Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0039673_Regional Office Historical File Pre 2018
Water Resources ENVIM*TAL04-1AUTY December 11, 2017 Mr. Wilmer Melton, 111, Director of Public Works City of Kannapolis 401 Laureate Way. Kannapolis, North Carolina 28081 Dear Mr. Melton: ROY COOPER Governor MICHAEL 5. REGAN snrrrayy LINDA CULPEPPER flIffri* Director. Subject: Permit No. WQ0039673 City of Kannapolis Project Hercules Private Sanitary Sewer Extension Wastewater Collection System Extension Permit Cabarrus County In accordance with your application received December 6, 2017, we are forwarding herewith Permit No. WQ0039673 dated December 11, 2017 to the City of Kannapolis (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, andior referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State or North Carolina I Environmental Quality t Water ResourcesWater Quality Regional Operations Mooresville Regional Office1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 704 663 1699 yon need additional nformationinformation concerning this matter, please contact Ori Tuvia a 7 _ 190 or. via e-mail at nr(.tuvia nc entgnv. Sincerely, by W., Corey Basinger, Regional Supervisor Water Quality Regional Operations Section. Division of Water Resources, NCDEO cc: Carlton urton (Pl.)) (E-copy) Mooresville Regional Office Files Water Resources Central Files PER (E-copy) Page 2 of Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Kannapolis Cabarrus County for the construction and operation of approximately 1,888 linear feet of 8-inch gravity sewer ; a —40 gallon per minute grinder pump with 65 feet total dynamic head pump station equipped with an on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 1,081 linear feet of 2-inch force main to serve the Hercules Private Sanitary Sewer Extension Project , and the discharge of 20,000 gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received December 6, 2017, and in conformity with 15A NCAC 2T; the Divisions Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently fled and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental. Management Commission Permit Number: WQ0039673 Permit Issued: December 11, 2017 Page 3of8 SL PPLEMENT TO PERMIT COVER SHEET City of Kannapolis is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension, The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 20,000 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304 (b)] II. STANDARD CONDITIONS This pennit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in, accordance with the conditions of this permit; 15A NCAC 21, the Division's Gravity Shyer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. g. A general observation of the entire sewer system shall be conducted at least once per year. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h, A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall 'include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3 Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system, 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered as the.initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Desin Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. (15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected, If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02'T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [1.5A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local governrnent agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CITY OF KANNAPLIS PERMIT #: WQ0039673 PROJECT: PROJECT HERCULES PRIVATE SANITARY SEWER EXTENSION ISSUE DATE: DECEMBER 11, 2017 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable designiconstniction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof Printed 'Name, Title Signature Date ENGINEER'S CERTIFICATION , as a duly registered Professional Eineer in the State of North Carolina, having been authorized to observe (El] periodically, E weekly, time) the constniction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials, North Carolina Professional Engineer's Seal w/signature & date: at E Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Application Number: jA,1 (to be complocd by DWR) AI:I items must be compIted or the application will be returned I. APPLICANT INFORMATION: I Applicant's name: TPA Group. (company, municipality, HOA, utility, etc.) 2. Applicant type: 0 Individual Corporation 0 General Partnership LJ Privately -Owned Public Utility El Federal State/County [1] Municipal El Other 3. Signature authority's name: Joe IvicGorrey per 15A NCAC 02T 0106(b) Title: Principal 4. Applicant's mailing address: City: Atlanta State: GA Zip: .5, Applicant's contact information: Pho:ne number: (770) 436-3400 Email Address: jmcgorrey(iiVa-grp.corn IL PROJECT INFORMATION: 1,, Project name: Pro"ect Hercul - Priv Sewe Extensi . n 2 Applicatiotaroject status: If a. modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a, master plan, provide the existing permit number: WQ00 3„ County where project is located: Cabarrus 4. Approximate Coordinates (Decimal Degree's): Latitude: ,35,437.9Longitude: -t30,6866' 5. Parcel ID (if applicable): 46917579100: 4691894379000: 46927079800900 (or Parcel ID to closest downstream sewer) Z Proposed (New Permit) E] Existing Permit/Project I . CONSULTANT INFORMATION: I. Professional Engineer: Carlton Burton, PE License Number: 12557 Firm: Dorton Engineering Associates Mailing address: 50 Fa' City: Charlotte State: NC Zip: 28210- Phone number,: (704) 553-8881 Email Address: CBurtondburtoncngineeringcom IV. WASTEWATER TREATMENT FACILITY (WWTF) INFO • MATION: I . Facility Name: j kRivrReionalWastewaterTeatDjentPlant Permit Number: NC 036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s) : WQ Downstream (Receiving) Sewer Size: inch IS em Wide Collection Owner Name(s): stem Perrni f a WQCS FORM: FTA 04-16 Page 1 of 5 0 Car Wash El Hotel anchor Motels .0 Swimming Pool /Clubhouse El Swimming Pool/Filter Backwash [::1 Other (Explain in ,Attachment) Yes 4No No GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? 0 Yes 0No N/A 2. If the Applicant is a Developer of 'o s to be sold, has a Developer's Operational Agreement (FORM: DIM been attached? 0 Yes 0No. NIA 3, If the Applicantis a Home/Property Own.ersAssociation, has an Operational Agreement (FORM: HON) been attached? 0 Yes ElNo N/A 4. Origin of wastewater, (check all that apply): 0 Residential Owned O Residential Leased 0 School / preschool / day care O Food and drink facilities Businesses offices / factories ED Retail (stores, centers, malls) O Retail with food preparation/service 0 Medical / dental / veterinary facilities 0 Church Nursing Home 5. Nature of wastewater 100 % Domestic/Commercial % Commercial % Industrial (See I SA, NCAC 02T .0103(201) >Is there a Pretreatment Program in effect? 6. Has a flow reduction been approved under 'I 5A NCAC 02T ,01 14(Q? Ej Yes If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114( Daily Design Flow WarehousingD.istribution 100 galloading bay a See 15A NCAC 021' .01 14(b), (d), (c)(1) and (e)(2 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential developinent uses; public access facilities located near high public use areas, and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per I SA NCAC 02T .0114(c), design flow rates for establishments not identified [in table I5A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data, 8. Wastewater generated by project: 20,000 GPD (per iSA NCAC 02T ,01 14) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that conneet to thisline E Flow has already been allocated in Permit Number: Ej Rehabilitation or replacement of existing sewer with no new flow expected 0 Other (Explain): FORM: FTA 04-16 Page 2 of 5 P11. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T ..0305 & MDC (Gravity Sewers): rirr-1.Summrize gravity sewer to be permitted: Size (inches) 8 Length ( e 1,888 Material PVC • Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria So Section 111 contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION ILESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I. Purnp station number or name: Lift Station 2, Approximate Coordinates (Decimal Degrees): Latitude: 35.4399Longitude: -80.6869' 3. Design flow of the pump station: 0,02 millions gallons per day (firm capacit)) 4. Operational point(s) of the pump(s): 40 gallons per minute at 65 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Purnp Station): Size (inches) Length (feet) 1,081 Material PVC 6. Power reliability in accordance with 1.5A NCAC 02T 0305(h)(1): Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T ,0305(h)(1)(8): fr Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day • Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: EI Portable power source with manual. activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or LI Portable pumping unit with plugged emergency pump connection and telemetry - 1.5A NCAC 02T .0.305(h)(1)(C): `fr It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement). and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage. capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(1)): 1. Does the project comply with all separations found in 15A NCAC 021 .0305(0 & (g) I5A NCAC 02T 0305(1) contains minimum separations that shall be provided for sewer systems: Setback Parame ter* Storm sewers and other utilities not listed below (vertical) Water mains vertical -water over sewer including in benched trenches) Water mains (horizontal Reclaimed water lines vertical - reclaimed over sewe Reclaimed water lines (horizontal - reclaimed over sewer **Any private or public water supply source, including any wells, WS-I waters of Class I or Class 11 impounded reservoirs used as a source of drinkin water **Waters classified WS (except WS-I or WS-V), B, SA, ORW, IIQW, or SB from normal high water (or tide elevation) and wetlands (see item IX,2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Yes Separation Required 24 inches 18 inches 10 feet 18 inches 2 feet 100 50 feet 10 feet Any building foundation .Anv basement 5 feet 10 feet Top slope of embankment or cuts of 2 feetre vertical height 10 feet Drainage systems._and in Any swimming pools, Final earth grade (vertical) drains 5 feet 10 feet 36 inches 15ANCA 2T,0305). contains alternatives where separations in 021.0305(f) cannot be achieved. > **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > if .noncompliance with 021.0305(0 or (g), see Section X. of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Yes El No 111 N/A > See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the alternative design criteria specified is utilized in design and construction > As built d.ocumentsshould reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A ,NCAC 02B .0200? El Yes El No NIA > This would include Trout Buffered Streams per 15A .NCAC 2B.020.2 4, Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? > Information can be obtained from the 401 & Buffer Permittin,g,Braneh El Yes 5., Does project comply with 1.5A NCAC 021.0105(c)(6) (additional permits/certifications)? Yes LJ No Per 15A NCAC,02,1.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6.. Does this project include any sewer collection lines that are deemed "high -priority?" Per 1.5,A NCAC' 021.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer, Yes No Ej N/A • If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual Systern-Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting„of„Purnp Statim and Force Mains (latest versiort). and the Gravity Sewer Minimum Design Criteria (latest versimi) as applicable? Yes No If No, complete and submit the Variance/Alternative Design Request application (VA DC 10-14) and supporting documents for review. ,Approval of the request is required prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: Carlton T. Burton, PE (Professional Engineer's name from .Application Item attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity, Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version), Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design, NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3 Applicant's t Signanir Author mini JOE AI `&0191EY has been ewed by me and is accurate and this application are not completed and that application package is subject to being ret discharge system to surface waters or the la injunctive relief, and/or criminal prosecution. 7 • • SEAL • 12557 attest that this application for Application Item 1.3.) (4 014* 44 eil9terz— o the best of my knowledge. I understand that if all required parts of tired supporting documentation and attachments are not included, this omplete, I understand that any discharge of wastewater from this non- esult in an immediate enforcement action that may include civil penalties, will make no claim against the Division of Water Resources should a condition fxr, ,ci+7 of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete, NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: ETA 04-16 Page 5 of 5 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, purnp stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A, NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300 Divisio policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T ,0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in I.5A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division,. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02E0303., Projects not eligible for review via the fast track process (must be submitted for full technical review): • Projects that require an environmental. assessment in accordance with 1,5A NCAC IC ,0100; Projects that do not meet any part of the minimum design criteria (MDC) document; Projects that involve a variance from the requirements of 1.5A NCAC 2T; Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinder pumps; );;. STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); )0• Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents Required unless otherwise noted B. Cover Letter (Required for All Application Packages): List all items included in the application package, as well as a brief description of the requested permitting action. • Be specific as to the system type, number of homes served, flow allocation required, etc. ▪ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. :fr. Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): Submit the completed and appropriately executed application. • if necessary for clarity or due to space restrictions,attachments to the application may be made. If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. D If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. The Project Name in item II. I shall be consistent with the project name on the flow acceptance letters, agreements, etc, 10 The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En.,i eet. The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .01.06(b).. Per 15A NCAC 02'T .0.106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 low Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility, ‘..0' Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and form FTSE indicates that owmer has adequate capacity and will not violate G.S. 143- 215,67(a). • Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE, .7. Site Maps (All Application Packages): Submit an 8,5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. • Location of the project (gravity sewer, pump stations & force main) Downstream connection points and pemiit number (if known) for the receiving sewer include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): O Submit the most recently issued existing permit. O Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i,e„ permit description, flow allocation, treatment facility, etc). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): 0 Per 15A NCAC 02T „0305(h)(1), submit documentation of power reliability for pumping stations. This alternative is only available for average daily flows less than 15,000 gallons per day It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station, The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station," If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): O Per 15A NCAC 02T ..0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or 0 Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOMPOA and Developers for , be sold): 0 Home/Property Owners' As. ociations El Per 15A NCAC 02T ,01.15(c), submit the properly executed 0 erational ATreement (FORM: UOA). O Per 1,5A NCAC 02T .01.15(c), submit a copy of the Articles of Incorporation, Declarations and By-laws, O Developers of lots to be sold O Per 1,5A NCAC 02T ,01, I 5(b), submit the properly executed Operational Agreement (FORM. DENT). .For more in/hr,noxion, visit the Division's collection systems wehsite INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS Asheville Regional Office Water Quality Section Fayetteville Regional Office Water Quality Section Moo esvil Regional Office Water Qua ity Section Rai 'oh Regional Office Water Quality Section shinqtori Reqiona Office Water Quality Section Wilmington Regional Office Water Quality Section Winston-Salem Regional Office Water Quality Section 2090 US Highway 70 Swannanoa, North Carolina 28778 (828) 296-4500 (828) 299-7043 Fax 225 Green Street Suite 714 Fayetteville, North Carolina 283 0 (910) 433-3300 (910) 486-0707 Fax 610 E, Center Avenue Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax 1628 Mail Service Center Raleigh, North Carolina 276 2 (919) 791-4200 (919) 788-7159 Fax 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax 127 Cardinal Drive Extension Wilmington, North Carotina 28405 (910) 796-7215 (910) 350-2004 Fax 450 W. Hanes Mill Road Suite 300 Winston-Salem, North Carolina 27105 (336) 776-9800 COUNTIES SERVED Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin INSTRUCTIONS FOR FORM: 'A 0416 & SUPPORTING DOCUMENTATION Page 3 of 3 Pr" WASTEWATER FLOW ACCEPTANCE FORM FORTHE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: 2017.11,17 DCity of Concord City of Kannapolis °Town ofHarrsburg DTown of Mt. Pleasant DCharlorte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Project Title: Pro'ect Hercules Private Sarnlarvwer Extension —Project #017,655.004 Description: The 'ect Hercules Prtvate Santary Sewer Extension ennieerin uins and s e" ions and sealed by CarltonNCPE witB ° Engineering Associates, for the wastewater collection system extension consisting of approximately 1,888 linear feet of 8-inch sanitary seffer,1,081 linear f of 2-inch force main. with 1 manholes and other appurtenances to serve a large industrial distributicm center located off/04 of NC Hwy 73, with a wastewater dischar e of 2 *Number of Lots 1 OR *Number of Units: ust be included in request. Where will the new line be connected: Directly into a WSACC Interceptor Into the Jurisdiction's existing collection system Into a private line Describe the location of the tie-in line to which the new sewer line will connect: The proposed 8-inch sanitainv sewer extension will tie-in to the existing 8-inch sanitary sewer system, which extends to the 15-inch PVC material WSACC Afton Run Branch Outfall Interceptor Which WSACC Interceptor will the flow ultimately be discharged into: 15-inch PVC WSACC Afton Run Branch Outfall'Interceptor What Is the WSACC manhole number that the flow will be discharged into? +/- Node 012661 What is the quantity of flow that will be discharged? 20,000 GPD Flow type: E1 Domestic Commercial 100 fl Industrial Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 El Muddy Creek Wastewater Treatment Facility Permit #NC0081621 Design drawings ofnew lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. if the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided, Mark Lomax at 704-786-1783, ext, 231, must be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after completion. If construction is not started within two (2) year from the date of approval of the flow acceptance for Ms project, the approval is rescinded and a second request and approval will be required for the project WSACC USE ONLY: DATE: EJ Current sewer model shows an Interceptor as being surcharged south of the manhole in question. Approved D Not Approved Current Sewer Model shows: Division of Water Resour State of North Carolina Department of Envkonrnent and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE -01/14) (JURISDICTION USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System; OCity of Concord City of Kannapolis DTown of Harrisburg LjTown of Mt, Pleasant Charlotte Mecklenburg Utilities Project Title, Description, and Number of LotsfUnit: Project Title: Project Hercules Private Sanitary Sewer Extension—Proiect #017.655.004 Description: The Pro-ect Hercules Private Sanita * Sewer Extension engineer,ngplans andsecificauons asiredid sealed by Carlton Burton, NCPE, with Burton Engineering Associates, for the wastewater collection syslcm extension consisting of approximately 1,888 linear feet of 8-inch sanitary sewer, 1,081 linear feet of 2-inch force main, with 7 manholes and other appurtenances to serve a largginclustrial distribution center located ofTion of NC 73 with a wastewater discharge of 20,000 GPD. What is the quantity of flow that will be discharged? 20,000 GPD Flow type; LI Domestic Commercial El Industrial Section 1 - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interce tor connection oint. Pump St atitsn (Name or Number) (A) .(1) (C) (D) Firm Capacity* Doign Average Ibily Flow " Approx. Current Obligated, Not Yet Total Current Flo MGD (Firrit'pf) Average Daily How Tributary Daily How Plus Obligated How MGT) NIG!) .SIGD NIGD Mailable Capacity.“ 11IGD The Firm Capacity of any pump station is defined m the Innirnui pumped flow that can be achieved %till he largest primp taken out of service. "iksign trap! Daily now is the firm capacity of the pump station divided by a peaking factor nut less than 2.5. *"A Planning Assessment Addendum shall be attached pnmp stationbed berm een the project connection po Ivni tk r P herr ,%uilabk C Section 11. Jurisdiction's Certification Statement: 1, Wilmer Melton, 111. Director of Public Works, certify that, to the best of my knowledge, the addition of the volume of wastewater to, be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor norinal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Section 1 plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downs' sewer capacity. Signature of this form indicates acceptance of this wastewater flow. 7? - 7- 7 „ . Arise • 's, Signature Date Revision Date: 08109113 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications Division of Water Resource3 (FTSE 41/14) (WSACC USE ONLY) Project Hercules Private Sanitary Sewer Extension Section I. Name of wastewater treatment facility (WWTF) receiving wastewater Rocky River Wastewater Treatment Facility — Permit #NC0036269 Ej Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 WWTP facility's permitted flow, MGD 'mated obligatedob1izated flownot vet Iribut WWTP facility's actual avg. daily flow, MGD Total flow for thi Total actual and obligated flows to the fci1iiy, MGD Percent ofpermitted flow used 26.500 2.49 16.205 (61.15% of perm' 0.020 18.717 70.63% Section H. Purnp stations along the route from the Jurisdiction's connection point to the WWTP. Pimp Stadon Fum Capacity (Name or Number) MGD (A irmfp MGD ily I Apprmt Current Average Daily Flow MGD Obhpted Not Yet Tributary Daily Flow MGD neat Current Flow Plus Obligated Flow MGI) ( )•'(A-D) Available pucity"" MGD ..ower Rocky River PS 37.000 14,800 9, 2,056 1.620 180 * Capacity of any pup station is delcan be achieved with the largest pump taken oat of service. ...Design Average Dopy plow is firm capodty of the pump Nation divided by a peaking factor not less than 2-5. ""A Planning Assessment Addendum shall be attached for each pomp station located between the project connection point and the WWTP where Available Capacity is < O. Section Ill. WSACC Certification Statement: I, J. Thomas Hahn. PE, certify that, to the best of my knowledge, the addition (Attie volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow frOrn this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section Il plus all attached planning assessment addendurns for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of this wastewater flow. o or W CC's Signing Official Signature Di te Revision Date: 08/09/13 Division State of North Carolina Department of .Errviro rnnient and Natural Resources Reso r ces Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE --0 1 / 14) F+'TSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a Planning Assessment Addendum for each pump station located between the project connection point and the -WWII' listed in section 1 or 2 where Available Capacity is < 0.: Pump Station Name ( Pump Station Address: the proportion and amount of Obligated, Not Yet Tributary Daily Plow (C) accounts for % and. MOL) ©f the Available Capacity (E) in Prrtrrfa Station name) and that; raf aetivahis obligated, not yet tributary capaeity is c rrer tly approximately MGD per year; and that A funded Capital Project that will provide the required planned capacity, through CIP project (name) is in design or under construction with a planned completion. date of ; and/or he following; applies: ten reasonably expected conditions an to allow, this flow to be permitted, without a system infrastructure. t information, there is st stifiication ?eart likelihood of aver -allocating capacity in inderstand that this does not relieve the collection system owner from complying with as. 43-215.67(a), which prohibits the introduction of any waste in excess of the capacity of the aSte disposal system. gn I Signature Dale: OV09/I3 Mr. Michael B. Legg City Manager City of Kannapolis 401 Laureate Way Kannapolis, NC 28081 WATERA SEWER AUTHORITY OF CABARRUS COUNTY 232 Dayldson Hwy. Concord, NC 28027 704,786.1783 • 704,795.1554 Fax November 30, 2017 www.wsacc..org DEC 0 5 2017 Subject: Flow Acceptance Request — City of Kannapolis Project Hercules Private Sanitary Sewer Extension Dear Mr. Le This is an approval of the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the City of Kannapolis on November 29, 2017. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the commercial wastewater from the proposed project entitled Project Hercules Private Sanitary Sewer Extension, located off NC Highway 73. The referenced project will serve a warehouse with 200 loading bays, with a projected wastewater flow of 20,000 gallons per day (gpd), The wastewater generated by this project will be conveyed through the proposed 8-inch line, through an existing gravity system, and then enter WSACC's system at the existing 15-inch Afton Run :ranch Outfall Interceptor. WSACC agrees to accept wastewater from the proposed development based on information provided by Burton Engineering Associates (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines. The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the C1P are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The list and schedule of C1P projects are tentative and are revised periodically to reflect changing conditions and needs. If construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded and a second request and approval will be required. Please notify WSACC, in writing, when construction of this project is initiated. If you have any questions, please call me at (704) 786-1783, extension 228. S incerely, a-hL- J. Thomas Hahn, PE Utility Systems Engineer cc: Misty Lippard, PE/Kannapolis Wilmer Melton/Kannapolis Carlton Burton, PE/Burton Engineering Associates Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Eitension Permit Applications Division of W (yrsE —01/14) (WSACC USE ONLY) Project Hercules Private Sanitary Sewer Extensio Section I. Name of wastewater treatment facility (W'WTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 WWTP facility's permitted flow, MGD alect otLigated tiowt WWTP facility's a tual avg. daily flow, MGD 16.205 (6 L 5%, of permit) 0.02 18.717 Section 11. Pump stations along the route from the Jurisdktion's connection point to the WWTP. Pump Station (Name or Number) Firm Capacity * MGD 7.000 14.8 As Daily Y MGD Approx. Current ObliXe& Not Yet Average Daily Flow Tributary Daily Flow MGD MGD 9.564 2. 6 (D) (B+C) Total Current Flow is Obligated Flow MGD .620 * The Firm Cspedty of any pump statioi tl ntxb*um pifflpQd flow that can he achieved with the tamest pomp token out of service. *Design Average lady Flow Ls the ftrist capacity of tbe pump stetter divided by a peakiag factor not less than LS. ***A !lanolin Assessment Addendum shall be attached for each pump station located between the protect coaamtiosi point A (E)—fA-D) Available capacity*** MGD 3180 Section III. WSACC Certification Statement: I, J. Thomas Hahn. PK, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow frem this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable, This analysis has been performed in accordance with local established policies and procedures using the best avail le data. This certification applies to those hems listed above in Section I and Section II plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Si»iature of this form indicates acceptance of this wastewater flow. t o o W CC's Signing Official Signature D te Revision Date: 08/09/13 November 20, 2017 The National Map Advanced Viewer 1:18,©56 0 0.15 0.3 Lr, �,, ' J, a tg 0 0,175 035 0.7 km 0.6 mi LAGS The Naticn4 Map: National Boundaries pit; National Eiention Dataset. Geographic Names Information *tern 'cnelHydrogrepty Dataset, Na'Ianal Land Cover Database, National Stnclres ©raasat, and National Transportalian tiataset U.'S. Census 8v®u- TFC A.ire; HERE Road Data USGS 3 TNM - National SFructures Dataset. Data Refreshed October, 2317,1 USGS The Nations! Mar: Geocradio Names Inkrntatien System, Data Refreshed JJv, 2017, I USGS TNM - US Tope Data Refreshed October, 2017. I North Carolina Elaine F.Marshall DEPARTMENT ENT rF THE Secretary SECRETARY OF STATE Click Here To: View Document Filings File an Annual Re Print a Pre -Populated Annual Report form Corporate Names Legal: TPA Group, LLC Limited Liability Company Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: State of Incorporation: Registered Agent: Corporate Addresses Reg Office: Reg Mailing: Mailing: Principal. Office: PO Box 29622 ilaleigh,NC 2782E-0622 (919)814-54 Amend a Previous Annual Report 1627458 Current -Active Current Foreign 9/28/2017 January GA Paracorp Incorporated 176 Mine Lake Ct #100 Raleigh, NC 27615 176 Mine Lake Ct #100 Raleigh, NC 27615 3350 Riverwood Parkway, Suite 750 Atlanta, GA 30339 3350 Riverwood Parkway, Suite 750 Atlanta, GA 30339 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Account Login Create Site Account a Sccreta; ed Liability Legal ame TPA Group„ LLC Information Page L at Sosid Status Annual Report Statu CitizenshipDate Formed 1627458 Current -Active Current Foreign /I17 Fiscal, o f tate of incorporatio gi to ed Agent January GA Addresses Paracorp in,comorated Reg Office Mailing 176 i Lake Ct #100 176 MineLake Ct #100 3350 Ripe ad Parkway, Suite 750 Raleigh, NC 27615 RaleighNC 27615Atlanta, GA 30339 Principal Office 3350 Rive cod Parkway, Suite 7 Atlanta, GA 30339 Company i i All LL_C are anaged by their manager pursuant to N,C,G,S, 57D-3-20, ps01 i rG � a gar t xt`L3 Sir1CSs Res '7/1 t t 7 irr Tuvia, OH A From: Sent: To: Cc: Subject: Eleanor Thomas<ERochelle@burtonengineering.com> Monday, December 11, 2017 10:33 AM Tuvia, Ori A Matthew Graham; Carlton Burton [External] Project Hercules - Private Sanitary Sewer Permit CA : External email. Do not click links or open attachment unlesserlf ed. Send all suspicious email as an attach tnentto repart.spam@nc,gov. Good Morning Ori, Per your request, this is confirmation that the Project Hercules plans speci connecting force main is 2". Let us know if you need anything else. Thanks, E Li ELEANOR ROCIr ILE TH MAS, CI Burton t gi e rinR .Associates Main: Q1,553_8881 [ Direct: 7Q4-9677,4Q45 5950 Fairview Road, 'Suite 100 ' Charlotte, NC 28210 0 N awv .BurtonEr7girteering r orn grinder pump for the lift station, as the BURTON COVER LETTER Project Name: Project Hercules Public Sanitary Sewer Extension Project Hercules Private Sanitary Sewer Extension Project Location: 6500 Davidson Hwy, Concord, NC Project Number: 017.655.004 From: Carlton Burton, PE — Burton Engineering Associates Date: November 17, 2017 Subject: DWR, Fast Track Sewer System Extension Application (FTA 04-1.6j — Public & Private TPA Group is proposing the construction a 1.015 mililon square foot logistics center in Kannapolis, North Carolina off NC Highway 73. The site is proposed to be served by 1,888 LF of new private 8" gravity sewer (as well as 149 LF of new 8" DIP public gravity sewer within the ROW and a public access easement), seven new private sanitary sewer manholes, one new public sanitary sewer manhole, 1,081 LF of new private 2" PVC force main, and a proposed private wet well pump station. Three 8" PVC gravity sewer laterals and one 4" PVC gravity sewer lateral (not to be permitted) will branch out from the permitted sanitary sewer to serve the building and the guardhouse. The proposed system will connect to an existing sanitary sewer manhole located on the west side of Barr Rd, but as a portion of Barr Rd is being rerouted, in the final condition, the existing manhole's location will be on the east side (far side) of Barr Rd, Private Sewer to be Permitted: Public Sewer to be Permitted: 1,888 LF of Private 8" PVC Gravity Sewer 1,081 LF of Private 2" PVC Force Main Sewer 7 Private Sanitary Sewer Manholes 1 Private Wet Well Pump Station 149 LF of new 8" DIP Gravity Sewer 1 Public Sanitary Sewer Manhole If you have any questions concerning this information, please contact me at (704) 553-8881 or by email at C8urtanWBurtonEngineering.cor . Sincerely, Carlton Burton, PE R 5TE 100 1 Charlotte, NC 28210 i 704,553,8881 (704) 553-8881 or by emailing Sincerely, Eleanor Rochelle Thomas TRANSMITTAL Attention: Water Quality Section Company: Address: Phone #: From: Project Name: Project Number: Date: Re: Via: BURTON Mooresville Regional Office 610 E. Center Avenue Mooresville, NC 28115 704-663-1699 Eleanor Rochelle Thomas Project Hercules 017.655.004 Dec. 5, 2017 - Burton Engineering Associates Private Sanitary Sewer Fast Track Application Package E@UPS OUSPS ECourier EiHand Deliver OPick Up Copies Date Pages Description 2 11/20/2017 2 11/17/2017 2 12J05/2017 2 11/17/2017 2 2 1 11/20/2017 11/20/2017 11/17/2017 8 4 2 NCDEQ SS FTA Application (Private) as ewater Flow Acceptance Form tor WSACC (Private) WSACC Flow Acceptance (Private) ter for NCDEQ SS Submittal USGS Map TPA Group NC Secretary of State Filing Check to NCDEQ for $480.00 El As Requested For Approval El For Your Use For Review and Comment Comments: If you have any questions concerning this information, please contact Burton Engineering Associates by caning erochelle@burtonengineering.com Burton Engineering Associates PLEASE NOTIFY AT ONCE IF ALL ENCLOSURES ARE NOT INCLUDED 5950 Fairview Rd STE 100 Charlotte, NC 28210 * 704,553,8881 Permit Number '3d Central Fins: APS SVVP` 12/11/2017 Permit Tracking Slip Program Category Noneffischarge Permit Type Gravity Sewer Extension, Ptarnp Stations, & Pn Primary Reviewer ori.tuvia Coastal Ste/Rule Perm tted Platy 20,000 Facility ure r Ext nsions Facility Name Pro ect Hercules Private Sanitary Sewer Location Address Owner Status Project Type Active New Project Version Permit Classification 1,00 Individual Pearl Contact Affiliation lajor/Minor Minor Facility Contact At1Ihatio1 Region Mooresville County Cabatrus ner Name Tpa Group DatesiEvents Scheduled u App Received Draft lnrtaated ssuance 017 12161201" Regulated Activiti uta Own Type Non -Government Owner Affiliation Joe fvloGerrey 50 Rive +. ' P Ste 75,0 Atl nla 303 Public Notice lsse 12/11/2017 2i1112017 Requested /Received Events Additional information requested Ater collection Additional information rl-ive erbody Name Strearnlndex Number Curren! Class Expiration 12/8117 Subbasot 17