Loading...
HomeMy WebLinkAboutNC0085839_Fact Sheet_20081114 (2)DENR/DWQ FACT SHEET FOR NPDES PERMIT DEVELOPMENT NPDES No. NC0085839 Facility Information Applicant/ Facility Name: Unimin Corporation -Red Hill Quartz Plant Applicant Address: P.O. Box 588, Hwy 226N Spruce Pine NC 28777 Facility Address: Highway 197N Bakersville NC 28705 Permitted Flow 2.0 mgd Type of Waste: Industrial Facility/Permit Status: Modification Facility Classification Physical/Chemical Class II County: Mitchell Miscellaneous Receiving Stream: North Toe River Regional Office: Asheville Stream Classification: C Trout USGS Topo Quad: C9SE 303(d) Listed?: No Permit Writer: Jim McKay Subbasin: 04-03-06 Date: 11/14/2008 Drainage Area (mi2): 340 41111CIPP Summer 7Q10 (cfs) 90.7 Winter 7Q10 (cfs): 125.6 Average Flow (cfs): 510 IWC (%): 3.3% Primary SIC Code: 1499 SUMMARY OF FACILITY INFORMATION AND WASTELOAD ALLOCATION Unimin Corporation is requesting a permit modification for its Red Hill Quartz Plant to increase flow to 2.0 mgd from it's currently permitted flow of 0.682 mgd in order to increase production. The Red Hill Quartz Plant performs extraction and mineral processing to produce high purity quartz. No mining is done at this site. The facility is permitted to discharge into the North Toe River, class C-Trout waters, in French Broad River Basin. Outfall 001 discharges process water. Outfall 002 is an intermittent stormwater discharge. The wastewater treatment plant consists of: • Mix -reactor tanks; • Lime and polymer feed systems; • 2 thickeners; • 2 drum filters • pH adjustment; • flow measurement and, • 2 emergency ponds. Processes for treatment include neutralization, precipitation, settling, vacuum filtering of solids and disposal of solids by land filling. RECEIVING STREAM INFORMATION: The North Toe River downstream of the facility has a bioclassification rating of Good. According to the US Fish and Wildlife office, that stretch of North Toe River is designated critical habitat for the federally endangered Appalachian elktoe. We have records of the federally endangered Alasmidonta raveneliana (Appalachian elktoe), the state listed Lampsilis fasciola (Wavy rayed lamp mussel), and Etheostoma acuticeps (Sharphead darter) listed as a federal species of concern all occuring in that reach of the North Toe. A section of the North Toe River upstream of this facility is listed on North Carolina's 2006- 303(d) list, based on turbidity and riparian area loss. This upstream segment has a bioclassification rating of Fair. The Red Hill Quartz Plant is located approximately 15 miles downstream of the impaired segment of the North Toe River. Unimin Corporation — Red Hill Facility Fact Sheet NPDES Modification NC0085839 Page 1 At this time, DWQ proposes no changes to the previously developed load allocations. Neither the impairment nor the turbidity violation is directly attributable to this downstream discharge. Likely, the upstream discharges will be re-evaluated in the future. INSTREAM MONITORING: Upstream: Upstream at least 50 feet Downstream: Downstream at least 300 feet. Parameters: Fluoride, Turbidity, pH The fluoride instream standard of 1.8 mg/ L was exceeded both upstream and downstream of the discharge in 2005, with 7 instances of upstream exceedance in 2005, none in 2006, none in 2007 and none through March 2008. A review of instream data for 2005 through March 2008 showed no exceedances of the turbidity standard of 10 NTU for trout streams. Per Unimin, the cause of the exceedances upstream are unknown. It is speculated that some quality control problems with upstream discharges occurred and caused sporadic exceedances of Total Fluoride. Extreme drought conditions could have also been a contributing factor. Because of the sporadic upstream exceedances, the Division of Water Quality used the 95'th percentile of the previous 2 years of upstream data for fluoride to calculate the upstream value for use in calculating the allowable fluoride limit (See explanation under proposed changes). TOXICITY TEST RESULTS: Existing: Quarterly Chronic P/F, 1.2% Ceriodaphnia test. JAN APR JUL OCT Facility has passed all tests since January 2002 except for one failure in January 2004. It was followed by two passed tests in Feb. and March 2004 and all subsequent tests through July 2007. Recommendation: Renewal of quarterly chronic test @ 3.3% based on increased flow. COMPLIANCE REVIEW: The facility has been in compliance with nearly all permit limits consistently in 2005, 2006 2007 and 2008 YTD. One NOV was issued in November 2006 for exceeding the TSS Limit and one NOV in 2007 for exceeding the flow limit. Unimin is no longer required to conduct the Priority Pollutant analysis based on category of discharger. Chlorine is added for disinfection of the intake water. A TRC limit of 28 ug/L was added on permit renewal in November, 2006 based on trout classification of receiving stream and NC standard for TRC. An 18 month compliance schedule was given, the TRC limit began June 1, 2008. The TRC limit will continue with this permit modification. PROPOSED CHANGES: At the request of the permittee, flow is increased to 2.0 MGD from 0.682 MGD. TSS concentration limits were kept the same at 25 mg/ L, based on 40 CFR 436 for similar type operations. The new mass limit is 417 lb/ day monthly average for TSS, and 834.0 lb/ day daily max. North Carolina's DWQ has determined that this increase in TSS loading is necessary to accommodate an important economic development in the area in which the receiving water is located, per 40 CFR Part 131.12 (a) (2). Unimin Corporation — Red Hill Facility Fact Sheet NPDES Modification NC0085839 Page 2 The new fluoride limit is based on the NC WQ Standard of 1.8 mg/L. Instream data for April 2006, 2007 through March 2008 was reviewed. A background upstream fluoride concentration of 1.07 mg/L was calculated based on the 95'th percentile of the data range. A standard material balance limit calculation results in an allowable discharge concentration of 23 mg/L, or 384.0 pounds per day, which is given as a weekly average based on the chronic WQ standard. A daily maximum limit of two times the weekly average (768.0 lb/day) has been given based on discussion with Marshall Hyatt of EPA Region 4, Jeff Ferguson of Unimin, and their attorney, Steve Levitas. The existing fluoride limit is 200.0 pounds per day monthly average and 400.0 pounds per day daily maximum at a flow of 0.682 MGD. These limits were based on BPJ of Best Available Control Technology of 27 mg/L when the permit was first issued. PROPOSED SCHEDULE FOR PERMIT ISSUANCE: Draft Permit to Public Notice: 9/24/2008 Permit Scheduled to Issue: (Tentative) 11/14/2008 Projected Effective Date of Permit: 12/01/2008 STATE CONTACT: If you have any questions on any of the above information or on the attached permit, please contact Jim McKay at (919) 807-6404. NAME: DATE: REGIONAL OFFICE COMMENT: NAME: DATE: REGIONAL SUPERVISOR: NAME: DATE: Unimin Corporation — Red Hill Facility Fact Sheet NPDES Modification NC0085839 Page 3 NPDES SUPERVISOR COMMENT: NAME: DATE: Unimin Corporation — Red Hill Facility Fact Sheet NPDES Modification NC0085839 Page 4