; CI.)F.0 Greg Welsh (f'.h.) ( -copy) Mooresville Regional Office Files (L,aserfche) Water Resources es Central Files it aserfiche) PL .C: (Laserf ehe) Page 2af10 NI', CD 0". H CA C:14._ N Eirvfroolrnerrrai Quality WASTEWA- ER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws. Rules, and Regulations, permission is hereby granted to the Riverbend Concord Properties 11, LLC Cabarrus County for the construction and operation of approximately 650 linear feet of 2-inch force main; 26 GPM grinder pump station with 32 feet of total dynamic head and portable power source with manual activation, quick -connection receptacle and telemetry; to serve '2 warehouses. with 87 loading hays as part of Griffin International construction, and the discharge of 8,700 gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received 'November 13, 2018and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until .escinded and shall be subject to the specified conditions and limitations contained therein. DocuSigned by: Al 4 GC6.84AF-2-7425.-- for Linda Culpepper interim. Director, Division of Water Resources by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0040425 Permit Issued: November 15, 2018 Page 3 of 10 SUPPLEMENT TO PERMIT COVER SHEET Riverbend Concord Properties II, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet I5.A. NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina.-ficen.sed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 8,700 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [ 5A NCAC 02T.0304 (b)]. II. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved, [15A NCAC 02T,0104; G.S 143-215.1(d.3)J 2. This permit shall become voidable unless the wastewater collection facilities are constructed in. accordance with the conditions of this permit; I 5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12„ 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15,A. NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [I 5A NCAC 02T .01101 4. The wastewater collection facilities shall be properly maintained and operated at all times,. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. if an individual permit is not required, the following performance criteria shall be met: [15A. NCAC 02T .010801)* Page 4 of 10 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i,e. 365 days per year). Pump stations that are connected to a telemetry system shall he inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f. A general observation of the entire sewer system shall be conducted at least once per year, g- Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with I5A NCAC 28 .0506(a), and public notice shall be provided as required by. North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as -follows: 1, For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include. legal means .for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2 For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the perminee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows, i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map. which shall be maintained for the life of the system. 5, The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the Occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 10 Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300.. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Fonn CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control, [G.S. 143- 215,1C(a1)] 6, Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification fOru attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable.. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Perminee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pu.m.p velocity, pump cycle tim.es, and level control settings, pump station buoyancy, wet well stora.ge, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form, Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including but not limited to pipe length changes of 1.0% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Page 6 of 10 Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After - construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [1.5A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the 'minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall he evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0.105(n)] 9. A copy of the construction record drawings shall be maintained on file 'by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .01161 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T.; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000..as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §1.43-215.6A through §143-215.6C, Construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities, [15A NCAC 02T .011.0; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may he required by the Division or any other 'Federal, State. of Local governinent agencies. [G.S. 143-215.1 (b)] Page 7 of 10 CER.TIFICATION CHECKLIST To be com-pleted by the certifying engineer prior to operation of the permitted sewers, per 1 5A •NCAC 02T.0116. Certifying Engineer: Certification Review Date: Project Name: WQOO Project County: 1) Has permittee information changed since the permit was issued (or ast modified): change of mailing address, change ofownership, transfer from developer to HOA/P0A, etc El Yes No If yes, please provide either a change of ownership form or new contact inforniation. Note that transfer of permits from the developer to the HOA/P0A must occur with the first certification. 2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? L Yes L 3) Final Engineering certification? El Yes I No No • If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase, what was previously certified (if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: [ Yes E No E N/A • Three feet minimum cover has been provided for ail sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines. • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 'feet; minimum diameter shall be 4 feet (48-inches). 5) Adequate information related to pump stations: 'D Yes No N/A • Ensure. power reliability option was selected per I5A NCAC 02T.0305011. 6) Was project construction completed in accordance with all ofthe following: j Yes E No P NIA. • I 5A NC.AC 021, Minimum Design Criteria NIX") for the permitting of Gravity Sewersilatest version), and MDC forthePrrningfPunigStations and force Mains (latest version)? If not, a variance approval is required in accordance with I 5A NCAC (12T,0 05(b), prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority lines (15A NCAC 02T ,04022jJ? El Yes El No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15.A NCAC 02T,0403 (a)(5). If the permit does not include this -language, the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with. this permit (including but not limited to pipe length changes of 10'..N or greater, change in flow, pump station design capacity design change of 5°/0 or greater, and/or change in the number/type of connections)? 1 Yes fl No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: RIVERBEND CONCORD PROPERTIES 11, LLC PERMIT #: WQ0040425 PROJECT: GRIFFIN INTERNATIONAL ISSUE DATE: NOVEMBER 15, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page looter. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shah be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature ENGINEER'S CERTIFICATION Date 1, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically, LI weekly, fJ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best ofmy abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division. of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I, 2000, as applicable; and other supporting materials,. North Carolina. Professional Engineer's Seal w/signature & date: —1 Final T Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 Division of Water Resources State of North Carolina Department of Environmental Quality .Division of Water Resources 15 NCAC 021 .0300 — FAST TRACK SEWER SYSTEM EXTENSION .APPL1CATION FrA (14-16 & SUPPORTING DOCUMENTATION Application Number: i<VQ0 011-1-014.01e5ito be compkied by DWR) All items must be completed irthe application will be returned I. APPLICANTINFORMATION: 1. Applicant's name: Riverbend Concord Properties IL LL( (company, municipal ity, 110A. etc) 2. Applicant type:Individual Corporation 0 General Partnership Lil Privately -Owned Public Litility 0 Federal L State/County Municipal LJ Other Signature authority's name: Scott Bosco per 15A NCAC 021 .0106(h) Title: Vice President, Construction Management 4. Applicant's mailing address: 204 West Newberry Road. City: .Bloomlield State: CT Zip: 06002- 5. Applicant's contact information: Phone number: (860) 286-7660 Email Address: sbosco(dtriffinindustrial.com 11. PROJECT INFORMATION: 1, Project name: Griffin International 2, A pplicat„ion/Project status: Proposed (New Permit) Ej Existing Permit/Project if a modification, provide theexistine permit number: WOOD .and issued date: If new construction but part of a master plan, provide the existing permit number; WOO° 3. County where project is located: Cabana's 4, Approximate Coordinates (Decimal Degrees): Latitude: 35,4 51' Longitude: -80.65,36' 5, Parcel ID (if applicable): 5601-70-5554, 5601-70-4051 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1, Professional Engineer: Greg Welsh, K.', License Number: 33996 Firm: OAK Ermineerigg MEC Mailing address: 828 East Boulevard City: charlotte State: NC Zip: 28203- Phone number: (704) 989-4046 Email Address: gregr&oak.engineering IV, WASTEWATER TREATMENT FACILITY (WWTF) INFORM:XTION: 1, Facility Name: WSACC Rocky River WV Owner Name: Water & Sewer Authority of Cabarrus (our RECEIVING DOWNSTREAM SEWER INFORMATION Of different than WWIT): I, Permit Numbertsy WQ Unknown Downstream (Receiving) Sewer Size: 87 inch System Wid.e Col iectipn System Permit Number(s) applicablel: WQCSW'QCS00326 Owner Narne(s): City of Concord Permit Number: NC0036269 FORM: FTA 4-16 Page 1 of 5 CENERAL REQUITIFMEN'ILS lithe Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? 0 Ye L3o N/A 2. Ifthe Applicant is a ;t; to be sold, has a Developer's Operational Agree .FOR1/1.: DEVI been attached? 0 Yes EJso NA 1. If the ,k.pplicant is d Home/Propertv Owners' ikssociation, has an Operational Agreement (FORM: DOA) been attached? 0 Yes 0No NA 4. Origin of wastewater: (check all that apply): O Residential Owned O Residential Leased 0 School / preschool / day care O Food and drink facilities Z Businesses / offices./ factories 0 Retail (stores, centers., malls) 0 Retail with food preparationtservice 0 Medical/ dental / veterinary facilities 0 Church El Nursing Home Nature of wastewater : 100:N, Domestic/Commercial 0 tt/0 Commercial 0 %industrial (See ISA NCAC 02'1 .010120)) Is there a Pretreatment Program in effect'? 6. 1 las a Ilow reduction been approved under 15A NCAC 024.0114(0? 0 Yes If yes, provide a copy of flow reduction approval letter 7, Summarize wastewater generated by project: :stablisliment Type (see 02T.0114(1 Building A - Warehouse Daily Design Flow 100 gailloading bay Building B - Warehouse 100 galfloading bay gal/ gat/ oar LI Car Wash El Hotel and or Motels El Swimrning Pool /Clubhouse 0 Swimming Pool/Filter Backwash Other (Explain in .Attachinen0 No. of Units 4.400 GPI) 4,300 CiPD ( PI) GPD GPD GPI) Tota/ 8,700 (IPI) a See .I5A NCAC 02/1 ,01.14(b). te)(D and (e)(2) for caveats 10 wastewater design flow rates (i.e„ minimum flow per dwelling, proposed unknown non-residential development uses; public access facilities located near high public, use areas: and residential .property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42,A-4). b Per 15,A NCAC 021 ,0114(c), design flow rates for establishments not .identified [in table 156, NCAC 021/.0114J shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. Wastewater generated by project; 8,700 GPD (per 15A N ,A( 02T .0114) /.--; Do nor include future flows or previously permitted allocations If permitted flow is zero, indicate ‘vity1111 ; Pump Station or Gravity Sewer where now will he peril-1race, in su :set EJ Flow has already been allocated in Permit Nu her; Lil Rehabilitation or replacement of existing sewer with no new flow expected 0 ( Alter (Explain): ha CO is iiiie FORM: ETA 04-16 Page 2 of 5 . GRAVITY'. SEWER DESIGN CRITERIA Of Applicable) - Or F .0305. & MD( (Gravty Sewers) 1, SUM mat ize gravity sewer to be permitted: VHI. Size (inches) Section 11 & 111 ofthe MDC 'for Permitting of Gravity Sewers contains information related to design criteria Section 111 contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the M DC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MD( (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1.. Pump station number or name: 1 HP Grinder Pump Package 2,Approximate Coordinates (Decimal Degrees): Latitude 35.4 160Lorwitude: -0.6529' 3. Design flow of the pump station: 0,0087 millions gallons per day (firm capacity) 4.. Operational point(s) of the pump(s): 26. gallons per minute at 32 feet total dynamic head (TDIT) 5. Summarize the force main to be permitted (for this Pump Station): Size (inclie Length (feet) Material 650 6. Poyver reliability in accordance with 15A.:l\ICAC 02T „03051.111W: fl Standby power source or pump with automatic activation and telemetry I 5A NCiNC 02T ,0305(h)(1)(B): Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 021 .0305(11)(1K) or El Portable pumping unit ).vith plugged emergency pump connection and telemetry - 15 A NCA.0 02T .0305(10(1 )(('): I( shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple punt p stations, an evaluation °fall the pump stations' storage capacities and the rotation schedule of the .portable power source or pump, including travel timeframes, shall he provided in the case of a Multiple station power outage. FORM: FTA 04- I 6 Page. 3 of 5 TX. SETBACKS & SEPARATIONS — (021I .0200 & 15A N(:AC 02T ,0305(0): 1. Does the project comply with all separations found in NCAC 02T „0305 15A Nt-.'„AC 02T.0305(ficontains minimum separations that shall be provided sewers and -other utilities Setback Parameter* 'ertical) 'ter mains (vertical -water over .sewer including in benched tre Water mains (horizontal) Reclaimed water lines (vertical - reclaimed over sewer) lnled water lines (horizontal - reclaimed over sewer) y private or public water supply source, including any wells. WS-I waters of Class I or Class I1. impounded reservoirs .used as a source of drinking water ' -sewer s **Waters classified WS (except WS-I or 'VS-V), U. SA, ORW, IIQW, or SB from normal high water (or tide elevation) and +.8,etlands (see kern IX,2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation A basement slope of embankment or cuts of 2 feet or more vertical height rage systems and iterceptor drains Anv swimmtng pools Final earth grade (vertical) Yes 1 1 No stents: Separation Required 24 inches 18 inches 10 feet 18 inches 2 feet 50 feet 10 feet 5 feet 10 feet 10 feet 5 feet 10 feet 36 inches 15A NC.A.0 0.2T.0305(1) contains alternatives where separations in 02T.0305(0 cannot he achieved, **Stream classifications can he identified using the Divisions NC Surface Water Classifications ‘vebpage If noncompliance with 02T.0305(f) or (g), see Section X of this application Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes See the Division's draft separation requirements..tbr situations where separation cannot be meet 'fr No variance is required .i.r.the alternative design criteria specified is utilized in design and construction As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ';•-• 'This would include Trout Buffered Streams per 15A NCAC 213,0202 4. Does the project require coveragelauthorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Information can he obtained from the 401 & Buffer Permitting Branch 5. Does project comply with I5A NC:AC 02T.0105(e)() (additional permitslcertifications)? No N/A. cs L No I] NIA Ei Yes [1] No Yes El No Per -15A -NC.AC 02T,0105(c)(6)„, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, storm water management plans, etc.). 6. Does this project include any, sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402., "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. Ej Yes No If yes, include an attachnnt with details for each line. including type (aerial line, size, material, and location). H igh priority lines shall be inspected by the permittee or its representative at least once every six.-montlis and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FOR PTA 04-16 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with .I5A NCAC 021, the Minimum Design Criteria for the Permitting of Puttp Stations - aorLe .Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes 11] No I f No, complete and submit the VariancehAlternative Design Request application (VADC I 0-14) and supporting documents for review. Approval of the request is required prior to sti bmitta I of the Fast Track Application and supporting docurnents Professional Engineer's Certification: „ f- attest that this application for (Professional Engineer's name from Application Itern111.1.1 has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of in knowledge. 1 fin -filer attest that to the best of nty knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Iksign Criteria for Gravity Sewers (latest versionit, and the Minimum Design Criteria tbr the Fast -Track Permitting or Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this .submittal package. inclusion of these materials under my signature and seal signifies that 1 have. reviewed this material and have judged it to be consistent with the proposed design. NOTE --- In accordance with General Statutes 143-215.6,A and 143-215,613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a tine not to exceed $ 10,000, as well as civil penalties up to $25,000 per violation, North Carolina Professional Engineer's seal, signature, and date: 3, Applicant's Certification per 1..5A NC.,,\C 021 .01 attest that this application for (Signature Authority's name & title from :Application Item 1.3,) has been reviewed by me and is accurate and complete to the best of iny knowledge, I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as inetymplete. 1 understand that any discharge of wastewater from this non - discharge systetn to surface ‘vaters or the land will retitlit in an immediate enforcement action that may include civil penalties., injunctive relief, amid or criminal prosecution, I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NO - In accordance with General Statutes .143-215:6A and 143-215,613, any person Who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S110„000 as well as civil penalties up to $25,000 per violation, Signature.: Date: 57/ FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of the Secretary of State Limited Liability Company ARTICLES OF ORGANIZATION SOSID: 1663670 Date Filed: 24/2018 2:36:00 PM Elaine F. Marshall North Carolina Secretary of State C2018 039 00913 Pursuant to §57D-2-20 dale General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a limited liability company. The name of the limited liability company is: Riverhead Concord Properties (See Item tot' the instructions for appropriate entity deli LC 2. The name and address of each person executing these articles of organization is as follows: (State whether each person is executing these articles of or nization in the capacity of a member, organizer or both by checking all applicable boxes.) Note: This document must be signed by all persons listed.) Name Bass Business Address Moore & Van Allen PILC 100 North Tryon Street, Suite 4700 Charlotte, North Carolina 28202 The name of the initial registered agent is: Capacity 0 Member 0 Member CT, orporatioa System Organizer 0 4. The greet address and county of the initial registered agent office of the limited liability company is: Number and Street: City: Raleigh State: pir L CourtSt.dte Zip Code: 27615 County: Wake The mailing address, if different from the street address, of the initial registered agent office is: Number and Street: City: State: Zip Code: zer County:, 6. Principal office information: [Select either (a) or (b)] (a) 0 The limited liability company has a principal office. (Select either a or b) The principal office telephone number: The atreet address and county of the principal office of the limited liability company is: Number and Street: City: State: Zip Code: County: BUSINESS REGISTRATION DIVISION (Revised August 2017) P.O. Box 29622 Page 1 of 2 RALEIGH, NC 27626-0622 Form 1,01 CHAR211991795v I The retailing addres4, if different from the street rdress, of the principal office of the company is: Number and Street: City: State: (h Zip Code: The limited Liability company does not have a principal office. County: _ Any other provisions which the limited liability company elects to include (e.g., fhe purpose of the entity) are attached. (Optional): Listing of Company Officials (See instructions on the importance of listing the company officials in the creation document. Title (Optional): Please provide a busirtess email address: The Secretary of States Office will e-mail the husine automatically at the address provided ataave at no cast wren a a nem. is filed, The e-mail provided will not be viewable on the website. For more information on why this service is offered, please see the instructions for this document. d Privacy Redaction 10. These articles will be effective upon filing, unless a future date is specified: This the 8iday of February, 2018.. air �. bass Oratait Type Name and Title The below space to be used if more than one organizer or member is Listed in Item #2 above. Signature Type Name and Title Signatun e Name and 'Tit Sig, ype Name and Title Type Name and Title NOTE: 1. Filing fee is $125. This document must be filed with the Secretary of State. BUSINESS REGISTRATION DIVISION (Revised August 2017) P.O. Box 29622 Page 2 of 2 RALEIGH, NC 27626-0622 Form L-01 C 11AR2'li 991795v I ortlyCarolina.::SetTeart. ibf:.Stkte File an Annual Report/Amend an Annual Report Upload a PDF Filing Order a Document Online Add Entity to My Email Notification List View Filings Print an Amended a Annual Report form Print a Pre Populated Annual Report form Li ited Liability Company Legal Name Riverbend Concord Properties H LLC Information Sosic: 1663670 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 2/8/2018 Registered Agent: CT Corporation System resses Reg Office Reg Mailing 160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Raleigh, NC 27615 any fficials All LLCs are managed by their managers pursuant to N,C.G.S. 57D-3-20. :..11ttps:hfwcywsosnc,go:NdontineLservitesl.soae.ht Rusint.§.:R,egj:s:trationLRettlts: 5 September 12, 2018 VIA EMAIL ONLY City of Concord elo Oak Engineering ineerin Attn: Greg Walsh re@oal.enineerin Re: Riverberrd Concord properties fl LLC Tear Crt g Van Atte A trays atLa Suits 4700 100 North Tryon Str* Charlotte, NC 28202 vet m an attorney with doors& Van .Alen 1 LLC, licensed to pr reticc i1r the State of l'irrth Carolina and am counsel for l iverbend Concord properties l LL.C, a North_ Carolina limited liability corrrparry (the "Developer') understand that this letter mil[ e relied upon solely by the City of Concord. Scott Bosco is a Vice Preside and is authorized to sign pert x►it applications on behalf of Developer. Very truly yours. C TATt'313080692v1 ire, NC rtltirtts 'ttrrk.NC WSACC October 19., 2018 14.14VIDI $t3t Puk Sachet • (18.S.;413a1IN1 Mr. Lloyd Payne City Manager City of Concord P,O, Box 308 Concord, NC 28026-0308 Subject: Flow Acceptance Request — City of Concord Griffin International Spec Buildings Dear Mr„ Payne: WATER & SEWER AUTHORITY OF CABARRUS COUNTY 232„Davidson Hwy, Concord, NC 28027 704,786.1783 • 704,795.1564 Fax www.wsacc.org This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) tram the City of Concord on October 19, 2018. WSACChas or will have capacity at the Rocky River Regional Wastewater 'Treatment Plant and appropriate sewer interceptorss to transport and treat the commercial wastewater from the proposed project entitled .Grittin International Spec Buildings., located off International Drive. The referenced project will serve an 87-bay warehouse, with a projected flow of 8,'700 gallons per day (gpdl) The wastewater generated by this project will be conveyed through a proposed force main, through the existing gravity system, and then enter WSACC's system at the existing 48-inch Irish Buffalo Creek Interceptor. WSACC acknowledges it has or will have capacity for wastewater from the proposed development based on information provided by Oak Engineering, PLLC (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines, The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005. -- 2006. funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the finure. Projects on the Cl1P are subject to approvid by WSACC's Board of Directors, support horn local governing bodies, regu.l.atory approval, and funding availability. The list. and .schedule ofCIP projects are tentative and are revised periodically to reflect changing conditions and needs, If construction of this .project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated, This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy, Please note that the final .commitment to service to provide .wastewater treatment services shall occur upon application for a building permit fbr the project and when system development fees are paid pursuant to N.C.G.S. 062.4,.4rticle 8. 11 you have any questions, please call me at (704) 788-4164, extension 104, Sincerely, Thomas Halm, PE Utility Systems Engineer cc: Sherri Moore/Concord Greg Welsh, PE/Oak Engineering, PLI..„C Michael Wilson/WSACC -rim Kiser, PEAVSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC.l. WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY risdiction Requesting Flow Acceptance: Date: September 12, 2018 City of Concord OCity of Kannapolis Drown of Harrisburg OTown of Mt. Pleasant OCharlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: Griffin Interuationstl SDK pilildirass —(CoC Proffer #20l8.O32l Description: The Griffin Internetionaj Sine Buildings engineering plans and specifications. a prepared and sealed by jgPLLCJorthepriae ateater ollectionf 26 gpm at 32 fepj 'DP duplex HP Grinder Pump Package rftunp station with 0,0087 mop firm caPaciti and 050 liner fss.L.QL2-inch ftrce Main and other sopurtenances,to scrve a 147.000 so, ft. and 136.500 s j peculative witelio= ff offonlar Tent Road and International Drive. with a wastewater discharge of Where will tine new line be connected: o Directly into a WSACC Interceptor Into the Jurisdiction's existing collection sysiem 0 Into a private line Describe the location of the tie-in line to which the new sewer tint will connect: The proposed private pump station forrA plain extension will ticnn to the existing 8-incti. 12 nth and 24-inch sanitary sewer system, which extends to the 48-ipsh RCY WS.ACc Irish fittiffilo Creek interceptor Which WSACC Interceptor will the flow ultimately be discharged into; 48-inch RCP WSACC Irish Buffalo Creels lasacptor What is the WSACC manhole number that the flow will be discharged into? Node OW 12 What is the quantity of flow that will be discharged? 8,700 GPO Flow type: O DomesticDomesti ii Commercial Industrial of wastewater treatment facility (WWTF) receiving wastewater: ky River Wastewater Treatment Facility — Permit IONC0036269 ddy Creek Wastewater Treatment Fidility * Permit JONC04181621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawin8s can be submned as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided, Mark Lomax at 744-786-1783, ext, 231, must be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after compietion. lf construction is not started within two (2) year front the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required/or the project SACC USE ONLY: DATE: 0 Current sewamodel show!fen bnterceptor as being surcharged south of the manhole in question. Approved 114A$ 0 Not Aproved Current Sewer Model shows: stacctLiVr4r E )(CPIs (_A PAC t F. GALLO DP 6C U) AT PA DAILY R.004 CV NI) al 0"5 ''''*"tttltsvvogao".-' Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE -04/16) WSACC USE ONLY) Griffin Internationa1 Spec Buildings Section L Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility - Permit #NC0036269 Muddy Creek Wastewater Treatment Facility Permit #NC0081621 WWTPfacility's permitted flow, MGD Estimated obligated flow not yet tributy to the WWTP, MGD WWTP facility's actual avg, daily flow, MGD Total flow for this specific request, MGD ToiaJactuiob1tedflows to the faci1ity, MGD 26.500 .79 17. 0 (64.30% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. Piunp Station (Manse Or Number) rm C (A) Aircrew Daily Flow (Firodp1) MGD Appmx Current Average Daily Flaw MGD Y Total Current Flow Tributary Duly Flow Plus Opted Flow MGO MGO Avaiiable Capacity*** c. 11,734 0.442 • The Etna Capacity of ady pomp station hi delilised as the CIES7a1811111 pumped flew that me achieved with the is "'Desists Average Ugly new is the firm capacity of the pump station divided by * peaking tamer sat lees than Z.& * **A Pitman! Assessinatt Addendum shall be attached for OSA pomp statio* located between the project connection po by is <0., Section 111 WSACC Certification Statement: I, L_TIQ. PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving wastewater treatment facility, and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data., This oenifieation ,,fies to those items listed above in Section 1 and Section 11 plus all attached planning assessment addendums for which lam the responsible party. Signature of this form indicates WSACC's guarantee of capacity for this wastewater flow. Notwithstanding the guarantee of capacity, WSACC does not make a commitment to service this wastewater flow until a building permit is requested through the Cabarrus County Building Inspections Department and WSACC receives payment of the System Development Fee, ACC1Signing Official Signature DIvIslon of Water Reso State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) (JURISDICTION USE ONLY) Griffin International Spec Buildings —((oC Project #2018-032) Jurisdiction Requesting Flow Acceptance for Collection System: City of Concord lCity of Kannapolis Town of Harrisburg DTown ofMt Pleasant Charlotte Mecklenburg Utilities Project Title, Description, and 'Number of Lots/Unit: Project Title: Griffin International Spec Buildings - (CoC Project #2018-032) Description: The Griffin International Spec 'Buildings engineering plans and specifications, as prepared and sealed by Greg Welsh, NUPE,. with Oak E.ngineering, PLL,C, for the private wastewater collection system extension consisting of a 26 gpm at 32 fe-et TDH. du lex HP Grinder Purn Packa e UM station with 0.0087.MGD firm ca. a- and 650 linear feet of 2-inch force main an.d oJrp.jurtenances to serve a 147,000 sq. -ft. and 136,500 sq._fi speculative warehouse buildings with 87 loading bays located off of Poplar Tent Roadand International. Drive, with a wastcwaterdjjareof87GPD. What is the quantity of flow that will be discharged? 8,700 GPD Flow type: Domestic Commercial 100 % [I] Industrial Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC ce or connection oin Puinp Station (Name or Number) Frrn Capacity * MCI) (A) (B) (C) (D) Design Average' Daily now A pprox, Current Obligated, Not: Vet Total Current Flaw (Firinipf) Average Dally flow Tributary Daily Flow plus Obligated, Fkw MGD MGD MCD MGD * The Firm Capacity co any pump station is defined as the maximum pumped flow that can he achieved with the largest pump taken out of service.. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. "-"A Planning Assessment Addendum shall be attached Inc each pump station located between the project connection point and the WWTP where Available Capacity is < O. VET9:A-D) Avaitabte Capariiy***: MCI) Section 11. Jurisdiction's Certification Statement: 1, M. Sue Hyde, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project. has been evaluated along the route to (he receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSA.CC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessmentwhere applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section I plus all attached planning assessment addendums for which, to the hest of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. Sue H de Digitally signed by Sue Hyde Date 2018.10,15 1327135 'Irisdiction's Signing Official Signature Dale Revision Date: 05/09/D 3 The National Map Advanced Viewer April 18, 2018 1:14,731 0 0,13 0,25 0 0.2 0.4 0,5 mi 0,8 km USGS The Natkanal Map: National BotroParies Dermal, National Elevation Datesety Geographic Names Information System, National Hydrography USGS Foresr Service, Dela Refreshed ApPI 10. 2018 1 USGS TWO Naional Slnyclures. Dateset, Data refreshed April 10, 2018, 1 USGS The Natonal Maw Geographic, Names Infonnation System, Data Refreshed April 10, 2018 y USGS TNM - US Top. Data Refreshed April, 2018, y State of North Carolina Division of Environmental Quality Division of Water Resources 610 P. Center Avenue Mooresville, North (arollna (/0) 663-1699 RE. Griffin Intern ti°nal Power Reliability Plan To Whom ay Concern: RerLured fo ortale Reliability Option Utilized for Pump Stationl The undersigned applicant and owner of the proposed facility acknowledges and agrees that a portable power generation unit or portable, independently -powered pumping units, associated appurtenances shall be available for distribution and operation of the proposed pump station, Sincerely, Scott Bosco liverbend Concord Properties ll, LC c/o Griffin industrial 204 West Newberry Road Bloomfield, 6T 06002 (860) 6-7660 August 31,2018 COVER LE ER RE: Private aoint ry Server Extension Apollo on: Griffin Interne na 4530 Poplar Tent Rd Concord, I l Griffin Industrial Realty, Inc. is proposing the construction of two new speculative industrial +warehousing facilities at 4530 Poplar Tent Road in Concord,. Loath Carolina (Parcel Ilk's t 1- , 5601-70,4051 and t 1- 9 4,,The proposed improvements will include a 1 , - f building, a r ,i -sf building,. shored buck court and approximately vehicultar parking spaces to serve the park. The two buildings will be;served by a sanitary seer extension connecting to an existing manhole in Poplar Tent Rood. This application includes approaairrrately 6feel of private -inch PVC to be permitted. An additional 1 -feet and 1' -feet of non-pernaitted private inch PVC will connect Building and Building B to the permitted system. Thank you for your review of this priet. If you have zany questions contact me of lake ooloengineering. Sincerely¢ Luke Buagnke, PE OAK IC .."i aalo ngineering aiding th submittal, please November 12, 2018 Ori Tuvi a NCDEQ VVater C uality Section Mooresville Regional Office 610 E. Center Avenue Mooresville, NC 28115 " -2 5.21 g RE: Griffin International 530 Poplar Tent Rd, Concord, NC NC EC Private Sanitary Sever Extension Per ittin Mr Tuvia, Enclosed are the follo your use:: Fast Track Sewer System ;application -2 copies Cover Letter - 2 copies NC Secretary of ;fate Filing - 2 copies Registered Agent authorisation 2 copies Flow Tracking/acceptance Form -- 2 copies Site Maps - 2 copies Rower Reliability letter - 2 copies Check far $480:00 to NCCEC Please let e kno if you need any additional information far your review of this project. Sincerely, Luke J. Bugenske, PE OAK ocak:engine ring FAST TRACK SEWER ENGINEERING CERTIFICATION PEttroilITTEE: RIVERBEND CONCORD PROPERTIES 11, LLC PERMIT #: WQ0040425 PROJECT: GRIFFIN INTERNATIONAL ISSUE DATE: NOVEMBER 15, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt.. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the 'Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/constniction information to the Permittee, and the Permittcc is prepared to operate & maintain the wastewater collection system permitted herein Or portions thereof. Scott Bosco, VP Construction Printed Name, Title Date ENGINEER'S CERTIFICATION 1, Greg Welsh, PE , as a duly registered Professional Egineer in the State of North Carolina, having been authorized to observe (X periodically, Ell weekly, J fullfuil tirne) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal wisignaturc & date: LXJ Final LI Partial (include description Certification Comments/Qualitiers (attach if necessary): 9/11/19 NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Region& Office Phone: (704) 663-1699 FAX: (704)-633-6040 CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sewers, per I5A NCAC 02T.01 16. Certifying Engineer: Greg Welsh, PE Certification Review Date: 9/11/19 , Project Name: Griffin International wQop 40425 Project County: Cabarrus I) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership, transfer from developer to I-10A/P0A, etc. Yes Dia No If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? J Yes 0 No 3) Final Engineering certification? J Yes 0 No • if Partial Engineering certification, provide detailed narrative i.neluding what is being certified in the current phase, what was previously certified (if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: f3 Yes El No 0 N/A • Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches). 5) Adcquatc information related to pump stations: ri Ycs Ej No 0 N/A Ensure power reliability option was selected per 15A NCAC 02T.0305(h 6) Was project construction completed in accordance with all of the following: Yes n No El N/A • I5A NCAC 02T, MinimumDesign Criteria (MDC) for the permitting of Grav4 Scwerj1atcst version), and MDC for Jhe Permitting of Pump Stations and Force Mains (latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0 105 b , prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the reissued permit with variance language or the variance letter must be maintained with the original doeurne ts. 7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? El Yes gj No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including but not limited to pipe length changes of 10% or greater, change in flow, pump station design capacity design change of 5% or greater, and/or change in the number/type of connections)? I-- Yes 4 No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. NC DWR — Water Quality Regional operationsSection 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040