Loading...
HomeMy WebLinkAboutNc0025071_PAR Review_20210428ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director Chris Powell, Pretreatment Coordinator City of Eden P.O. Box 70 Eden, NC 27289-0070 NORTH CAROLiNA Environmental Quality April 28th, 2021 SUBJECT: Pretreatment Annual Report Review City of Eden NPDES Permit No. NCO025071 Rockingham County Dear Mr. Powell: The Pretreatment staff of the Division of Water Resources at the Winston-Salem Regional Office has reviewed the Pretreatment Annual Report (PAR) covering January through December 2020. Our review indicates that the PAR is adequate and satisfies the requirements of 15A NCAC 2H .908(b) and the Comprehensive Guidance for North Carolina Pretreatment Programs. Thank you for your continued support of the Pretreatment Program. If you have any questions, please contact me at (336) 403-4684 or alex.lowe(ancdenr.gov. Sincerely, Docu�Signed by: 2 56128CCA9465... Alex owe Environmental Specialist Water Quality Regional Operations Section Division of Water Resources, WSRO Enclosed: Pretreatment Annual Report Review cc: DWR Laserfiche Files WSRO Electronic Files PERCS Unit — Michael Montebello (Electronic Copy) D Q �� North Carolina Department of Environmental quality I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 3MO 1 Winston-Salem. North Carolina 27105 &M.776.9800 Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ® YES ❑ NO ❑ NA ® YES ❑ NO ❑ NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ® YES ❑ NO ® YES ❑ NO Allocation Table ® YES ❑ NO ® YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ® YES ❑ NO [:]YES ❑ NO Historical SNC ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA ❑ YES ❑ NO ❑ NA Regional Office: WSRO POTW: Mebane Bridge WWTP NPDES Permit No. NCO025071 Report Period: 01/01/2020 — 12/31/2020 ❑ Full ❑ Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below; 1. Have at least 90% of SIU permits been issued within 180 ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form) 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ❑ NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Reviewed By: Alex Lowe Date: 04/26/2021 Regional Pretreatment Annual Report Review