Loading...
HomeMy WebLinkAboutWQ0039866_Regional Office Historical File Pre 2018ROY COOPER Governa MICHAEL S. REGAN Sea elcIty L[NDA CULPEPPER Nertm.litrecror Nt r es'oiff-..-es E NE'. EN :•." E;;L: •-• March 21, 2018 Mr. Brian Cone, Director of Construction Cabarrus County Schools P.O. Box 388 Concord, North Carolina 28026 Subject: Permit No. WQ0039866 Cabarrus County Schools West Cabarrus High School. 2019 Wastewater Collection System Extension Permit Cabarrus County Dear Mr, Cone: In accordance with your application received March 16, 2018, we are forwarding herewith Permit No. WQ0039866 dated March 21, 2018 to Cabarrus County Schools (Peunittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated. therein by reference. Please pay particular attention to the following conditions contained within this peintit: Condition 1.1.1: This permit shall not he automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 1.5A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall he the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute § I 43-21.5.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an. adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of 'North Carolina General Statutes, and filed with the Office of Administrative Hearings, 671.4 Mail Service Center, Raleigh, NC 2-7699-6714: Unless such demands are made, this permit shall be final and binding. State 1Noh Carolina Erwironrnental Quality J Water Resources I ViAteT Qualiiry Regiowl Operation5 Mooresvthe Regional Office j 610 East Center Avenue, Sii4e. 301 j Mooresville, Noith Carolina 28115 704 663 1699 If you need additional information concerning this matter, please contact Ori ruvia at (704) 235-2190 cr via e-mail at ori.tuviaoncdenrnov Sincerely, DocuSigned by: A14CC681AF27425... byW. Corey Basinger, Regional Supervisor Water Quality, Regional Operations Section Division of Water Resources, NCDEQ cc: Wesley Sherrill (PE) (El -copy) Mooresville Regional Office Files (Laserfiche) Water Resources Central Files (Laserfiehe) PFRCS ((Laserfiche) Page 2 of 8 Environmentvl Qz,aiity STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERM In accordance with the provisions of Article 21. of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Cabarrus County Schools Cabarrus County for the construction and operation of a.pproximately 1.14 linear feet of 6-inch gravity sewer, 594 linear feet of 8-inch gravity sewer to serve West Cabarrus High School '201.9 Project , and the discharge of 24,000 Gallons per day of collected wastewater into the Water and Sewer Authority of Cabarrus County's existing sewerage system, pursuant to the application received March 16, 2018, and in conformity with 1.5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective 'front the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. DocuSigned by: A14CC681AF27425 by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0039866 Permit Issued: March 21, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Cabarrus County Schools is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Water and Sewer Authority of Cabarrus County's Rocky River Regional Wastewater Treatment Facility in accordance with Permit Number NC0036269. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15.A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum 'Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I., 2000, as applicable, unless specifically mentioned herein. Division approval is basedon acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special. Conditions identified below. I. SPECIAL CONDITIONS 1.) No flow in excess of the quantity permitted herein, 24,000 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15.A NCAC 02T.0304 (b)] IL STANDARD CONDITIONS L. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [1.5A NCAC 02T.0 I 04; G.S 143-215.1(.3)] 'fhis permit shall become voidable unless .the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 21'; the Division's Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4.. The wastewater collection facilities shall be properly maintained and operated at all times. The Perrnittee shalt maintain compliance with an individual system -wide collection system permit for the operation arid maintenance of these facilities as required by 15A NCAC 2T .0401 [f an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 a„ The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented.. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i..e„ 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer be inspected at least once per every six months and inspections documented. LA general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 1,5A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § l43215, IC, h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control. Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems.. 2 For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, 'which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff .member at the Mooresville Regional Office, telephone number (704) 663-1.699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following a. Any process unit failure, due 10 known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO andlor spill over 1,000 gallons,. or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone. number (80.0) 858-0368 or (919) 733-3300, Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence, Th is report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Forrn CS-SSO (or the most current Division approved form) can also be completed to show that the SSO as beyond control. [G.S. 1:43- 21.5.1Cfallj 6, Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by. the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)i 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Perrnittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and .Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views, of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should he clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawing,s that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc, b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity„ pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis.. If a portable 'power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identifiedon the record drawings, on the certification in the space provided, or in written summary form, Prior to Certification (Hoar or Partial): Permit modifications are required for any changes resulting„ in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the nuMberttype of connections), regulations, or the Minimum. Design Criteria. Requested modifications Page 6 of or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on. its own merit. Please note that variances to the Minimum Design Criteria should be requested and. approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [1.5.A NCAC 02T .011 6] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where a.1i viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall he evident prior to completing and. submitting the construction certification, [ 15A. NCAC 02T.0105(n.)] 9. A copy of the construction record drawings shall he maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10, Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1.996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted. June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-21.5,6A through §1.43-215,6C, construction of additional or replacement wastewater collection facilities, andlor referral of the North Carolina -licensed Professional Engineer to the licensing board, [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 1 L In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A. NCAC 02T .0108(b)] 12, The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal. State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 1.43-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: CABARRUS COUNTY SCH001 S PERMIT #: WQ0039866 PROJECT: WEST CABARRUS HIGH SCHOOL 2019 ISSUE DATE: MARCH 21, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, it should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable d.esigniconstruction information to the Permit:tee,and the Pennittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (F. L weekly, El full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation ofthe construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T, the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: E Final LI Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX (704)-633-6040 Periffit Numlaer WQ0039866 Progragi Category Non -discharge Central Files: APS S 3121/2018 Permit Tracking Slip Status Active Project Type New Project Perrritt Type Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensffins 1 DO Individual Primary Reviewer bri.tuffia Coastal SVVRule Permitted Flow 24 000 Fusiehts Permit Contact Affiliation Facility Name West Canarrus ffigh tool 2019 Location Address Owner Major/Minor Region Minor Mooresville County Cabarrus Facility Contact Affiliation Owner Name Cabarrus County Schools Dafieffitiffilitid Owner Type Nog -Government Owner Affiliation David Burnett PO Box 388 Concord NC 28026070 Scheduled Or Issue App Received Draft initiated Issuance Public Not se Issue Effective Expiration 3721/2018 3/162018 3/21/2018 3/21/2018 Regulated Activities School iialestawator collection °utilise Requested ifiteesived Events hviditional information requested Additional. information received Waterbody Name Streamffidex Number Current as Subbasin benesch Transm To: kal Form NCDEQ- Water Quality Section 610 E. Center Ave, Suite 301 Mooresville, NC 28115 e: 14.18 Alfred Benesch & Company 2359 Perimeter Pointe Parkway, Suite 350 Charlotte, NC 28208 www,benesch,com P 704-521-9880 ;. 704-521-8955 Job No, MT17000144 Subject: West Cabarrus High School (WCHS 2019) Fast Track 55 Application Mail fl Messenger - Next Day Delivery UPS Ground WE ARE SENDING YOU: COPIES 2 2 2 2 2 DATE 3.13.18 2.15.18 1.16.18 1.29,18 2.9.18 Attached DESCRIPTION Under separate cover: Cove etter 'Check ff7046 for $480,00 Application Fee Fast Track Application FTA 04-16 Flow Acceptance Letter -Form FTSE 04-16 City of Concord Willingness to Serve Letter Other: NAL OFFICE USGS Topo Map Enlarged USGS Topo Map Street Level Photos THESE ARE TRANSM For approval For your use • As requested • For review and comment Re ED as checked below: 0 Approved as submitted 0 A• pproved as noted 0 R• eturned for corrections Resubmit Submit Return copies for approval copies for distribution corrected prints The attached information is being submitted to obtain a per mains at a proposed high school in Concord. Let me know if you have any questions or need anything else. o construct new private sewer Signature: Wesley E. Sherrill, PE EED AP PS©t.-0998-06 form West Cabarrus i h School H 019) Cover Letter March 13, 2018 This project is the construction of new high school on Wecklington Road in Concord. The school is being designed for a student population of 1,60 students with room for expansion by adding a third floor. The project will require the constrution new private sewer mains connection the building plumbing system to the exisitng publice sewer mains that cross the site. Also, in some cases the public sewer mains will be relocated and in other cases the sewer will be modified in order to meet cle. »nee and cover requirements. The public sewer construction has been permitted With the City of Concord. The following items are included in the Private Public Sewer application package. e following refer to the checklist on Page I of the Fast Track Application. A. 2 copies of application and supporting documents B. 2 Cover letters C. Application fee: $480.00 D. 2 Application forms: FTA04-16 E. 2 Application forms: WSACC flow acceptance letter v l FTSE 04 6. City of Concord Willingness to Serve letter F. 2 USGS Topo Map & StreetView Map NiA H. N. I. NA J. WA slon of Water State of North Carolina Department of Environmental Quality Division of Water Resources NCAC' 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: ' V Ve'.J (r (to be eoarnpoeted by Dwtzl All items must be completed or the application w °ilI be returned APPLICANT INFORMAT'iON: 1. Applicant's name: Cabarrus County Schools (company, municipality, HOA, utility, etc.) ?. Applicant type: 0 Individual 0 Corporation 0 General Partnership 0 Privately -Owned Publi 0 Federal State/County El Municipal 3. Signature authrartty's name: Brian C» Cone per 1.5A NCAC 02T .0106(h) Title: Director of Construction, Cabarrus County Schools 4. Applicant's mailing address: PO Box 388 City: Concord State: NC Zip: 28026-0338 5, Applicant's contact information: Phone number: (704) 262-6258 Email Address: Brian.Cone@Caba• k 2.n.c.us Q Other II. PROJECT INFORMATION: 1. Project name: West Cabarrus High School 2019 (WCI-ES 2019 2. Applicat'ioniProject status: Proposed (New Permit) 0 Existing Pernit+Project If a modification, provide the existing permit number: WQOO and issued date: If new construction but part of a master plan, provide the existing permitnumber: WQOO 3. County where project is located: Cabarrus 4, Approximate Coordinates (Decimal Degrees): Latitude: 39.3986' Longitude:-80,6440' 5, Parcel ID (if applicable): 5600-94-9671 (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: I. Professional Engineer: Wesley Sherrill License Number: 15471 Firrn: Alfred Benesch & Co Mailing address: 2359 Perimeter Pointe Parkway, Suite 350 City: Charlotte State: NC Zip: 28208- Phone number: (704) 521-9880 Email Address: wsherr'il nesch,com. IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Rocky River WW'TF Permit Number: NC0036269 Owner Name: Water & Sewer Authority of Cabarrus County RECEIVING DOWNSTREAM SEWER INFORMATION (ifdiffer ent than WWTF): 1. Permit Nuimber(s): WO Downstream (Receiving) Sewer Size: 10 inch System Wide Collection, System PermtitTM�umhe s)(jfapplicable): WQCS Owner Name(s): City of Concord WQROS FORM: FTA 04-16 Page I of 5 • VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Own.ed Public Utility, has a Certificate of Public Convenience and Necessity' been attached? 0 Yes No NIA 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational ,AgreernentLFORI DES:) been attached? 0 Yes ONO l N/A 3. If the Applicant is a Home/Property Owners° Associatiohas an Qpgrational Agreement (FORM; 1-1()A) been attached? 0 Yes DNo N/IA 4, Origin of wastewater: (check all that apply): Residential Owned 0 Residential Leased School preschool day care 0 Food and drink facilities 0 Businesses offices / factories El Retail (stores, centers, malls) 0 Retail with food preparation/service Ej Medical / dental / veterinary facilities Ej Church Nursing Home 5. Nature of wastewater : % Domestic/Commercial 100 % Commercial % Industrial (Sec 15A NCAC 02T .010;3(20)) Li Car Wash fl Hotel and/or Motels 0 Swimming Pool /Clubhouse 0 Swimming Pool/Filter Backwash El Other (Explain in Attachment) *Is there a Pretreatment Program in effect? D Yes 6. Has a flow reduction been approved under 15A_NCAC 02T .0114(f)? 0 Yes No If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: No Establishment Type 14(fl Daily Design Flow Lb No. of Units Flow School 5 galistudent 1600 24,000 GPD gall GPD gal/ aU gal/ gal/ GPD iPD GPD GPD Total 24,000 GPD a See I5A NCAC 021,01140,),(4),, (e)( 1)and (0(2) for caveats to wastewater design flow rates (i,e,, minimum flow per dwelling: proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 021.01 141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 24,000 GPD (per I 5A NCAC 02T .0114) .%',0 Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: 0 Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected. 0 Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 MDCIGravity Sewer 1. Summarize gravity sewer to be permitted: Material PVC PVC Section II & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria ▪ Section III contains information related to minimum slopes for gravity sewer(s) ),4 Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable)- 021 .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: N/A 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): 6. Power reliability in accordance with 15A NCAC 02T .0305(J1)(1): 1:1 Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)( 1)(B); • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day » Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: 0 Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(11)(1)(C) or El Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)( I "ao It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & I5A NCAC 02T .0305(0): I. Does the project comply with all separations found in 15A NCAC 02T .030,_(5.1) & (g) I5A NCAC 02T.0305(f) contains minimum separations that shafl be provided fo Sto s nd other utilities n Setback Parameter* verticaF) ter 'n (vertical-waterve sewer including in benched trench ater mains (horizontal Reclaimed water line Reclaimed wate ines horizontal - reclaimed over sew ewe Any° private or public water supply source, including any wells, WS-I waters of Class I or imtounded reservoirs used as a source ofdrinkng water ys.tet S: Yes LINo .paration Required 24 inches 10 feet inches 2 feet 100 feet ers classified WS (except WS-I or WS-V), 13, SA, ORW, HQW, or SB from norma high waterwateror tide elevation) and e d item 1X.2) **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 50 feet 10 feet Any building foundation Any basement Top slope of embankment Drainage systemsd interceptordrains ore vertical height Any swimming pools Final earth grade (vertical) 5 feet 0 fee 10 feet 5 fect 10 feet 36 inches Y. 15A NCAC 02T.030510 contains alternatives where separations in 02I,0305(1) cannot be achieved, Y **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage "Y If noncompliance with 02T.0305(f) or (g,), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of sepa n) P Yes 0 No fl N/A 'Y See the Division's draft separation requirements for situations where separation cannot be meet Y No variance is required if the alternative design criteria specified is utilized in design and construction Y As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? Yes Y This would include Trout Buffered Streams per I 5A 'NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Y Information can be obtained from the 401 & Buffer Permitting Branch Yes 5. Does project comply with 1 5A NCAC 02T,0105(c)(6) (additional permits/certifications)? Yes No Per I 5A NCAC 021'.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any .sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02-F.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. 0 Yes No 0 N/A Y If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I5A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICAT ft)N I, Does the iodine itted system comply with ISA NCA 02T CJtJ. P UttJn. f PitAMP 514119111 0114..E.91W' ii.md ie cavity . a.s applicable? M Yes IF No, complete and submit the Variance.' Alternative Design Request application ( VAN; 10-14) and supporting documents for review, Approval of the request :4 reAtiired prior to stihrnittal nithe Fast 'Track Applienittart and 310)pp. tint/ itociimeats, 2. ProtcoraI Engineer's Certification: 14.4.ne Rrofe. sional Engneer's name from Application Item 111.1.) attest that thls. application for has been reviewed by me and is accurate, complete- and consistent with the information supplied in the plans,specifications, engineering calculations., and all other supporting documentation to the best of my kno kdgc 1 further attest that to the best of my knowledge the. proposed design has been prepared in accordance with the applicable regulations, Gravity SCWer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the East -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package„ inclusion of these materials tinder my" sipatore and seal signifies that. I have reviewed this material and have Judged it to be consistent with the proposed design, NOTE — In accordance with General Statutes 143-215:6A ,and 1,43-215„6B, any person who ,knowingly makes any false statement, representation, or certification in any application package shall he guilty of a Class 2 misdemeanor. which may include a fine not to exceed $10.000. a well as civil penalties up to $.25.000 per violation„ North Carolina Professional Engineer's seal, signature, and date: 3, Applicant's CertFauon per 15A NCAC 02T .0106(b): dff. car---' attest that this application for tSienature Atnhontsis name 8.i title from Application Item 1.3,1 has been reviewed by me and is accurate and complete to the best of lily knowledge. I understand theta if all required parts of this application are not completed and that if ilI required supporting documentation and anachments are not included, this, application package" is subject to being returned as: iticomplere_ I understand that any dischatiee of wastewater from this non - discharge N1' stem to surface waters or the. land will. result in an immediate enforcement action that may include civil penalties, injunctive reIet and or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated_ I also understand that if all required parts of this application package are not completed and that if all required .supporfing information and attachments are not included, this application package wili he returned to me as incomplete, NO'FF In accordance ivith General Suit:ores .1_4,-2t54A and 143-215:6B, any person who knowingly makes any false statement representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include ia fine not to exceed $.10,000 as well as civil penalties up to 525,000 per violation, Signature:. I: FA 04-16 46otor of Page 5 of 5 WSACC January 29, 2018 W. Brian Hiatt City Manager City ofConcord P. 0, Box 308 Concord, NC 28026-0308 Subject: Flow Acceptance Request - City of Concord Weddington Road Cabarrus County High School Private Sewer Dear Mr, Hiatt: WATER & SEWER AUTHORITY Of CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704,786.1783 • 704,795,1564 Fax www.wsacc.org This is an approval of the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the City of Concord on January 25, 2018„ WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and. treat the domestic wastewater from the proposed project entitled Weddington Road Cabarrus County High School Private Sewer, located on Weddington Road. The referenced project will serve a high school with 1,600 students and sports facilities, with a projected wastewater flow of 24,000 gallons per day (gpc1). The wastewater generated by this project will be conveyed through the proposed 8-inch line, through an existing gravity system, and then enter WSACC's system at the existing 36-inch: Coddle Creek Interceptor. WSACC agrees to accept wastewater from the proposed development based on information provided by Alfred Benesch & Co. (Civil Engineer for the project) using North Carolina 'Department of Environmental Quality (NCDEQ) wastewater flow guidelines, The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue .this policy into the future. Projects on the CIP are .subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. If construction of this project is not started within two (2) years of the date of this approval, the approval is rescinded arid a second .request and approval will he required. Please notify WSACC, in writing, when construction of this project is initiated, If you have any questions, please call me at (704) 736-1783, extension 228. Sincerely, J. Thomas Hahn, P..E„ Utility Systems Engineer cc; Sherri Moore/Concord Wesley E.„ Sherrill, PE/Alfred Benesch & Co. Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requestingw Acceptance: : January 20, 2018 City of Concord DCky fKannapoIis 0Town of Harris OWTI of Mt. Pleasant DCharlotte Mecklenburg Utilities Project Title. Description, and Number of Lots/Unit: Project Title: Weddinoton Rd_Cabarrus Counts/ Hith Sehool,Private Sewer — (CoC Prefect tt; 2017-04,3) Description: :The Waddington Rd Caharrus County Hitt School Private Sewer engineering plans and Specification% d led W She 1,4 P w' d Bene h c rivatelv owned an r wastewater collection system eater consistinti of pro,jn Iy9i inear feet of 8-incb sanitary sewer with holes 144 Linflnearfeetof6-nehnjtar swrCleockunouts nd othe a1owtenatcesto serveh 1 school complex with sportities located off of Wtddington Raul grid Harrison Drive NW with an average domestic +.vastewater discharge of 24.9QQ ciPP., umber of Lots: 1 OR *Number of Units: *Must be included in request. Where will the new line be connected; 0 Directly into a WSACC Interceptor Into the Jurisdiction's existing collection system Into a private line Deseribe the location of the tie-in line to which the new sewer line will connect: The proposed DritiatC 8-410_511114ml° sewer extension will tie-in to the existing City of Concord's 12-Mch. 10-inch and 8-i' 11 sanitary sewer sysierijs. which exthJ6!inch PVC WitikcC Middle Coddle Cree intereentor Which WSACC Interceptor will the flow ultimately be discharged into: 36-inch PVC WSACC MiddleCuddle Creek Interceptor What Is the WSACC manhole nurnber that the flow will be discharged into? -*4- Node 012576 What is the quantity of flow that will be discharged? 24,900 GPD Flow type: Domestic jj_10_ 'Y. 0 Commercial fe 0 Industrial astewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Pernik aNC00$1621 Design drawings of new lines will be submitted to WSACC ,with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification ofthe tap, will be required before flow acceptance wit, be provided. Mark Lomax at 704-786-1783, ext. 231, must be notified 48 hours in advance Ora connccton nto a WSACC interceptor, WSACC will inspect connection before, during, and after completion. If construction is not started within two (2) year from the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project, WSACC USE ONLY: Current sel..,...1yeapdel show Approved Current Sewer Model shows: frf DATE: as being surcharged south ot the manhole in question, 0 Not Approved (JURISDICTION USE ONLY) Weddington Rd Cabarros County High School Private Sewer — (Cot; Project #: 2017-043) State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —01/14) (WSACC USE ONLY) Weddington Road Cabarrus County High School Private Sewer Section I: Name of wastewater treatment facility (WWTF) receiving wastewater: Rocky River Wastewater Treatment Facility — Permit 01C0036269 fl Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 WWTP facility's permitted flow, MGD Estimated obli ted flow not yet tributary to the WWTP, MGD P facility's actual avg. daily flow, MGD ow forthsscicreuesMGD Total ual and obligated flows to the facility, MGD Percent of permitted flow used 26.500 1.658 17.040 (64:30% ofpei 0:024 18.722 70.65% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP, Pump Station Firm Capacity * Denugn Average D711 ly Hew tot ' Appros, Current Obge, NYet liatdot (A) (Dr) .(C) (Name Or Number) i MGD (Firnitpl) MGDAvernr D''aily flow lsutary 'Daily Flow h4G0 , l i t Lower. Rocky River PS 37.000 100 &290 I 1,291 (D) in+C) Total Current Flow Plus Oini led Flow MCD A vailabk Capacil y• • • MCD 9.581 5.219 • The Firm Capacity of any pomp stiffen is defined is tbe maximum pumpedMau can be schhes-ed with the largest pomp ftke, ot service. **Design Average Daily Flow is the arm capacity of the pomp station divided by a peaking factor mot less Mae LS. ."°A Planning Assessment Addendum shell be attacked for eh p station located between ttc proiect co.uatthnt c %NWT? where Availabk Capacity is < O. Section 111. WSACC Certification Statement: 1, J. Thomas Rahn, PE, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the interceptor to the receiving wastewater treatment facility; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section 1 and Section II plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer capacity. Signature of this forn_LiActiEates acceptance of this wastewater flow, 'C Signing Revislon Date; 08/09113 Signature State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE - 01/14) jurisdiction Requesting Flow Acceptance for Collection System: City of Concord ECity of Kann.apolis OTown ofHarrisburg TiTown ofMt P easant ECharlotte Mecklenburg Utilities Project Title, Description, and Number of .Lots/Unit: Project Title: Wedding -ton Rd Cabarrus County High School Private Sewer —Project 2017-043 Description: The Weddington Rd Cabarrus County High School .Private Sewer .engineering .. and 1.ficat prepared and sealed by Wesley E, S.herrill, NCPE, with Alfred. lieriesch & Co„ fur the privatelyprivelv od and operated wastewater collodion system extension consisting of_approximately .596 linear feet of 8-inch sanitary sewer with manholes, .144 linear feet of 6-inch sanitary sewer with cleapouts and other a urtenan.ces to serve the 1,600 student high school complex with sports facilities located off of Weddington Road and Harrison DriveNW with an average domestic wastewater discharge of 24,000 GPD. What is the quantity of flow that will he discharged? 24,900GPD Flow type: Domestic 100 % El Commercial Industrial /0 Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. (A) (13.) (() (D) Pump Station. Firm Capaciry Design Average Daily How •* Approx. CIA -lent Obligated, Not 're i Twill Current Flow (Name or Number) 1 NIGO t.Fieru,pt) Ai+erapii Daily Flow "hibutar,ii Dai.ly Flow Pius Obligateid Floss, !ACV MGD MCI) *The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of sersice. I **Design A ver age DadFlew is the firm capacity of the pump station divided by * peaking factor not less than ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the 'ANA '11' W1 he r e Available Capes Available Capacity... MCI) Section II. Jurisdiction's Certification Statement: I, M. Sue Hyde, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor, and the flow .from this project is not anticipated to cause any capacity related sanitary sewer overflows 01 overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the .implementation of the planned improvements identified in the planning assessment where applicable, This analysis has been performed. in accordance with local established policies and procedures using the best available data, This certification applies to those items listedabove in Section 1 plus all attached planning assessment addendurns for which,. to the best. of rny knowledge, will riot adversely affect the downstream sewer capacity. Signature of this form indicates acceptance of th.is wastewater flow. M. Sue Hyde by Sby +by., F,C. Cbabro,d, oa.bingyboy,,,, YUY Arisdietion's Signing Vicki! Signature ate (WSACC USE ONLY) Weddington Rd Cabarrus County High School .Private Sewer — (Cu(' Project 2017-043) r*on.Datc: 08109,213 1,4 OKTH CAROLINA High Perfunriance lying 71717i021' 111%;1111111111111 Cabarrus County Schools Brian Cone, Director of Construction PO Box 388 Concord, NC 28026-0388 704-262-6258 Brian.cone@cabarrus,k12,nc.us 850 Warren C. Coleman Blvd., P.O. Box 308, Coneonl, NC 28026-www.eonconine,gov February 9, 2018 SUBJECT: City of Concord illingness to Serve Private Wastewater Collection System Extension/Modification City of Concord Project Title: Weddington Rd Cabarrus County High School Private Sewer City of Concord Project # 2017-043 Receipt Date: February 9,2018 (WSACC Response dated January 29, 2018) February 5, 2018 (Complete Package) Engineering Plan Seal Date: January 16, 2018 WSACC Rocky River WWTP — NC0036269 ofConeord, Cabarrus County, North Carolina Dear Mr. Cone: This letter is to confirm that on Feb uary 5, 2018, our office received the .Weddington Rd Cabarrus County High School Private Sewer approved engineering plans and specifications, a digital copy of the engineering plans, and private wastewater collection system application, as prepared and sealed by Wesley E. Sherrill, NCPE„ with Alfred Benesch & Co., for the privately owned and operated wastewater collection system extension consisting of approximately 596 linear feet of 8-inch sanitary sewer with 'manholes, 144 linear feet of 6-inch sanitary sewer with cleanouts and other appurtenances to serve the 1,600 student high school complex with sports facilities located off of Weddington Road and. Harrison Drive NW with an average domestic wastewater discharge of 24,000 CiPD, The City of Concord's public wastewater collection system has the capacity to accommodate the estimated total average wastewater discharge of 24,000 GPD based en the information indicated on the NCDENR. Fast Track applicationfor the project. The City of Concord, however, will not guarantee the acceptance of any additional requests, revisions, deficiencies, or expansions that were not included in the consulting engineer's submitted engineering plans, specifications, reports, and/or calculations associated with this private system. THE CITY OF CONCORD AND ITS STAFF ARE NOT RESPONSIBLE FOR ERRORS IN DESIGNS, CALCULATIONS, DRAWINGS OR STATEMENTS SUBMITTED BY APPLICANTS, THEIR TECHNICAL CONSULTANTS, SURVEYORS OR ENGINEERS. THE CITY OF CONCORD AND ITS STAFF ARE NOT RESPONSIBLE FOR FINDING OR CORRECTING ANY ERRORS OR DEFICIENCIES IN PLANS SUBMITTED TO THE CITY OF CONCORD FOR REVIEW AND APPROVAL. THE CITY OF CONCORD DISCLAIMS ANY LIABILITY FOR ERRORS CONTAINED IN PLANS SUBMITTED TO THE CITY OF CONCORD, THE SIGNATURE OF THE CITY OF CONCORD ENGINEER MAY NOT BE RELIED UPON TO ESTABLISH ANY DUTY OR RELATIONSHIP (SUCH AS A THIRD Engineering Phone (704) 920-5425 • Fax. (704) 784521 PARTY BENEFICIARY) WITH ANY PARTY USING THIS PLAN OR DRAWING. PARTIES USING THIS DOCUMENT SHOULD CONDUCT THEIR OWN REVIEW AND ANALYSIS FOR MAKING A DECISION IN RELIANCE ON THIS DOCUMENT. This letter shall not be construed as an Authorization to Construct by the City of Concord. All applicable permits associated with this project in:ust be obtained and copies must be presented on site prior to commencement of the work. IMPORTANT: The Cabarrus County Schools must submit a copy of the NCDENR-Division of Water Quality, Non -Discharge approval letter and authorization to construct permit and a copy of the engineer's final certification to the City of Concord prior to interconnection with the City of Concord's public wastewater collection system. The City of Concord must be present to observe the connection of this private system, in order to meet the Standard Specifications for Wastewater Collection and Water Distribution for Cabarrus County. Contact Gary Stansbury, Construction Administrator, at (704) 920- 5404 at least 48 hours prior to the initiating system connection. Construction of the private wastewater collection system project shall be in accordance with 1.5A NCAC 02T,0300; The Division of Water Quality's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable. This does not constitute an acceptance of any part of the project that does not meet North Carolina Administrative Code Title 1.5A 02T.0300, as a.pplicable. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143- 215.6C, construction of additional or replacement facilities, andlor referral of the North Carolina - licensed Professional Engineer to the licensing board. Please be aware that the City will not assume any responsibility for the operation and maintenance of the subject private wastewater collection system that is located on the property beyond the public utility easement/rights-of-way. The Cabarrus County Schools will be responsible for complying with the regulatory requirements in accordance with North Carolina Administrative Code Title ISA 02T.0300, the maintenance and operation of the private wastewater collection system, and obtaining the required permit approvals associated with the private wastewater collection system. Please review this section of the Administrative Code prior to submitting your application to the State. If the permit applicant is unable to perform all of the operation and maintenance duties required by the State's Administrative Code, a private wastewater collection system extension should not be requested. The City reserves the right to disconnect the subject wastewater collection system and potable water service from the City of Concord's public system if improper operation and maintenance of the private system violations of any Federal, State or local regulations, ordinances, or policies. After the private wastewater collection system has been constructed and prior to water service activation, the Cabarrus County Schools must complete the NCDENR DWQ regulatory requirements in accordance with North Carolina Administrative Code 15A NCAC 2'1' for final approval and the Cabarrus County School's engineer must certify that the private wastewater collection systern has been installed in accordance with North Carolina Administrative Code 15A NCAC 2T. Hy A copy of the engineer's certifications, primate system final approval/acceptance letter, and correspondences, as applicable must be submitted to the City of Concord. Sincerely, City of Concord Si lain WON signed lo04, Sue Hyde IL; oxy-A. Hydo mCky of Como -of, otoEngiromfing, emailyloydoommoodmam e c'tj5 Dem 18.02/2 $EHO:04 CHOY M. Sue Hyde„ PE Director of Engineering Date Altachmentm WSACC Approval Letter FTSE-01/14 signed by Sue lki Hyde on I/2212018 FTSE-01/14 signed by Timothy Rr Kiser on 1/2972018 Electronic cm Project 420043 Alfred Beriesch di Co Wesley E. Sherrill, NCPE 2359 Perimeter Pointe Parkway, Suite 350 Charlotte NC 28208 wsherrillw bedew...Room Sincerely, City of Concord Thomas A. Bach, PE Engineering Manager Water Rt3sourc 'llorrias A, Bach, Engineering Manner, Wastewater Resources, bacht@concorithte,goy Gary Stansbury, Construction Administrator, htansbutyg@Honcordnc„gov IVL Sue Hyde, Director of Engineering, hydes@cortcorrinctgov Date 1 • 001041004,01 310$11iW11,11b 91,Di'reiXw}I A.0sr6 wAtoeitmo'S'9➢ von$3t44 31.4.1 :bti 0,0101711+:439 "50 Go g laps, 4173 Weddington Rd NW Image capture: Apr 2017 © 2017 Google Concord, North Carolina Google, Inc Street View - Apr 2017